Reduction of air pollutant emissions by the replacement of heating equipment in the territory of the city and the municipality of poultry (Q109129): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Removed claims) |
||||||||||||||
Property / budget | |||||||||||||||
| |||||||||||||||
Property / budget: 1,610,037.63 zloty / rank | |||||||||||||||
Property / budget | |||||||||||||||
| |||||||||||||||
Property / budget: 386,409.03119999997 Euro / rank | |||||||||||||||
Property / budget: 386,409.03119999997 Euro / qualifier | |||||||||||||||
| |||||||||||||||
Property / budget: 386,409.03119999997 Euro / qualifier | |||||||||||||||
|
Revision as of 19:12, 22 June 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Reduction of air pollutant emissions by the replacement of heating equipment in the territory of the city and the municipality of poultry |
Project in Poland financed by DG Regio |
Statements
1,075,259.92 zloty
0 references
80.0 percent
0 references
15 June 2018
0 references
31 December 2020
0 references
MIASTO I GMINA DROBIN
0 references
Założeniem i głównym celem projektu jest likwidacja emisji powierzchniowej (tzw. niskiej emisji), pochodzącej z indywidualnych palenisk domowych i osiedlowej kotłowni (zasilającej system ogrzewania 7 budynków) o 344,46 ton równoważnika CO2/rocznie i 3,1 ton PM10/rocznie oraz zwiększenie efektywności energetycznej 3 budynków wielorodzinnych dla poprawy stanu środowiska w Mieście i Gminie Drobin. Cel projektu zostanie osiągnięty przez wymianę 18 piecy (12 gazowych, 5 na biomasę-pellet, 1 na zgazowanie drewna) oraz termomodernizację 3 budynków. Zmianie sposobu ogrzewania ulegnie 9530,74 m2. Realizacja inwestycji jest zgodna z Planem Gospodarki Niskoemisyjnej dla Gminy Drobin, gdyż realizuje jego cel: redukcja emisji CO2 o 6,15% do 2020 roku (o 2 965,87 Mg CO2). Miasto i Gmina Drobin zaliczona jest do obszarów przekroczeń stężenia pyłu zawieszonego PM10 o okresie uśredniania 24 – godziny w 2015 roku w strefie mazowieckiej. Obszar ten określony jest w Programie Ochrony Powietrza dla strefy mazowieckiej, w której zostały przekroczone poziomy dopuszczalne pyłów PM10 i PM2,5. Projekt uwzględnia odnawialne źródła energii (biomasa) dla produkcji energii cieplnej -6 urządzeń/kotłów, które zapewnią zdolność wytwarzania energii cieplnej w wysokości 0,56 MW. Projekt skierowany do mieszkańców Gminy, realizowany jest na obszarze, na którym uchwalony i wdrażany jest program wsparcia dla najuboższych osób, które w wyniku realizacji projektu będą ponosić zwiększone koszty grzewcze lokalu związane z trwałą zmianą sytemu ogrzewania. W ramach projektu ponoszone będą także koszty inspektora nadzoru oraz promocji projektu. Projekt realizowany będzie w formule "zaprojektuj i wybuduj". Efektywność kosztowa: 27,53 euro/m2. Koszt przygotowania audytów ex-post zostanie poniesiony w IV kw. 2020. Na potrzeby realizacji inwestycji opracowano dokumentację techniczną – PFU, świadectwa charakterystyki energetycznej i audyty energetyczne oraz szacunek kosztów a także studium wykonalności. (Polish)
0 references
The objective and main objective of the project is the elimination of the surface emissions (so-called ‘low emission’) from individual domestic furnaces and residential boiler housing (for heating 7 buildings) by 344,46 tonnes CO2/rocznie equivalent and 3,1 tonnes PM10/rocznie, and an increase in the energy efficiency of 3 multi-dwelling buildings for improving the environment in the city and in the poultry industry. The purpose of the project will be achieved through the replacement of 18 (12 gas, 5 on the biomassas-pellet, 1 for the gasification of wood) and the thermal refurbishment of 3 buildings. The heating of 9 530.74 m² will be changed to m². The implementation of the investment is in line with the Low Carbon Economy Plan for the poultry municipality, as it pursues its objective: reducing CO2 emissions by 6.15 % by 2020 (by 2 965,87 Mg CO2). The town and the municipality of poultry are included in the exceedance areas of the particulate matter PM10 with an averaging period of 24 hours in 2015 in the Mazowieckie region. This area is defined in the air protection programme for the Mazowieckie area where PM10 and PM2,5 limit values have been exceeded. The project takes into account renewable energy sources (biomass) for the thermal energy production of -6 appliances/boilers that will provide a heat generation capacity of 0.56 MW. The project aimed at the local population is implemented in the area where the support programme for the most deprived persons is adopted and implemented, which will bear the increased heating costs of the premises linked to the permanent change of the heating system. The project will also incur costs for supervising and promoting the project. The project will be implemented in the “design and demolition” formula. Cost-effectiveness: EUR 27,53/m². The cost of preparing ex-post audits will be borne in the 4th quarter of the year. 2020. Technical documentation — PFU, energy performance certificates and energy audits and cost estimation as well as a feasibility study have been developed for the implementation of the investment. (English)
0 references
Identifiers
RPMA.04.03.01-14-B354/18
0 references