PROJECT CODE: 16982 — ERDF 20142020 — AXIS 6. ACTION 16.1 RESTRUCTURING INTERNAL AND EXTERNAL AREA — “SANGALLO BASTION” — LORETO (Q4187926): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in nl, and other parts: Adding Dutch translations) |
(Changed label, description and/or aliases in pt) |
||||||||||||||
(8 intermediate revisions by 2 users not shown) | |||||||||||||||
label / da | label / da | ||||||||||||||
PROJEKTKODE: 16982 — EFRU 20142020 — AKSE 6. AKTION 16.1 OMSTRUKTURERING AF DET INTERNE OG EKSTERNE OMRÅDE — "SANGALLO BASTION" — LORETO | |||||||||||||||
label / el | label / el | ||||||||||||||
ΚΩΔΙΚΌΣ ΈΡΓΟΥ: 16982 — ΕΤΠΑ 20142020 — ΆΞΟΝΑΣ 6. ΔΡΆΣΗ 16.1 ΑΝΑΔΙΆΡΘΡΩΣΗ ΤΟΥ ΕΣΩΤΕΡΙΚΟΎ ΚΑΙ ΕΞΩΤΕΡΙΚΟΎ ΧΏΡΟΥ — «SANGALLO BASTION» — LORETO | |||||||||||||||
label / hr | label / hr | ||||||||||||||
KOD PROJEKTA: 16982 – EFRR 2014. – 2020. – OS 6. MJERA 16.1. RESTRUKTURIRANJE UNUTARNJEG I VANJSKOG PODRUČJA – „SANGALLO BASTION” – LORETO | |||||||||||||||
label / ro | label / ro | ||||||||||||||
CODUL PROIECTULUI: 16982 – FEDR 20142020 – AXA 6. ACȚIUNEA 16.1 RESTRUCTURAREA ZONEI INTERNE ȘI EXTERNE – „SANGALLO BASTION” – LORETO | |||||||||||||||
label / sk | label / sk | ||||||||||||||
KÓD PROJEKTU: 16982 – EFRR 20142020 – OS 6. OPATRENIE 16.1 REŠTRUKTURALIZÁCIA VNÚTORNEJ A VONKAJŠEJ OBLASTI – BASTION SANGALLO – LORETO | |||||||||||||||
label / mt | label / mt | ||||||||||||||
KODIĊI TAL-PROĠETT: 16982 — FEŻR 20142020 — ASSI 6. AZZJONI 16.1 IR-RISTRUTTURAR TAL-QASAM INTERN U ESTERN — “BAĊIR SANGALLO” — LORETO | |||||||||||||||
label / pt | label / pt | ||||||||||||||
CÓDIGO DO PROJECTO: 16982 — FEDER 20142020 — AXIS 6. AÇÃO 16.1 REESTRUTURAÇÃO DA ZONA INTERNA E EXTERNA — “BAIXO DE SANGALLO” — LORETO | |||||||||||||||
label / fi | label / fi | ||||||||||||||
HANKKEEN KOODI: 16982 – EAKR 2014–2020 – TOIMINTALINJA 6. TOIMI 16.1 SISÄISEN JA ULKOISEN ALUEEN RAKENNEUUDISTUS – ”SANGALLO BASTION” – LORETO | |||||||||||||||
label / pl | label / pl | ||||||||||||||
KOD PROJEKTU: 16982 – EFRR 20142020 – OŚ 6. DZIAŁANIE 16.1 RESTRUKTURYZACJA OBSZARU WEWNĘTRZNEGO I ZEWNĘTRZNEGO – „BASTION SANGALLO” – LORETO | |||||||||||||||
label / sl | label / sl | ||||||||||||||
KODA PROJEKTA: 16982 – ESRR ZA OBDOBJE 2014–2020 – OS 6. UKREP 16.1 PRESTRUKTURIRANJE NOTRANJEGA IN ZUNANJEGA PODROČJA – „SANGALLO BASTION“ – LORETO | |||||||||||||||
label / cs | label / cs | ||||||||||||||
KÓD PROJEKTU: 16982 – EFRR 20142020 – OSA 6. AKCE 16.1 RESTRUKTURALIZACE VNITŘNÍ A VNĚJŠÍ OBLASTI – „SANGALLO BASTION“ – LORETO | |||||||||||||||
label / lt | label / lt | ||||||||||||||
PROJEKTO KODAS: 16982 – ERPF 2014–2020 M. 6 KRYPTIS. VEIKSMAS. VIDAUS IR IŠORĖS TERITORIJOS RESTRUKTŪRIZAVIMAS – „SANGALLO BASTION“ – LORETO | |||||||||||||||
label / lv | label / lv | ||||||||||||||
PROJEKTA KODS: 16982 — ERAF 2014.–2020. GADAM — 6. ASS. DARBĪBA “IEKŠĒJĀ UN ĀRĒJĀ APGABALA PĀRSTRUKTURĒŠANA” — “SANGALLO BASTION” — LORETO | |||||||||||||||
label / bg | label / bg | ||||||||||||||
