* bonding (Q2043973): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Label in wikidata changed)
(‎Changed label, description and/or aliases in pt)
 
(22 intermediate revisions by 2 users not shown)
label / frlabel / fr
 
*individuel* INCLUDING
label / nllabel / nl
 
*individueel* INCLUDING
label / delabel / de
 
*individuell* INCLUDING
label / eslabel / es
 
*individual* INCLUIDO
label / dalabel / da
 
* binding
label / ellabel / el
 
* σύνδεση
label / hrlabel / hr
 
* lijepljenje
label / rolabel / ro
 
* lipirea
label / sklabel / sk
 
* lepenie
label / mtlabel / mt
 
* l-irbit
label / ptlabel / pt
 
* ligação
label / filabel / fi
 
* liimaus
label / pllabel / pl
 
* klejenie
label / sllabel / sl
 
* lepljenje
label / cslabel / cs
 
* lepení
label / ltlabel / lt
 
* klijavimas
label / lvlabel / lv
 
* līmēšana
label / bglabel / bg
 
* свързване
label / hulabel / hu
 
* kötés
label / galabel / ga
 
* nascáil
label / svlabel / sv
 
* bindning
label / etlabel / et
 
* liimimine
description / endescription / en
Project in Italy financed by DG Regio
Project Q2043973 in Italy
description / itdescription / it
Progetto in Italia finanziato da DG Regio
Progetto Q2043973 in Italia
description / bgdescription / bg
 
Проект Q2043973 в Италия
description / hrdescription / hr
 
Projekt Q2043973 u Italiji
description / hudescription / hu
 
Projekt Q2043973 Olaszországban
description / csdescription / cs
 
Projekt Q2043973 v Itálii
description / dadescription / da
 
Projekt Q2043973 i Italien
description / nldescription / nl
 
Project Q2043973 in Italië
description / etdescription / et
 
Projekt Q2043973 Itaalias
description / fidescription / fi
 
Projekti Q2043973 Italiassa
description / frdescription / fr
 
Projet Q2043973 en Italie
description / dedescription / de
 
Projekt Q2043973 in Italien
description / eldescription / el
 
Έργο Q2043973 στην Ιταλία
description / gadescription / ga
 
Tionscadal Q2043973 san Iodáil
description / lvdescription / lv
 
Projekts Q2043973 Itālijā
description / ltdescription / lt
 
Projektas Q2043973 Italijoje
description / mtdescription / mt
 
Proġett Q2043973 fl-Italja
description / pldescription / pl
 
Projekt Q2043973 we Włoszech
description / ptdescription / pt
 
Projeto Q2043973 na Itália
description / rodescription / ro
 
Proiectul Q2043973 în Italia
description / skdescription / sk
 
Projekt Q2043973 v Taliansku
description / sldescription / sl
 
Projekt Q2043973 v Italiji
description / esdescription / es
 
Proyecto Q2043973 en Italia
description / svdescription / sv
 
Projekt Q2043973 i Italien
Property / financed by
 
Property / financed by: Directorate-General for Regional and Urban Policy / rank
Normal rank
 
Property / EU contribution
22,500.0 Euro
Amount22,500.0 Euro
UnitEuro
 
Property / EU contribution: 22,500.0 Euro / rank
Normal rank
 
Property / budget
45,000.0 Euro
Amount45,000.0 Euro
UnitEuro
 
Property / budget: 45,000.0 Euro / rank
Normal rank
 
Property / co-financing rate
50.0 percent
Amount50.0 percent
Unitpercent
 
Property / co-financing rate: 50.0 percent / rank
Normal rank
 
Property / end time
30 January 2019
Timestamp+2019-01-30T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
 
Property / end time: 30 January 2019 / rank
Normal rank
 
Property / beneficiary name (string)
CISAPLAST S.P.A.
 
Property / beneficiary name (string): CISAPLAST S.P.A. / rank
Normal rank
 
Property / beneficiary
 
Property / beneficiary: Q286119 / rank
Normal rank
 
Property / contained in Local Administrative Unit
 
Property / contained in Local Administrative Unit: Suzzara / rank
 
Normal rank
Property / summary
 
THE PROJECT IS PART OF A FOUR-YEAR BUSINESS PLAN WHICH IS DIVIDED INTO THE FOLLOWING STAGES: 1. Installation of an individual * of bonding PORT TO DUE EXISTS (2 SEMESTRE 2016) 2. THE ASSEMBLY OF THE FRAME ASSEMBLY UNIT IN A NEW PRODUCTION SITE AND THE RESULTING RECONFIGURATION OF THE PRODUCTION LAYOUT OF THE FINAL ASSEMBLY OF THE DOORS (1 SEMESTERS 2017) 3. REPLACEMENT OF ONE OF THE TWO EXISTING ROBOT-BONDING ISLANDS (English)
Property / summary: THE PROJECT IS PART OF A FOUR-YEAR BUSINESS PLAN WHICH IS DIVIDED INTO THE FOLLOWING STAGES: 1. Installation of an individual * of bonding PORT TO DUE EXISTS (2 SEMESTRE 2016) 2. THE ASSEMBLY OF THE FRAME ASSEMBLY UNIT IN A NEW PRODUCTION SITE AND THE RESULTING RECONFIGURATION OF THE PRODUCTION LAYOUT OF THE FINAL ASSEMBLY OF THE DOORS (1 SEMESTERS 2017) 3. REPLACEMENT OF ONE OF THE TWO EXISTING ROBOT-BONDING ISLANDS (English) / rank
 
Normal rank
Property / summary: THE PROJECT IS PART OF A FOUR-YEAR BUSINESS PLAN WHICH IS DIVIDED INTO THE FOLLOWING STAGES: 1. Installation of an individual * of bonding PORT TO DUE EXISTS (2 SEMESTRE 2016) 2. THE ASSEMBLY OF THE FRAME ASSEMBLY UNIT IN A NEW PRODUCTION SITE AND THE RESULTING RECONFIGURATION OF THE PRODUCTION LAYOUT OF THE FINAL ASSEMBLY OF THE DOORS (1 SEMESTERS 2017) 3. REPLACEMENT OF ONE OF THE TWO EXISTING ROBOT-BONDING ISLANDS (English) / qualifier
 
readability score: 0.0122541956509985
Amount0.0122541956509985
Unit1
Property / summary
 
LE PROJET FAISAIT PARTIE D’UN PLAN D’ACTIVITÉS QUADRIENNAL ARTICULÉ AUX ÉTAPES SUIVANTES:1. Installation D’UN *individuel* INCLUDING PORTS AJOURS À DEUX PORTS existants (2 semestre 2016)2. DÉPLACER LES CADRES DU DÉPARTEMENT DE L’ASSEMBLAGE VERS UN NOUVEAU SITE DE PRODUCTION ET, PAR LA SUITE, RECONFIGURER LA CONFIGURATION DE PRODUCTION DU DÉPARTEMENT DE L’ASSEMBLAGE FINAL DES PORTES (1 SEMESTRE 2017)3. REMPLACEMENT DE L’UNE DES DEUX ÎLES DE LIAISON ROBOTIQUE EXISTANTES (French)
Property / summary: LE PROJET FAISAIT PARTIE D’UN PLAN D’ACTIVITÉS QUADRIENNAL ARTICULÉ AUX ÉTAPES SUIVANTES:1. Installation D’UN *individuel* INCLUDING PORTS AJOURS À DEUX PORTS existants (2 semestre 2016)2. DÉPLACER LES CADRES DU DÉPARTEMENT DE L’ASSEMBLAGE VERS UN NOUVEAU SITE DE PRODUCTION ET, PAR LA SUITE, RECONFIGURER LA CONFIGURATION DE PRODUCTION DU DÉPARTEMENT DE L’ASSEMBLAGE FINAL DES PORTES (1 SEMESTRE 2017)3. REMPLACEMENT DE L’UNE DES DEUX ÎLES DE LIAISON ROBOTIQUE EXISTANTES (French) / rank
 
Normal rank
Property / summary: LE PROJET FAISAIT PARTIE D’UN PLAN D’ACTIVITÉS QUADRIENNAL ARTICULÉ AUX ÉTAPES SUIVANTES:1. Installation D’UN *individuel* INCLUDING PORTS AJOURS À DEUX PORTS existants (2 semestre 2016)2. DÉPLACER LES CADRES DU DÉPARTEMENT DE L’ASSEMBLAGE VERS UN NOUVEAU SITE DE PRODUCTION ET, PAR LA SUITE, RECONFIGURER LA CONFIGURATION DE PRODUCTION DU DÉPARTEMENT DE L’ASSEMBLAGE FINAL DES PORTES (1 SEMESTRE 2017)3. REMPLACEMENT DE L’UNE DES DEUX ÎLES DE LIAISON ROBOTIQUE EXISTANTES (French) / qualifier
 
point in time: 16 December 2021
Timestamp+2021-12-16T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
HET PROJECT MAAKTE DEEL UIT VAN EEN VIERJARIG BUSINESSPLAN DAT IN DE VOLGENDE STAPPEN IS UITGEWERKT:1. Installatie van een *individuele* INCLUDING PORTS TWEE existents (2 semestre 2016)2. HET VERPLAATSEN VAN DE FRAMES VAN DE AFDELING ASSEMBLAGE NAAR EEN NIEUWE PRODUCTIELOCATIE EN DE DAARUIT VOORTVLOEIENDE HERCONFIGURATIE VAN DE PRODUCTIE-INDELING VAN DE DEFINITIEVE AFDELING ASSEMBLAGE VAN DE DEUREN (1 SEMESTER 2017)3. VERVANGING VAN EEN VAN DE TWEE BESTAANDE ROBOTGEBONDEN EILANDEN (Dutch)
Property / summary: HET PROJECT MAAKTE DEEL UIT VAN EEN VIERJARIG BUSINESSPLAN DAT IN DE VOLGENDE STAPPEN IS UITGEWERKT:1. Installatie van een *individuele* INCLUDING PORTS TWEE existents (2 semestre 2016)2. HET VERPLAATSEN VAN DE FRAMES VAN DE AFDELING ASSEMBLAGE NAAR EEN NIEUWE PRODUCTIELOCATIE EN DE DAARUIT VOORTVLOEIENDE HERCONFIGURATIE VAN DE PRODUCTIE-INDELING VAN DE DEFINITIEVE AFDELING ASSEMBLAGE VAN DE DEUREN (1 SEMESTER 2017)3. VERVANGING VAN EEN VAN DE TWEE BESTAANDE ROBOTGEBONDEN EILANDEN (Dutch) / rank
 
