Property / budget | |||||||||||||||
245,000.0 zloty
| |||||||||||||||
Property / budget: 245,000.0 zloty / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / budget | |||||||||||||||
58,800.0 Euro
| |||||||||||||||
Property / budget: 58,800.0 Euro / rank | |||||||||||||||
Preferred rank | |||||||||||||||
Property / budget: 58,800.0 Euro / qualifier | |||||||||||||||
exchange rate to Euro: 0.24 Euro
| |||||||||||||||
Property / budget: 58,800.0 Euro / qualifier | |||||||||||||||
point in time: 13 January 2020
|
Revision as of 18:07, 22 June 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Improving the energy efficiency of the building of the company Cyberbyte |
Project in Poland financed by DG Regio |
Statements
159,250.0 zloty
0 references
245,000.0 zloty
0 references
65.0 percent
0 references
1 December 2017
0 references
17 August 2018
0 references
CYBERBAJT TADEUSZ NOWAK
0 references
Przedsięwzięcie pn. "Poprawa efektywności energetycznej budynku firmy Cyberbajt" polega na głębokiej i kompleksowej modernizacji energetycznej budynku biurowo-produkcyjnego stanowiącego własność firmy w którym mieści się siedziba główna Beneficjenta. Głównym celem projektu jest poprawa efektywności energetycznej obiektu, co przejawi się zmniejszeniem rocznego zapotrzebowania na energię końcową o 76,70%. Cel główny projektu zostanie osiągnięty poprzez realizację celów szczegółowych do których zalicza się: 1) zmniejszenie strat przez przenikanie ciepła przez ściany zewnętrzne, strop, okna 2) usprawnienie systemu grzewczego instalacji c.o wewnątrz budynku, 3/ montaż energooszczędnego oświetlenia i zastosowanie odnawialnych źródeł energii elektrycznej. Realizacja projektu przyczynia się do redukcji emisji CO2 o 94,13% (tj. 208,16 ton CO2 rocznie) oraz redukcji pyłu PM10 o 71,13% (tj. 0,019 ton rocznie). W projekcie, na podstawie sporządzonego audytu energetycznego, przewidziano następujące prace termodernizacyjne: a) Docieplenie ścian zewnętrznych o pow. 668,00 m2 i stropodachu o pow. 486,50 m2, b) Wymiana okien o pow. 62,52 m2, c). Montaż 8 szt. zaworów podpionowych, d) Wymiana źródeł światła na 26 kpl. oświetlenia LED, e) Montaż instalacji fotowoltaicznej mocy 18,5 kWp (74 szt.). (Polish)
0 references
The project: “The improvement of the energy efficiency of the building of the Cyberbyte building” consists of a deep and comprehensive energy modernisation of the office/production building which is the company in which the head office of the beneficiary is located. The main objective of the project is to improve the energy efficiency of the plant, which will decrease the annual final energy demand by 76.70 %. The main objective of the project will be achieved through the achievement of the specific objectives of which are: (1) reducing the losses through the flow of heat through the external walls, ceiling, window (2), upgrading of the heating system within the building inside the building, 3/montaż of the energy efficient lighting and the use of renewable sources of electricity. The project contributes to a 94.13 % reduction in CO2 emissions (i.e.: 208,16 tonnes of CO2 per year) and the reduction of PM10 by 71.13 % (i.e. 0,019 tonnes per year). The project provides, on the basis of an energy audit, the following work to modernise: insulation of outdoor walls. 668.00 m² and flat top 486.50 m², (b) Exchange of windows 62.52 m², c). Assembly of 8 subvertical valves, (d) Exchange of light sources against 26 LED lighting, (e) Installation of 18,5 kWp’s photovoltaic power installation (74 units). (English)
0 references
Identifiers
RPLU.05.01.00-06-0101/17
0 references