КОД НА ПРОЕКТА: 16982 — ЕФРР ЗА ПЕРИОДА 2014—2020 Г. — ОС 6. ДЕЙСТВИЕ 16.1 ПРЕСТРУКТУРИРАНЕ НА ВЪТРЕШНО И ВЪНШНО ПРОСТРАНСТВО — „SANGALLO BASTION“ — LORETO | |||||||||||||||
label / hu | label / hu | ||||||||||||||
A PROJEKT KÓDJA: 16982 – ERFA 20142020–6. TENGELY INTÉZKEDÉS: A BELSŐ ÉS KÜLSŐ TERÜLET SZERKEZETÁTALAKÍTÁSA – „SANGALLO BÁSTYA” – LORETO | |||||||||||||||
label / ga | label / ga | ||||||||||||||
CÓD AN TIONSCADAIL: 16982 — CFRE 20142020 — AIS 6. GNÍOMH 16.1 ATHSTRUCHTÚRÚ LIMISTÉAR INMHEÁNACH AGUS SEACHTRACH — “SANGALLO BASTION” — LORETO | |||||||||||||||
label / sv | label / sv | ||||||||||||||
PROJEKTKOD: 16982 – ERUF 20142020 – AXEL 6. ÅTGÄRD 16.1 OMSTRUKTURERING AV DET INTERNA OCH EXTERNA OMRÅDET – ”SANGALLO BASTION” – LORETO | |||||||||||||||
label / et | label / et | ||||||||||||||
PROJEKTI KOOD: 16982 – ERF 20142020–6. TELG. MEEDE 16.1 SISE- JA VÄLISVALDKONNA ÜMBERKORRALDAMINE – „SANGALLO BASTION“ – LORETO | |||||||||||||||
description / bg | description / bg | ||||||||||||||
Проект Q4187926 в Италия | |||||||||||||||
description / hr | description / hr | ||||||||||||||
Projekt Q4187926 u Italiji | |||||||||||||||
description / hu | description / hu | ||||||||||||||
Projekt Q4187926 Olaszországban | |||||||||||||||
description / cs | description / cs | ||||||||||||||
Projekt Q4187926 v Itálii | |||||||||||||||
description / da | description / da | ||||||||||||||
Projekt Q4187926 i Italien | |||||||||||||||
description / nl | description / nl | ||||||||||||||
Project Q4187926 in Italië | |||||||||||||||
description / et | description / et | ||||||||||||||
Projekt Q4187926 Itaalias | |||||||||||||||
description / fi | description / fi | ||||||||||||||
Projekti Q4187926 Italiassa | |||||||||||||||
description / fr | description / fr | ||||||||||||||
Projet Q4187926 en Italie | |||||||||||||||
description / de | description / de | ||||||||||||||
Projekt Q4187926 in Italien | |||||||||||||||
description / el | description / el | ||||||||||||||
Έργο Q4187926 στην Ιταλία | |||||||||||||||
description / ga | description / ga | ||||||||||||||
Tionscadal Q4187926 san Iodáil | |||||||||||||||
description / it | description / it | ||||||||||||||
Progetto Q4187926 in Italia | |||||||||||||||
description / lv | description / lv | ||||||||||||||
Projekts Q4187926 Itālijā | |||||||||||||||
description / lt | description / lt | ||||||||||||||
Projektas Q4187926 Italijoje | |||||||||||||||
description / mt | description / mt | ||||||||||||||
Proġett Q4187926 fl-Italja | |||||||||||||||
description / pl | description / pl | ||||||||||||||
Projekt Q4187926 we Włoszech | |||||||||||||||
description / pt | description / pt | ||||||||||||||
Projeto Q4187926 na Itália | |||||||||||||||
description / ro | description / ro | ||||||||||||||
Proiectul Q4187926 în Italia | |||||||||||||||
description / sk | description / sk | ||||||||||||||
Projekt Q4187926 v Taliansku | |||||||||||||||
description / sl | description / sl | ||||||||||||||
Projekt Q4187926 v Italiji | |||||||||||||||
description / es | description / es | ||||||||||||||
