RES installations in the municipality of Zawonia and in the municipality of Trzebnica (Q95375): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Removed claims) |
||||||||||||||
Property / budget | |||||||||||||||
| |||||||||||||||
Property / budget: 3,760,266.1 zloty / rank | |||||||||||||||
Property / budget | |||||||||||||||
| |||||||||||||||
Property / budget: 902,463.864 Euro / rank | |||||||||||||||
Property / budget: 902,463.864 Euro / qualifier | |||||||||||||||
| |||||||||||||||
Property / budget: 902,463.864 Euro / qualifier | |||||||||||||||
|
Revision as of 16:02, 22 June 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | RES installations in the municipality of Zawonia and in the municipality of Trzebnica |
Project in Poland financed by DG Regio |
Statements
3,181,594.46 zloty
0 references
84.81 percent
0 references
1 January 2017
0 references
31 August 2019
0 references
GMINA ZAWONIA
0 references
Przedmiotem projektu jest montaż mikroinstalacji OZE obejmujących mikroinstalacje fotowoltaiczne (on-grid, z możliwością oddawania nadwyżek energii do sieci) oraz pompy ciepła. W przypadku każdego grantu wystąpi pomoc de minimis na poziomie Grantobiorcy, co będzie przedmiotem analizy w kontekście możliwości oraz zakresu uzyskania pomocy de minimis przez potencjalnych Grantobiorców. Zakres rzeczowy to mikroinstalacje fotowoltaiczne przyłączone do sieci oraz pompy ciepła powietrze - woda do przygotowania ciepłej wody użytkowej oraz centralnego ogrzewania. W ramach realizacji przedsięwzięcia przewiduje się montaż: a) Gmina Zawonia: liczba instalacji PV 101 liczba pomp ciepła 26 sumaryczna moc instalacji PV 388 kWe sumaryczna moc pomp ciepła 65 kWt b) Gmina Trzebnica: liczba instalacji PV 60 liczba pomp ciepła 30 sumaryczna moc instalacji PV 267,80 kWe sumaryczna moc pomp ciepła 170,00 kWt Odbiorcami projektu są mieszkańcy domów jednorodzinnych gminy Zawonia oraz Gminy Trzebnica. Efektami projektu będzie zwiększenie mocy instalacji OZE, zwiększenie produkcji energii z OZE oraz redukcja emisji gazów cieplarnianych oraz niskiej emisji przez wykorzystanie pomp ciepła. Redukcja emisji w projekcie Roczna produkcja energii elektrycznej netto 456,32 MWhe Roczna produkcja energii cieplnej netto 204,76 MWht Roczna produkcja energii z OZE 661,08 Mwhe+t Uniknięta emisja CO2 - en. el.KSE 371 Mg / rok Uniknięta emisja CO2 - CO i CWU 72 Mg / rok Suma 442,41 Mg / rok (Polish)
0 references
The project is the installation of a micro-installation for renewable micro-installations (on-grid, with the possibility to put surplus energy to the grid) and a heat pump. In the case of each grant, de minimis aid will be provided at the level of the recipient, which will be analysed in the context of the possibilities and scope for obtaining de minimis aid by potential grant recipients. The material scope is micro-solar installations connected to the grid and air heat pumps — water for the preparation of domestic hot water and district heating. The project shall provide for the installation of: the municipality of Zawonia: number of installations PV 101 number of heat pumps 26 total installation power of PV 388 kWe total heat pumps capacity 65 kWt b) Gmina Trzebnica: the number of PV 60 is the number of heat pumps 30. total installation power of PV 267,80 kWe total heat pumps power of 170,00 kWt of the project is the inhabitants of the family houses of the municipalities of Zawonia and Trzebnica. The project will increase the capacity of RES installations, increase RES production and reduce greenhouse gas emissions and low emissions by using heat pumps. Emissions reduction for 204,76 MWhe Annual net electricity generation 456,32 MWHT Annual electricity generation MWHT MWHT Annual generation from RES 661,08 Mwhe + CO2 avoided CO emissions — en. el.KSE 371 Mg/year avoided CO2 emissions — CO and CWU 72 Mg/year Suma 442,41 tonnes/year (English)
0 references
Identifiers
RPDS.03.01.00-02-0018/17
0 references