Property / budget | |||||||||||||||
| |||||||||||||||
Property / budget: 3,724,847.48 zloty / rank | |||||||||||||||
Property / budget | |||||||||||||||
| |||||||||||||||
Property / budget: 893,963.3951999999 Euro / rank | |||||||||||||||
Property / budget: 893,963.3951999999 Euro / qualifier | |||||||||||||||
| |||||||||||||||
Property / budget: 893,963.3951999999 Euro / qualifier | |||||||||||||||
|
Revision as of 19:46, 22 June 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Thermal modernisation of educational buildings — the administrative district of Brzeski |
Project in Poland financed by DG Regio |
Statements
1,938,174.37 zloty
0 references
60.0 percent
0 references
11 January 2016
0 references
31 December 2018
0 references
POWIAT BRZESKI
0 references
Projekt jest w pełni zgodny z przeprowadzonymi audytami energetycznymi dla obu budynków. Budynek administracyjny Starostwa Powiatowego przy Piastowskiej 2B: 1. Wymiana instalacji z rur stalowych oraz wymiana grzejników żeliwnych na płytowe, zastosowanie termostatów, zaworów podpionowych i liczników ciepła; 2. Istniejąca instalacja centralna z kotłowni gazowej + sprężarkowa pompa ciepła, 3. Instalacja klimatyzacji w systemie VRF; 4. Docieplenie ścian zewnętrznych; 5. Docieplenie ściany zewnętrznej przy gruncie; 6. Docieplenie stropu zewnętrznego i stropu nad nieogrzewanym poddaszem; 7. Wymiana starych okien zewnętrznych oraz starych drzwi zewnętrznych 8. Wymiana oświetlenia na LED 9. Instalacja fotowoltaiczna. Budynek MOS: 1. Wymiana pozostałej części instalacji z rur stalowych na rurociągi miedziane oraz wymianę grzejników żeliwnych na nowe płytowe a także wbudowanie istniejących grzejników płytowych po wykonaniu nowej instalacji wraz z zaworami termostatycznymi, montaż licznika ciepła. 2. Istniejąca instalacja centralna z kotłowni gazowej + jako priorytet sprężarkowa pompa ciepła powietrze woda o mocy 20 kW; 3. Wykonanie instalacji klimatyzacji w systemie VRF; 4. Docieplenie ścian zewnętrznych; 5. Docieplenie ściany zewnętrznej przy gruncie; 6. Docieplenie dachów płaskich wełną mineralną oraz strop zewnętrzny styropianem 7. Wymiana starych drzwi zewnętrznych. 8. Wymiana oświetlenia na LED 9. Instalacja fotowoltaiczna - w systemie on-grid wykorzystywaną na potrzeby własne. Projekt cechują następujące wskaźniki: 1. % wartość poprawy efektywności energetycznej: 78,33%; 2. W projekcie zostały zastosowane liczniki ciepła; 3. Audyt energetyczny budynku wskazuje na konieczność wprowadzenia urządzeń utrzymujących zadaną temp. poprzez aktywne działanie (termostaty) i/lub regulatory różnicy ciśnień (zawory podpionowe). W projekcie zostały zastosowane ww. urządzenia. 4. % wartość redukcji emisji CO2: 78,33%; 5. % wartość obniżenia emisji pyłów (PM 10 i PM 2,5): 78,31%. (Polish)
0 references
The project is fully in line with the energy audits carried out for both buildings. Administrative building at Piastorska 2B: 1. Replacement of steel tube systems and replacement of cast iron tubes to plate, use of thermostats, sub-vertical valves and heat meters; 2. Existing central gas installation with gas boiler + compressor heat pump, 3. The installation of an air-conditioning system in the VRF system; 4. Insulation of external walls; 5. Insulation of the external wall on the ground; 6. The insulation of the outer ceiling and the ceiling over the unheated attaines; 7. Replacement of old external windows and old external doors 8. LED light replacement for LED 9. Photovoltaic installation. MOS Building: 1. Replacement of the remaining part of the installation from steel pipes into copper piping and replacement of cast iron radiators for new panels and also for the construction of existing ones following the completion of a new installation with thermostatic valves, installation of the heat meter. 2. The existing central gas installation from the gas boiler + as a compression priority air water pump with a power output of 20 kW as a priority; 3. Installation of an air-conditioning system in the RF system; 4. Insulation of external walls; 5. Insulation of the external wall on the ground; 6. Insulation of the flat mineral wool and the outer ceiling of the Styropine 7. Replacement of old external doors. 8. LED light replacement for LED 9. Photovoltaic installation, in-house, used for own purposes. The project is characterised by the following indicators: 1. % value of energy efficiency improvement: 78.33 %; 2. Heat meters were used in the project; 3. The energy audit of a building indicates the need for equipment to be fitted with a given temperature through active operation (thermostats) and/or pressure differential controls (subvertical). The equipment was used in the project. 4. % CO2 emissions reduction: 78.33 %; 5. % reduction of particulate matter (PM 10 and PM 2,5): 78.31 %. (English)
0 references
Identifiers
RPMP.04.03.02-12-0198/16
0 references