The construction of photovoltaic installations together with the infrastructure accompanying the companies of the project partners. (Q118553): Difference between revisions
Jump to navigation
Jump to search
(Created claim: summary (P836): The project aims at generating energy from renewable sources in order to increase the production of electricity from renewable sources and thus to reduce the greenhouse gas emissions to the atmosphere. The detailed objectives of the project are set out in Part 2.1 of the Feasibility Study. The project aims to build new infrastructure on the basis of existing buildings and land owned by the project partners’ companies. However, the project concer...) |
(Changed label, description and/or aliases in pt) |
||||||||||||||
(40 intermediate revisions by 2 users not shown) | |||||||||||||||
label / en | label / en | ||||||||||||||
The construction of photovoltaic installations together with the infrastructure accompanying the companies of the project partners. | |||||||||||||||
label / fr | label / fr | ||||||||||||||
Construction d’installations photovoltaïques et d’infrastructures d’accompagnement dans les entreprises des partenaires du projet. | |||||||||||||||
label / de | label / de | ||||||||||||||
Bau von Photovoltaikanlagen zusammen mit begleitender Infrastruktur in den Unternehmen der Projektpartner. | |||||||||||||||
label / nl | label / nl | ||||||||||||||
Bouw van fotovoltaïsche installaties samen met bijbehorende infrastructuur in de ondernemingen van de projectpartners. | |||||||||||||||
label / it | label / it | ||||||||||||||
Costruzione di impianti fotovoltaici insieme ad infrastrutture di accompagnamento nelle imprese dei partner del progetto. | |||||||||||||||
label / es | label / es | ||||||||||||||
Construcción de instalaciones fotovoltaicas junto con infraestructuras de acompañamiento en las empresas de los socios del proyecto. | |||||||||||||||
label / da | label / da | ||||||||||||||
Opførelse af solcelleanlæg sammen med tilhørende infrastruktur i projektpartnernes virksomheder. | |||||||||||||||
label / el | label / el | ||||||||||||||
Κατασκευή φωτοβολταϊκών εγκαταστάσεων μαζί με συνοδευτικές υποδομές στις επιχειρήσεις των εταίρων του έργου. | |||||||||||||||
label / hr | label / hr | ||||||||||||||
Izgradnja fotonaponskih instalacija zajedno s pratećom infrastrukturom u poduzećima projektnih partnera. | |||||||||||||||
label / ro | label / ro | ||||||||||||||
Construirea de instalații fotovoltaice împreună cu infrastructura însoțitoare în întreprinderile partenerilor de proiect. | |||||||||||||||
label / sk | label / sk | ||||||||||||||
Výstavba fotovoltických zariadení spolu so sprievodnou infraštruktúrou v podnikoch partnerov projektu. | |||||||||||||||
label / mt | label / mt | ||||||||||||||
Il-kostruzzjoni ta’ installazzjonijiet fotovoltajċi flimkien ma’ infrastruttura ta’ akkumpanjament fl-intrapriżi tal-imsieħba tal-proġett. | |||||||||||||||
label / pt | label / pt | ||||||||||||||
A construção de instalações fotovoltaicas juntamente com a infra-estrutura que acompanha as empresas dos parceiros do projecto. | |||||||||||||||
label / fi | label / fi | ||||||||||||||
Aurinkosähkölaitteistojen ja siihen liittyvän infrastruktuurin rakentaminen hankekumppaneiden yrityksiin. | |||||||||||||||
label / sl | label / sl | ||||||||||||||
Izgradnja fotonapetostnih instalacij skupaj s spremljajočo infrastrukturo v podjetjih projektnih partnerjev. | |||||||||||||||
label / cs | label / cs | ||||||||||||||
Výstavba fotovoltaických zařízení spolu s doprovodnou infrastrukturou v podnicích partnerů projektu. | |||||||||||||||
label / lt | label / lt | ||||||||||||||
Fotovoltinių įrenginių statyba kartu su susijusia infrastruktūra projekto partnerių įmonėse. | |||||||||||||||
label / lv | label / lv | ||||||||||||||
Fotoelementu iekārtu būvniecība kopā ar saistīto infrastruktūru projekta partneru uzņēmumos. | |||||||||||||||
label / bg | label / bg | ||||||||||||||
Изграждане на фотоволтаични инсталации заедно с съпътстваща инфраструктура в предприятията на партньорите по проекта. | |||||||||||||||
label / hu | label / hu | ||||||||||||||
Fotovoltaikus berendezések építése a projektpartnerek vállalkozásaiban a kísérő infrastruktúrával együtt. | |||||||||||||||
label / ga | label / ga | ||||||||||||||
Suiteálacha fótavoltacha a thógáil mar aon leis an mbonneagar tionlacain i bhfiontair chomhpháirtithe an tionscadail. | |||||||||||||||
label / sv | label / sv | ||||||||||||||
Uppförande av solcellsanläggningar tillsammans med tillhörande infrastruktur i projektpartnernas företag. | |||||||||||||||
label / et | label / et | ||||||||||||||
Fotogalvaaniliste seadmete ehitamine koos sellega kaasneva taristuga projektipartnerite ettevõtetes. | |||||||||||||||
description / en | description / en | ||||||||||||||
Project in Poland | Project Q118553 in Poland | ||||||||||||||
description / pl | description / pl | ||||||||||||||
Projekt w Polsce | Projekt Q118553 w Polsce | ||||||||||||||
description / bg | description / bg | ||||||||||||||
Проект Q118553 в Полша | |||||||||||||||
description / hr | description / hr | ||||||||||||||
Projekt Q118553 u Poljskoj | |||||||||||||||
description / hu | description / hu | ||||||||||||||
Projekt Q118553 Lengyelországban | |||||||||||||||
description / cs | description / cs | ||||||||||||||
Projekt Q118553 v Polsku | |||||||||||||||
description / da | description / da | ||||||||||||||
Projekt Q118553 i Polen | |||||||||||||||
description / nl | description / nl | ||||||||||||||
Project Q118553 in Polen | |||||||||||||||
description / et | description / et | ||||||||||||||
Projekt Q118553 Poolas | |||||||||||||||
description / fi | description / fi | ||||||||||||||
Projekti Q118553 Puolassa | |||||||||||||||
description / fr | description / fr | ||||||||||||||
Projet Q118553 en Pologne | |||||||||||||||
description / de | description / de | ||||||||||||||
Projekt Q118553 in Polen | |||||||||||||||
description / el | description / el | ||||||||||||||
Έργο Q118553 στην Πολωνία | |||||||||||||||
description / ga | description / ga | ||||||||||||||
Tionscadal Q118553 sa Pholainn | |||||||||||||||
description / it | description / it | ||||||||||||||
Progetto Q118553 in Polonia | |||||||||||||||
description / lv | description / lv | ||||||||||||||
Projekts Q118553 Polijā | |||||||||||||||
description / lt | description / lt | ||||||||||||||
Projektas Q118553 Lenkijoje | |||||||||||||||
description / mt | description / mt | ||||||||||||||
Proġett Q118553 fil-Polonja | |||||||||||||||
description / pt | description / pt | ||||||||||||||
Projeto Q118553 na Polônia | |||||||||||||||
description / ro | description / ro | ||||||||||||||
Proiectul Q118553 în Polonia | |||||||||||||||
description / sk | description / sk | ||||||||||||||
Projekt Q118553 v Poľsku | |||||||||||||||
description / sl | description / sl | ||||||||||||||
Projekt Q118553 na Poljskem | |||||||||||||||
description / es | description / es | ||||||||||||||
Proyecto Q118553 en Polonia | |||||||||||||||
description / sv | description / sv | ||||||||||||||
Projekt Q118553 i Polen | |||||||||||||||
Property / EU contribution | |||||||||||||||
| |||||||||||||||
Property / EU contribution: 155,269.2936 Euro / rank | |||||||||||||||
Property / EU contribution: 155,269.2936 Euro / qualifier | |||||||||||||||
| |||||||||||||||
Property / EU contribution: 155,269.2936 Euro / qualifier | |||||||||||||||
| |||||||||||||||
Property / budget | |||||||||||||||
| |||||||||||||||
Property / budget: 936,182.52 zloty / rank | |||||||||||||||
Property / budget | |||||||||||||||
| |||||||||||||||
Property / budget: 224,683.80479999998 Euro / rank | |||||||||||||||
Property / budget: 224,683.80479999998 Euro / qualifier | |||||||||||||||
| |||||||||||||||
Property / budget: 224,683.80479999998 Euro / qualifier | |||||||||||||||
| |||||||||||||||
Property / co-financing rate | |||||||||||||||
| |||||||||||||||
Property / co-financing rate: 85.0 percent / rank | |||||||||||||||
Property / summary | |||||||||||||||
Property / summary: The project aims at generating energy from renewable sources in order to increase the production of electricity from renewable sources and thus to reduce the greenhouse gas emissions to the atmosphere. The detailed objectives of the project are set out in Part 2.1 of the Feasibility Study. The project aims to build new infrastructure on the basis of existing buildings and land owned by the project partners’ companies. However, the project concerns the construction of new infrastructure on the basis of existing properties owned by the project partners’ companies. These properties are located in the municipalities of Mielec, National Horns and Kolbusov. The object of the project is the installation of systems consisting of polycrystalline modules for the production of electricity (with a total installed capacity of 0.19 MW). The planned installation consists of a total of 697 modules of solar panels with a single panel power of 280 W, including the support structure, all necessary fittings and wiring. A total of six installations will be created for five entities. The installations will be connected to the existing electricity grid. The basic elements of the planned installation are as follows: — Modular photovoltaics, inverters, installation systems — roof and ground, wiring, switchgear, hermetic housing, monitoring system. The total installed capacity is the sum of the capacity of each installation, which in turn is the product of the number of panels and the power of the single panel. RSM — Number of modules (140x 285W = 39,9 kWp). MET Month — Number of modules (123 x 325W = 39,97kWp). Baker’s bakery — Number of modules (134 x 285 W = 38,19kWp). Hoke — Number of modules (70 x 285 W = 19,95 kWp). Karkut: Installation No 1 — Number of modules (116 x 325 W = 37,70 kWp), Installation No 2 — Number of modules (61 x 325 W = 19,82 kWp). All plants are micro-installations. They will be connected to the energy network. Implementation is planned to be completed at 31.05. (English) / rank | |||||||||||||||
Property / financed by | |||||||||||||||
Property / financed by: Directorate-General for Regional and Urban Policy / rank | |||||||||||||||
Property / contained in Local Administrative Unit | |||||||||||||||
Property / contained in Local Administrative Unit: Cmolas / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / contained in Local Administrative Unit: Cmolas / qualifier | |||||||||||||||
Property / EU contribution | |||||||||||||||
143,818.18 Euro
| |||||||||||||||
Property / EU contribution: 143,818.18 Euro / rank | |||||||||||||||
Preferred rank | |||||||||||||||