Normal rank
Property / summary: HET PROJECT MAAKTE DEEL UIT VAN EEN VIERJARIG BUSINESSPLAN DAT IN DE VOLGENDE STAPPEN IS UITGEWERKT:1. Installatie van een *individuele* INCLUDING PORTS TWEE existents (2 semestre 2016)2. HET VERPLAATSEN VAN DE FRAMES VAN DE AFDELING ASSEMBLAGE NAAR EEN NIEUWE PRODUCTIELOCATIE EN DE DAARUIT VOORTVLOEIENDE HERCONFIGURATIE VAN DE PRODUCTIE-INDELING VAN DE DEFINITIEVE AFDELING ASSEMBLAGE VAN DE DEUREN (1 SEMESTER 2017)3. VERVANGING VAN EEN VAN DE TWEE BESTAANDE ROBOTGEBONDEN EILANDEN (Dutch) / qualifier
 
point in time: 23 December 2021
Timestamp+2021-12-23T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
DAS PROJEKT WAR IN EINEM VIERJÄHRIGEN GESCHÄFTSPLAN ENTHALTEN, DER IN DEN FOLGENDEN SCHRITTEN:1 FORMULIERT WURDE. Installation von A *individuell* INCLUDING PORTS AN TWO existenten (2 semestre 2016)2. UMZUG DER MONTAGEABTEILUNG AUF EINE NEUE PRODUKTIONSSTÄTTE UND KONSEQUENTE NEUKONFIGURATION DES PRODUKTIONSLAYOUTS DER ENDGÜLTIGEN MONTAGEABTEILUNG DER TÜREN (1 HALBJAHR 2017)3. ERSATZ EINER DER BEIDEN BESTEHENDEN ROBOTIC BONDING ISLANDS (German)
Property / summary: DAS PROJEKT WAR IN EINEM VIERJÄHRIGEN GESCHÄFTSPLAN ENTHALTEN, DER IN DEN FOLGENDEN SCHRITTEN:1 FORMULIERT WURDE. Installation von A *individuell* INCLUDING PORTS AN TWO existenten (2 semestre 2016)2. UMZUG DER MONTAGEABTEILUNG AUF EINE NEUE PRODUKTIONSSTÄTTE UND KONSEQUENTE NEUKONFIGURATION DES PRODUKTIONSLAYOUTS DER ENDGÜLTIGEN MONTAGEABTEILUNG DER TÜREN (1 HALBJAHR 2017)3. ERSATZ EINER DER BEIDEN BESTEHENDEN ROBOTIC BONDING ISLANDS (German) / rank
 
Normal rank
Property / summary: DAS PROJEKT WAR IN EINEM VIERJÄHRIGEN GESCHÄFTSPLAN ENTHALTEN, DER IN DEN FOLGENDEN SCHRITTEN:1 FORMULIERT WURDE. Installation von A *individuell* INCLUDING PORTS AN TWO existenten (2 semestre 2016)2. UMZUG DER MONTAGEABTEILUNG AUF EINE NEUE PRODUKTIONSSTÄTTE UND KONSEQUENTE NEUKONFIGURATION DES PRODUKTIONSLAYOUTS DER ENDGÜLTIGEN MONTAGEABTEILUNG DER TÜREN (1 HALBJAHR 2017)3. ERSATZ EINER DER BEIDEN BESTEHENDEN ROBOTIC BONDING ISLANDS (German) / qualifier
 
point in time: 24 December 2021
Timestamp+2021-12-24T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
EL PROYECTO SE INCLUYÓ EN UN PLAN DE ACTIVIDADES CUATRIENAL ARTICULADO EN LOS SIGUIENTES PASOS:1. Instalación de un *individual* INCLUIDO PORTOS A DOS Existentes (2 semestre 2016)2. TRASLADAR LOS MARCOS DEL DEPARTAMENTO DE ENSAMBLE A UN NUEVO LUGAR DE PRODUCCIÓN Y LA CONSIGUIENTE RECONFIGURACIÓN DE LA DISTRIBUCIÓN DE LA PRODUCCIÓN DEL DEPARTAMENTO DE MONTAJE FINAL DE LAS PUERTAS (1 SEMESTRE DE 2017)3. SUSTITUCIÓN DE UNA DE LAS DOS ISLAS DE UNIÓN ROBÓTICA EXISTENTES (Spanish)
Property / summary: EL PROYECTO SE INCLUYÓ EN UN PLAN DE ACTIVIDADES CUATRIENAL ARTICULADO EN LOS SIGUIENTES PASOS:1. Instalación de un *individual* INCLUIDO PORTOS A DOS Existentes (2 semestre 2016)2. TRASLADAR LOS MARCOS DEL DEPARTAMENTO DE ENSAMBLE A UN NUEVO LUGAR DE PRODUCCIÓN Y LA CONSIGUIENTE RECONFIGURACIÓN DE LA DISTRIBUCIÓN DE LA PRODUCCIÓN DEL DEPARTAMENTO DE MONTAJE FINAL DE LAS PUERTAS (1 SEMESTRE DE 2017)3. SUSTITUCIÓN DE UNA DE LAS DOS ISLAS DE UNIÓN ROBÓTICA EXISTENTES (Spanish) / rank
 
Normal rank
Property / summary: EL PROYECTO SE INCLUYÓ EN UN PLAN DE ACTIVIDADES CUATRIENAL ARTICULADO EN LOS SIGUIENTES PASOS:1. Instalación de un *individual* INCLUIDO PORTOS A DOS Existentes (2 semestre 2016)2. TRASLADAR LOS MARCOS DEL DEPARTAMENTO DE ENSAMBLE A UN NUEVO LUGAR DE PRODUCCIÓN Y LA CONSIGUIENTE RECONFIGURACIÓN DE LA DISTRIBUCIÓN DE LA PRODUCCIÓN DEL DEPARTAMENTO DE MONTAJE FINAL DE LAS PUERTAS (1 SEMESTRE DE 2017)3. SUSTITUCIÓN DE UNA DE LAS DOS ISLAS DE UNIÓN ROBÓTICA EXISTENTES (Spanish) / qualifier
 
point in time: 25 January 2022
Timestamp+2022-01-25T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
PROJEKTET INDGÅR I EN FIREÅRIG FORRETNINGSPLAN, SOM ER OPDELT I FØLGENDE FASER: 1. Installation af en person * af bonding PORT TO DUE EXISTS (2 semestre 2016) 2. MONTERING AF RAMMEMONTERINGSENHEDEN I ET NYT PRODUKTIONSANLÆG OG DEN DERAF FØLGENDE OMKONFIGURERING AF PRODUKTIONSLAYOUTET FOR DEN ENDELIGE MONTAGE AF DØRENE (1. SEMESTRE 2017) 3. UDSKIFTNING AF EN AF DE TO EKSISTERENDE ROBOT-BONDING ISLANDS (Danish)
Property / summary: PROJEKTET INDGÅR I EN FIREÅRIG FORRETNINGSPLAN, SOM ER OPDELT I FØLGENDE FASER: 1. Installation af en person * af bonding PORT TO DUE EXISTS (2 semestre 2016) 2. MONTERING AF RAMMEMONTERINGSENHEDEN I ET NYT PRODUKTIONSANLÆG OG DEN DERAF FØLGENDE OMKONFIGURERING AF PRODUKTIONSLAYOUTET FOR DEN ENDELIGE MONTAGE AF DØRENE (1. SEMESTRE 2017) 3. UDSKIFTNING AF EN AF DE TO EKSISTERENDE ROBOT-BONDING ISLANDS (Danish) / rank
 
Normal rank
Property / summary: PROJEKTET INDGÅR I EN FIREÅRIG FORRETNINGSPLAN, SOM ER OPDELT I FØLGENDE FASER: 1. Installation af en person * af bonding PORT TO DUE EXISTS (2 semestre 2016) 2. MONTERING AF RAMMEMONTERINGSENHEDEN I ET NYT PRODUKTIONSANLÆG OG DEN DERAF FØLGENDE OMKONFIGURERING AF PRODUKTIONSLAYOUTET FOR DEN ENDELIGE MONTAGE AF DØRENE (1. SEMESTRE 2017) 3. UDSKIFTNING AF EN AF DE TO EKSISTERENDE ROBOT-BONDING ISLANDS (Danish) / qualifier
 
point in time: 5 July 2022
Timestamp+2022-07-05T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
ΤΟ ΈΡΓΟ ΕΝΤΆΣΣΕΤΑΙ ΣΕ ΈΝΑ ΤΕΤΡΑΕΤΈΣ ΕΠΙΧΕΙΡΗΜΑΤΙΚΌ ΣΧΈΔΙΟ, ΤΟ ΟΠΟΊΟ ΧΩΡΊΖΕΤΑΙ ΣΤΑ ΑΚΌΛΟΥΘΑ ΣΤΆΔΙΑ: 1. Εγκατάσταση ενός ατόμου * της σύνδεσης PORT TO DUE EXISTS (2 semestre 2016) 2. Η ΣΥΝΑΡΜΟΛΌΓΗΣΗ ΤΗΣ ΜΟΝΆΔΑΣ ΣΥΝΑΡΜΟΛΌΓΗΣΗΣ ΠΛΑΙΣΊΩΝ ΣΕ ΝΈΟ ΧΏΡΟ ΠΑΡΑΓΩΓΉΣ ΚΑΙ Η ΣΥΝΑΚΌΛΟΥΘΗ ΑΝΑΔΙΑΜΌΡΦΩΣΗ ΤΗΣ ΔΙΆΤΑΞΗΣ ΠΑΡΑΓΩΓΉΣ ΤΗΣ ΤΕΛΙΚΉΣ ΣΥΝΑΡΜΟΛΌΓΗΣΗΣ ΤΩΝ ΘΥΡΏΝ (1 ΕΞΆΜΗΝΑ 2017) 3. ΑΝΤΙΚΑΤΆΣΤΑΣΗ ΕΝΌΣ ΑΠΌ ΤΑ ΔΎΟ ΥΦΙΣΤΆΜΕΝΑ ΝΗΣΙΆ ΡΟΜΠΌΤ-ΔΕΣΜΏΝ (Greek)
Property / summary: ΤΟ ΈΡΓΟ ΕΝΤΆΣΣΕΤΑΙ ΣΕ ΈΝΑ ΤΕΤΡΑΕΤΈΣ ΕΠΙΧΕΙΡΗΜΑΤΙΚΌ ΣΧΈΔΙΟ, ΤΟ ΟΠΟΊΟ ΧΩΡΊΖΕΤΑΙ ΣΤΑ ΑΚΌΛΟΥΘΑ ΣΤΆΔΙΑ: 1. Εγκατάσταση ενός ατόμου * της σύνδεσης PORT TO DUE EXISTS (2 semestre 2016) 2. Η ΣΥΝΑΡΜΟΛΌΓΗΣΗ ΤΗΣ ΜΟΝΆΔΑΣ ΣΥΝΑΡΜΟΛΌΓΗΣΗΣ ΠΛΑΙΣΊΩΝ ΣΕ ΝΈΟ ΧΏΡΟ ΠΑΡΑΓΩΓΉΣ ΚΑΙ Η ΣΥΝΑΚΌΛΟΥΘΗ ΑΝΑΔΙΑΜΌΡΦΩΣΗ ΤΗΣ ΔΙΆΤΑΞΗΣ ΠΑΡΑΓΩΓΉΣ ΤΗΣ ΤΕΛΙΚΉΣ ΣΥΝΑΡΜΟΛΌΓΗΣΗΣ ΤΩΝ ΘΥΡΏΝ (1 ΕΞΆΜΗΝΑ 2017) 3. ΑΝΤΙΚΑΤΆΣΤΑΣΗ ΕΝΌΣ ΑΠΌ ΤΑ ΔΎΟ ΥΦΙΣΤΆΜΕΝΑ ΝΗΣΙΆ ΡΟΜΠΌΤ-ΔΕΣΜΏΝ (Greek) / rank
 