Proyecto Q4187926 en Italia | |||||||||||||||
description / sv | description / sv | ||||||||||||||
Projekt Q4187926 i Italien | |||||||||||||||
Property / summary: PROJECT CODE: 16982 — ERDF 20142020 — AXIS 6. ACTION 16.1 RESTRUCTURING INTERNAL AND EXTERNAL AREA — “SANGALLO BASTION” — LORETO (English) / qualifier | |||||||||||||||
readability score: 0.0010347267163035
| |||||||||||||||
Property / contained in Local Administrative Unit | |||||||||||||||
Property / contained in Local Administrative Unit: Loreto / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary | |||||||||||||||
PROJEKTKODE: 16982 — EFRU 20142020 — AKSE 6. AKTION 16.1 OMSTRUKTURERING AF DET INTERNE OG EKSTERNE OMRÅDE — "SANGALLO BASTION" — LORETO (Danish) | |||||||||||||||
Property / summary: PROJEKTKODE: 16982 — EFRU 20142020 — AKSE 6. AKTION 16.1 OMSTRUKTURERING AF DET INTERNE OG EKSTERNE OMRÅDE — "SANGALLO BASTION" — LORETO (Danish) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: PROJEKTKODE: 16982 — EFRU 20142020 — AKSE 6. AKTION 16.1 OMSTRUKTURERING AF DET INTERNE OG EKSTERNE OMRÅDE — "SANGALLO BASTION" — LORETO (Danish) / qualifier | |||||||||||||||
point in time: 21 July 2022
| |||||||||||||||
Property / summary | |||||||||||||||
ΚΩΔΙΚΌΣ ΈΡΓΟΥ: 16982 — ΕΤΠΑ 20142020 — ΆΞΟΝΑΣ 6. ΔΡΆΣΗ 16.1 ΑΝΑΔΙΆΡΘΡΩΣΗ ΤΟΥ ΕΣΩΤΕΡΙΚΟΎ ΚΑΙ ΕΞΩΤΕΡΙΚΟΎ ΧΏΡΟΥ — «SANGALLO BASTION» — LORETO (Greek) | |||||||||||||||
Property / summary: ΚΩΔΙΚΌΣ ΈΡΓΟΥ: 16982 — ΕΤΠΑ 20142020 — ΆΞΟΝΑΣ 6. ΔΡΆΣΗ 16.1 ΑΝΑΔΙΆΡΘΡΩΣΗ ΤΟΥ ΕΣΩΤΕΡΙΚΟΎ ΚΑΙ ΕΞΩΤΕΡΙΚΟΎ ΧΏΡΟΥ — «SANGALLO BASTION» — LORETO (Greek) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: ΚΩΔΙΚΌΣ ΈΡΓΟΥ: 16982 — ΕΤΠΑ 20142020 — ΆΞΟΝΑΣ 6. ΔΡΆΣΗ 16.1 ΑΝΑΔΙΆΡΘΡΩΣΗ ΤΟΥ ΕΣΩΤΕΡΙΚΟΎ ΚΑΙ ΕΞΩΤΕΡΙΚΟΎ ΧΏΡΟΥ — «SANGALLO BASTION» — LORETO (Greek) / qualifier | |||||||||||||||
point in time: 21 July 2022
| |||||||||||||||
Property / summary | |||||||||||||||
KOD PROJEKTA: 16982 – EFRR 2014. – 2020. – OS 6. MJERA 16.1. RESTRUKTURIRANJE UNUTARNJEG I VANJSKOG PODRUČJA – „SANGALLO BASTION” – LORETO (Croatian) | |||||||||||||||
Property / summary: KOD PROJEKTA: 16982 – EFRR 2014. – 2020. – OS 6. MJERA 16.1. RESTRUKTURIRANJE UNUTARNJEG I VANJSKOG PODRUČJA – „SANGALLO BASTION” – LORETO (Croatian) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: KOD PROJEKTA: 16982 – EFRR 2014. – 2020. – OS 6. MJERA 16.1. RESTRUKTURIRANJE UNUTARNJEG I VANJSKOG PODRUČJA – „SANGALLO BASTION” – LORETO (Croatian) / qualifier | |||||||||||||||
point in time: 21 July 2022
| |||||||||||||||
Property / summary | |||||||||||||||
CODUL PROIECTULUI: 16982 – FEDR 20142020 – AXA 6. ACȚIUNEA 16.1 RESTRUCTURAREA ZONEI INTERNE ȘI EXTERNE – „SANGALLO BASTION” – LORETO (Romanian) | |||||||||||||||
Property / summary: CODUL PROIECTULUI: 16982 – FEDR 20142020 – AXA 6. ACȚIUNEA 16.1 RESTRUCTURAREA ZONEI INTERNE ȘI EXTERNE – „SANGALLO BASTION” – LORETO (Romanian) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: CODUL PROIECTULUI: 16982 – FEDR 20142020 – AXA 6. ACȚIUNEA 16.1 RESTRUCTURAREA ZONEI INTERNE ȘI EXTERNE – „SANGALLO BASTION” – LORETO (Romanian) / qualifier | |||||||||||||||