Property / EU contribution: 143,818.18 Euro / qualifier | |||||||||||||||
exchange rate to Euro: 0.24 Euro
| |||||||||||||||
Property / EU contribution: 143,818.18 Euro / qualifier | |||||||||||||||
point in time: 13 January 2020
| |||||||||||||||
Property / summary | |||||||||||||||
The aim of the project is to generate energy from renewable sources The general objective of the project is to increase the production of electricity from renewable sources and thus reduce greenhouse gas emissions into the atmosphere. Detailed objectives of the project are presented in section 2.1 of the Feasibility Study. The object of the project is the construction of new infrastructure, however, based on existing buildings and land belonging to the companies of the partners of the project. The project concerns the construction of new infrastructure, however, based on existing properties owned by the partners of the project. These properties are located in the municipalities of Mielec, Tuszyn Narodowy and Kolbuszowa. The subject of the project is the assembly of systems consisting of polycrystalline modules for the production of electricity (with a total installed capacity of 0,19 MW). The planned installation consists of a total of 697 modules of photovoltaic panel modules with a single 280 W panel, together with support structure, all necessary accessories and wiring. A total of six installations will be created for five entities. The installations will be connected to the existing power grid. The basic elements of the planned installation are: — Photovoltaic modules, inverters, mounting systems – roof and ground, wiring, electric switchgear, hermetic housings, monitoring system. The total installed power is the sum of the power of each installation, which in turn represents the product of the number of panels and the power of a single panel. RSM – Number of modules (140x 285 W= 39.9 kWp). Miel MET – Number of modules (123 x 325 W = 39,97kWp). Bakery Necessary – Number of modules (134 x 285 W= 38.19kWp). Hook – Number of modules (70 x 285 W = 19.95 kWp). The carcass: Installation No 1 – Number of modules (116 x 325 W = 37.70 kWp), Installation No 2 – Number of modules (61 x 325 W= 19,82 kWp). All of the installations are micro-installations. They will be connected to the energetic network within the existing connections for the property. Completion of the implementation is planned at 31.05. (English) | |||||||||||||||
Property / summary: The aim of the project is to generate energy from renewable sources The general objective of the project is to increase the production of electricity from renewable sources and thus reduce greenhouse gas emissions into the atmosphere. Detailed objectives of the project are presented in section 2.1 of the Feasibility Study. The object of the project is the construction of new infrastructure, however, based on existing buildings and land belonging to the companies of the partners of the project. The project concerns the construction of new infrastructure, however, based on existing properties owned by the partners of the project. These properties are located in the municipalities of Mielec, Tuszyn Narodowy and Kolbuszowa. The subject of the project is the assembly of systems consisting of polycrystalline modules for the production of electricity (with a total installed capacity of 0,19 MW). The planned installation consists of a total of 697 modules of photovoltaic panel modules with a single 280 W panel, together with support structure, all necessary accessories and wiring. A total of six installations will be created for five entities. The installations will be connected to the existing power grid. The basic elements of the planned installation are: — Photovoltaic modules, inverters, mounting systems – roof and ground, wiring, electric switchgear, hermetic housings, monitoring system. The total installed power is the sum of the power of each installation, which in turn represents the product of the number of panels and the power of a single panel. RSM – Number of modules (140x 285 W= 39.9 kWp). Miel MET – Number of modules (123 x 325 W = 39,97kWp). Bakery Necessary – Number of modules (134 x 285 W= 38.19kWp). Hook – Number of modules (70 x 285 W = 19.95 kWp). The carcass: Installation No 1 – Number of modules (116 x 325 W = 37.70 kWp), Installation No 2 – Number of modules (61 x 325 W= 19,82 kWp). All of the installations are micro-installations. They will be connected to the energetic network within the existing connections for the property. Completion of the implementation is planned at 31.05. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The aim of the project is to generate energy from renewable sources The general objective of the project is to increase the production of electricity from renewable sources and thus reduce greenhouse gas emissions into the atmosphere. Detailed objectives of the project are presented in section 2.1 of the Feasibility Study. The object of the project is the construction of new infrastructure, however, based on existing buildings and land belonging to the companies of the partners of the project. The project concerns the construction of new infrastructure, however, based on existing properties owned by the partners of the project. These properties are located in the municipalities of Mielec, Tuszyn Narodowy and Kolbuszowa. The subject of the project is the assembly of systems consisting of polycrystalline modules for the production of electricity (with a total installed capacity of 0,19 MW). The planned installation consists of a total of 697 modules of photovoltaic panel modules with a single 280 W panel, together with support structure, all necessary accessories and wiring. A total of six installations will be created for five entities. The installations will be connected to the existing power grid. The basic elements of the planned installation are: — Photovoltaic modules, inverters, mounting systems – roof and ground, wiring, electric switchgear, hermetic housings, monitoring system. The total installed power is the sum of the power of each installation, which in turn represents the product of the number of panels and the power of a single panel. RSM – Number of modules (140x 285 W= 39.9 kWp). Miel MET – Number of modules (123 x 325 W = 39,97kWp). Bakery Necessary – Number of modules (134 x 285 W= 38.19kWp). Hook – Number of modules (70 x 285 W = 19.95 kWp). The carcass: Installation No 1 – Number of modules (116 x 325 W = 37.70 kWp), Installation No 2 – Number of modules (61 x 325 W= 19,82 kWp). All of the installations are micro-installations. They will be connected to the energetic network within the existing connections for the property. Completion of the implementation is planned at 31.05. (English) / qualifier | |||||||||||||||
point in time: 20 October 2020
| |||||||||||||||
Property / summary: The aim of the project is to generate energy from renewable sources The general objective of the project is to increase the production of electricity from renewable sources and thus reduce greenhouse gas emissions into the atmosphere. Detailed objectives of the project are presented in section 2.1 of the Feasibility Study. The object of the project is the construction of new infrastructure, however, based on existing buildings and land belonging to the companies of the partners of the project. The project concerns the construction of new infrastructure, however, based on existing properties owned by the partners of the project. These properties are located in the municipalities of Mielec, Tuszyn Narodowy and Kolbuszowa. The subject of the project is the assembly of systems consisting of polycrystalline modules for the production of electricity (with a total installed capacity of 0,19 MW). The planned installation consists of a total of 697 modules of photovoltaic panel modules with a single 280 W panel, together with support structure, all necessary accessories and wiring. A total of six installations will be created for five entities. The installations will be connected to the existing power grid. The basic elements of the planned installation are: — Photovoltaic modules, inverters, mounting systems – roof and ground, wiring, electric switchgear, hermetic housings, monitoring system. The total installed power is the sum of the power of each installation, which in turn represents the product of the number of panels and the power of a single panel. RSM – Number of modules (140x 285 W= 39.9 kWp). Miel MET – Number of modules (123 x 325 W = 39,97kWp). Bakery Necessary – Number of modules (134 x 285 W= 38.19kWp). Hook – Number of modules (70 x 285 W = 19.95 kWp). The carcass: Installation No 1 – Number of modules (116 x 325 W = 37.70 kWp), Installation No 2 – Number of modules (61 x 325 W= 19,82 kWp). All of the installations are micro-installations. They will be connected to the energetic network within the existing connections for the property. Completion of the implementation is planned at 31.05. (English) / qualifier | |||||||||||||||
readability score: 0.8188334436128336
| |||||||||||||||
Property / summary | |||||||||||||||
L’objectif général du projet est d’augmenter la production d’électricité à partir de sources renouvelables et de réduire ainsi les émissions de gaz à effet de serre dans l’atmosphère. Les objectifs détaillés du projet sont présentés à la section 2.1 de l’étude de faisabilité. L’objet du projet est cependant la construction de nouvelles infrastructures basées sur des bâtiments existants et des terrains appartenant aux entreprises des partenaires du projet. Le projet concerne cependant la construction de nouvelles infrastructures basées sur des propriétés existantes appartenant aux entreprises des partenaires du projet. Ces propriétés sont situées dans les municipalités de Mielec, Tuszyn Narodowy et Kolbuszowa. L’objet du projet est l’installation de systèmes constitués de modules polycristallins pour la production d’électricité (d’une capacité installée totale de 0,19 MW). L’installation prévue comprend un total de 697 unités de panneaux photovoltaïques avec la puissance d’un seul panneau 280 W, ainsi qu’une structure de support, tout l’équipement nécessaire et le câblage. Au total, six installations seront construites pour cinq entités. Les installations seront raccordées au réseau électrique existant. Les éléments de base de l’installation planifiée sont: — Modules photovoltaïques, onduleurs, systèmes de montage — toiture et sol, câblage, appareillage électrique, boîtiers hermétiques, système de surveillance. La puissance totale installée est la somme de la puissance de chaque installation, qui à son tour est le produit du nombre de panneaux et de la puissance d’un seul panneau. RSM — Nombre de modules (140x 285W = 39,9 kWc). Miel MET — Nombre de modules (123 x 325W = 39,97kWp). Boulangerie Konieczny — Nombre de modules (134 x 285 W= 38.19kWp). Hockey — Nombre de modules (70 x 285 W = 19,95 kWc). Karkut: Installation no 1 — Nombre de modules (116 x 325 W = 37,70 kWc), numéro d’installation 2 — Nombre de modules (61 x 325 W = 19,82 kWc). Toutes les installations sont des micro-installations. Ils seront connectés au réseau électrique. dans les connexions existantes pour la propriété. L’achèvement est prévu pour le 31.05. (French) | |||||||||||||||