Normal rank
Property / summary: ΤΟ ΈΡΓΟ ΕΝΤΆΣΣΕΤΑΙ ΣΕ ΈΝΑ ΤΕΤΡΑΕΤΈΣ ΕΠΙΧΕΙΡΗΜΑΤΙΚΌ ΣΧΈΔΙΟ, ΤΟ ΟΠΟΊΟ ΧΩΡΊΖΕΤΑΙ ΣΤΑ ΑΚΌΛΟΥΘΑ ΣΤΆΔΙΑ: 1. Εγκατάσταση ενός ατόμου * της σύνδεσης PORT TO DUE EXISTS (2 semestre 2016) 2. Η ΣΥΝΑΡΜΟΛΌΓΗΣΗ ΤΗΣ ΜΟΝΆΔΑΣ ΣΥΝΑΡΜΟΛΌΓΗΣΗΣ ΠΛΑΙΣΊΩΝ ΣΕ ΝΈΟ ΧΏΡΟ ΠΑΡΑΓΩΓΉΣ ΚΑΙ Η ΣΥΝΑΚΌΛΟΥΘΗ ΑΝΑΔΙΑΜΌΡΦΩΣΗ ΤΗΣ ΔΙΆΤΑΞΗΣ ΠΑΡΑΓΩΓΉΣ ΤΗΣ ΤΕΛΙΚΉΣ ΣΥΝΑΡΜΟΛΌΓΗΣΗΣ ΤΩΝ ΘΥΡΏΝ (1 ΕΞΆΜΗΝΑ 2017) 3. ΑΝΤΙΚΑΤΆΣΤΑΣΗ ΕΝΌΣ ΑΠΌ ΤΑ ΔΎΟ ΥΦΙΣΤΆΜΕΝΑ ΝΗΣΙΆ ΡΟΜΠΌΤ-ΔΕΣΜΏΝ (Greek) / qualifier
 
point in time: 5 July 2022
Timestamp+2022-07-05T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
PROJEKT JE DIO ČETVEROGODIŠNJEG POSLOVNOG PLANA KOJI JE PODIJELJEN NA SLJEDEĆE FAZE: 1. Ugradnja pojedinca * lijepljenja PORT TO DUE EXISTS (2 semestre 2016) 2. MONTAŽA SKUPŠTINE OKVIRA U NOVOM PROIZVODNOM POGONU I POSLJEDIČNA REKONFIGURACIJA PROIZVODNOG RASPOREDA ZAVRŠNOG MONTAŽE VRATA (1 SEMESTAR 2017.) 3. ZAMJENA JEDNOG OD DVA POSTOJEĆA OTOKA ZA ROBOTE (Croatian)
Property / summary: PROJEKT JE DIO ČETVEROGODIŠNJEG POSLOVNOG PLANA KOJI JE PODIJELJEN NA SLJEDEĆE FAZE: 1. Ugradnja pojedinca * lijepljenja PORT TO DUE EXISTS (2 semestre 2016) 2. MONTAŽA SKUPŠTINE OKVIRA U NOVOM PROIZVODNOM POGONU I POSLJEDIČNA REKONFIGURACIJA PROIZVODNOG RASPOREDA ZAVRŠNOG MONTAŽE VRATA (1 SEMESTAR 2017.) 3. ZAMJENA JEDNOG OD DVA POSTOJEĆA OTOKA ZA ROBOTE (Croatian) / rank
 
Normal rank
Property / summary: PROJEKT JE DIO ČETVEROGODIŠNJEG POSLOVNOG PLANA KOJI JE PODIJELJEN NA SLJEDEĆE FAZE: 1. Ugradnja pojedinca * lijepljenja PORT TO DUE EXISTS (2 semestre 2016) 2. MONTAŽA SKUPŠTINE OKVIRA U NOVOM PROIZVODNOM POGONU I POSLJEDIČNA REKONFIGURACIJA PROIZVODNOG RASPOREDA ZAVRŠNOG MONTAŽE VRATA (1 SEMESTAR 2017.) 3. ZAMJENA JEDNOG OD DVA POSTOJEĆA OTOKA ZA ROBOTE (Croatian) / qualifier
 
point in time: 5 July 2022
Timestamp+2022-07-05T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
PROIECTUL FACE PARTE DINTR-UN PLAN DE AFACERI PE PATRU ANI, CARE ESTE ÎMPĂRȚIT ÎN URMĂTOARELE ETAPE: 1. Instalarea unui individ * de lipire PORT LA DUE EXISTS (2 semestre 2016) 2. ASAMBLAREA ANSAMBLULUI CADRU ÎNTR-UN NOU LOC DE PRODUCȚIE ȘI RECONFIGURAREA REZULTATĂ A STRUCTURII DE PRODUCȚIE A ANSAMBLULUI FINAL AL UȘILOR (1 SEMESTRE 2017) 3. ÎNLOCUIREA UNEIA DINTRE CELE DOUĂ INSULE EXISTENTE DE LEGARE A ROBOȚILOR (Romanian)
Property / summary: PROIECTUL FACE PARTE DINTR-UN PLAN DE AFACERI PE PATRU ANI, CARE ESTE ÎMPĂRȚIT ÎN URMĂTOARELE ETAPE: 1. Instalarea unui individ * de lipire PORT LA DUE EXISTS (2 semestre 2016) 2. ASAMBLAREA ANSAMBLULUI CADRU ÎNTR-UN NOU LOC DE PRODUCȚIE ȘI RECONFIGURAREA REZULTATĂ A STRUCTURII DE PRODUCȚIE A ANSAMBLULUI FINAL AL UȘILOR (1 SEMESTRE 2017) 3. ÎNLOCUIREA UNEIA DINTRE CELE DOUĂ INSULE EXISTENTE DE LEGARE A ROBOȚILOR (Romanian) / rank
 
Normal rank
Property / summary: PROIECTUL FACE PARTE DINTR-UN PLAN DE AFACERI PE PATRU ANI, CARE ESTE ÎMPĂRȚIT ÎN URMĂTOARELE ETAPE: 1. Instalarea unui individ * de lipire PORT LA DUE EXISTS (2 semestre 2016) 2. ASAMBLAREA ANSAMBLULUI CADRU ÎNTR-UN NOU LOC DE PRODUCȚIE ȘI RECONFIGURAREA REZULTATĂ A STRUCTURII DE PRODUCȚIE A ANSAMBLULUI FINAL AL UȘILOR (1 SEMESTRE 2017) 3. ÎNLOCUIREA UNEIA DINTRE CELE DOUĂ INSULE EXISTENTE DE LEGARE A ROBOȚILOR (Romanian) / qualifier
 
point in time: 5 July 2022
Timestamp+2022-07-05T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
PROJEKT JE SÚČASŤOU ŠTVORROČNÉHO PODNIKATEĽSKÉHO PLÁNU, KTORÝ JE ROZDELENÝ DO NASLEDUJÚCICH ETÁP: 1. Inštalácia jednotlivca * lepenie PORT TO DUE EXISTS (2 semestre 2016) 2. MONTÁŽ RÁMOVEJ MONTÁŽNEJ JEDNOTKY V NOVOM VÝROBNOM ZÁVODE A VÝSLEDNÁ REKONFIGURÁCIA VÝROBNÉHO USPORIADANIA FINÁLNEJ MONTÁŽE DVERÍ (1 SEMESTRE 2017) 3. NAHRADENIE JEDNÉHO Z DVOCH EXISTUJÚCICH ROBOTICKÝCH OSTROVOV (Slovak)
Property / summary: PROJEKT JE SÚČASŤOU ŠTVORROČNÉHO PODNIKATEĽSKÉHO PLÁNU, KTORÝ JE ROZDELENÝ DO NASLEDUJÚCICH ETÁP: 1. Inštalácia jednotlivca * lepenie PORT TO DUE EXISTS (2 semestre 2016) 2. MONTÁŽ RÁMOVEJ MONTÁŽNEJ JEDNOTKY V NOVOM VÝROBNOM ZÁVODE A VÝSLEDNÁ REKONFIGURÁCIA VÝROBNÉHO USPORIADANIA FINÁLNEJ MONTÁŽE DVERÍ (1 SEMESTRE 2017) 3. NAHRADENIE JEDNÉHO Z DVOCH EXISTUJÚCICH ROBOTICKÝCH OSTROVOV (Slovak) / rank
 
Normal rank
Property / summary: PROJEKT JE SÚČASŤOU ŠTVORROČNÉHO PODNIKATEĽSKÉHO PLÁNU, KTORÝ JE ROZDELENÝ DO NASLEDUJÚCICH ETÁP: 1. Inštalácia jednotlivca * lepenie PORT TO DUE EXISTS (2 semestre 2016) 2. MONTÁŽ RÁMOVEJ MONTÁŽNEJ JEDNOTKY V NOVOM VÝROBNOM ZÁVODE A VÝSLEDNÁ REKONFIGURÁCIA VÝROBNÉHO USPORIADANIA FINÁLNEJ MONTÁŽE DVERÍ (1 SEMESTRE 2017) 3. NAHRADENIE JEDNÉHO Z DVOCH EXISTUJÚCICH ROBOTICKÝCH OSTROVOV (Slovak) / qualifier
 
point in time: 5 July 2022
Timestamp+2022-07-05T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
IL-PROĠETT HUWA PARTI MINN PJAN TA’ NEGOZJU TA’ ERBA’ SNIN LI HUWA MAQSUM FL-ISTADJI LI ĠEJJIN: 1. Installazzjoni ta’ individwu * ta’ PORT ta’ twaħħil GĦANDU EŻISTI (2 semestre 2016) 2. L-ASSEMBLEA TAL-UNITÀ TAL-ASSEMBLAĠĠ TAL-QAFAS F’SIT TA’ PRODUZZJONI ĠDID U L-KONFIGURAZZJONI MILL-ĠDID LI TIRRIŻULTA TAT-TQASSIM TAL-PRODUZZJONI TAL-ASSEMBLEA FINALI TAL-BIBIEN (1 SEMESTRI 2017) 3. SOSTITUZZJONI TA’ WAĦDA MIŻ-ŻEWĠ GŻEJJER EŻISTENTI LI JGĦAQQDU R-ROBOTS (Maltese)
Property / summary: IL-PROĠETT HUWA PARTI MINN PJAN TA’ NEGOZJU TA’ ERBA’ SNIN LI HUWA MAQSUM FL-ISTADJI LI ĠEJJIN: 1. Installazzjoni ta’ individwu * ta’ PORT ta’ twaħħil GĦANDU EŻISTI (2 semestre 2016) 2. L-ASSEMBLEA TAL-UNITÀ TAL-ASSEMBLAĠĠ TAL-QAFAS F’SIT TA’ PRODUZZJONI ĠDID U L-KONFIGURAZZJONI MILL-ĠDID LI TIRRIŻULTA TAT-TQASSIM TAL-PRODUZZJONI TAL-ASSEMBLEA FINALI TAL-BIBIEN (1 SEMESTRI 2017) 3. SOSTITUZZJONI TA’ WAĦDA MIŻ-ŻEWĠ GŻEJJER EŻISTENTI LI JGĦAQQDU R-ROBOTS (Maltese) / rank
 