point in time: 21 July 2022
| |||||||||||||||
Property / summary | |||||||||||||||
KÓD PROJEKTU: 16982 – EFRR 20142020 – OS 6. OPATRENIE 16.1 REŠTRUKTURALIZÁCIA VNÚTORNEJ A VONKAJŠEJ OBLASTI – BASTION SANGALLO – LORETO (Slovak) | |||||||||||||||
Property / summary: KÓD PROJEKTU: 16982 – EFRR 20142020 – OS 6. OPATRENIE 16.1 REŠTRUKTURALIZÁCIA VNÚTORNEJ A VONKAJŠEJ OBLASTI – BASTION SANGALLO – LORETO (Slovak) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: KÓD PROJEKTU: 16982 – EFRR 20142020 – OS 6. OPATRENIE 16.1 REŠTRUKTURALIZÁCIA VNÚTORNEJ A VONKAJŠEJ OBLASTI – BASTION SANGALLO – LORETO (Slovak) / qualifier | |||||||||||||||
point in time: 21 July 2022
| |||||||||||||||
Property / summary | |||||||||||||||
KODIĊI TAL-PROĠETT: 16982 — FEŻR 20142020 — ASSI 6. AZZJONI 16.1 IR-RISTRUTTURAR TAL-QASAM INTERN U ESTERN — “BAĊIR SANGALLO” — LORETO (Maltese) | |||||||||||||||
Property / summary: KODIĊI TAL-PROĠETT: 16982 — FEŻR 20142020 — ASSI 6. AZZJONI 16.1 IR-RISTRUTTURAR TAL-QASAM INTERN U ESTERN — “BAĊIR SANGALLO” — LORETO (Maltese) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: KODIĊI TAL-PROĠETT: 16982 — FEŻR 20142020 — ASSI 6. AZZJONI 16.1 IR-RISTRUTTURAR TAL-QASAM INTERN U ESTERN — “BAĊIR SANGALLO” — LORETO (Maltese) / qualifier | |||||||||||||||
point in time: 21 July 2022
| |||||||||||||||
Property / summary | |||||||||||||||
CÓDIGO DO PROJECTO: 16982 — FEDER 20142020 — AXIS 6. AÇÃO 16.1 REESTRUTURAÇÃO DA ZONA INTERNA E EXTERNA — “BAIXO DE SANGALLO” — LORETO (Portuguese) | |||||||||||||||
Property / summary: CÓDIGO DO PROJECTO: 16982 — FEDER 20142020 — AXIS 6. AÇÃO 16.1 REESTRUTURAÇÃO DA ZONA INTERNA E EXTERNA — “BAIXO DE SANGALLO” — LORETO (Portuguese) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: CÓDIGO DO PROJECTO: 16982 — FEDER 20142020 — AXIS 6. AÇÃO 16.1 REESTRUTURAÇÃO DA ZONA INTERNA E EXTERNA — “BAIXO DE SANGALLO” — LORETO (Portuguese) / qualifier | |||||||||||||||
point in time: 21 July 2022
| |||||||||||||||
Property / summary | |||||||||||||||
HANKKEEN KOODI: 16982 – EAKR 2014–2020 – TOIMINTALINJA 6. TOIMI 16.1 SISÄISEN JA ULKOISEN ALUEEN RAKENNEUUDISTUS – ”SANGALLO BASTION” – LORETO (Finnish) | |||||||||||||||
Property / summary: HANKKEEN KOODI: 16982 – EAKR 2014–2020 – TOIMINTALINJA 6. TOIMI 16.1 SISÄISEN JA ULKOISEN ALUEEN RAKENNEUUDISTUS – ”SANGALLO BASTION” – LORETO (Finnish) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: HANKKEEN KOODI: 16982 – EAKR 2014–2020 – TOIMINTALINJA 6. TOIMI 16.1 SISÄISEN JA ULKOISEN ALUEEN RAKENNEUUDISTUS – ”SANGALLO BASTION” – LORETO (Finnish) / qualifier | |||||||||||||||
point in time: 21 July 2022
| |||||||||||||||
Property / summary | |||||||||||||||
KOD PROJEKTU: 16982 – EFRR 20142020 – OŚ 6. DZIAŁANIE 16.1 RESTRUKTURYZACJA OBSZARU WEWNĘTRZNEGO I ZEWNĘTRZNEGO – „BASTION SANGALLO” – LORETO (Polish) | |||||||||||||||