Property / summary: L’objectif général du projet est d’augmenter la production d’électricité à partir de sources renouvelables et de réduire ainsi les émissions de gaz à effet de serre dans l’atmosphère. Les objectifs détaillés du projet sont présentés à la section 2.1 de l’étude de faisabilité. L’objet du projet est cependant la construction de nouvelles infrastructures basées sur des bâtiments existants et des terrains appartenant aux entreprises des partenaires du projet. Le projet concerne cependant la construction de nouvelles infrastructures basées sur des propriétés existantes appartenant aux entreprises des partenaires du projet. Ces propriétés sont situées dans les municipalités de Mielec, Tuszyn Narodowy et Kolbuszowa. L’objet du projet est l’installation de systèmes constitués de modules polycristallins pour la production d’électricité (d’une capacité installée totale de 0,19 MW). L’installation prévue comprend un total de 697 unités de panneaux photovoltaïques avec la puissance d’un seul panneau 280 W, ainsi qu’une structure de support, tout l’équipement nécessaire et le câblage. Au total, six installations seront construites pour cinq entités. Les installations seront raccordées au réseau électrique existant. Les éléments de base de l’installation planifiée sont: — Modules photovoltaïques, onduleurs, systèmes de montage — toiture et sol, câblage, appareillage électrique, boîtiers hermétiques, système de surveillance. La puissance totale installée est la somme de la puissance de chaque installation, qui à son tour est le produit du nombre de panneaux et de la puissance d’un seul panneau. RSM — Nombre de modules (140x 285W = 39,9 kWc). Miel MET — Nombre de modules (123 x 325W = 39,97kWp). Boulangerie Konieczny — Nombre de modules (134 x 285 W= 38.19kWp). Hockey — Nombre de modules (70 x 285 W = 19,95 kWc). Karkut: Installation no 1 — Nombre de modules (116 x 325 W = 37,70 kWc), numéro d’installation 2 — Nombre de modules (61 x 325 W = 19,82 kWc). Toutes les installations sont des micro-installations. Ils seront connectés au réseau électrique. dans les connexions existantes pour la propriété. L’achèvement est prévu pour le 31.05. (French) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: L’objectif général du projet est d’augmenter la production d’électricité à partir de sources renouvelables et de réduire ainsi les émissions de gaz à effet de serre dans l’atmosphère. Les objectifs détaillés du projet sont présentés à la section 2.1 de l’étude de faisabilité. L’objet du projet est cependant la construction de nouvelles infrastructures basées sur des bâtiments existants et des terrains appartenant aux entreprises des partenaires du projet. Le projet concerne cependant la construction de nouvelles infrastructures basées sur des propriétés existantes appartenant aux entreprises des partenaires du projet. Ces propriétés sont situées dans les municipalités de Mielec, Tuszyn Narodowy et Kolbuszowa. L’objet du projet est l’installation de systèmes constitués de modules polycristallins pour la production d’électricité (d’une capacité installée totale de 0,19 MW). L’installation prévue comprend un total de 697 unités de panneaux photovoltaïques avec la puissance d’un seul panneau 280 W, ainsi qu’une structure de support, tout l’équipement nécessaire et le câblage. Au total, six installations seront construites pour cinq entités. Les installations seront raccordées au réseau électrique existant. Les éléments de base de l’installation planifiée sont: — Modules photovoltaïques, onduleurs, systèmes de montage — toiture et sol, câblage, appareillage électrique, boîtiers hermétiques, système de surveillance. La puissance totale installée est la somme de la puissance de chaque installation, qui à son tour est le produit du nombre de panneaux et de la puissance d’un seul panneau. RSM — Nombre de modules (140x 285W = 39,9 kWc). Miel MET — Nombre de modules (123 x 325W = 39,97kWp). Boulangerie Konieczny — Nombre de modules (134 x 285 W= 38.19kWp). Hockey — Nombre de modules (70 x 285 W = 19,95 kWc). Karkut: Installation no 1 — Nombre de modules (116 x 325 W = 37,70 kWc), numéro d’installation 2 — Nombre de modules (61 x 325 W = 19,82 kWc). Toutes les installations sont des micro-installations. Ils seront connectés au réseau électrique. dans les connexions existantes pour la propriété. L’achèvement est prévu pour le 31.05. (French) / qualifier | |||||||||||||||
point in time: 2 December 2021
| |||||||||||||||
Property / summary | |||||||||||||||
Übergeordnetes Ziel des Projekts ist es, die Stromerzeugung aus erneuerbaren Quellen zu steigern und so die Treibhausgasemissionen in die Atmosphäre zu reduzieren. Die detaillierten Ziele des Projekts sind in Abschnitt 2.1 der Machbarkeitsstudie dargestellt. Gegenstand des Projekts ist jedoch der Bau neuer Infrastrukturen, die auf bestehenden Gebäuden und Grundstücken basieren, die den Unternehmen der Projektpartner gehören. Das Projekt betrifft jedoch den Bau neuer Infrastrukturen, die auf bestehenden Grundstücken basieren, die sich im Besitz der Unternehmen der Projektpartner befinden. Diese Liegenschaften befinden sich in den Gemeinden Mielec, Tuszyn Narodowy und Kolbuszowa. Gegenstand des Projekts ist die Installation von Systemen, die aus polykristallinen Modulen zur Stromerzeugung bestehen (mit einer installierten Gesamtleistung von 0,19 MW). Die geplante Installation umfasst insgesamt 697 Photovoltaik-Module mit der Leistung eines einzigen Panels 280 W, zusammen mit einer Stützstruktur, allen notwendigen Geräten und Verkabelungen. Insgesamt werden sechs Anlagen für fünf Einheiten gebaut. Die Anlagen werden an das bestehende Stromnetz angeschlossen. Die Grundelemente der geplanten Installation sind: — Photovoltaik-Module, Wechselrichter, Montagesysteme – Dach und Boden, Verdrahtung, elektrische Schaltanlagen, hermetische Gehäuse, Überwachungssystem. Die gesamte installierte Leistung ist die Summe der Leistung jeder Anlage, die wiederum das Produkt der Anzahl der Paneele und der Leistung eines einzelnen Panels ist. RSM – Anzahl der Module (140x 285W = 39,9 kWp). Miel MET – Anzahl der Module (123 x 325W = 39.97kWp). Bäckerei Konieczny – Anzahl der Module (134 x 285 W = 38.19kWp). Hockey – Anzahl der Module (70 x 285 W = 19,95 kWp). Karkut: Einbau Nr. 1 – Anzahl der Module (116 x 325 W = 37,70 kWp), Installation Nr. 2 – Anzahl der Module (61 x 325 W = 19,82 kWp). Alle Installationen sind Mikroinstallationen. Sie werden an das Stromnetz angeschlossen. innerhalb der bestehenden Anschlüsse für das Grundstück. Die Fertigstellung ist für 31.05. geplant. (German) | |||||||||||||||
Property / summary: Übergeordnetes Ziel des Projekts ist es, die Stromerzeugung aus erneuerbaren Quellen zu steigern und so die Treibhausgasemissionen in die Atmosphäre zu reduzieren. Die detaillierten Ziele des Projekts sind in Abschnitt 2.1 der Machbarkeitsstudie dargestellt. Gegenstand des Projekts ist jedoch der Bau neuer Infrastrukturen, die auf bestehenden Gebäuden und Grundstücken basieren, die den Unternehmen der Projektpartner gehören. Das Projekt betrifft jedoch den Bau neuer Infrastrukturen, die auf bestehenden Grundstücken basieren, die sich im Besitz der Unternehmen der Projektpartner befinden. Diese Liegenschaften befinden sich in den Gemeinden Mielec, Tuszyn Narodowy und Kolbuszowa. Gegenstand des Projekts ist die Installation von Systemen, die aus polykristallinen Modulen zur Stromerzeugung bestehen (mit einer installierten Gesamtleistung von 0,19 MW). Die geplante Installation umfasst insgesamt 697 Photovoltaik-Module mit der Leistung eines einzigen Panels 280 W, zusammen mit einer Stützstruktur, allen notwendigen Geräten und Verkabelungen. Insgesamt werden sechs Anlagen für fünf Einheiten gebaut. Die Anlagen werden an das bestehende Stromnetz angeschlossen. Die Grundelemente der geplanten Installation sind: — Photovoltaik-Module, Wechselrichter, Montagesysteme – Dach und Boden, Verdrahtung, elektrische Schaltanlagen, hermetische Gehäuse, Überwachungssystem. Die gesamte installierte Leistung ist die Summe der Leistung jeder Anlage, die wiederum das Produkt der Anzahl der Paneele und der Leistung eines einzelnen Panels ist. RSM – Anzahl der Module (140x 285W = 39,9 kWp). Miel MET – Anzahl der Module (123 x 325W = 39.97kWp). Bäckerei Konieczny – Anzahl der Module (134 x 285 W = 38.19kWp). Hockey – Anzahl der Module (70 x 285 W = 19,95 kWp). Karkut: Einbau Nr. 1 – Anzahl der Module (116 x 325 W = 37,70 kWp), Installation Nr. 2 – Anzahl der Module (61 x 325 W = 19,82 kWp). Alle Installationen sind Mikroinstallationen. Sie werden an das Stromnetz angeschlossen. innerhalb der bestehenden Anschlüsse für das Grundstück. Die Fertigstellung ist für 31.05. geplant. (German) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: Übergeordnetes Ziel des Projekts ist es, die Stromerzeugung aus erneuerbaren Quellen zu steigern und so die Treibhausgasemissionen in die Atmosphäre zu reduzieren. Die detaillierten Ziele des Projekts sind in Abschnitt 2.1 der Machbarkeitsstudie dargestellt. Gegenstand des Projekts ist jedoch der Bau neuer Infrastrukturen, die auf bestehenden Gebäuden und Grundstücken basieren, die den Unternehmen der Projektpartner gehören. Das Projekt betrifft jedoch den Bau neuer Infrastrukturen, die auf bestehenden Grundstücken basieren, die sich im Besitz der Unternehmen der Projektpartner befinden. Diese Liegenschaften befinden sich in den Gemeinden Mielec, Tuszyn Narodowy und Kolbuszowa. Gegenstand des Projekts ist die Installation von Systemen, die aus polykristallinen Modulen zur Stromerzeugung bestehen (mit einer installierten Gesamtleistung von 0,19 MW). Die geplante Installation umfasst insgesamt 697 Photovoltaik-Module mit der Leistung eines einzigen Panels 280 W, zusammen mit einer Stützstruktur, allen notwendigen Geräten und Verkabelungen. Insgesamt werden sechs Anlagen für fünf Einheiten gebaut. Die Anlagen werden an das bestehende Stromnetz angeschlossen. Die Grundelemente der geplanten Installation sind: — Photovoltaik-Module, Wechselrichter, Montagesysteme – Dach und Boden, Verdrahtung, elektrische Schaltanlagen, hermetische Gehäuse, Überwachungssystem. Die gesamte installierte Leistung ist die Summe der Leistung jeder Anlage, die wiederum das Produkt der Anzahl der Paneele und der Leistung eines einzelnen Panels ist. RSM – Anzahl der Module (140x 285W = 39,9 kWp). Miel MET – Anzahl der Module (123 x 325W = 39.97kWp). Bäckerei Konieczny – Anzahl der Module (134 x 285 W = 38.19kWp). Hockey – Anzahl der Module (70 x 285 W = 19,95 kWp). Karkut: Einbau Nr. 1 – Anzahl der Module (116 x 325 W = 37,70 kWp), Installation Nr. 2 – Anzahl der Module (61 x 325 W = 19,82 kWp). Alle Installationen sind Mikroinstallationen. Sie werden an das Stromnetz angeschlossen. innerhalb der bestehenden Anschlüsse für das Grundstück. Die Fertigstellung ist für 31.05. geplant. (German) / qualifier | |||||||||||||||
