INTERNSHIP IN BARTENDER – M.S. (Q1974288): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Changed label, description and/or aliases in pt) |
||||||
(3 intermediate revisions by 2 users not shown) | |||||||
label / pt | label / pt | ||||||
INTERNSHIP IN BARTENDER – M.S. | |||||||
Property / summary: TRAINING PLACEMENT IN THE PIPOL PROGRAMME – OCCUPABILIT PROJECT. IT LASTS 6 MONTHS, AIMS TO FORM A BARTENDER PROFILE AND TAKES PLACE IN POZZUOLO DEL FRIULI (UD). (English) / qualifier | |||||||
readability score: 0.00009898763768821426
| |||||||
Property / summary | Property / summary | ||||||
ESTABELECIMENTO DE FORMAÇÃO NO PROGRAMA PIPOL – PROJETO OCCUPABILIT. DURANTE 6 MESES, OBJECTIVOS DE FORMAÇÃO DE UM PERFIL DE BARTENDER E SERVIÇO EM POZZUOLO DEL FRIULI (UD). (Portuguese) | |||||||
Property / contained in Local Administrative Unit | |||||||
Property / contained in Local Administrative Unit: Pozzuolo del Friuli / rank | |||||||
Normal rank |
Latest revision as of 04:33, 11 October 2024
Project Q1974288 in Italy
Language | Label | Description | Also known as |
---|---|---|---|
English | INTERNSHIP IN BARTENDER – M.S. |
Project Q1974288 in Italy |
Statements
1,650.0 Euro
0 references
3,300.0 Euro
0 references
50.0 percent
0 references
29 May 2019
0 references
16 November 2020
0 references
28 January 2020
0 references
ATI 3 - HUB UDINE E BASSA FRIULANA - EN.A.I.P.
0 references
TIROCINIO FORMATIVO NELLÂAMBITO DEL PROGRAMMA PIPOL - PROGETTO OCCUPABILITÃ . HA UNA DURATA DI 6 MESI, MIRA A FORMARE UN PROFILO DI BARISTA E SI SVOLGE A POZZUOLO DEL FRIULI (UD). (Italian)
0 references
TRAINING PLACEMENT IN THE PIPOL PROGRAMME – OCCUPABILIT PROJECT. IT LASTS 6 MONTHS, AIMS TO FORM A BARTENDER PROFILE AND TAKES PLACE IN POZZUOLO DEL FRIULI (UD). (English)
0.00009898763768821426
0 references
FORMATION DANS L’ENVIRONNEMENT DU PROGRAMME PIPOL — PROJET D’EMPLOYABILITÉ. IL DURE 6 MOIS, VISE À FORMER UN PROFIL BARMAN ET A LIEU À POZZUOLO DEL FRIULI (UD). (French)
13 December 2021
0 references
OPLEIDING IN HET MILIEU VAN HET PIPOL-PROGRAMMA — INZETBAARHEIDSPROJECT. HET DUURT 6 MAANDEN, WIL EEN BARMAN PROFIEL VORMEN EN VINDT PLAATS IN POZZUOLO DEL FRIULI (UD). (Dutch)
22 December 2021
0 references
AUSBILDUNG IM UMWELTBEREICH DES PROGRAMMS PIPOL – BESCHÄFTIGUNGSFÄHIGKEIT. ES DAUERT 6 MONATE, ZIELT DARAUF AB, EIN BARKEEPER-PROFIL ZU BILDEN UND FINDET IN POZZUOLO DEL FRIULI (UD) STATT. (German)
23 December 2021
0 references
FORMACIÓN EN EL MEDIO AMBIENTE DEL PROGRAMA PIPOL — PROYECTO DE EMPLEABILIDAD. TIENE UNA DURACIÓN DE 6 MESES, TIENE COMO OBJETIVO FORMAR UN PERFIL DE CAMARERO Y TIENE LUGAR EN POZZUOLO DEL FRIULI (UD). (Spanish)
24 January 2022
0 references
UDDANNELSESOPHOLD I PIPOL-PROGRAMMET — OCCUPABILIT-PROJEKTET. DET VARER 6 MÅNEDER, SIGTER MOD AT DANNE EN BARTENDER PROFIL OG FINDER STED I POZZUOLO DEL FRIULI (UD). (Danish)
4 July 2022
0 references
ΠΡΑΚΤΙΚΉ ΆΣΚΗΣΗ ΚΑΤΆΡΤΙΣΗΣ ΣΤΟ ΠΡΌΓΡΑΜΜΑ PIPOL — ΈΡΓΟ OCCUPABILIT. ΔΙΑΡΚΕΊ 6 ΜΉΝΕΣ, ΈΧΕΙ ΩΣ ΣΤΌΧΟ ΝΑ ΣΧΗΜΑΤΊΣΕΙ ΈΝΑ ΠΡΟΦΊΛ BARTENDER ΚΑΙ ΛΑΜΒΆΝΕΙ ΧΏΡΑ ΣΤΟ POZZUOLO DEL FRIULI (UD). (Greek)
4 July 2022
0 references