Property / summary: KOD PROJEKTU: 16982 – EFRR 20142020 – OŚ 6. DZIAŁANIE 16.1 RESTRUKTURYZACJA OBSZARU WEWNĘTRZNEGO I ZEWNĘTRZNEGO – „BASTION SANGALLO” – LORETO (Polish) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: KOD PROJEKTU: 16982 – EFRR 20142020 – OŚ 6. DZIAŁANIE 16.1 RESTRUKTURYZACJA OBSZARU WEWNĘTRZNEGO I ZEWNĘTRZNEGO – „BASTION SANGALLO” – LORETO (Polish) / qualifier | |||||||||||||||
point in time: 21 July 2022
| |||||||||||||||
Property / summary | |||||||||||||||
KODA PROJEKTA: 16982 – ESRR ZA OBDOBJE 2014–2020 – OS 6. UKREP 16.1 PRESTRUKTURIRANJE NOTRANJEGA IN ZUNANJEGA PODROČJA – „SANGALLO BASTION“ – LORETO (Slovenian) | |||||||||||||||
Property / summary: KODA PROJEKTA: 16982 – ESRR ZA OBDOBJE 2014–2020 – OS 6. UKREP 16.1 PRESTRUKTURIRANJE NOTRANJEGA IN ZUNANJEGA PODROČJA – „SANGALLO BASTION“ – LORETO (Slovenian) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: KODA PROJEKTA: 16982 – ESRR ZA OBDOBJE 2014–2020 – OS 6. UKREP 16.1 PRESTRUKTURIRANJE NOTRANJEGA IN ZUNANJEGA PODROČJA – „SANGALLO BASTION“ – LORETO (Slovenian) / qualifier | |||||||||||||||
point in time: 21 July 2022
| |||||||||||||||
Property / summary | |||||||||||||||
KÓD PROJEKTU: 16982 – EFRR 20142020 – OSA 6. AKCE 16.1 RESTRUKTURALIZACE VNITŘNÍ A VNĚJŠÍ OBLASTI – „SANGALLO BASTION“ – LORETO (Czech) | |||||||||||||||
Property / summary: KÓD PROJEKTU: 16982 – EFRR 20142020 – OSA 6. AKCE 16.1 RESTRUKTURALIZACE VNITŘNÍ A VNĚJŠÍ OBLASTI – „SANGALLO BASTION“ – LORETO (Czech) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: KÓD PROJEKTU: 16982 – EFRR 20142020 – OSA 6. AKCE 16.1 RESTRUKTURALIZACE VNITŘNÍ A VNĚJŠÍ OBLASTI – „SANGALLO BASTION“ – LORETO (Czech) / qualifier | |||||||||||||||
point in time: 21 July 2022
| |||||||||||||||
Property / summary | |||||||||||||||
PROJEKTO KODAS: 16982 – ERPF 2014–2020 M. 6 KRYPTIS. VEIKSMAS. VIDAUS IR IŠORĖS TERITORIJOS RESTRUKTŪRIZAVIMAS – „SANGALLO BASTION“ – LORETO (Lithuanian) | |||||||||||||||
Property / summary: PROJEKTO KODAS: 16982 – ERPF 2014–2020 M. 6 KRYPTIS. VEIKSMAS. VIDAUS IR IŠORĖS TERITORIJOS RESTRUKTŪRIZAVIMAS – „SANGALLO BASTION“ – LORETO (Lithuanian) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: PROJEKTO KODAS: 16982 – ERPF 2014–2020 M. 6 KRYPTIS. VEIKSMAS. VIDAUS IR IŠORĖS TERITORIJOS RESTRUKTŪRIZAVIMAS – „SANGALLO BASTION“ – LORETO (Lithuanian) / qualifier | |||||||||||||||
point in time: 21 July 2022
| |||||||||||||||
Property / summary | |||||||||||||||
PROJEKTA KODS: 16982 — ERAF 2014.–2020. GADAM — 6. ASS. DARBĪBA “IEKŠĒJĀ UN ĀRĒJĀ APGABALA PĀRSTRUKTURĒŠANA” — “SANGALLO BASTION” — LORETO (Latvian) | |||||||||||||||
Property / summary: PROJEKTA KODS: 16982 — ERAF 2014.–2020. GADAM — 6. ASS. DARBĪBA “IEKŠĒJĀ UN ĀRĒJĀ APGABALA PĀRSTRUKTURĒŠANA” — “SANGALLO BASTION” — LORETO (Latvian) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: PROJEKTA KODS: 16982 — ERAF 2014.–2020. GADAM — 6. ASS. DARBĪBA “IEKŠĒJĀ UN ĀRĒJĀ APGABALA PĀRSTRUKTURĒŠANA” — “SANGALLO BASTION” — LORETO (Latvian) / qualifier | |||||||||||||||
point in time: 21 July 2022
| |||||||||||||||
Property / summary | |||||||||||||||