point in time: 7 December 2021
| |||||||||||||||
Property / summary | |||||||||||||||
De algemene doelstelling van het project is de productie van elektriciteit uit hernieuwbare bronnen te verhogen en zo de uitstoot van broeikasgassen in de atmosfeer te verminderen. De gedetailleerde doelstellingen van het project worden uiteengezet in punt 2.1 van de haalbaarheidsstudie. Het onderwerp van het project is echter de bouw van nieuwe infrastructuur op basis van bestaande gebouwen en grond die toebehoren aan de bedrijven van de projectpartners. Het project betreft echter de bouw van nieuwe infrastructuur op basis van bestaande panden die eigendom zijn van de bedrijven van de projectpartners. Deze woningen bevinden zich in de gemeenten Mielec, Tuszyn Narodowy en Kolbuszowa. Het onderwerp van het project is de installatie van systemen die bestaan uit polykristallijne modules voor de productie van elektriciteit (met een totaal geïnstalleerd vermogen van 0,19 MW). De geplande installatie omvat in totaal 697 eenheden fotovoltaïsche panelen met het vermogen van een enkel paneel 280 W, samen met een ondersteuningsstructuur, alle benodigde apparatuur en bedrading. Er zullen in totaal zes installaties worden gebouwd voor vijf entiteiten. De installaties zullen worden aangesloten op het bestaande elektriciteitsnet. De basiselementen van de geplande installatie zijn: — Fotovoltaïsche modules, omvormers, montagesystemen — dak en grond, bedrading, elektrische schakelinrichtingen, hermetische behuizingen, bewakingssysteem. Het totale geïnstalleerde vermogen is de som van het vermogen van elke installatie, dat op zijn beurt het product is van het aantal panelen en het vermogen van een enkel paneel. RSM — Aantal modules (140x 285W= 39,9 kWp). Miel MET — Aantal modules (123 x 325W = 39,97kWp). Bakkerij Konieczny — Aantal modules (134 x 285 W= 38.19kWp). Hockey — Aantal modules (70 x 285 W= 19,95 kWp). Karkut: Installatie nr. 1 — Aantal modules (116 x 325 W= 37,70 kWp), Installatie nr. 2 — Aantal modules (61 x 325 W= 19,82 kWp). Alle installaties zijn micro-installaties. Ze zullen worden aangesloten op het elektriciteitsnet. binnen de bestaande aansluitingen voor het pand. De voltooiing is gepland voor 31.05. (Dutch) | |||||||||||||||
Property / summary: De algemene doelstelling van het project is de productie van elektriciteit uit hernieuwbare bronnen te verhogen en zo de uitstoot van broeikasgassen in de atmosfeer te verminderen. De gedetailleerde doelstellingen van het project worden uiteengezet in punt 2.1 van de haalbaarheidsstudie. Het onderwerp van het project is echter de bouw van nieuwe infrastructuur op basis van bestaande gebouwen en grond die toebehoren aan de bedrijven van de projectpartners. Het project betreft echter de bouw van nieuwe infrastructuur op basis van bestaande panden die eigendom zijn van de bedrijven van de projectpartners. Deze woningen bevinden zich in de gemeenten Mielec, Tuszyn Narodowy en Kolbuszowa. Het onderwerp van het project is de installatie van systemen die bestaan uit polykristallijne modules voor de productie van elektriciteit (met een totaal geïnstalleerd vermogen van 0,19 MW). De geplande installatie omvat in totaal 697 eenheden fotovoltaïsche panelen met het vermogen van een enkel paneel 280 W, samen met een ondersteuningsstructuur, alle benodigde apparatuur en bedrading. Er zullen in totaal zes installaties worden gebouwd voor vijf entiteiten. De installaties zullen worden aangesloten op het bestaande elektriciteitsnet. De basiselementen van de geplande installatie zijn: — Fotovoltaïsche modules, omvormers, montagesystemen — dak en grond, bedrading, elektrische schakelinrichtingen, hermetische behuizingen, bewakingssysteem. Het totale geïnstalleerde vermogen is de som van het vermogen van elke installatie, dat op zijn beurt het product is van het aantal panelen en het vermogen van een enkel paneel. RSM — Aantal modules (140x 285W= 39,9 kWp). Miel MET — Aantal modules (123 x 325W = 39,97kWp). Bakkerij Konieczny — Aantal modules (134 x 285 W= 38.19kWp). Hockey — Aantal modules (70 x 285 W= 19,95 kWp). Karkut: Installatie nr. 1 — Aantal modules (116 x 325 W= 37,70 kWp), Installatie nr. 2 — Aantal modules (61 x 325 W= 19,82 kWp). Alle installaties zijn micro-installaties. Ze zullen worden aangesloten op het elektriciteitsnet. binnen de bestaande aansluitingen voor het pand. De voltooiing is gepland voor 31.05. (Dutch) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: De algemene doelstelling van het project is de productie van elektriciteit uit hernieuwbare bronnen te verhogen en zo de uitstoot van broeikasgassen in de atmosfeer te verminderen. De gedetailleerde doelstellingen van het project worden uiteengezet in punt 2.1 van de haalbaarheidsstudie. Het onderwerp van het project is echter de bouw van nieuwe infrastructuur op basis van bestaande gebouwen en grond die toebehoren aan de bedrijven van de projectpartners. Het project betreft echter de bouw van nieuwe infrastructuur op basis van bestaande panden die eigendom zijn van de bedrijven van de projectpartners. Deze woningen bevinden zich in de gemeenten Mielec, Tuszyn Narodowy en Kolbuszowa. Het onderwerp van het project is de installatie van systemen die bestaan uit polykristallijne modules voor de productie van elektriciteit (met een totaal geïnstalleerd vermogen van 0,19 MW). De geplande installatie omvat in totaal 697 eenheden fotovoltaïsche panelen met het vermogen van een enkel paneel 280 W, samen met een ondersteuningsstructuur, alle benodigde apparatuur en bedrading. Er zullen in totaal zes installaties worden gebouwd voor vijf entiteiten. De installaties zullen worden aangesloten op het bestaande elektriciteitsnet. De basiselementen van de geplande installatie zijn: — Fotovoltaïsche modules, omvormers, montagesystemen — dak en grond, bedrading, elektrische schakelinrichtingen, hermetische behuizingen, bewakingssysteem. Het totale geïnstalleerde vermogen is de som van het vermogen van elke installatie, dat op zijn beurt het product is van het aantal panelen en het vermogen van een enkel paneel. RSM — Aantal modules (140x 285W= 39,9 kWp). Miel MET — Aantal modules (123 x 325W = 39,97kWp). Bakkerij Konieczny — Aantal modules (134 x 285 W= 38.19kWp). Hockey — Aantal modules (70 x 285 W= 19,95 kWp). Karkut: Installatie nr. 1 — Aantal modules (116 x 325 W= 37,70 kWp), Installatie nr. 2 — Aantal modules (61 x 325 W= 19,82 kWp). Alle installaties zijn micro-installaties. Ze zullen worden aangesloten op het elektriciteitsnet. binnen de bestaande aansluitingen voor het pand. De voltooiing is gepland voor 31.05. (Dutch) / qualifier | |||||||||||||||
point in time: 17 December 2021
| |||||||||||||||
Property / summary | |||||||||||||||
L'obiettivo generale del progetto è aumentare la produzione di energia elettrica da fonti rinnovabili e quindi ridurre le emissioni di gas a effetto serra nell'atmosfera. Gli obiettivi dettagliati del progetto sono presentati nella sezione 2.1 dello studio di fattibilità. Oggetto del progetto è la costruzione di nuove infrastrutture, tuttavia, basate su edifici esistenti e terreni appartenenti alle aziende dei partner del progetto. Il progetto riguarda la costruzione di nuove infrastrutture, tuttavia, sulla base di immobili esistenti di proprietà delle società dei partner del progetto. Queste proprietà si trovano nei comuni di Mielec, Tuszyn Narodowy e Kolbuszowa. Oggetto del progetto è l'installazione di impianti costituiti da moduli policristallini per la produzione di energia elettrica (con una capacità installata totale di 0,19 MW). L'installazione prevista comprende un totale di 697 unità di pannelli fotovoltaici con la potenza di un singolo pannello 280 W, insieme a una struttura di supporto, tutte le attrezzature necessarie e cablaggio. Un totale di sei installazioni saranno costruite per cinque entità. Gli impianti saranno collegati alla rete elettrica esistente. Gli elementi di base dell'installazione prevista sono: — Moduli fotovoltaici, inverter, sistemi di montaggio — tetto e terra, cablaggio, quadri elettrici, custodie ermetiche, sistema di monitoraggio. La potenza totale installata è la somma della potenza di ogni installazione, che a sua volta è il prodotto del numero di pannelli e della potenza di un singolo pannello. RSM — Numero di moduli (140x 285W= 39,9 kWp). Miel MET — Numero di moduli (123 x 325W = 39.97kWp). Panetteria Konieczny — Numero di moduli (134 x 285 W= 38,19kWp). Hockey — Numero di moduli (70 x 285 W= 19,95 kWp). Karkut: Installazione n. 1 — Numero di moduli (116 x 325 W= 37,70 kWp), No. 2 — Numero di moduli (61 x 325 W= 19,82 kWp). Tutte le installazioni sono micro-installazioni. Saranno collegati alla rete elettrica all'interno delle connessioni esistenti per la proprietà. Il completamento è previsto per il 31.05. (Italian) | |||||||||||||||