TRENING STAŽ U PIPOL PROGRAMU – OCCUPABILIT PROJEKT. TRAJE 6 MJESECI, IMA ZA CILJ STVORITI BARMEN PROFIL I ODVIJA SE U POZZUOLO DEL FRIULI (UD). (Croatian)
4 July 2022
0 references
STAGIU DE FORMARE ÎN CADRUL PROGRAMULUI PIPOL – PROIECT OCCUPABILIT. ACESTA DUREAZĂ 6 LUNI, ÎȘI PROPUNE SĂ FORMEZE UN PROFIL DE BARMAN ȘI ARE LOC ÎN POZZUOLO DEL FRIULI (UD). (Romanian)
4 July 2022
0 references
STÁŽ V PROGRAME PIPOL – PROJEKT OCCUPABILIT. TRVÁ 6 MESIACOV, MÁ ZA CIEĽ VYTVORIŤ BARMANSKÝ PROFIL A KONÁ SA V POZZUOLO DEL FRIULI (UD). (Slovak)
4 July 2022
0 references
KOLLOKAMENT TA’ TAĦRIĠ FIL-PROGRAMM PIPOL — PROĠETT OCCUPABILIT. DAN IDUM 6 XHUR, GĦANDU L-GĦAN LI JIFFORMA PROFIL TA’ BARTENDER U JSIR F’POZZUOLO DEL FRIULI (UD). (Maltese)
4 July 2022
0 references
ESTABELECIMENTO DE FORMAÇÃO NO PROGRAMA PIPOL – PROJETO OCCUPABILIT. DURANTE 6 MESES, OBJECTIVOS DE FORMAÇÃO DE UM PERFIL DE BARTENDER E SERVIÇO EM POZZUOLO DEL FRIULI (UD). (Portuguese)
4 July 2022
0 references
KOULUTUSJAKSO PIPOL-OHJELMASSA – OCCUPABILIT-HANKE. SE KESTÄÄ 6 KUUKAUTTA, PYRKII MUODOSTAMAAN BAARIMIKON PROFIILIN JA TAPAHTUU POZZUOLO DEL FRIULISSA (UD). (Finnish)
4 July 2022
0 references
STAŻ SZKOLENIOWY W PROGRAMIE PIPOL – PROJEKT OCCUPABILIT. TRWA 6 MIESIĘCY, MA NA CELU STWORZENIE PROFILU BARMANA I ODBYWA SIĘ W POZZUOLO DEL FRIULI (UD). (Polish)
4 July 2022
0 references
USPOSABLJANJE V PROGRAMU PIPOL – PROJEKT OCCUPABILIT. TRAJA 6 MESECEV, SI PRIZADEVA OBLIKOVATI NATAKAR PROFIL IN POTEKA V POZZUOLO DEL FRIULI (UD). (Slovenian)
4 July 2022
0 references
ŠKOLENÍ V PROGRAMU PIPOL – PROJEKT OCCUPABILIT. TRVÁ 6 MĚSÍCŮ, MÁ ZA CÍL VYTVOŘIT BARMANSKÝ PROFIL A KONÁ SE V POZZUOLO DEL FRIULI (UD). (Czech)
4 July 2022
0 references
MOKOMOJI PRAKTIKA PIPOL PROGRAMOJE – OCCUPABILIT PROJEKTAS. JIS TRUNKA 6 MĖNESIUS, SIEKIA SUFORMUOTI BARMENO PROFILĮ IR VYKSTA POZZUOLO DEL FRIULI (UD). (Lithuanian)
4 July 2022
0 references
MĀCĪBU PRAKSE PIPOL PROGRAMMĀ — OCCUPABILIT PROJEKTS. TAS ILGST 6 MĒNEŠUS, MĒRĶIS IR VEIDOT BĀRMEŅU PROFILU UN NOTIEK POZZUOLO DEL FRIULI (UD). (Latvian)
4 July 2022
0 references
ОБУЧЕНИЕ ПО ПРОГРАМА „ПИПОЛ“ — ПРОЕКТ OCCUPABILIT. ТОЙ ПРОДЪЛЖАВА 6 МЕСЕЦА, ИМА ЗА ЦЕЛ ДА СЪЗДАДЕ БАРМАНСКИ ПРОФИЛ И СЕ ПРОВЕЖДА В POZZUOLO DEL FRIULI (UD). (Bulgarian)
4 July 2022
0 references
KÉPZÉS A PIPOL PROGRAMBAN – OCCUPABILIT PROJEKT. 6 HÓNAPIG TART, PULTOS PROFILT KÍVÁN LÉTREHOZNI, ÉS POZZUOLO DEL FRIULIBAN (UD) KERÜL MEGRENDEZÉSRE. (Hungarian)
4 July 2022
0 references
SOCRÚCHÁN OILIÚNA I GCLÁR PIPOL — TIONSCADAL OCCUPABILIT. MAIREANN SÉ 6 MHÍ, MAR AIDHM CHUN FOIRM PRÓIFÍL TÁBHAIRNE AGUS BÍONN SÉ AR SIÚL I POZZUOLO DEL FRIULI (UD). (Irish)
4 July 2022
0 references
PRAKTIK I PIPOL-PROGRAMMET – OCCUPABILIT-PROJEKTET. DET VARAR 6 MÅNADER, SYFTAR TILL ATT BILDA EN BARTENDER PROFIL OCH ÄGER RUM I POZZUOLO DEL FRIULI (UD). (Swedish)
4 July 2022
0 references
PRAKTIKA PIPOLI PROGRAMMIS – PROJEKT OCCUPABILIT. SEE KESTAB 6 KUUD, SELLE EESMÄRK ON MOODUSTADA BAARMEN PROFIILI JA TOIMUB POZZUOLO DEL FRIULI (UD). (Estonian)
4 July 2022
0 references
POZZUOLO DEL FRIULI
0 references
8 April 2023
0 references
Identifiers
D68I19000510009
0 references