КОД НА ПРОЕКТА: 16982 — ЕФРР ЗА ПЕРИОДА 2014—2020 Г. — ОС 6. ДЕЙСТВИЕ 16.1 ПРЕСТРУКТУРИРАНЕ НА ВЪТРЕШНО И ВЪНШНО ПРОСТРАНСТВО — „SANGALLO BASTION“ — LORETO (Bulgarian) | |||||||||||||||
Property / summary: КОД НА ПРОЕКТА: 16982 — ЕФРР ЗА ПЕРИОДА 2014—2020 Г. — ОС 6. ДЕЙСТВИЕ 16.1 ПРЕСТРУКТУРИРАНЕ НА ВЪТРЕШНО И ВЪНШНО ПРОСТРАНСТВО — „SANGALLO BASTION“ — LORETO (Bulgarian) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: КОД НА ПРОЕКТА: 16982 — ЕФРР ЗА ПЕРИОДА 2014—2020 Г. — ОС 6. ДЕЙСТВИЕ 16.1 ПРЕСТРУКТУРИРАНЕ НА ВЪТРЕШНО И ВЪНШНО ПРОСТРАНСТВО — „SANGALLO BASTION“ — LORETO (Bulgarian) / qualifier | |||||||||||||||
point in time: 21 July 2022
| |||||||||||||||
Property / summary | |||||||||||||||
A PROJEKT KÓDJA: 16982 – ERFA 20142020–6. TENGELY INTÉZKEDÉS: A BELSŐ ÉS KÜLSŐ TERÜLET SZERKEZETÁTALAKÍTÁSA – „SANGALLO BÁSTYA” – LORETO (Hungarian) | |||||||||||||||
Property / summary: A PROJEKT KÓDJA: 16982 – ERFA 20142020–6. TENGELY INTÉZKEDÉS: A BELSŐ ÉS KÜLSŐ TERÜLET SZERKEZETÁTALAKÍTÁSA – „SANGALLO BÁSTYA” – LORETO (Hungarian) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: A PROJEKT KÓDJA: 16982 – ERFA 20142020–6. TENGELY INTÉZKEDÉS: A BELSŐ ÉS KÜLSŐ TERÜLET SZERKEZETÁTALAKÍTÁSA – „SANGALLO BÁSTYA” – LORETO (Hungarian) / qualifier | |||||||||||||||
point in time: 21 July 2022
| |||||||||||||||
Property / summary | |||||||||||||||
CÓD AN TIONSCADAIL: 16982 — CFRE 20142020 — AIS 6. GNÍOMH 16.1 ATHSTRUCHTÚRÚ LIMISTÉAR INMHEÁNACH AGUS SEACHTRACH — “SANGALLO BASTION” — LORETO (Irish) | |||||||||||||||
Property / summary: CÓD AN TIONSCADAIL: 16982 — CFRE 20142020 — AIS 6. GNÍOMH 16.1 ATHSTRUCHTÚRÚ LIMISTÉAR INMHEÁNACH AGUS SEACHTRACH — “SANGALLO BASTION” — LORETO (Irish) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: CÓD AN TIONSCADAIL: 16982 — CFRE 20142020 — AIS 6. GNÍOMH 16.1 ATHSTRUCHTÚRÚ LIMISTÉAR INMHEÁNACH AGUS SEACHTRACH — “SANGALLO BASTION” — LORETO (Irish) / qualifier | |||||||||||||||
point in time: 21 July 2022
| |||||||||||||||
Property / summary | |||||||||||||||
PROJEKTKOD: 16982 – ERUF 20142020 – AXEL 6. ÅTGÄRD 16.1 OMSTRUKTURERING AV DET INTERNA OCH EXTERNA OMRÅDET – ”SANGALLO BASTION” – LORETO (Swedish) | |||||||||||||||
Property / summary: PROJEKTKOD: 16982 – ERUF 20142020 – AXEL 6. ÅTGÄRD 16.1 OMSTRUKTURERING AV DET INTERNA OCH EXTERNA OMRÅDET – ”SANGALLO BASTION” – LORETO (Swedish) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: PROJEKTKOD: 16982 – ERUF 20142020 – AXEL 6. ÅTGÄRD 16.1 OMSTRUKTURERING AV DET INTERNA OCH EXTERNA OMRÅDET – ”SANGALLO BASTION” – LORETO (Swedish) / qualifier | |||||||||||||||
point in time: 21 July 2022
| |||||||||||||||
Property / summary | |||||||||||||||
PROJEKTI KOOD: 16982 – ERF 20142020–6. TELG. MEEDE 16.1 SISE- JA VÄLISVALDKONNA ÜMBERKORRALDAMINE – „SANGALLO BASTION“ – LORETO (Estonian) | |||||||||||||||
Property / summary: PROJEKTI KOOD: 16982 – ERF 20142020–6. TELG. MEEDE 16.1 SISE- JA VÄLISVALDKONNA ÜMBERKORRALDAMINE – „SANGALLO BASTION“ – LORETO (Estonian) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: PROJEKTI KOOD: 16982 – ERF 20142020–6. TELG. MEEDE 16.1 SISE- JA VÄLISVALDKONNA ÜMBERKORRALDAMINE – „SANGALLO BASTION“ – LORETO (Estonian) / qualifier | |||||||||||||||