Property / summary: L'obiettivo generale del progetto è aumentare la produzione di energia elettrica da fonti rinnovabili e quindi ridurre le emissioni di gas a effetto serra nell'atmosfera. Gli obiettivi dettagliati del progetto sono presentati nella sezione 2.1 dello studio di fattibilità. Oggetto del progetto è la costruzione di nuove infrastrutture, tuttavia, basate su edifici esistenti e terreni appartenenti alle aziende dei partner del progetto. Il progetto riguarda la costruzione di nuove infrastrutture, tuttavia, sulla base di immobili esistenti di proprietà delle società dei partner del progetto. Queste proprietà si trovano nei comuni di Mielec, Tuszyn Narodowy e Kolbuszowa. Oggetto del progetto è l'installazione di impianti costituiti da moduli policristallini per la produzione di energia elettrica (con una capacità installata totale di 0,19 MW). L'installazione prevista comprende un totale di 697 unità di pannelli fotovoltaici con la potenza di un singolo pannello 280 W, insieme a una struttura di supporto, tutte le attrezzature necessarie e cablaggio. Un totale di sei installazioni saranno costruite per cinque entità. Gli impianti saranno collegati alla rete elettrica esistente. Gli elementi di base dell'installazione prevista sono: — Moduli fotovoltaici, inverter, sistemi di montaggio — tetto e terra, cablaggio, quadri elettrici, custodie ermetiche, sistema di monitoraggio. La potenza totale installata è la somma della potenza di ogni installazione, che a sua volta è il prodotto del numero di pannelli e della potenza di un singolo pannello. RSM — Numero di moduli (140x 285W= 39,9 kWp). Miel MET — Numero di moduli (123 x 325W = 39.97kWp). Panetteria Konieczny — Numero di moduli (134 x 285 W= 38,19kWp). Hockey — Numero di moduli (70 x 285 W= 19,95 kWp). Karkut: Installazione n. 1 — Numero di moduli (116 x 325 W= 37,70 kWp), No. 2 — Numero di moduli (61 x 325 W= 19,82 kWp). Tutte le installazioni sono micro-installazioni. Saranno collegati alla rete elettrica all'interno delle connessioni esistenti per la proprietà. Il completamento è previsto per il 31.05. (Italian) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: L'obiettivo generale del progetto è aumentare la produzione di energia elettrica da fonti rinnovabili e quindi ridurre le emissioni di gas a effetto serra nell'atmosfera. Gli obiettivi dettagliati del progetto sono presentati nella sezione 2.1 dello studio di fattibilità. Oggetto del progetto è la costruzione di nuove infrastrutture, tuttavia, basate su edifici esistenti e terreni appartenenti alle aziende dei partner del progetto. Il progetto riguarda la costruzione di nuove infrastrutture, tuttavia, sulla base di immobili esistenti di proprietà delle società dei partner del progetto. Queste proprietà si trovano nei comuni di Mielec, Tuszyn Narodowy e Kolbuszowa. Oggetto del progetto è l'installazione di impianti costituiti da moduli policristallini per la produzione di energia elettrica (con una capacità installata totale di 0,19 MW). L'installazione prevista comprende un totale di 697 unità di pannelli fotovoltaici con la potenza di un singolo pannello 280 W, insieme a una struttura di supporto, tutte le attrezzature necessarie e cablaggio. Un totale di sei installazioni saranno costruite per cinque entità. Gli impianti saranno collegati alla rete elettrica esistente. Gli elementi di base dell'installazione prevista sono: — Moduli fotovoltaici, inverter, sistemi di montaggio — tetto e terra, cablaggio, quadri elettrici, custodie ermetiche, sistema di monitoraggio. La potenza totale installata è la somma della potenza di ogni installazione, che a sua volta è il prodotto del numero di pannelli e della potenza di un singolo pannello. RSM — Numero di moduli (140x 285W= 39,9 kWp). Miel MET — Numero di moduli (123 x 325W = 39.97kWp). Panetteria Konieczny — Numero di moduli (134 x 285 W= 38,19kWp). Hockey — Numero di moduli (70 x 285 W= 19,95 kWp). Karkut: Installazione n. 1 — Numero di moduli (116 x 325 W= 37,70 kWp), No. 2 — Numero di moduli (61 x 325 W= 19,82 kWp). Tutte le installazioni sono micro-installazioni. Saranno collegati alla rete elettrica all'interno delle connessioni esistenti per la proprietà. Il completamento è previsto per il 31.05. (Italian) / qualifier | |||||||||||||||
point in time: 15 January 2022
| |||||||||||||||
Property / summary | |||||||||||||||
El objetivo general del proyecto es aumentar la producción de electricidad a partir de fuentes renovables y reducir así las emisiones de gases de efecto invernadero a la atmósfera. Los objetivos detallados del proyecto se presentan en la sección 2.1 del estudio de viabilidad. El objeto del proyecto es la construcción de nuevas infraestructuras, sin embargo, basadas en edificios existentes y terrenos pertenecientes a las empresas de los socios del proyecto. El proyecto se refiere a la construcción de nuevas infraestructuras, sin embargo, sobre la base de las propiedades existentes propiedad de las empresas de los socios del proyecto. Estas propiedades se encuentran en los municipios de Mielec, Tuszyn Narodowy y Kolbuszowa. El objeto del proyecto es la instalación de sistemas consistentes en módulos policristalinos para la producción de electricidad (con una capacidad instalada total de 0,19 MW). La instalación prevista incluye un total de 697 unidades de paneles fotovoltaicos con la potencia de un solo panel 280 W, junto con una estructura de soporte, todos los equipos necesarios y cableado. Se construirán un total de seis instalaciones para cinco entidades. Las instalaciones estarán conectadas a la red eléctrica existente. Los elementos básicos de la instalación prevista son: — Módulos fotovoltaicos, inversores, sistemas de montaje — techo y tierra, cableado, conmutadores eléctricos, cerramientos herméticos, sistema de monitorización. La potencia instalada total es la suma de la potencia de cada instalación, que a su vez es el producto del número de paneles y la potencia de un solo panel. RSM — Número de módulos (140x 285W= 39,9 kWp). Miel MET — Número de módulos (123 x 325W = 39,97kWp). Panadería Konieczny — Número de módulos (134 x 285 W= 38,19kWp). Hockey — Número de módulos (70 x 285 W= 19,95 kWp). ¿Por qué? Instalación N.º 1 — Número de módulos (116 x 325 W= 37,70 kWp), Instalación n.º 2 — Número de módulos (61 x 325 W= 19,82 kWp). Todas las instalaciones son microinstalaciones. Se conectarán a la red eléctrica dentro de las conexiones existentes para la propiedad. La finalización está prevista para el 31.05. (Spanish) | |||||||||||||||
Property / summary: El objetivo general del proyecto es aumentar la producción de electricidad a partir de fuentes renovables y reducir así las emisiones de gases de efecto invernadero a la atmósfera. Los objetivos detallados del proyecto se presentan en la sección 2.1 del estudio de viabilidad. El objeto del proyecto es la construcción de nuevas infraestructuras, sin embargo, basadas en edificios existentes y terrenos pertenecientes a las empresas de los socios del proyecto. El proyecto se refiere a la construcción de nuevas infraestructuras, sin embargo, sobre la base de las propiedades existentes propiedad de las empresas de los socios del proyecto. Estas propiedades se encuentran en los municipios de Mielec, Tuszyn Narodowy y Kolbuszowa. El objeto del proyecto es la instalación de sistemas consistentes en módulos policristalinos para la producción de electricidad (con una capacidad instalada total de 0,19 MW). La instalación prevista incluye un total de 697 unidades de paneles fotovoltaicos con la potencia de un solo panel 280 W, junto con una estructura de soporte, todos los equipos necesarios y cableado. Se construirán un total de seis instalaciones para cinco entidades. Las instalaciones estarán conectadas a la red eléctrica existente. Los elementos básicos de la instalación prevista son: — Módulos fotovoltaicos, inversores, sistemas de montaje — techo y tierra, cableado, conmutadores eléctricos, cerramientos herméticos, sistema de monitorización. La potencia instalada total es la suma de la potencia de cada instalación, que a su vez es el producto del número de paneles y la potencia de un solo panel. RSM — Número de módulos (140x 285W= 39,9 kWp). Miel MET — Número de módulos (123 x 325W = 39,97kWp). Panadería Konieczny — Número de módulos (134 x 285 W= 38,19kWp). Hockey — Número de módulos (70 x 285 W= 19,95 kWp). ¿Por qué? Instalación N.º 1 — Número de módulos (116 x 325 W= 37,70 kWp), Instalación n.º 2 — Número de módulos (61 x 325 W= 19,82 kWp). Todas las instalaciones son microinstalaciones. Se conectarán a la red eléctrica dentro de las conexiones existentes para la propiedad. La finalización está prevista para el 31.05. (Spanish) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: El objetivo general del proyecto es aumentar la producción de electricidad a partir de fuentes renovables y reducir así las emisiones de gases de efecto invernadero a la atmósfera. Los objetivos detallados del proyecto se presentan en la sección 2.1 del estudio de viabilidad. El objeto del proyecto es la construcción de nuevas infraestructuras, sin embargo, basadas en edificios existentes y terrenos pertenecientes a las empresas de los socios del proyecto. El proyecto se refiere a la construcción de nuevas infraestructuras, sin embargo, sobre la base de las propiedades existentes propiedad de las empresas de los socios del proyecto. Estas propiedades se encuentran en los municipios de Mielec, Tuszyn Narodowy y Kolbuszowa. El objeto del proyecto es la instalación de sistemas consistentes en módulos policristalinos para la producción de electricidad (con una capacidad instalada total de 0,19 MW). La instalación prevista incluye un total de 697 unidades de paneles fotovoltaicos con la potencia de un solo panel 280 W, junto con una estructura de soporte, todos los equipos necesarios y cableado. Se construirán un total de seis instalaciones para cinco entidades. Las instalaciones estarán conectadas a la red eléctrica existente. Los elementos básicos de la instalación prevista son: — Módulos fotovoltaicos, inversores, sistemas de montaje — techo y tierra, cableado, conmutadores eléctricos, cerramientos herméticos, sistema de monitorización. La potencia instalada total es la suma de la potencia de cada instalación, que a su vez es el producto del número de paneles y la potencia de un solo panel. RSM — Número de módulos (140x 285W= 39,9 kWp). Miel MET — Número de módulos (123 x 325W = 39,97kWp). Panadería Konieczny — Número de módulos (134 x 285 W= 38,19kWp). Hockey — Número de módulos (70 x 285 W= 19,95 kWp). ¿Por qué? Instalación N.º 1 — Número de módulos (116 x 325 W= 37,70 kWp), Instalación n.º 2 — Número de módulos (61 x 325 W= 19,82 kWp). Todas las instalaciones son microinstalaciones. Se conectarán a la red eléctrica dentro de las conexiones existentes para la propiedad. La finalización está prevista para el 31.05. (Spanish) / qualifier | |||||||||||||||
point in time: 18 January 2022
| |||||||||||||||
Property / summary | |||||||||||||||