Normal rank
Property / summary: IL-PROĠETT HUWA PARTI MINN PJAN TA’ NEGOZJU TA’ ERBA’ SNIN LI HUWA MAQSUM FL-ISTADJI LI ĠEJJIN: 1. Installazzjoni ta’ individwu * ta’ PORT ta’ twaħħil GĦANDU EŻISTI (2 semestre 2016) 2. L-ASSEMBLEA TAL-UNITÀ TAL-ASSEMBLAĠĠ TAL-QAFAS F’SIT TA’ PRODUZZJONI ĠDID U L-KONFIGURAZZJONI MILL-ĠDID LI TIRRIŻULTA TAT-TQASSIM TAL-PRODUZZJONI TAL-ASSEMBLEA FINALI TAL-BIBIEN (1 SEMESTRI 2017) 3. SOSTITUZZJONI TA’ WAĦDA MIŻ-ŻEWĠ GŻEJJER EŻISTENTI LI JGĦAQQDU R-ROBOTS (Maltese) / qualifier
 
point in time: 5 July 2022
Timestamp+2022-07-05T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
O PROJETO faz parte de um PLANO DE ATIVIDADE DE QUATRO ANOS, DIVIDIDO NAS SEGUINTES FASES: 1. Instalação de um indivíduo * de ligação PORTO A DEVIDA EXISTE (2 SEMESTRE 2016) 2. A ASSEMBLEIA DA UNIDADE-QUADRO NUM NOVO SÍTIO DE PRODUÇÃO E A RECONFIGURAÇÃO RESULTANTE DA PRODUÇÃO ESTABELECIDA DA ASSEMBLEIA FINAL DAS PORTAS (1 SEMESTROS 2017) 3. SUBSTITUIÇÃO DE UMA DAS DOIS ILHAS LIGADORAS A ROBOT EXISTENTES (Portuguese)
Property / summary: O PROJETO faz parte de um PLANO DE ATIVIDADE DE QUATRO ANOS, DIVIDIDO NAS SEGUINTES FASES: 1. Instalação de um indivíduo * de ligação PORTO A DEVIDA EXISTE (2 SEMESTRE 2016) 2. A ASSEMBLEIA DA UNIDADE-QUADRO NUM NOVO SÍTIO DE PRODUÇÃO E A RECONFIGURAÇÃO RESULTANTE DA PRODUÇÃO ESTABELECIDA DA ASSEMBLEIA FINAL DAS PORTAS (1 SEMESTROS 2017) 3. SUBSTITUIÇÃO DE UMA DAS DOIS ILHAS LIGADORAS A ROBOT EXISTENTES (Portuguese) / rank
 
Normal rank
Property / summary: O PROJETO faz parte de um PLANO DE ATIVIDADE DE QUATRO ANOS, DIVIDIDO NAS SEGUINTES FASES: 1. Instalação de um indivíduo * de ligação PORTO A DEVIDA EXISTE (2 SEMESTRE 2016) 2. A ASSEMBLEIA DA UNIDADE-QUADRO NUM NOVO SÍTIO DE PRODUÇÃO E A RECONFIGURAÇÃO RESULTANTE DA PRODUÇÃO ESTABELECIDA DA ASSEMBLEIA FINAL DAS PORTAS (1 SEMESTROS 2017) 3. SUBSTITUIÇÃO DE UMA DAS DOIS ILHAS LIGADORAS A ROBOT EXISTENTES (Portuguese) / qualifier
 
point in time: 5 July 2022
Timestamp+2022-07-05T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
HANKE ON OSA NELIVUOTISTA LIIKETOIMINTASUUNNITELMAA, JOKA JAKAUTUU SEURAAVIIN VAIHEISIIN: 1. Asennus yksittäisen * liimaus PORT TO DUE EXISTS (2 semestre 2016) 2. KOKOONPANOYKSIKÖN KOKOONPANO UUDESSA TUOTANTOPAIKASSA JA TULOKSENA TUOTANNON UUDELLEENJÄRJESTELY LOPULLISEN KOKOONPANON OVIEN (1 LUKUKAUSI 2017) 3. JOMMANKUMMAN KAHDESTA OLEMASSA OLEVASTA ROBOTTISIDONTASAARESTA KORVAAMINEN (Finnish)
Property / summary: HANKE ON OSA NELIVUOTISTA LIIKETOIMINTASUUNNITELMAA, JOKA JAKAUTUU SEURAAVIIN VAIHEISIIN: 1. Asennus yksittäisen * liimaus PORT TO DUE EXISTS (2 semestre 2016) 2. KOKOONPANOYKSIKÖN KOKOONPANO UUDESSA TUOTANTOPAIKASSA JA TULOKSENA TUOTANNON UUDELLEENJÄRJESTELY LOPULLISEN KOKOONPANON OVIEN (1 LUKUKAUSI 2017) 3. JOMMANKUMMAN KAHDESTA OLEMASSA OLEVASTA ROBOTTISIDONTASAARESTA KORVAAMINEN (Finnish) / rank
 
Normal rank
Property / summary: HANKE ON OSA NELIVUOTISTA LIIKETOIMINTASUUNNITELMAA, JOKA JAKAUTUU SEURAAVIIN VAIHEISIIN: 1. Asennus yksittäisen * liimaus PORT TO DUE EXISTS (2 semestre 2016) 2. KOKOONPANOYKSIKÖN KOKOONPANO UUDESSA TUOTANTOPAIKASSA JA TULOKSENA TUOTANNON UUDELLEENJÄRJESTELY LOPULLISEN KOKOONPANON OVIEN (1 LUKUKAUSI 2017) 3. JOMMANKUMMAN KAHDESTA OLEMASSA OLEVASTA ROBOTTISIDONTASAARESTA KORVAAMINEN (Finnish) / qualifier
 
point in time: 5 July 2022
Timestamp+2022-07-05T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
PROJEKT JEST CZĘŚCIĄ CZTEROLETNIEGO BIZNESPLANU, KTÓRY DZIELI SIĘ NA NASTĘPUJĄCE ETAPY: 1. Montaż indywidualnego * PORT PORT DO DUE EXISTS (2 semestr 2016) 2. MONTAŻ ZESPOŁU MONTAŻOWEGO RAMY W NOWYM ZAKŁADZIE PRODUKCYJNYM I WYNIKAJĄCA Z TEGO REKONFIGURACJA UKŁADU PRODUKCYJNEGO KOŃCOWEGO MONTAŻU DRZWI (1 PÓŁROCZE 2017 R.) 3. ZASTĄPIENIE JEDNEJ Z DWÓCH ISTNIEJĄCYCH WYSP ROBOT-BONDING (Polish)
Property / summary: PROJEKT JEST CZĘŚCIĄ CZTEROLETNIEGO BIZNESPLANU, KTÓRY DZIELI SIĘ NA NASTĘPUJĄCE ETAPY: 1. Montaż indywidualnego * PORT PORT DO DUE EXISTS (2 semestr 2016) 2. MONTAŻ ZESPOŁU MONTAŻOWEGO RAMY W NOWYM ZAKŁADZIE PRODUKCYJNYM I WYNIKAJĄCA Z TEGO REKONFIGURACJA UKŁADU PRODUKCYJNEGO KOŃCOWEGO MONTAŻU DRZWI (1 PÓŁROCZE 2017 R.) 3. ZASTĄPIENIE JEDNEJ Z DWÓCH ISTNIEJĄCYCH WYSP ROBOT-BONDING (Polish) / rank
 
Normal rank
Property / summary: PROJEKT JEST CZĘŚCIĄ CZTEROLETNIEGO BIZNESPLANU, KTÓRY DZIELI SIĘ NA NASTĘPUJĄCE ETAPY: 1. Montaż indywidualnego * PORT PORT DO DUE EXISTS (2 semestr 2016) 2. MONTAŻ ZESPOŁU MONTAŻOWEGO RAMY W NOWYM ZAKŁADZIE PRODUKCYJNYM I WYNIKAJĄCA Z TEGO REKONFIGURACJA UKŁADU PRODUKCYJNEGO KOŃCOWEGO MONTAŻU DRZWI (1 PÓŁROCZE 2017 R.) 3. ZASTĄPIENIE JEDNEJ Z DWÓCH ISTNIEJĄCYCH WYSP ROBOT-BONDING (Polish) / qualifier
 
point in time: 5 July 2022
Timestamp+2022-07-05T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
PROJEKT JE DEL ŠTIRILETNEGA POSLOVNEGA NAČRTA, KI JE RAZDELJEN NA NASLEDNJE FAZE: 1. Namestitev posameznega * lepljenja PORT TO DUE EXISTS (2 pol leta 2016) 2. MONTAŽA ENOTE ZA MONTAŽO OKVIRJA V NOVEM PROIZVODNEM OBRATU IN POSLEDIČNA REKONFIGURACIJA PROIZVODNE RAZPOREDITVE KONČNE MONTAŽE VRAT (1 POL LETA 2017) 3. ZAMENJAVA ENEGA OD DVEH OBSTOJEČIH ROBOTSKO VEZANIH OTOKOV (Slovenian)
Property / summary: PROJEKT JE DEL ŠTIRILETNEGA POSLOVNEGA NAČRTA, KI JE RAZDELJEN NA NASLEDNJE FAZE: 1. Namestitev posameznega * lepljenja PORT TO DUE EXISTS (2 pol leta 2016) 2. MONTAŽA ENOTE ZA MONTAŽO OKVIRJA V NOVEM PROIZVODNEM OBRATU IN POSLEDIČNA REKONFIGURACIJA PROIZVODNE RAZPOREDITVE KONČNE MONTAŽE VRAT (1 POL LETA 2017) 3. ZAMENJAVA ENEGA OD DVEH OBSTOJEČIH ROBOTSKO VEZANIH OTOKOV (Slovenian) / rank
 