point in time: 21 July 2022
| |||||||||||||||
Property / coordinate location | |||||||||||||||
43°26'22.20"N, 13°36'25.27"E
| |||||||||||||||
Property / coordinate location: 43°26'22.20"N, 13°36'25.27"E / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / contained in NUTS | |||||||||||||||
Property / contained in NUTS: Province of Ancona / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / priority axis | |||||||||||||||
Property / priority axis: Protecting the environment and promoting resource efficiency / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / thematic objective | |||||||||||||||
Property / thematic objective: Environment protection and resource efficiency / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / start time | |||||||||||||||
30 October 2018
| |||||||||||||||
Property / start time: 30 October 2018 / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / date of last update | |||||||||||||||
8 April 2023
| |||||||||||||||
Property / date of last update: 8 April 2023 / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / Call for proposal | |||||||||||||||
Property / Call for proposal: POR FESR 20142020 - ASSE 6. AZIONE 16.1 Ristrutturazione area interna ed esterna - "BASTIONE SANGALLO" - LORETO / rank | |||||||||||||||
Normal rank |
Latest revision as of 15:45, 11 October 2024
Project Q4187926 in Italy
Language | Label | Description | Also known as |
---|---|---|---|
English | PROJECT CODE: 16982 — ERDF 20142020 — AXIS 6. ACTION 16.1 RESTRUCTURING INTERNAL AND EXTERNAL AREA — “SANGALLO BASTION” — LORETO |
Project Q4187926 in Italy |
Statements
182,500.0 Euro
0 references
365,000.0 Euro
0 references
50.0 percent
0 references
30 October 2018
0 references
COMUNE DI LORETO
0 references
CODICE PROGETTO: 16982 - POR FESR 20142020 - ASSE 6. AZIONE 16.1 RISTRUTTURAZIONE AREA INTERNA ED ESTERNA - "BASTIONE SANGALLO" - LORETO (Italian)
0 references
CÓDIGO DEL PROYECTO: 16982 — FEDER 20142020 — EJE 6. ACCIÓN 16.1 REESTRUCTURACIÓN DEL ESPACIO INTERIOR Y EXTERIOR — BASTIÓN SANGALLO — LORETO (Spanish)
31 January 2022
0 references
PROJECT CODE: 16982 — ERDF 20142020 — AXIS 6. ACTION 16.1 RESTRUCTURING INTERNAL AND EXTERNAL AREA — “SANGALLO BASTION” — LORETO (English)
31 January 2022
0.0010347267163035
0 references
CODE DU PROJET: 16982 — FEDER 20142020 — AXE 6. ACTION 16.1 RESTRUCTURATION DE L’ESPACE INTERNE ET EXTÉRIEUR — «SANGALLO BASTION» — LORETO (French)
2 February 2022
0 references
PROJEKTCODE: 16982 – EFRE 20142020 – SCHWERPUNKT 6. MASSNAHME 16.1 UMSTRUKTURIERUNG INTERNER UND EXTERNER BEREICHE – „SANGALLO BASTION“ – LORETO (German)
3 February 2022
0 references
PROJECTCODE: 16982 — EFRO 20142020 — AS 6. ACTIE 16.1 HERSTRUCTURERING VAN DE INTERNE EN EXTERNE RUIMTE — „SANGALLO BASTION” — LORETO (Dutch)
4 February 2022
0 references
PROJEKTKODE: 16982 — EFRU 20142020 — AKSE 6. AKTION 16.1 OMSTRUKTURERING AF DET INTERNE OG EKSTERNE OMRÅDE — "SANGALLO BASTION" — LORETO (Danish)
21 July 2022