Projektets overordnede mål er at øge produktionen af elektricitet fra vedvarende energikilder og dermed reducere udledningen af drivhusgasser til atmosfæren. De detaljerede målsætninger for projektet er beskrevet i punkt 2.1 i gennemførlighedsundersøgelsen. Projektets emne er imidlertid opførelse af ny infrastruktur baseret på eksisterende bygninger og jord tilhørende projektpartnernes virksomheder. Projektet vedrører imidlertid opførelse af ny infrastruktur baseret på eksisterende ejendomme ejet af projektpartnernes virksomheder. Disse ejendomme er beliggende i kommunerne Mielec, Tuszyn Narodowy og Kolbuszowa. Projektets emne er installation af systemer bestående af polykrystallinske moduler til produktion af elektricitet (med en samlet installeret kapacitet på 0,19 MW). Den planlagte installation omfatter i alt 697 enheder af fotovoltaiske paneler med kraft af et enkelt panel 280 W, sammen med en støttestruktur, alt nødvendigt udstyr og ledninger. Der vil blive bygget i alt seks anlæg til fem enheder. Anlæggene vil blive tilsluttet det eksisterende elnet. De grundlæggende elementer i den planlagte installation er: — Fotovoltaiske moduler, invertere, monteringssystemer — tag og jord, ledninger, elektrisk koblingsudstyr, hermetiske kabinetter, overvågningssystem. Den samlede installerede effekt er summen af effekten af hvert anlæg, som igen er produktet af antallet af paneler og kraften i et enkelt panel. RSM — Antal moduler (140x 285W= 39,9 kWp). Miel MET — Antal moduler (123 x 325W = 39,97kWp). Bageri Konieczny — Antal moduler (134 x 285 W= 38,19kWp). Hockey — Antal moduler (70 x 285 W = 19,95 kWp). Hvad er Karkut? Installation nr. 1 — Antal moduler (116 x 325 W = 37,70 kWp), installation nr. 2 — Antal moduler (61 x 325 W = 19,82 kWp). Alle installationer er mikroinstallationer. De vil blive tilsluttet elnettet. inden for de eksisterende forbindelser til ejendommen. Færdiggørelsen er planlagt til 31.05. (Danish) | |||||||||||||||
Property / summary: Projektets overordnede mål er at øge produktionen af elektricitet fra vedvarende energikilder og dermed reducere udledningen af drivhusgasser til atmosfæren. De detaljerede målsætninger for projektet er beskrevet i punkt 2.1 i gennemførlighedsundersøgelsen. Projektets emne er imidlertid opførelse af ny infrastruktur baseret på eksisterende bygninger og jord tilhørende projektpartnernes virksomheder. Projektet vedrører imidlertid opførelse af ny infrastruktur baseret på eksisterende ejendomme ejet af projektpartnernes virksomheder. Disse ejendomme er beliggende i kommunerne Mielec, Tuszyn Narodowy og Kolbuszowa. Projektets emne er installation af systemer bestående af polykrystallinske moduler til produktion af elektricitet (med en samlet installeret kapacitet på 0,19 MW). Den planlagte installation omfatter i alt 697 enheder af fotovoltaiske paneler med kraft af et enkelt panel 280 W, sammen med en støttestruktur, alt nødvendigt udstyr og ledninger. Der vil blive bygget i alt seks anlæg til fem enheder. Anlæggene vil blive tilsluttet det eksisterende elnet. De grundlæggende elementer i den planlagte installation er: — Fotovoltaiske moduler, invertere, monteringssystemer — tag og jord, ledninger, elektrisk koblingsudstyr, hermetiske kabinetter, overvågningssystem. Den samlede installerede effekt er summen af effekten af hvert anlæg, som igen er produktet af antallet af paneler og kraften i et enkelt panel. RSM — Antal moduler (140x 285W= 39,9 kWp). Miel MET — Antal moduler (123 x 325W = 39,97kWp). Bageri Konieczny — Antal moduler (134 x 285 W= 38,19kWp). Hockey — Antal moduler (70 x 285 W = 19,95 kWp). Hvad er Karkut? Installation nr. 1 — Antal moduler (116 x 325 W = 37,70 kWp), installation nr. 2 — Antal moduler (61 x 325 W = 19,82 kWp). Alle installationer er mikroinstallationer. De vil blive tilsluttet elnettet. inden for de eksisterende forbindelser til ejendommen. Færdiggørelsen er planlagt til 31.05. (Danish) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: Projektets overordnede mål er at øge produktionen af elektricitet fra vedvarende energikilder og dermed reducere udledningen af drivhusgasser til atmosfæren. De detaljerede målsætninger for projektet er beskrevet i punkt 2.1 i gennemførlighedsundersøgelsen. Projektets emne er imidlertid opførelse af ny infrastruktur baseret på eksisterende bygninger og jord tilhørende projektpartnernes virksomheder. Projektet vedrører imidlertid opførelse af ny infrastruktur baseret på eksisterende ejendomme ejet af projektpartnernes virksomheder. Disse ejendomme er beliggende i kommunerne Mielec, Tuszyn Narodowy og Kolbuszowa. Projektets emne er installation af systemer bestående af polykrystallinske moduler til produktion af elektricitet (med en samlet installeret kapacitet på 0,19 MW). Den planlagte installation omfatter i alt 697 enheder af fotovoltaiske paneler med kraft af et enkelt panel 280 W, sammen med en støttestruktur, alt nødvendigt udstyr og ledninger. Der vil blive bygget i alt seks anlæg til fem enheder. Anlæggene vil blive tilsluttet det eksisterende elnet. De grundlæggende elementer i den planlagte installation er: — Fotovoltaiske moduler, invertere, monteringssystemer — tag og jord, ledninger, elektrisk koblingsudstyr, hermetiske kabinetter, overvågningssystem. Den samlede installerede effekt er summen af effekten af hvert anlæg, som igen er produktet af antallet af paneler og kraften i et enkelt panel. RSM — Antal moduler (140x 285W= 39,9 kWp). Miel MET — Antal moduler (123 x 325W = 39,97kWp). Bageri Konieczny — Antal moduler (134 x 285 W= 38,19kWp). Hockey — Antal moduler (70 x 285 W = 19,95 kWp). Hvad er Karkut? Installation nr. 1 — Antal moduler (116 x 325 W = 37,70 kWp), installation nr. 2 — Antal moduler (61 x 325 W = 19,82 kWp). Alle installationer er mikroinstallationer. De vil blive tilsluttet elnettet. inden for de eksisterende forbindelser til ejendommen. Færdiggørelsen er planlagt til 31.05. (Danish) / qualifier | |||||||||||||||
point in time: 2 July 2022
| |||||||||||||||
Property / summary | |||||||||||||||
Ο γενικός στόχος του έργου είναι η αύξηση της παραγωγής ηλεκτρικής ενέργειας από ανανεώσιμες πηγές και, ως εκ τούτου, η μείωση των εκπομπών αερίων του θερμοκηπίου στην ατμόσφαιρα. Οι λεπτομερείς στόχοι του έργου παρουσιάζονται στο τμήμα 2.1 της μελέτης σκοπιμότητας. Αντικείμενο του έργου είναι η κατασκευή νέων υποδομών, ωστόσο, με βάση υφιστάμενα κτίρια και οικόπεδα που ανήκουν στις εταιρείες των εταίρων του έργου. Το έργο αφορά την κατασκευή νέων υποδομών, ωστόσο, βάσει υφιστάμενων ακινήτων που ανήκουν στις εταιρείες των εταίρων του έργου. Τα ακίνητα αυτά βρίσκονται στους δήμους Mielec, Tuszyn Narodowy και Kolbuszowa. Αντικείμενο του έργου είναι η εγκατάσταση συστημάτων που αποτελούνται από πολυκρυσταλλικές μονάδες παραγωγής ηλεκτρικής ενέργειας (με συνολική εγκατεστημένη ισχύ 0,19 MW). Η σχεδιαζόμενη εγκατάσταση περιλαμβάνει συνολικά 697 μονάδες φωτοβολταϊκών πάνελ με την ισχύ ενός ενιαίου πάνελ 280 W, μαζί με δομή στήριξης, όλο τον απαραίτητο εξοπλισμό και καλωδίωση. Συνολικά θα κατασκευαστούν έξι εγκαταστάσεις για πέντε φορείς. Οι εγκαταστάσεις θα συνδεθούν με το υπάρχον δίκτυο ηλεκτρικής ενέργειας. Τα βασικά στοιχεία της σχεδιαζόμενης εγκατάστασης είναι: — Φωτοβολταϊκές μονάδες, αναστροφείς, συστήματα στερέωσης — στέγη και έδαφος, καλωδίωση, ηλεκτρικός μηχανισμός διανομής, ερμητικά περιβλήματα, σύστημα παρακολούθησης. Η συνολική εγκατεστημένη ισχύς είναι το άθροισμα της ισχύος κάθε εγκατάστασης, η οποία με τη σειρά της είναι το γινόμενο του αριθμού των πάνελ και της ισχύος ενός ενιαίου πίνακα. RSM — Αριθμός δομοστοιχείων (140x 285W= 39,9 kWp). MET Miel — Αριθμός δομοστοιχείων (123 x 325W = 39,97kWp). Αρτοποιείο Konieczny — Αριθμός μονάδων (134 x 285 W= 38.19kWp). Χόκεϊ — Αριθμός μονάδων (70 x 285 W= 19,95 kWp). Ο Καρκούτ: Εγκατάσταση αριθ. 1 — Αριθμός δομοστοιχείων (116 x 325 W= 37,70 kWp), εγκατάσταση αριθ. 2 — Αριθμός δομοστοιχείων (61 x 325 W= 19,82 kWp). Όλες οι εγκαταστάσεις είναι μικροεγκαταστάσεις. Θα συνδεθούν με το δίκτυο ηλεκτρικής ενέργειας. εντός των υφιστάμενων συνδέσεων για το ακίνητο. Η ολοκλήρωση έχει προγραμματιστεί για τις 31.05. (Greek) | |||||||||||||||
Property / summary: Ο γενικός στόχος του έργου είναι η αύξηση της παραγωγής ηλεκτρικής ενέργειας από ανανεώσιμες πηγές και, ως εκ τούτου, η μείωση των εκπομπών αερίων του θερμοκηπίου στην ατμόσφαιρα. Οι λεπτομερείς στόχοι του έργου παρουσιάζονται στο τμήμα 2.1 της μελέτης σκοπιμότητας. Αντικείμενο του έργου είναι η κατασκευή νέων υποδομών, ωστόσο, με βάση υφιστάμενα κτίρια και οικόπεδα που ανήκουν στις εταιρείες των εταίρων του έργου. Το έργο αφορά την κατασκευή νέων υποδομών, ωστόσο, βάσει υφιστάμενων ακινήτων που ανήκουν στις εταιρείες των εταίρων του έργου. Τα ακίνητα αυτά βρίσκονται στους δήμους Mielec, Tuszyn Narodowy και Kolbuszowa. Αντικείμενο του έργου είναι η εγκατάσταση συστημάτων που αποτελούνται από πολυκρυσταλλικές μονάδες παραγωγής ηλεκτρικής ενέργειας (με συνολική εγκατεστημένη ισχύ 0,19 MW). Η σχεδιαζόμενη εγκατάσταση περιλαμβάνει συνολικά 697 μονάδες φωτοβολταϊκών πάνελ με την ισχύ ενός ενιαίου πάνελ 280 W, μαζί με δομή στήριξης, όλο τον απαραίτητο εξοπλισμό και καλωδίωση. Συνολικά θα κατασκευαστούν έξι εγκαταστάσεις για πέντε φορείς. Οι εγκαταστάσεις θα συνδεθούν με το υπάρχον δίκτυο ηλεκτρικής ενέργειας. Τα βασικά στοιχεία της σχεδιαζόμενης εγκατάστασης είναι: — Φωτοβολταϊκές μονάδες, αναστροφείς, συστήματα στερέωσης — στέγη και έδαφος, καλωδίωση, ηλεκτρικός μηχανισμός διανομής, ερμητικά περιβλήματα, σύστημα παρακολούθησης. Η συνολική εγκατεστημένη ισχύς είναι το άθροισμα της ισχύος κάθε εγκατάστασης, η οποία με τη σειρά της είναι το γινόμενο του αριθμού των πάνελ και της ισχύος ενός ενιαίου πίνακα. RSM — Αριθμός δομοστοιχείων (140x 285W= 39,9 kWp). MET Miel — Αριθμός δομοστοιχείων (123 x 325W = 39,97kWp). Αρτοποιείο Konieczny — Αριθμός μονάδων (134 x 285 W= 38.19kWp). Χόκεϊ — Αριθμός μονάδων (70 x 285 W= 19,95 kWp). Ο Καρκούτ: Εγκατάσταση αριθ. 1 — Αριθμός δομοστοιχείων (116 x 325 W= 37,70 kWp), εγκατάσταση αριθ. 2 — Αριθμός δομοστοιχείων (61 x 325 W= 19,82 kWp). Όλες οι εγκαταστάσεις είναι μικροεγκαταστάσεις. Θα συνδεθούν με το δίκτυο ηλεκτρικής ενέργειας. εντός των υφιστάμενων συνδέσεων για το ακίνητο. Η ολοκλήρωση έχει προγραμματιστεί για τις 31.05. (Greek) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: Ο γενικός στόχος του έργου είναι η αύξηση της παραγωγής ηλεκτρικής ενέργειας από ανανεώσιμες πηγές και, ως εκ τούτου, η μείωση των εκπομπών αερίων του θερμοκηπίου στην ατμόσφαιρα. Οι λεπτομερείς στόχοι του έργου παρουσιάζονται στο τμήμα 2.1 της μελέτης σκοπιμότητας. Αντικείμενο του έργου είναι η κατασκευή νέων υποδομών, ωστόσο, με βάση υφιστάμενα κτίρια και οικόπεδα που ανήκουν στις εταιρείες των εταίρων του έργου. Το έργο αφορά την κατασκευή νέων υποδομών, ωστόσο, βάσει υφιστάμενων ακινήτων που ανήκουν στις εταιρείες των εταίρων του έργου. Τα ακίνητα αυτά βρίσκονται στους δήμους Mielec, Tuszyn Narodowy και Kolbuszowa. Αντικείμενο του έργου είναι η εγκατάσταση συστημάτων που αποτελούνται από πολυκρυσταλλικές μονάδες παραγωγής ηλεκτρικής ενέργειας (με συνολική εγκατεστημένη ισχύ 0,19 MW). Η σχεδιαζόμενη εγκατάσταση περιλαμβάνει συνολικά 697 μονάδες φωτοβολταϊκών πάνελ με την ισχύ ενός ενιαίου πάνελ 280 W, μαζί με δομή στήριξης, όλο τον απαραίτητο εξοπλισμό και καλωδίωση. Συνολικά θα κατασκευαστούν έξι εγκαταστάσεις για πέντε φορείς. Οι εγκαταστάσεις θα συνδεθούν με το υπάρχον δίκτυο ηλεκτρικής ενέργειας. Τα βασικά στοιχεία της σχεδιαζόμενης εγκατάστασης είναι: — Φωτοβολταϊκές μονάδες, αναστροφείς, συστήματα στερέωσης — στέγη και έδαφος, καλωδίωση, ηλεκτρικός μηχανισμός διανομής, ερμητικά περιβλήματα, σύστημα παρακολούθησης. Η συνολική εγκατεστημένη ισχύς είναι το άθροισμα της ισχύος κάθε εγκατάστασης, η οποία με τη σειρά της είναι το γινόμενο του αριθμού των πάνελ και της ισχύος ενός ενιαίου πίνακα. RSM — Αριθμός δομοστοιχείων (140x 285W= 39,9 kWp). MET Miel — Αριθμός δομοστοιχείων (123 x 325W = 39,97kWp). Αρτοποιείο Konieczny — Αριθμός μονάδων (134 x 285 W= 38.19kWp). Χόκεϊ — Αριθμός μονάδων (70 x 285 W= 19,95 kWp). Ο Καρκούτ: Εγκατάσταση αριθ. 1 — Αριθμός δομοστοιχείων (116 x 325 W= 37,70 kWp), εγκατάσταση αριθ. 2 — Αριθμός δομοστοιχείων (61 x 325 W= 19,82 kWp). Όλες οι εγκαταστάσεις είναι μικροεγκαταστάσεις. Θα συνδεθούν με το δίκτυο ηλεκτρικής ενέργειας. εντός των υφιστάμενων συνδέσεων για το ακίνητο. Η ολοκλήρωση έχει προγραμματιστεί για τις 31.05. (Greek) / qualifier | |||||||||||||||
