Energy renovation of public buildings in the municipality of Opole Lubelskie (Q105448): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Removed claims) |
||||||||||||||
Property / budget | |||||||||||||||
| |||||||||||||||
Property / budget: 12,900,038.98 zloty / rank | |||||||||||||||
Property / budget | |||||||||||||||
| |||||||||||||||
Property / budget: 3,096,009.3552 Euro / rank | |||||||||||||||
Property / budget: 3,096,009.3552 Euro / qualifier | |||||||||||||||
| |||||||||||||||
Property / budget: 3,096,009.3552 Euro / qualifier | |||||||||||||||
|
Revision as of 18:16, 22 June 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Energy renovation of public buildings in the municipality of Opole Lubelskie |
Project in Poland financed by DG Regio |
Statements
8,112,897.26 zloty
0 references
85.0 percent
0 references
8 December 2015
0 references
30 December 2019
0 references
GMINA OPOLE LUBELSKIE
0 references
W ramach projektu Wnioskodawca zaplanował inwestycję polegającą na termomodernizacji 5 budynków użyteczności publicznej - 5 szkół zlokalizowanych na terenie Gminy Opole Lubelskie. Celem głównym projektu jest podniesienie jakości świadczonych usług społecznych dzięki poprawie efektywności energetycznej w budynkach użyteczności publicznej. W ramach inwestycji osiągnięte zostanie zwiększenie efektywności energetycznej budynku o 61,90%. Zaproponowany wariant obejmuje prace termo modernizacyjne w budynkach: Budynek szkoły przy Ul. Fabrycznej 28 w Opolu Lubelskim, Budynek szkoły w miejscowości Skoków ; Budynek szkoły w Wandalinie; Budynek szkoły w Kluczkowicach; Budynek szkoły przy Ul. Szkolnej 5 w Opolu Lubelskim. W zakresie projektu jest także wykonanie systemu na cele zarządzania energią. W ramach inwestycji osiągnięte zostaną następujące wartości wskaźników rezultatu:1. Ilość zaoszczędzonej energii cieplnej. - 9548,38 GJ/rok 2. Szacowany roczny spadek emisji gazów cieplarnianych (CI34) - 840,08 t/rok 3. Produkcja energii elektrycznej z nowo wybudowanych/nowych mocy wytwórczych instalacji wykorzystujących OZE - 34,65 MWh/rok 4. Produkcja energii elektrycznej z nowo wybudowanych instalacji wykorzystujących OZE - 34,65 MWh/rok 5. Zmniejszenie rocznego zużycia energii pierwotnej w budynkach publicznych (CI32) - 3793164,10kWh/rok 6. Produkcja energii cieplnej z nowo wybudowanych/nowych mocy wytwórczych instalacji wykorzystujących OZE - 98,93 MWh/rok 7. Produkcja energii cieplnej z nowo wybudowanych instalacji wykorzystujących OZE - 98,93 MWh/rok Powstanie 5 instalacji PV na 5 budynkach w/w szkół. Instalacje zostaną zlokalizowane na dachach.Moduły PV wykonane z ogniw krzemowych. Łączna moc instalacji wynosi 31,5 KW tj. 0,031MW. Powstanie 1 instalacja 10,8 KW, 1 inst. 5,1KW, oraz 3 inst. po 5,2KW. (Polish)
0 references
As part of the project, the applicant has planned an investment in the thermal modernisation of 5 public buildings — 5 schools located in Opole Lubelskie. The main aim of the project is to improve the quality of social services provided by improving energy efficiency in public buildings. The investment will achieve a 61.90 % increase in the energy efficiency of the building. The proposed option includes the work of thermal modernisation in buildings: School building at Ul. Factory 28 in Opole Lubelskie, School in the city of jumps; School building in Wandalisnie; School building in Kluchowice; School building at Ul. 5 in Opole Lubelskie. The project is also implementing a system for energy management. As part of the investment, the following result indicators are achieved: 1. Amount of thermal energy saved. — 9548,38 GJ/year 2. Estimated annual decrease in greenhouse gas emissions (CI34) — 840.08 t/year 3. Production of electricity from newly built/new generation capacity of installations using RES — 34.65 MWh/year 4. Electricity production from newly built RES installations — 34.65 MWh/year 5. Reduction of annual primary energy consumption in public buildings (CI32) — 3 793 164.10 kWh/year 6. Heat generation from newly built/new generation capacity of RES installations — 98.93 MWh/year 7. Heat generation from newly built RES installations — 98.93 MWh/year Power of 5 PV installations per 5 in/in schools. The installations will be located on the roofs of the Modular PV, made of silicon cells. The total power of the installation is 31,5 KW, i.e. 0.031 MW. 1 installation of 10,8 KW, 1 against. 5.1 kW and 3 inst after 5,2KW. (English)
0 references
Identifiers
RPLU.05.02.00-06-0117/16
0 references