0 references
ΚΩΔΙΚΌΣ ΈΡΓΟΥ: 16982 — ΕΤΠΑ 20142020 — ΆΞΟΝΑΣ 6. ΔΡΆΣΗ 16.1 ΑΝΑΔΙΆΡΘΡΩΣΗ ΤΟΥ ΕΣΩΤΕΡΙΚΟΎ ΚΑΙ ΕΞΩΤΕΡΙΚΟΎ ΧΏΡΟΥ — «SANGALLO BASTION» — LORETO (Greek)
21 July 2022
0 references
KOD PROJEKTA: 16982 – EFRR 2014. – 2020. – OS 6. MJERA 16.1. RESTRUKTURIRANJE UNUTARNJEG I VANJSKOG PODRUČJA – „SANGALLO BASTION” – LORETO (Croatian)
21 July 2022
0 references
CODUL PROIECTULUI: 16982 – FEDR 20142020 – AXA 6. ACȚIUNEA 16.1 RESTRUCTURAREA ZONEI INTERNE ȘI EXTERNE – „SANGALLO BASTION” – LORETO (Romanian)
21 July 2022
0 references
KÓD PROJEKTU: 16982 – EFRR 20142020 – OS 6. OPATRENIE 16.1 REŠTRUKTURALIZÁCIA VNÚTORNEJ A VONKAJŠEJ OBLASTI – BASTION SANGALLO – LORETO (Slovak)
21 July 2022
0 references
KODIĊI TAL-PROĠETT: 16982 — FEŻR 20142020 — ASSI 6. AZZJONI 16.1 IR-RISTRUTTURAR TAL-QASAM INTERN U ESTERN — “BAĊIR SANGALLO” — LORETO (Maltese)
21 July 2022
0 references
CÓDIGO DO PROJECTO: 16982 — FEDER 20142020 — AXIS 6. AÇÃO 16.1 REESTRUTURAÇÃO DA ZONA INTERNA E EXTERNA — “BAIXO DE SANGALLO” — LORETO (Portuguese)
21 July 2022
0 references
HANKKEEN KOODI: 16982 – EAKR 2014–2020 – TOIMINTALINJA 6. TOIMI 16.1 SISÄISEN JA ULKOISEN ALUEEN RAKENNEUUDISTUS – ”SANGALLO BASTION” – LORETO (Finnish)
21 July 2022
0 references
KOD PROJEKTU: 16982 – EFRR 20142020 – OŚ 6. DZIAŁANIE 16.1 RESTRUKTURYZACJA OBSZARU WEWNĘTRZNEGO I ZEWNĘTRZNEGO – „BASTION SANGALLO” – LORETO (Polish)
21 July 2022
0 references
KODA PROJEKTA: 16982 – ESRR ZA OBDOBJE 2014–2020 – OS 6. UKREP 16.1 PRESTRUKTURIRANJE NOTRANJEGA IN ZUNANJEGA PODROČJA – „SANGALLO BASTION“ – LORETO (Slovenian)
21 July 2022
0 references
KÓD PROJEKTU: 16982 – EFRR 20142020 – OSA 6. AKCE 16.1 RESTRUKTURALIZACE VNITŘNÍ A VNĚJŠÍ OBLASTI – „SANGALLO BASTION“ – LORETO (Czech)
21 July 2022
0 references
PROJEKTO KODAS: 16982 – ERPF 2014–2020 M. 6 KRYPTIS. VEIKSMAS. VIDAUS IR IŠORĖS TERITORIJOS RESTRUKTŪRIZAVIMAS – „SANGALLO BASTION“ – LORETO (Lithuanian)
21 July 2022
0 references
PROJEKTA KODS: 16982 — ERAF 2014.–2020. GADAM — 6. ASS. DARBĪBA “IEKŠĒJĀ UN ĀRĒJĀ APGABALA PĀRSTRUKTURĒŠANA” — “SANGALLO BASTION” — LORETO (Latvian)
21 July 2022
0 references
КОД НА ПРОЕКТА: 16982 — ЕФРР ЗА ПЕРИОДА 2014—2020 Г. — ОС 6. ДЕЙСТВИЕ 16.1 ПРЕСТРУКТУРИРАНЕ НА ВЪТРЕШНО И ВЪНШНО ПРОСТРАНСТВО — „SANGALLO BASTION“ — LORETO (Bulgarian)
21 July 2022
0 references
A PROJEKT KÓDJA: 16982 – ERFA 20142020–6. TENGELY INTÉZKEDÉS: A BELSŐ ÉS KÜLSŐ TERÜLET SZERKEZETÁTALAKÍTÁSA – „SANGALLO BÁSTYA” – LORETO (Hungarian)
21 July 2022
0 references
CÓD AN TIONSCADAIL: 16982 — CFRE 20142020 — AIS 6. GNÍOMH 16.1 ATHSTRUCHTÚRÚ LIMISTÉAR INMHEÁNACH AGUS SEACHTRACH — “SANGALLO BASTION” — LORETO (Irish)
21 July 2022
0 references
PROJEKTKOD: 16982 – ERUF 20142020 – AXEL 6. ÅTGÄRD 16.1 OMSTRUKTURERING AV DET INTERNA OCH EXTERNA OMRÅDET – ”SANGALLO BASTION” – LORETO (Swedish)
21 July 2022
0 references
PROJEKTI KOOD: 16982 – ERF 20142020–6. TELG. MEEDE 16.1 SISE- JA VÄLISVALDKONNA ÜMBERKORRALDAMINE – „SANGALLO BASTION“ – LORETO (Estonian)
21 July 2022
0 references
LORETO
0 references
8 April 2023
0 references