point in time: 2 July 2022
| |||||||||||||||
Property / summary | |||||||||||||||
Opći cilj projekta je povećati proizvodnju električne energije iz obnovljivih izvora i time smanjiti emisije stakleničkih plinova u atmosferu. Detaljni ciljevi projekta prikazani su u odjeljku 2.1. studije izvedivosti. Predmet projekta je izgradnja nove infrastrukture, međutim, na temelju postojećih zgrada i zemljišta koje pripadaju tvrtkama projektnih partnera. Međutim, projekt se odnosi na izgradnju nove infrastrukture na temelju postojećih nekretnina u vlasništvu tvrtki projektnih partnera. Te nekretnine nalaze se u općinama Mielec, Tuszyn Narodowy i Kolbuszowa. Predmet projekta je instalacija sustava koji se sastoje od polikristalnih modula za proizvodnju električne energije (ukupnog instaliranog kapaciteta 0,19 MW). Planirana instalacija uključuje ukupno 697 jedinica fotonaponskih panela snage jedne ploče 280 W, zajedno s potpornom strukturom, sve potrebne opreme i ožičenja. Ukupno će biti izgrađeno šest postrojenja za pet entiteta. Postrojenja će biti priključena na postojeću elektroenergetsku mrežu. Osnovni elementi planirane instalacije su: — Fotonaponski moduli, pretvarači, sustavi za montažu – krov i tlo, ožičenje, električna rasklopna postrojenja, hermetička kućišta, sustav nadzora. Ukupna instalirana snaga je zbroj snage svake instalacije, što je zauzvrat umnožak broja ploča i snage jedne ploče. RSM – Broj modula (140x 285W= 39,9 kWp). Miel MET – Broj modula (123 x 325W = 39,97kWp). Pekara Konieczny – Broj modula (134 x 285 W=38,19kWp). Hokej – broj modula (70 x 285 W = 19,95 kWp). Što se događa? Ugradnja br. 1 – Broj modula (116 x 325 W=37,70 kWp), Instalacija br. 2 – Broj modula (61 x 325 W= 19,82 kWp). Sve instalacije su mikroinstalacije. Oni će biti priključeni na elektroenergetsku mrežu. unutar postojećih priključaka za nekretninu. Završetak je planiran za 31.05. (Croatian) | |||||||||||||||
Property / summary: Opći cilj projekta je povećati proizvodnju električne energije iz obnovljivih izvora i time smanjiti emisije stakleničkih plinova u atmosferu. Detaljni ciljevi projekta prikazani su u odjeljku 2.1. studije izvedivosti. Predmet projekta je izgradnja nove infrastrukture, međutim, na temelju postojećih zgrada i zemljišta koje pripadaju tvrtkama projektnih partnera. Međutim, projekt se odnosi na izgradnju nove infrastrukture na temelju postojećih nekretnina u vlasništvu tvrtki projektnih partnera. Te nekretnine nalaze se u općinama Mielec, Tuszyn Narodowy i Kolbuszowa. Predmet projekta je instalacija sustava koji se sastoje od polikristalnih modula za proizvodnju električne energije (ukupnog instaliranog kapaciteta 0,19 MW). Planirana instalacija uključuje ukupno 697 jedinica fotonaponskih panela snage jedne ploče 280 W, zajedno s potpornom strukturom, sve potrebne opreme i ožičenja. Ukupno će biti izgrađeno šest postrojenja za pet entiteta. Postrojenja će biti priključena na postojeću elektroenergetsku mrežu. Osnovni elementi planirane instalacije su: — Fotonaponski moduli, pretvarači, sustavi za montažu – krov i tlo, ožičenje, električna rasklopna postrojenja, hermetička kućišta, sustav nadzora. Ukupna instalirana snaga je zbroj snage svake instalacije, što je zauzvrat umnožak broja ploča i snage jedne ploče. RSM – Broj modula (140x 285W= 39,9 kWp). Miel MET – Broj modula (123 x 325W = 39,97kWp). Pekara Konieczny – Broj modula (134 x 285 W=38,19kWp). Hokej – broj modula (70 x 285 W = 19,95 kWp). Što se događa? Ugradnja br. 1 – Broj modula (116 x 325 W=37,70 kWp), Instalacija br. 2 – Broj modula (61 x 325 W= 19,82 kWp). Sve instalacije su mikroinstalacije. Oni će biti priključeni na elektroenergetsku mrežu. unutar postojećih priključaka za nekretninu. Završetak je planiran za 31.05. (Croatian) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: Opći cilj projekta je povećati proizvodnju električne energije iz obnovljivih izvora i time smanjiti emisije stakleničkih plinova u atmosferu. Detaljni ciljevi projekta prikazani su u odjeljku 2.1. studije izvedivosti. Predmet projekta je izgradnja nove infrastrukture, međutim, na temelju postojećih zgrada i zemljišta koje pripadaju tvrtkama projektnih partnera. Međutim, projekt se odnosi na izgradnju nove infrastrukture na temelju postojećih nekretnina u vlasništvu tvrtki projektnih partnera. Te nekretnine nalaze se u općinama Mielec, Tuszyn Narodowy i Kolbuszowa. Predmet projekta je instalacija sustava koji se sastoje od polikristalnih modula za proizvodnju električne energije (ukupnog instaliranog kapaciteta 0,19 MW). Planirana instalacija uključuje ukupno 697 jedinica fotonaponskih panela snage jedne ploče 280 W, zajedno s potpornom strukturom, sve potrebne opreme i ožičenja. Ukupno će biti izgrađeno šest postrojenja za pet entiteta. Postrojenja će biti priključena na postojeću elektroenergetsku mrežu. Osnovni elementi planirane instalacije su: — Fotonaponski moduli, pretvarači, sustavi za montažu – krov i tlo, ožičenje, električna rasklopna postrojenja, hermetička kućišta, sustav nadzora. Ukupna instalirana snaga je zbroj snage svake instalacije, što je zauzvrat umnožak broja ploča i snage jedne ploče. RSM – Broj modula (140x 285W= 39,9 kWp). Miel MET – Broj modula (123 x 325W = 39,97kWp). Pekara Konieczny – Broj modula (134 x 285 W=38,19kWp). Hokej – broj modula (70 x 285 W = 19,95 kWp). Što se događa? Ugradnja br. 1 – Broj modula (116 x 325 W=37,70 kWp), Instalacija br. 2 – Broj modula (61 x 325 W= 19,82 kWp). Sve instalacije su mikroinstalacije. Oni će biti priključeni na elektroenergetsku mrežu. unutar postojećih priključaka za nekretninu. Završetak je planiran za 31.05. (Croatian) / qualifier | |||||||||||||||
point in time: 2 July 2022
| |||||||||||||||
Property / summary | |||||||||||||||
Obiectivul general al proiectului este de a crește producția de energie electrică din surse regenerabile și, astfel, de a reduce emisiile de gaze cu efect de seră în atmosferă. Obiectivele detaliate ale proiectului sunt prezentate în secțiunea 2.1 a studiului de fezabilitate. Obiectul proiectului este construirea de noi infrastructuri, cu toate acestea, pe baza clădirilor existente și a terenurilor aparținând companiilor partenerilor de proiect. Proiectul se referă însă la construirea de noi infrastructuri, pe baza proprietăților existente deținute de companiile partenerilor de proiect. Aceste proprietăți sunt situate în municipalitățile Mielec, Tuszyn Narodowy și Kolbuszowa. Obiectul proiectului este instalarea de sisteme compuse din module policristaline pentru producția de energie electrică (cu o capacitate totală instalată de 0,19 MW). Instalarea planificată include un total de 697 de unități de panouri fotovoltaice cu puterea unui singur panou 280 W, împreună cu o structură de sprijin, toate echipamentele necesare și cablajul. Un total de șase instalații vor fi construite pentru cinci entități. Instalațiile vor fi conectate la rețeaua electrică existentă. Elementele de bază ale instalației planificate sunt: Module fotovoltaice, invertoare, sisteme de montare – acoperiș și sol, cabluri, întrerupătoare electrice, incinte ermetice, sistem de monitorizare. Puterea totală instalată este suma puterii fiecărei instalații, care, la rândul său, este produsul numărului de panouri și a puterii unui singur panou. RSM – Număr de module (140x 285W= 39,9 kWp). Miel MET – Număr de module (123 x 325W = 39,97kWp). Brutărie Konieczny – Număr de module (134 x 285 W= 38,19kWp). Hochei – Numărul de module (70 x 285 W = 19,95 kWp). În Karkut: Instalarea nr. 1 – Numărul de module (116 x 325 W = 37,70 kWp), instalația nr. 2 – Număr de module (61 x 325 W = 19,82 kWp). Toate instalațiile sunt microinstalații. Acestea vor fi conectate la rețeaua electrică. în cadrul conexiunilor existente pentru proprietate. Finalizarea este planificată pentru 31.05. (Romanian) | |||||||||||||||
Property / summary: Obiectivul general al proiectului este de a crește producția de energie electrică din surse regenerabile și, astfel, de a reduce emisiile de gaze cu efect de seră în atmosferă. Obiectivele detaliate ale proiectului sunt prezentate în secțiunea 2.1 a studiului de fezabilitate. Obiectul proiectului este construirea de noi infrastructuri, cu toate acestea, pe baza clădirilor existente și a terenurilor aparținând companiilor partenerilor de proiect. Proiectul se referă însă la construirea de noi infrastructuri, pe baza proprietăților existente deținute de companiile partenerilor de proiect. Aceste proprietăți sunt situate în municipalitățile Mielec, Tuszyn Narodowy și Kolbuszowa. Obiectul proiectului este instalarea de sisteme compuse din module policristaline pentru producția de energie electrică (cu o capacitate totală instalată de 0,19 MW). Instalarea planificată include un total de 697 de unități de panouri fotovoltaice cu puterea unui singur panou 280 W, împreună cu o structură de sprijin, toate echipamentele necesare și cablajul. Un total de șase instalații vor fi construite pentru cinci entități. Instalațiile vor fi conectate la rețeaua electrică existentă. Elementele de bază ale instalației planificate sunt: Module fotovoltaice, invertoare, sisteme de montare – acoperiș și sol, cabluri, întrerupătoare electrice, incinte ermetice, sistem de monitorizare. Puterea totală instalată este suma puterii fiecărei instalații, care, la rândul său, este produsul numărului de panouri și a puterii unui singur panou. RSM – Număr de module (140x 285W= 39,9 kWp). Miel MET – Număr de module (123 x 325W = 39,97kWp). Brutărie Konieczny – Număr de module (134 x 285 W= 38,19kWp). Hochei – Numărul de module (70 x 285 W = 19,95 kWp). În Karkut: Instalarea nr. 1 – Numărul de module (116 