Normal rank
Property / summary: PROJEKT JE DEL ŠTIRILETNEGA POSLOVNEGA NAČRTA, KI JE RAZDELJEN NA NASLEDNJE FAZE: 1. Namestitev posameznega * lepljenja PORT TO DUE EXISTS (2 pol leta 2016) 2. MONTAŽA ENOTE ZA MONTAŽO OKVIRJA V NOVEM PROIZVODNEM OBRATU IN POSLEDIČNA REKONFIGURACIJA PROIZVODNE RAZPOREDITVE KONČNE MONTAŽE VRAT (1 POL LETA 2017) 3. ZAMENJAVA ENEGA OD DVEH OBSTOJEČIH ROBOTSKO VEZANIH OTOKOV (Slovenian) / qualifier
 
point in time: 5 July 2022
Timestamp+2022-07-05T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
PROJEKT JE SOUČÁSTÍ ČTYŘLETÉHO OBCHODNÍHO PLÁNU, KTERÝ JE ROZDĚLEN DO NÁSLEDUJÍCÍCH FÁZÍ: 1. Instalace jedince * lepení PORT TO DUE EXISTS (2 semestr 2016) 2. MONTÁŽ RÁMOVÉ MONTÁŽNÍ JEDNOTKY V NOVÉM VÝROBNÍM ZÁVODĚ A NÁSLEDNÁ REKONFIGURACE VÝROBNÍHO USPOŘÁDÁNÍ ZÁVĚREČNÉ MONTÁŽE DVEŘÍ (1 SEMESTRY 2017) 3. NAHRAZENÍ JEDNOHO ZE DVOU STÁVAJÍCÍCH OSTROVŮ PRO SPOJENÍ ROBOTŮ (Czech)
Property / summary: PROJEKT JE SOUČÁSTÍ ČTYŘLETÉHO OBCHODNÍHO PLÁNU, KTERÝ JE ROZDĚLEN DO NÁSLEDUJÍCÍCH FÁZÍ: 1. Instalace jedince * lepení PORT TO DUE EXISTS (2 semestr 2016) 2. MONTÁŽ RÁMOVÉ MONTÁŽNÍ JEDNOTKY V NOVÉM VÝROBNÍM ZÁVODĚ A NÁSLEDNÁ REKONFIGURACE VÝROBNÍHO USPOŘÁDÁNÍ ZÁVĚREČNÉ MONTÁŽE DVEŘÍ (1 SEMESTRY 2017) 3. NAHRAZENÍ JEDNOHO ZE DVOU STÁVAJÍCÍCH OSTROVŮ PRO SPOJENÍ ROBOTŮ (Czech) / rank
 
Normal rank
Property / summary: PROJEKT JE SOUČÁSTÍ ČTYŘLETÉHO OBCHODNÍHO PLÁNU, KTERÝ JE ROZDĚLEN DO NÁSLEDUJÍCÍCH FÁZÍ: 1. Instalace jedince * lepení PORT TO DUE EXISTS (2 semestr 2016) 2. MONTÁŽ RÁMOVÉ MONTÁŽNÍ JEDNOTKY V NOVÉM VÝROBNÍM ZÁVODĚ A NÁSLEDNÁ REKONFIGURACE VÝROBNÍHO USPOŘÁDÁNÍ ZÁVĚREČNÉ MONTÁŽE DVEŘÍ (1 SEMESTRY 2017) 3. NAHRAZENÍ JEDNOHO ZE DVOU STÁVAJÍCÍCH OSTROVŮ PRO SPOJENÍ ROBOTŮ (Czech) / qualifier
 
point in time: 5 July 2022
Timestamp+2022-07-05T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
PROJEKTAS YRA KETVERIŲ METŲ VERSLO PLANO DALIS, SUSKIRSTYTA Į ŠIUOS ETAPUS: 1. Individualaus * klijavimo PORT TO DUE EXISTS įrengimas (2 semestre 2016) 2. RĖMO SURINKIMO BLOKO SURINKIMAS NAUJOJE GAMYBOS VIETOJE IR SU TUO SUSIJĘS GALUTINIO DURŲ SURINKIMO GAMYBOS IŠDĖSTYMO PERTVARKYMAS (1 SEMESTRAS 2017 M.) 3. VIENOS IŠ DVIEJŲ ESAMŲ ROBOTŲ SUKIBIMO SALŲ PAKEITIMAS (Lithuanian)
Property / summary: PROJEKTAS YRA KETVERIŲ METŲ VERSLO PLANO DALIS, SUSKIRSTYTA Į ŠIUOS ETAPUS: 1. Individualaus * klijavimo PORT TO DUE EXISTS įrengimas (2 semestre 2016) 2. RĖMO SURINKIMO BLOKO SURINKIMAS NAUJOJE GAMYBOS VIETOJE IR SU TUO SUSIJĘS GALUTINIO DURŲ SURINKIMO GAMYBOS IŠDĖSTYMO PERTVARKYMAS (1 SEMESTRAS 2017 M.) 3. VIENOS IŠ DVIEJŲ ESAMŲ ROBOTŲ SUKIBIMO SALŲ PAKEITIMAS (Lithuanian) / rank
 
Normal rank
Property / summary: PROJEKTAS YRA KETVERIŲ METŲ VERSLO PLANO DALIS, SUSKIRSTYTA Į ŠIUOS ETAPUS: 1. Individualaus * klijavimo PORT TO DUE EXISTS įrengimas (2 semestre 2016) 2. RĖMO SURINKIMO BLOKO SURINKIMAS NAUJOJE GAMYBOS VIETOJE IR SU TUO SUSIJĘS GALUTINIO DURŲ SURINKIMO GAMYBOS IŠDĖSTYMO PERTVARKYMAS (1 SEMESTRAS 2017 M.) 3. VIENOS IŠ DVIEJŲ ESAMŲ ROBOTŲ SUKIBIMO SALŲ PAKEITIMAS (Lithuanian) / qualifier
 
point in time: 5 July 2022
Timestamp+2022-07-05T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
PROJEKTS IR DAĻA NO ČETRU GADU UZŅĒMĒJDARBĪBAS PLĀNA, KAS SADALĪTS ŠĀDOS POSMOS: 1. Individuāls * galvojumu PORT TO DUE EXISTS uzstādīšana (2 semestre 2016) 2. RĀMJA MONTĀŽAS VIENĪBAS MONTĀŽA JAUNĀ RAŽOTNĒ UN NO TĀ IZRIETOŠĀ DURVJU GALĪGĀS MONTĀŽAS PRODUKCIJAS IZKĀRTOJUMA PĀRKONFIGURĀCIJA (1 SEMESTRI 2017) 3. VIENAS NO DIVĀM ESOŠAJĀM ROBOTU KAULĒŠANAS SALĀM AIZSTĀŠANA (Latvian)
Property / summary: PROJEKTS IR DAĻA NO ČETRU GADU UZŅĒMĒJDARBĪBAS PLĀNA, KAS SADALĪTS ŠĀDOS POSMOS: 1. Individuāls * galvojumu PORT TO DUE EXISTS uzstādīšana (2 semestre 2016) 2. RĀMJA MONTĀŽAS VIENĪBAS MONTĀŽA JAUNĀ RAŽOTNĒ UN NO TĀ IZRIETOŠĀ DURVJU GALĪGĀS MONTĀŽAS PRODUKCIJAS IZKĀRTOJUMA PĀRKONFIGURĀCIJA (1 SEMESTRI 2017) 3. VIENAS NO DIVĀM ESOŠAJĀM ROBOTU KAULĒŠANAS SALĀM AIZSTĀŠANA (Latvian) / rank
 
Normal rank
Property / summary: PROJEKTS IR DAĻA NO ČETRU GADU UZŅĒMĒJDARBĪBAS PLĀNA, KAS SADALĪTS ŠĀDOS POSMOS: 1. Individuāls * galvojumu PORT TO DUE EXISTS uzstādīšana (2 semestre 2016) 2. RĀMJA MONTĀŽAS VIENĪBAS MONTĀŽA JAUNĀ RAŽOTNĒ UN NO TĀ IZRIETOŠĀ DURVJU GALĪGĀS MONTĀŽAS PRODUKCIJAS IZKĀRTOJUMA PĀRKONFIGURĀCIJA (1 SEMESTRI 2017) 3. VIENAS NO DIVĀM ESOŠAJĀM ROBOTU KAULĒŠANAS SALĀM AIZSTĀŠANA (Latvian) / qualifier
 
point in time: 5 July 2022
Timestamp+2022-07-05T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
ПРОЕКТЪТ Е ЧАСТ ОТ ЧЕТИРИГОДИШЕН БИЗНЕС ПЛАН, КОЙТО Е РАЗДЕЛЕН НА СЛЕДНИТЕ ЕТАПИ: 1. Инсталиране на индивид * на свързващ ПОРТ ДО ДЕЙ ЕКСИСТИ (2 семестър 2016) 2. СГЛОБЯВАНЕ НА РАМКОВ СГЛОБЯЕМ БЛОК В НОВ ПРОИЗВОДСТВЕН ОБЕКТ И ПРОИЗТИЧАЩОТО ОТ ТОВА ПРЕКОНФИГУРИРАНЕ НА ПРОИЗВОДСТВЕНОТО ОФОРМЛЕНИЕ НА ОКОНЧАТЕЛНОТО СЪБРАНИЕ НА ВРАТИТЕ (1 СЕМЕСТЪР 2017 Г.) 3. ЗАМЯНА НА ЕДИН ОТ ДВАТА СЪЩЕСТВУВАЩИ ОСТРОВА ЗА СВЪРЗВАНЕ С РОБОТИ (Bulgarian)
Property / summary: ПРОЕКТЪТ Е ЧАСТ ОТ ЧЕТИРИГОДИШЕН БИЗНЕС ПЛАН, КОЙТО Е РАЗДЕЛЕН НА СЛЕДНИТЕ ЕТАПИ: 1. Инсталиране на индивид * на свързващ ПОРТ ДО ДЕЙ ЕКСИСТИ (2 семестър 2016) 2. СГЛОБЯВАНЕ НА РАМКОВ СГЛОБЯЕМ БЛОК В НОВ ПРОИЗВОДСТВЕН ОБЕКТ И ПРОИЗТИЧАЩОТО ОТ ТОВА ПРЕКОНФИГУРИРАНЕ НА ПРОИЗВОДСТВЕНОТО ОФОРМЛЕНИЕ НА ОКОНЧАТЕЛНОТО СЪБРАНИЕ НА ВРАТИТЕ (1 СЕМЕСТЪР 2017 Г.) 3. ЗАМЯНА НА ЕДИН ОТ ДВАТА СЪЩЕСТВУВАЩИ ОСТРОВА ЗА СВЪРЗВАНЕ С РОБОТИ (Bulgarian) / rank
 
Normal rank
Property / summary: ПРОЕКТЪТ Е ЧАСТ ОТ ЧЕТИРИГОДИШЕН БИЗНЕС ПЛАН, КОЙТО Е РАЗДЕЛЕН НА СЛЕДНИТЕ ЕТАПИ: 1. Инсталиране на индивид * на свързващ ПОРТ ДО ДЕЙ ЕКСИСТИ (2 семестър 2016) 2. СГЛОБЯВАНЕ НА РАМКОВ СГЛОБЯЕМ БЛОК В НОВ ПРОИЗВОДСТВЕН ОБЕКТ И ПРОИЗТИЧАЩОТО ОТ ТОВА ПРЕКОНФИГУРИРАНЕ НА ПРОИЗВОДСТВЕНОТО ОФОРМЛЕНИЕ НА ОКОНЧАТЕЛНОТО СЪБРАНИЕ НА ВРАТИТЕ (1 СЕМЕСТЪР 2017 Г.) 3. ЗАМЯНА НА ЕДИН ОТ ДВАТА СЪЩЕСТВУВАЩИ ОСТРОВА ЗА СВЪРЗВАНЕ С РОБОТИ (Bulgarian) / qualifier
 
point in time: 5 July 2022
Timestamp+2022-07-05T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
A PROJEKT EGY NÉGYÉVES ÜZLETI TERV RÉSZE, AMELY A KÖVETKEZŐ SZAKASZOKRA OSZLIK: 1. Telepítése egy egyedi * kötési PORT DUE EXISTS (2 semestre 2016) 2. A VÁZEGYSÉG ÖSSZESZERELÉSE EGY ÚJ GYÁRTÁSI HELYSZÍNEN, ÉS AZ AJTÓK VÉGLEGES ÖSSZESZERELÉSÉNEK GYÁRTÁSI ELRENDEZÉSÉNEK EBBŐL KÖVETKEZŐ ÁTALAKÍTÁSA (2017. FÉLÉV) 3. A KÉT MEGLÉVŐ ROBOTLÁNC EGYIKÉNEK HELYETTESÍTÉSE (Hungarian)
Property / summary: A PROJEKT EGY NÉGYÉVES ÜZLETI TERV RÉSZE, AMELY A KÖVETKEZŐ SZAKASZOKRA OSZLIK: 1. Telepítése egy egyedi * kötési PORT DUE EXISTS (2 semestre 2016) 2. A VÁZEGYSÉG ÖSSZESZERELÉSE EGY ÚJ GYÁRTÁSI HELYSZÍNEN, ÉS AZ AJTÓK VÉGLEGES ÖSSZESZERELÉSÉNEK GYÁRTÁSI ELRENDEZÉSÉNEK EBBŐL KÖVETKEZŐ ÁTALAKÍTÁSA (2017. FÉLÉV) 3. A KÉT MEGLÉVŐ ROBOTLÁNC EGYIKÉNEK HELYETTESÍTÉSE (Hungarian) / rank
 
Normal rank
Property / summary: A PROJEKT EGY NÉGYÉVES ÜZLETI TERV RÉSZE, AMELY A KÖVETKEZŐ SZAKASZOKRA OSZLIK: 1. Telepítése egy egyedi * kötési PORT DUE EXISTS (2 semestre 2016) 2. A VÁZEGYSÉG ÖSSZESZERELÉSE EGY ÚJ GYÁRTÁSI HELYSZÍNEN, ÉS AZ AJTÓK VÉGLEGES ÖSSZESZERELÉSÉNEK GYÁRTÁSI ELRENDEZÉSÉNEK EBBŐL KÖVETKEZŐ ÁTALAKÍTÁSA (2017. FÉLÉV) 3. A KÉT MEGLÉVŐ ROBOTLÁNC EGYIKÉNEK HELYETTESÍTÉSE (Hungarian) / qualifier
 
point in time: 5 July 2022
Timestamp+2022-07-05T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
TÁ AN TIONSCADAL MAR CHUID DE PHLEAN GNÓ CEITHRE BLIANA ATÁ ROINNTE SNA CÉIMEANNA SEO A LEANAS: 1. Suiteáil duine aonair * de nascáil PORT GO DUE EXISTS (2 semestre 2016) 2. TIONÓL AN AONAID TIONÓIL FRÁMA I LÁITHREÁN TÁIRGEACHTA NUA AGUS LEAGAN AMACH TÁIRGTHE THIONÓL DEIRIDH NA NDOIRSE A ATHCHUMRÚ MAR THORADH AIR SIN (1 SHEIMEASTAR 2017) 3. CEANN DEN DÁ OILEÁN NASCTHA RÓBAT ATÁ ANN CHEANA A ATHSHOLÁTHAR (Irish)
Property / summary: TÁ AN TIONSCADAL MAR CHUID DE PHLEAN GNÓ CEITHRE BLIANA ATÁ ROINNTE SNA CÉIMEANNA SEO A LEANAS: 1. Suiteáil duine aonair * de nascáil PORT GO DUE EXISTS (2 semestre 2016) 2. TIONÓL AN AONAID TIONÓIL FRÁMA I LÁITHREÁN TÁIRGEACHTA NUA AGUS LEAGAN AMACH TÁIRGTHE THIONÓL DEIRIDH NA NDOIRSE A ATHCHUMRÚ MAR THORADH AIR SIN (1 SHEIMEASTAR 2017) 3. CEANN DEN DÁ OILEÁN NASCTHA RÓBAT ATÁ ANN CHEANA A ATHSHOLÁTHAR (Irish) / rank
 
Normal rank
Property / summary: TÁ AN TIONSCADAL MAR CHUID DE PHLEAN GNÓ CEITHRE BLIANA ATÁ ROINNTE SNA CÉIMEANNA SEO A LEANAS: 1. Suiteáil duine aonair * de nascáil PORT GO DUE EXISTS (2 semestre 2016) 2. TIONÓL AN AONAID TIONÓIL FRÁMA I LÁITHREÁN TÁIRGEACHTA NUA AGUS LEAGAN AMACH TÁIRGTHE THIONÓL DEIRIDH NA NDOIRSE A ATHCHUMRÚ MAR THORADH AIR SIN (1 SHEIMEASTAR 2017) 3. CEANN DEN DÁ OILEÁN NASCTHA RÓBAT ATÁ ANN CHEANA A ATHSHOLÁTHAR (Irish) / qualifier
 
point in time: 5 July 2022
Timestamp+2022-07-05T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
PROJEKTET INGÅR I EN FYRAÅRIG AFFÄRSPLAN SOM ÄR UPPDELAD I FÖLJANDE ETAPPER: 1. Installation av en individ * av bindning PORT to DUE EXISTS (2 semestre 2016) 2. MONTERINGEN AV RAMMONTERINGSENHETEN I EN NY PRODUKTIONSANLÄGGNING OCH DEN RESULTERANDE OMKONFIGURERINGEN AV PRODUKTIONSLAYOUTEN FÖR DEN SLUTLIGA MONTERINGEN AV DÖRRARNA (1 HALVÅR 2017) 3. ERSÄTTNING AV EN AV DE TVÅ BEFINTLIGA ROBOTBINDNINGSÖARNA (Swedish)
Property / summary: PROJEKTET INGÅR I EN FYRAÅRIG AFFÄRSPLAN SOM ÄR UPPDELAD I FÖLJANDE ETAPPER: 1. Installation av en individ * av bindning PORT to DUE EXISTS (2 semestre 2016) 2. MONTERINGEN AV RAMMONTERINGSENHETEN I EN NY PRODUKTIONSANLÄGGNING OCH DEN RESULTERANDE OMKONFIGURERINGEN AV PRODUKTIONSLAYOUTEN FÖR DEN SLUTLIGA MONTERINGEN AV DÖRRARNA (1 HALVÅR 2017) 3. ERSÄTTNING AV EN AV DE TVÅ BEFINTLIGA ROBOTBINDNINGSÖARNA (Swedish) / rank
 
Normal rank
Property / summary: PROJEKTET INGÅR I EN FYRAÅRIG AFFÄRSPLAN SOM ÄR UPPDELAD I FÖLJANDE ETAPPER: 1. Installation av en individ * av bindning PORT to DUE EXISTS (2 semestre 2016) 2. MONTERINGEN AV RAMMONTERINGSENHETEN I EN NY PRODUKTIONSANLÄGGNING OCH DEN RESULTERANDE OMKONFIGURERINGEN AV PRODUKTIONSLAYOUTEN FÖR DEN SLUTLIGA MONTERINGEN AV DÖRRARNA (1 HALVÅR 2017) 3. ERSÄTTNING AV EN AV DE TVÅ BEFINTLIGA ROBOTBINDNINGSÖARNA (Swedish) / qualifier
 
point in time: 5 July 2022
Timestamp+2022-07-05T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
PROJEKT ON OSA NELJA-AASTASEST ÄRIPLAANIST, MIS ON JAGATUD JÄRGMISTESSE ETAPPIDESSE: 1. Indiviidi paigaldamine * liimimine PORT TO DUE EXISTS (2 semestre 2016) 2. RAAMI ASSAMBLEE ÜKSUSE KOKKUPANEK UUES TOOTMISKOHAS JA SELLEST TULENEV USTE LÕPLIKU ASSAMBLEE TOOTMISPLAANI ÜMBERKUJUNDAMINE (1 SEMESTRIT 2017) 3. ÜHE ASENDAMINE KAHEST OLEMASOLEVAST ROBOT-SIDESTUSSAAREST (Estonian)
Property / summary: PROJEKT ON OSA NELJA-AASTASEST ÄRIPLAANIST, MIS ON JAGATUD JÄRGMISTESSE ETAPPIDESSE: 1. Indiviidi paigaldamine * liimimine PORT TO DUE EXISTS (2 semestre 2016) 2. RAAMI ASSAMBLEE ÜKSUSE KOKKUPANEK UUES TOOTMISKOHAS JA SELLEST TULENEV USTE LÕPLIKU ASSAMBLEE TOOTMISPLAANI ÜMBERKUJUNDAMINE (1 SEMESTRIT 2017) 3. ÜHE ASENDAMINE KAHEST OLEMASOLEVAST ROBOT-SIDESTUSSAAREST (Estonian) / rank
 
Normal rank
Property / summary: PROJEKT ON OSA NELJA-AASTASEST ÄRIPLAANIST, MIS ON JAGATUD JÄRGMISTESSE ETAPPIDESSE: 1. Indiviidi paigaldamine * liimimine PORT TO DUE EXISTS (2 semestre 2016) 2. RAAMI ASSAMBLEE ÜKSUSE KOKKUPANEK UUES TOOTMISKOHAS JA SELLEST TULENEV USTE LÕPLIKU ASSAMBLEE TOOTMISPLAANI ÜMBERKUJUNDAMINE (1 SEMESTRIT 2017) 3. ÜHE ASENDAMINE KAHEST OLEMASOLEVAST ROBOT-SIDESTUSSAAREST (Estonian) / qualifier
 
point in time: 5 July 2022
Timestamp+2022-07-05T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / programme
 
Property / programme: Lombardia - ERDF / rank
 
Normal rank
Property / fund
 
Property / fund: European Regional Development Fund / rank
 
Normal rank
Property / contained in NUTS
 
Property / contained in NUTS: Province of Mantua / rank
 
Normal rank
Property / intervention field
 
Property / intervention field: Generic productive investment in small and medium–sized enterprises (‘SMEs’) / rank
 
Normal rank
Property / location (string)
 
SUZZARA
Property / location (string): SUZZARA / rank
 
Normal rank
Property / budget
 
42,000.0 Euro
Amount42,000.0 Euro
UnitEuro
Property / budget: 42,000.0 Euro / rank
 
Normal rank
Property / EU contribution
 
21,000.0 Euro
Amount21,000.0 Euro
UnitEuro
Property / EU contribution: 21,000.0 Euro / rank
 
Normal rank
Property / co-financing rate
 
50.0 percent
Amount50.0 percent
Unitpercent
Property / co-financing rate: 50.0 percent / rank
 
Normal rank
Property / beneficiary
 
Property / beneficiary: CISAPLAST S.P.A. / rank
 
Normal rank
Property / beneficiary name (string)
 
CISAPLAST S.P.A.
Property / beneficiary name (string): CISAPLAST S.P.A. / rank
 
Normal rank
Property / priority axis
 
Property / priority axis: PROMOTING THE COMPETITIVENESS OF SMALL AND MEDIUM-SIZED ENTERPRISES / rank
 
Normal rank
Property / thematic objective
 
Property / thematic objective: Competitiveness of SMEs / rank
 
Normal rank
Property / end time
 
31 January 2019
Timestamp+2019-01-31T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / end time: 31 January 2019 / rank
 
Normal rank
Property / date of last update
 
8 April 2023
Timestamp+2023-04-08T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / date of last update: 8 April 2023 / rank
 
Normal rank
Property / Call for proposal
 
Property / Call for proposal: AGEVOLAZIONI LOMBARDE PER LA VALORIZZAZIONE DEGLI INVESTIMENTI AZIENDALI AL VIA / rank
 
Normal rank

Latest revision as of 06:12, 10 October 2024

Project Q2043973 in Italy
Language Label Description Also known as
English
* bonding
Project Q2043973 in Italy

    Statements

    0 references
    21,000.0 Euro
    0 references
    42,000.0 Euro
    0 references
    50.0 percent
    0 references
    1 October 2017
    0 references
    31 January 2019
    0 references
    28 June 2018
    0 references
    CISAPLAST S.P.A.
    0 references

    44°59'30.73"N, 10°44'35.12"E
    0 references
    IL PROGETTO INSERITO ALLINTERNO DI UN PIANO INDUSTRIALE QUADRIENNALE ARTICOLATO NEI SEGUENTI PASSI:1. INSTALLAZIONE DI UNA *individuo* DI INCOLLAGGIO PORTE IN AGGIUNTA ALLE DUE ESISTENTI (2 SEMESTRE 2016)2. SPOSTAMENTO DEL REPARTO DI ASSEMBLAGGIO CORNICI IN UN NUOVO SITO PRODUTTIVO E CONSEGUENTE RICONFIGURAZIONE DEL LAYOUT PRODUTTIVO DEL REPARTO DI ASSEMBLAGGIO FINALE DELLE PORTE (1 SEMESTRE 2017)3. SOSTITUZIONE DI UNA DELLE DUE ISOLE ROBOTIZZATE DI INCOLLAGGIO GI ESISTENTI (Italian)
    0 references
    THE PROJECT IS PART OF A FOUR-YEAR BUSINESS PLAN WHICH IS DIVIDED INTO THE FOLLOWING STAGES: 1. Installation of an individual * of bonding PORT TO DUE EXISTS (2 SEMESTRE 2016) 2. THE ASSEMBLY OF THE FRAME ASSEMBLY UNIT IN A NEW PRODUCTION SITE AND THE RESULTING RECONFIGURATION OF THE PRODUCTION LAYOUT OF THE FINAL ASSEMBLY OF THE DOORS (1 SEMESTERS 2017) 3. REPLACEMENT OF ONE OF THE TWO EXISTING ROBOT-BONDING ISLANDS (English)
    0.0122541956509985
    0 references
    LE PROJET FAISAIT PARTIE D’UN PLAN D’ACTIVITÉS QUADRIENNAL ARTICULÉ AUX ÉTAPES SUIVANTES:1. Installation D’UN *individuel* INCLUDING PORTS AJOURS À DEUX PORTS existants (2 semestre 2016)2. DÉPLACER LES CADRES DU DÉPARTEMENT DE L’ASSEMBLAGE VERS UN NOUVEAU SITE DE PRODUCTION ET, PAR LA SUITE, RECONFIGURER LA CONFIGURATION DE PRODUCTION DU DÉPARTEMENT DE L’ASSEMBLAGE FINAL DES PORTES (1 SEMESTRE 2017)3. REMPLACEMENT DE L’UNE DES DEUX ÎLES DE LIAISON ROBOTIQUE EXISTANTES (French)
    16 December 2021
    0 references
    HET PROJECT MAAKTE DEEL UIT VAN EEN VIERJARIG BUSINESSPLAN DAT IN DE VOLGENDE STAPPEN IS UITGEWERKT:1. Installatie van een *individuele* INCLUDING PORTS TWEE existents (2 semestre 2016)2. HET VERPLAATSEN VAN DE FRAMES VAN DE AFDELING ASSEMBLAGE NAAR EEN NIEUWE PRODUCTIELOCATIE EN DE DAARUIT VOORTVLOEIENDE HERCONFIGURATIE VAN DE PRODUCTIE-INDELING VAN DE DEFINITIEVE AFDELING ASSEMBLAGE VAN DE DEUREN (1 SEMESTER 2017)3. VERVANGING VAN EEN VAN DE TWEE BESTAANDE ROBOTGEBONDEN EILANDEN (Dutch)
    23 December 2021
    0 references
    DAS PROJEKT WAR IN EINEM VIERJÄHRIGEN GESCHÄFTSPLAN ENTHALTEN, DER IN DEN FOLGENDEN SCHRITTEN:1 FORMULIERT WURDE. Installation von A *individuell* INCLUDING PORTS AN TWO existenten (2 semestre 2016)2. UMZUG DER MONTAGEABTEILUNG AUF EINE NEUE PRODUKTIONSSTÄTTE UND KONSEQUENTE NEUKONFIGURATION DES PRODUKTIONSLAYOUTS DER ENDGÜLTIGEN MONTAGEABTEILUNG DER TÜREN (1 HALBJAHR 2017)3. ERSATZ EINER DER BEIDEN BESTEHENDEN ROBOTIC BONDING ISLANDS (German)
    24 December 2021
    0 references
    EL PROYECTO SE INCLUYÓ EN UN PLAN DE ACTIVIDADES CUATRIENAL ARTICULADO EN LOS SIGUIENTES PASOS:1. Instalación de un *individual* INCLUIDO PORTOS A DOS Existentes (2 semestre 2016)2. TRASLADAR LOS MARCOS DEL DEPARTAMENTO DE ENSAMBLE A UN NUEVO LUGAR DE PRODUCCIÓN Y LA CONSIGUIENTE RECONFIGURACIÓN DE LA DISTRIBUCIÓN DE LA PRODUCCIÓN DEL DEPARTAMENTO DE MONTAJE FINAL DE LAS PUERTAS (1 SEMESTRE DE 2017)3. SUSTITUCIÓN DE UNA DE LAS DOS ISLAS DE UNIÓN ROBÓTICA EXISTENTES (Spanish)
    25 January 2022
    0 references
    PROJEKTET INDGÅR I EN FIREÅRIG FORRETNINGSPLAN, SOM ER OPDELT I FØLGENDE FASER: 1. Installation af en person * af bonding PORT TO DUE EXISTS (2 semestre 2016) 2. MONTERING AF RAMMEMONTERINGSENHEDEN I ET NYT PRODUKTIONSANLÆG OG DEN DERAF FØLGENDE OMKONFIGURERING AF PRODUKTIONSLAYOUTET FOR DEN ENDELIGE MONTAGE AF DØRENE (1. SEMESTRE 2017) 3. UDSKIFTNING AF EN AF DE TO EKSISTERENDE ROBOT-BONDING ISLANDS (Danish)
    5 July 2022
    0 references
    ΤΟ ΈΡΓΟ ΕΝΤΆΣΣΕΤΑΙ ΣΕ ΈΝΑ ΤΕΤΡΑΕΤΈΣ ΕΠΙΧΕΙΡΗΜΑΤΙΚΌ ΣΧΈΔΙΟ, ΤΟ ΟΠΟΊΟ ΧΩΡΊΖΕΤΑΙ ΣΤΑ ΑΚΌΛΟΥΘΑ ΣΤΆΔΙΑ: 1. Εγκατάσταση ενός ατόμου * της σύνδεσης PORT TO DUE EXISTS (2 semestre 2016) 2. Η ΣΥΝΑΡΜΟΛΌΓΗΣΗ ΤΗΣ ΜΟΝΆΔΑΣ ΣΥΝΑΡΜΟΛΌΓΗΣΗΣ ΠΛΑΙΣΊΩΝ ΣΕ ΝΈΟ ΧΏΡΟ ΠΑΡΑΓΩΓΉΣ ΚΑΙ Η ΣΥΝΑΚΌΛΟΥΘΗ ΑΝΑΔΙΑΜΌΡΦΩΣΗ ΤΗΣ ΔΙΆΤΑΞΗΣ ΠΑΡΑΓΩΓΉΣ ΤΗΣ ΤΕΛΙΚΉΣ ΣΥΝΑΡΜΟΛΌΓΗΣΗΣ ΤΩΝ ΘΥΡΏΝ (1 ΕΞΆΜΗΝΑ 2017) 3. ΑΝΤΙΚΑΤΆΣΤΑΣΗ ΕΝΌΣ ΑΠΌ ΤΑ ΔΎΟ ΥΦΙΣΤΆΜΕΝΑ ΝΗΣΙΆ ΡΟΜΠΌΤ-ΔΕΣΜΏΝ (Greek)
    5 July 2022
    0 references
    PROJEKT JE DIO ČETVEROGODIŠNJEG POSLOVNOG PLANA KOJI JE PODIJELJEN NA SLJEDEĆE FAZE: 1. Ugradnja pojedinca * lijepljenja PORT TO DUE EXISTS (2 semestre 2016) 2. MONTAŽA SKUPŠTINE OKVIRA U NOVOM PROIZVODNOM POGONU I POSLJEDIČNA REKONFIGURACIJA PROIZVODNOG RASPOREDA ZAVRŠNOG MONTAŽE VRATA (1 SEMESTAR 2017.) 3. ZAMJENA JEDNOG OD DVA POSTOJEĆA OTOKA ZA ROBOTE (Croatian)
    5 July 2022
    0 references
    PROIECTUL FACE PARTE DINTR-UN PLAN DE AFACERI PE PATRU ANI, CARE ESTE ÎMPĂRȚIT ÎN URMĂTOARELE ETAPE: 1. Instalarea unui individ * de lipire PORT LA DUE EXISTS (2 semestre 2016) 2. ASAMBLAREA ANSAMBLULUI CADRU ÎNTR-UN NOU LOC DE PRODUCȚIE ȘI RECONFIGURAREA REZULTATĂ A STRUCTURII DE PRODUCȚIE A ANSAMBLULUI FINAL AL UȘILOR (1 SEMESTRE 2017) 3. ÎNLOCUIREA UNEIA DINTRE CELE DOUĂ INSULE EXISTENTE DE LEGARE A ROBOȚILOR (Romanian)
    5 July 2022
    0 references
    PROJEKT JE SÚČASŤOU ŠTVORROČNÉHO PODNIKATEĽSKÉHO PLÁNU, KTORÝ JE ROZDELENÝ DO NASLEDUJÚCICH ETÁP: 1. Inštalácia jednotlivca * lepenie PORT TO DUE EXISTS (2 semestre 2016) 2. MONTÁŽ RÁMOVEJ MONTÁŽNEJ JEDNOTKY V NOVOM VÝROBNOM ZÁVODE A VÝSLEDNÁ REKONFIGURÁCIA VÝROBNÉHO USPORIADANIA FINÁLNEJ MONTÁŽE DVERÍ (1 SEMESTRE 2017) 3. NAHRADENIE JEDNÉHO Z DVOCH EXISTUJÚCICH ROBOTICKÝCH OSTROVOV (Slovak)
    5 July 2022
    0 references
    IL-PROĠETT HUWA PARTI MINN PJAN TA’ NEGOZJU TA’ ERBA’ SNIN LI HUWA MAQSUM FL-ISTADJI LI ĠEJJIN: 1. Installazzjoni ta’ individwu * ta’ PORT ta’ twaħħil GĦANDU EŻISTI (2 semestre 2016) 2. L-ASSEMBLEA TAL-UNITÀ TAL-ASSEMBLAĠĠ TAL-QAFAS F’SIT TA’ PRODUZZJONI ĠDID U L-KONFIGURAZZJONI MILL-ĠDID LI TIRRIŻULTA TAT-TQASSIM TAL-PRODUZZJONI TAL-ASSEMBLEA FINALI TAL-BIBIEN (1 SEMESTRI 2017) 3. SOSTITUZZJONI TA’ WAĦDA MIŻ-ŻEWĠ GŻEJJER EŻISTENTI LI JGĦAQQDU R-ROBOTS (Maltese)
    5 July 2022
    0 references
    O PROJETO faz parte de um PLANO DE ATIVIDADE DE QUATRO ANOS, DIVIDIDO NAS SEGUINTES FASES: 1. Instalação de um indivíduo * de ligação PORTO A DEVIDA EXISTE (2 SEMESTRE 2016) 2. A ASSEMBLEIA DA UNIDADE-QUADRO NUM NOVO SÍTIO DE PRODUÇÃO E A RECONFIGURAÇÃO RESULTANTE DA PRODUÇÃO ESTABELECIDA DA ASSEMBLEIA FINAL DAS PORTAS (1 SEMESTROS 2017) 3. SUBSTITUIÇÃO DE UMA DAS DOIS ILHAS LIGADORAS A ROBOT EXISTENTES (Portuguese)
    5 July 2022
    0 references
    HANKE ON OSA NELIVUOTISTA LIIKETOIMINTASUUNNITELMAA, JOKA JAKAUTUU SEURAAVIIN VAIHEISIIN: 1. Asennus yksittäisen * liimaus PORT TO DUE EXISTS (2 semestre 2016) 2. KOKOONPANOYKSIKÖN KOKOONPANO UUDESSA TUOTANTOPAIKASSA JA TULOKSENA TUOTANNON UUDELLEENJÄRJESTELY LOPULLISEN KOKOONPANON OVIEN (1 LUKUKAUSI 2017) 3. JOMMANKUMMAN KAHDESTA OLEMASSA OLEVASTA ROBOTTISIDONTASAARESTA KORVAAMINEN (Finnish)
    5 July 2022
    0 references
    PROJEKT JEST CZĘŚCIĄ CZTEROLETNIEGO BIZNESPLANU, KTÓRY DZIELI SIĘ NA NASTĘPUJĄCE ETAPY: 1. Montaż indywidualnego * PORT PORT DO DUE EXISTS (2 semestr 2016) 2. MONTAŻ ZESPOŁU MONTAŻOWEGO RAMY W NOWYM ZAKŁADZIE PRODUKCYJNYM I WYNIKAJĄCA Z TEGO REKONFIGURACJA UKŁADU PRODUKCYJNEGO KOŃCOWEGO MONTAŻU DRZWI (1 PÓŁROCZE 2017 R.) 3. ZASTĄPIENIE JEDNEJ Z DWÓCH ISTNIEJĄCYCH WYSP ROBOT-BONDING (Polish)
    5 July 2022
    0 references
    PROJEKT JE DEL ŠTIRILETNEGA POSLOVNEGA NAČRTA, KI JE RAZDELJEN NA NASLEDNJE FAZE: 1. Namestitev posameznega * lepljenja PORT TO DUE EXISTS (2 pol leta 2016) 2. MONTAŽA ENOTE ZA MONTAŽO OKVIRJA V NOVEM PROIZVODNEM OBRATU IN POSLEDIČNA REKONFIGURACIJA PROIZVODNE RAZPOREDITVE KONČNE MONTAŽE VRAT (1 POL LETA 2017) 3. ZAMENJAVA ENEGA OD DVEH OBSTOJEČIH ROBOTSKO VEZANIH OTOKOV (Slovenian)
    5 July 2022
    0 references
    PROJEKT JE SOUČÁSTÍ ČTYŘLETÉHO OBCHODNÍHO PLÁNU, KTERÝ JE ROZDĚLEN DO NÁSLEDUJÍCÍCH FÁZÍ: 1. Instalace jedince * lepení PORT TO DUE EXISTS (2 semestr 2016) 2. MONTÁŽ RÁMOVÉ MONTÁŽNÍ JEDNOTKY V NOVÉM VÝROBNÍM ZÁVODĚ A NÁSLEDNÁ REKONFIGURACE VÝROBNÍHO USPOŘÁDÁNÍ ZÁVĚREČNÉ MONTÁŽE DVEŘÍ (1 SEMESTRY 2017) 3. NAHRAZENÍ JEDNOHO ZE DVOU STÁVAJÍCÍCH OSTROVŮ PRO SPOJENÍ ROBOTŮ (Czech)
    5 July 2022
    0 references
    PROJEKTAS YRA KETVERIŲ METŲ VERSLO PLANO DALIS, SUSKIRSTYTA Į ŠIUOS ETAPUS: 1. Individualaus * klijavimo PORT TO DUE EXISTS įrengimas (2 semestre 2016) 2. RĖMO SURINKIMO BLOKO SURINKIMAS NAUJOJE GAMYBOS VIETOJE IR SU TUO SUSIJĘS GALUTINIO DURŲ SURINKIMO GAMYBOS IŠDĖSTYMO PERTVARKYMAS (1 SEMESTRAS 2017 M.) 3. VIENOS IŠ DVIEJŲ ESAMŲ ROBOTŲ SUKIBIMO SALŲ PAKEITIMAS (Lithuanian)
    5 July 2022
    0 references
    PROJEKTS IR DAĻA NO ČETRU GADU UZŅĒMĒJDARBĪBAS PLĀNA, KAS SADALĪTS ŠĀDOS POSMOS: 1. Individuāls * galvojumu PORT TO DUE EXISTS uzstādīšana (2 semestre 2016) 2. RĀMJA MONTĀŽAS VIENĪBAS MONTĀŽA JAUNĀ RAŽOTNĒ UN NO TĀ IZRIETOŠĀ DURVJU GALĪGĀS MONTĀŽAS PRODUKCIJAS IZKĀRTOJUMA PĀRKONFIGURĀCIJA (1 SEMESTRI 2017) 3. VIENAS NO DIVĀM ESOŠAJĀM ROBOTU KAULĒŠANAS SALĀM AIZSTĀŠANA (Latvian)
    5 July 2022
    0 references
    ПРОЕКТЪТ Е ЧАСТ ОТ ЧЕТИРИГОДИШЕН БИЗНЕС ПЛАН, КОЙТО Е РАЗДЕЛЕН НА СЛЕДНИТЕ ЕТАПИ: 1. Инсталиране на индивид * на свързващ ПОРТ ДО ДЕЙ ЕКСИСТИ (2 семестър 2016) 2. СГЛОБЯВАНЕ НА РАМКОВ СГЛОБЯЕМ БЛОК В НОВ ПРОИЗВОДСТВЕН ОБЕКТ И ПРОИЗТИЧАЩОТО ОТ ТОВА ПРЕКОНФИГУРИРАНЕ НА ПРОИЗВОДСТВЕНОТО ОФОРМЛЕНИЕ НА ОКОНЧАТЕЛНОТО СЪБРАНИЕ НА ВРАТИТЕ (1 СЕМЕСТЪР 2017 Г.) 3. ЗАМЯНА НА ЕДИН ОТ ДВАТА СЪЩЕСТВУВАЩИ ОСТРОВА ЗА СВЪРЗВАНЕ С РОБОТИ (Bulgarian)
    5 July 2022
    0 references
    A PROJEKT EGY NÉGYÉVES ÜZLETI TERV RÉSZE, AMELY A KÖVETKEZŐ SZAKASZOKRA OSZLIK: 1. Telepítése egy egyedi * kötési PORT DUE EXISTS (2 semestre 2016) 2. A VÁZEGYSÉG ÖSSZESZERELÉSE EGY ÚJ GYÁRTÁSI HELYSZÍNEN, ÉS AZ AJTÓK VÉGLEGES ÖSSZESZERELÉSÉNEK GYÁRTÁSI ELRENDEZÉSÉNEK EBBŐL KÖVETKEZŐ ÁTALAKÍTÁSA (2017. FÉLÉV) 3. A KÉT MEGLÉVŐ ROBOTLÁNC EGYIKÉNEK HELYETTESÍTÉSE (Hungarian)
    5 July 2022
    0 references
    TÁ AN TIONSCADAL MAR CHUID DE PHLEAN GNÓ CEITHRE BLIANA ATÁ ROINNTE SNA CÉIMEANNA SEO A LEANAS: 1. Suiteáil duine aonair * de nascáil PORT GO DUE EXISTS (2 semestre 2016) 2. TIONÓL AN AONAID TIONÓIL FRÁMA I LÁITHREÁN TÁIRGEACHTA NUA AGUS LEAGAN AMACH TÁIRGTHE THIONÓL DEIRIDH NA NDOIRSE A ATHCHUMRÚ MAR THORADH AIR SIN (1 SHEIMEASTAR 2017) 3. CEANN DEN DÁ OILEÁN NASCTHA RÓBAT ATÁ ANN CHEANA A ATHSHOLÁTHAR (Irish)
    5 July 2022
    0 references
    PROJEKTET INGÅR I EN FYRAÅRIG AFFÄRSPLAN SOM ÄR UPPDELAD I FÖLJANDE ETAPPER: 1. Installation av en individ * av bindning PORT to DUE EXISTS (2 semestre 2016) 2. MONTERINGEN AV RAMMONTERINGSENHETEN I EN NY PRODUKTIONSANLÄGGNING OCH DEN RESULTERANDE OMKONFIGURERINGEN AV PRODUKTIONSLAYOUTEN FÖR DEN SLUTLIGA MONTERINGEN AV DÖRRARNA (1 HALVÅR 2017) 3. ERSÄTTNING AV EN AV DE TVÅ BEFINTLIGA ROBOTBINDNINGSÖARNA (Swedish)
    5 July 2022
    0 references
    PROJEKT ON OSA NELJA-AASTASEST ÄRIPLAANIST, MIS ON JAGATUD JÄRGMISTESSE ETAPPIDESSE: 1. Indiviidi paigaldamine * liimimine PORT TO DUE EXISTS (2 semestre 2016) 2. RAAMI ASSAMBLEE ÜKSUSE KOKKUPANEK UUES TOOTMISKOHAS JA SELLEST TULENEV USTE LÕPLIKU ASSAMBLEE TOOTMISPLAANI ÜMBERKUJUNDAMINE (1 SEMESTRIT 2017) 3. ÜHE ASENDAMINE KAHEST OLEMASOLEVAST ROBOT-SIDESTUSSAAREST (Estonian)
    5 July 2022
    0 references
    SUZZARA
    0 references
    8 April 2023
    0 references

    Identifiers

    E52B18001230006
    0 references