x 325 W = 37,70 kWp), instalația nr. 2 – Număr de module (61 x 325 W = 19,82 kWp). Toate instalațiile sunt microinstalații. Acestea vor fi conectate la rețeaua electrică. în cadrul conexiunilor existente pentru proprietate. Finalizarea este planificată pentru 31.05. (Romanian) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: Obiectivul general al proiectului este de a crește producția de energie electrică din surse regenerabile și, astfel, de a reduce emisiile de gaze cu efect de seră în atmosferă. Obiectivele detaliate ale proiectului sunt prezentate în secțiunea 2.1 a studiului de fezabilitate. Obiectul proiectului este construirea de noi infrastructuri, cu toate acestea, pe baza clădirilor existente și a terenurilor aparținând companiilor partenerilor de proiect. Proiectul se referă însă la construirea de noi infrastructuri, pe baza proprietăților existente deținute de companiile partenerilor de proiect. Aceste proprietăți sunt situate în municipalitățile Mielec, Tuszyn Narodowy și Kolbuszowa. Obiectul proiectului este instalarea de sisteme compuse din module policristaline pentru producția de energie electrică (cu o capacitate totală instalată de 0,19 MW). Instalarea planificată include un total de 697 de unități de panouri fotovoltaice cu puterea unui singur panou 280 W, împreună cu o structură de sprijin, toate echipamentele necesare și cablajul. Un total de șase instalații vor fi construite pentru cinci entități. Instalațiile vor fi conectate la rețeaua electrică existentă. Elementele de bază ale instalației planificate sunt: Module fotovoltaice, invertoare, sisteme de montare – acoperiș și sol, cabluri, întrerupătoare electrice, incinte ermetice, sistem de monitorizare. Puterea totală instalată este suma puterii fiecărei instalații, care, la rândul său, este produsul numărului de panouri și a puterii unui singur panou. RSM – Număr de module (140x 285W= 39,9 kWp). Miel MET – Număr de module (123 x 325W = 39,97kWp). Brutărie Konieczny – Număr de module (134 x 285 W= 38,19kWp). Hochei – Numărul de module (70 x 285 W = 19,95 kWp). În Karkut: Instalarea nr. 1 – Numărul de module (116 x 325 W = 37,70 kWp), instalația nr. 2 – Număr de module (61 x 325 W = 19,82 kWp). Toate instalațiile sunt microinstalații. Acestea vor fi conectate la rețeaua electrică. în cadrul conexiunilor existente pentru proprietate. Finalizarea este planificată pentru 31.05. (Romanian) / qualifier | |||||||||||||||
point in time: 2 July 2022
| |||||||||||||||
Property / summary | |||||||||||||||
Celkovým cieľom projektu je zvýšiť výrobu elektrickej energie z obnoviteľných zdrojov, a tým znížiť emisie skleníkových plynov do atmosféry. Podrobné ciele projektu sú uvedené v oddiele 2.1 štúdie uskutočniteľnosti. Predmetom projektu je však výstavba novej infraštruktúry na základe existujúcich budov a pozemkov patriacich spoločnostiam partnerov projektu. Projekt sa však týka výstavby novej infraštruktúry na základe existujúcich nehnuteľností vlastnených spoločnosťami partnerov projektu. Tieto nehnuteľnosti sa nachádzajú v obciach Mielec, Tuszyn Narodowy a Kolbuszowa. Predmetom projektu je inštalácia systémov pozostávajúcich z polykryštalických modulov na výrobu elektrickej energie (s celkovým inštalovaným výkonom 0,19 MW). Plánovaná inštalácia zahŕňa celkom 697 jednotiek fotovoltaických panelov s výkonom jedného panela 280 W, spolu s nosnou konštrukciou, všetkým potrebným vybavením a elektroinštaláciou. Celkovo sa vybuduje šesť zariadení pre päť subjektov. Zariadenia budú pripojené k existujúcej elektrickej rozvodnej sieti. Základné prvky plánovanej inštalácie sú: — Fotovoltaické moduly, meniče, montážne systémy – strecha a zem, rozvody, elektrické rozvádzače, hermetické skrine, monitorovací systém. Celkový inštalovaný výkon je súčet výkonu každej inštalácie, čo je výsledok počtu panelov a výkonu jedného panelu. RSM – Počet modulov (140x 285W= 39,9 kWp). Miel MET – Počet modulov (123 x 325W = 39,97kWp). Pekáreň Konieczny – Počet modulov (134 x 285 W= 38.19kWp). Hokej – Počet modulov (70 x 285 W = 19,95 kWp). Kľúčové slová: Inštalácia č. 1 – Počet modulov (116 x 325 W= 37,70 kWp), inštalácia č. 2 – Počet modulov (61 x 325 W = 19,82 kWp). Všetky zariadenia sú mikrozariadenia. Budú pripojené k elektrickej sieti. v rámci existujúcich pripojení k nehnuteľnosti. Dokončenie je naplánované na 31.05. (Slovak) | |||||||||||||||
Property / summary: Celkovým cieľom projektu je zvýšiť výrobu elektrickej energie z obnoviteľných zdrojov, a tým znížiť emisie skleníkových plynov do atmosféry. Podrobné ciele projektu sú uvedené v oddiele 2.1 štúdie uskutočniteľnosti. Predmetom projektu je však výstavba novej infraštruktúry na základe existujúcich budov a pozemkov patriacich spoločnostiam partnerov projektu. Projekt sa však týka výstavby novej infraštruktúry na základe existujúcich nehnuteľností vlastnených spoločnosťami partnerov projektu. Tieto nehnuteľnosti sa nachádzajú v obciach Mielec, Tuszyn Narodowy a Kolbuszowa. Predmetom projektu je inštalácia systémov pozostávajúcich z polykryštalických modulov na výrobu elektrickej energie (s celkovým inštalovaným výkonom 0,19 MW). Plánovaná inštalácia zahŕňa celkom 697 jednotiek fotovoltaických panelov s výkonom jedného panela 280 W, spolu s nosnou konštrukciou, všetkým potrebným vybavením a elektroinštaláciou. Celkovo sa vybuduje šesť zariadení pre päť subjektov. Zariadenia budú pripojené k existujúcej elektrickej rozvodnej sieti. Základné prvky plánovanej inštalácie sú: — Fotovoltaické moduly, meniče, montážne systémy – strecha a zem, rozvody, elektrické rozvádzače, hermetické skrine, monitorovací systém. Celkový inštalovaný výkon je súčet výkonu každej inštalácie, čo je výsledok počtu panelov a výkonu jedného panelu. RSM – Počet modulov (140x 285W= 39,9 kWp). Miel MET – Počet modulov (123 x 325W = 39,97kWp). Pekáreň Konieczny – Počet modulov (134 x 285 W= 38.19kWp). Hokej – Počet modulov (70 x 285 W = 19,95 kWp). Kľúčové slová: Inštalácia č. 1 – Počet modulov (116 x 325 W= 37,70 kWp), inštalácia č. 2 – Počet modulov (61 x 325 W = 19,82 kWp). Všetky zariadenia sú mikrozariadenia. Budú pripojené k elektrickej sieti. v rámci existujúcich pripojení k nehnuteľnosti. Dokončenie je naplánované na 31.05. (Slovak) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: Celkovým cieľom projektu je zvýšiť výrobu elektrickej energie z obnoviteľných zdrojov, a tým znížiť emisie skleníkových plynov do atmosféry. Podrobné ciele projektu sú uvedené v oddiele 2.1 štúdie uskutočniteľnosti. Predmetom projektu je však výstavba novej infraštruktúry na základe existujúcich budov a pozemkov patriacich spoločnostiam partnerov projektu. Projekt sa však týka výstavby novej infraštruktúry na základe existujúcich nehnuteľností vlastnených spoločnosťami partnerov projektu. Tieto nehnuteľnosti sa nachádzajú v obciach Mielec, Tuszyn Narodowy a Kolbuszowa. Predmetom projektu je inštalácia systémov pozostávajúcich z polykryštalických modulov na výrobu elektrickej energie (s celkovým inštalovaným výkonom 0,19 MW). Plánovaná inštalácia zahŕňa celkom 697 jednotiek fotovoltaických panelov s výkonom jedného panela 280 W, spolu s nosnou konštrukciou, všetkým potrebným vybavením a elektroinštaláciou. Celkovo sa vybuduje šesť zariadení pre päť subjektov. Zariadenia budú pripojené k existujúcej elektrickej rozvodnej sieti. Základné prvky plánovanej inštalácie sú: — Fotovoltaické moduly, meniče, montážne systémy – strecha a zem, rozvody, elektrické rozvádzače, hermetické skrine, monitorovací systém. Celkový inštalovaný výkon je súčet výkonu každej inštalácie, čo je výsledok počtu panelov a výkonu jedného panelu. RSM – Počet modulov (140x 285W= 39,9 kWp). Miel MET – Počet modulov (123 x 325W = 39,97kWp). Pekáreň Konieczny – Počet modulov (134 x 285 W= 38.19kWp). Hokej – Počet modulov (70 x 285 W = 19,95 kWp). Kľúčové slová: Inštalácia č. 1 – Počet modulov (116 x 325 W= 37,70 kWp), inštalácia č. 2 – Počet modulov (61 x 325 W = 19,82 kWp). Všetky zariadenia sú mikrozariadenia. Budú pripojené k elektrickej sieti. v rámci existujúcich pripojení k nehnuteľnosti. Dokončenie je naplánované na 31.05. (Slovak) / qualifier | |||||||||||||||
point in time: 2 July 2022
| |||||||||||||||
Property / summary | |||||||||||||||
L-objettiv ġenerali tal-proġett huwa li tiżdied il-produzzjoni tal-elettriku minn sorsi rinnovabbli u b’hekk jitnaqqsu l-emissjonijiet tal-gassijiet serra fl-atmosfera. L-għanijiet dettaljati tal-proġett huma ppreżentati fit-taqsima 2.1 tal-istudju tal-fattibbiltà. Is-suġġett tal-proġett huwa l-kostruzzjoni ta’ infrastruttura ġdida, madankollu, ibbażata fuq bini eżistenti u art li tappartjeni lill-kumpaniji tal-imsieħba tal-proġett. Il-proġett jikkonċerna l-kostruzzjoni ta’ infrastruttura ġdida, madankollu, ibbażata fuq proprjetajiet eżistenti li huma proprjetà tal-kumpaniji tas-sħab tal-proġett. Dawn il-proprjetajiet jinsabu fil-muniċipalitajiet ta’ Mielec, Tuszyn Narodowy u Kolbuszowa. Is-suġġett tal-proġett huwa l-installazzjoni ta’ sistemi li jikkonsistu f’moduli polikristallini għall-produzzjoni tal-elettriku (b’kapaċità totali installata ta’ 0.19 MW). L-installazzjoni ppjanata tinkludi total ta’ 697 unità ta’ pannelli fotovoltajċi bil-qawwa ta’ pannell wieħed 280 W, flimkien ma’ struttura ta’ appoġġ, it-tagħmir kollu meħtieġ u l-wajers. Total ta’ sitt installazzjonijiet se jinbnew għal ħames entitajiet. L-installazzjonijiet se jkunu konnessi mal-grilja tal-elettriku eżistenti. L-elementi bażiċi tal-installazzjoni ppjanata huma: — Moduli fotovoltajċi, invertituri, sistemi ta’ mmuntar — saqaf u art, wajers, switchgear elettriku, kompartimenti ermetiċi, sistema ta’ monitoraġġ. L-enerġija totali installata hija s-somma tal-enerġija ta’ kull installazzjoni, li min-naħa tagħha hija l-prodott tan-numru ta’ pannelli u l-qawwa ta’ panel wieħed. RSM — Għadd ta’ moduli (140x 285W= 39.9 kWp). Miel MET — Numru ta’ moduli (123 x 325W = 39.97kWp). Forn Konieczny — Numru ta’ moduli (134 x 285 W= 38.19kWp). Hockey — Għadd ta’ moduli (70 x 285 W= 19.95 kWp). Karkut: Installazzjoni Nru 1 — Numru ta’ moduli (116 x 325 W= 37.70 kWp), Installazzjoni Nru 2 — Numru ta’ moduli (61 x 325 W= 19.82 kWp). L-installazzjonijiet kollha huma mikroinstallazzjonijiet. Dawn se jkunu konnessi mal-grilja tal-elettriku fi ħdan il-konnessjonijiet eżistenti għall-proprjetà. It-tlestija hija ppjanata għall-31.05. (Maltese) | |||||||||||||||
Property / summary: L-objettiv ġenerali tal-proġett huwa li tiżdied il-produzzjoni tal-elettriku minn sorsi rinnovabbli u b’hekk jitnaqqsu l-emissjonijiet tal-gassijiet serra fl-atmosfera. L-għanijiet dettaljati tal-proġett huma ppreżentati fit-taqsima 2.1 tal-istudju tal-fattibbiltà. Is-suġġett tal-proġett huwa l-kostruzzjoni ta’ infrastruttura ġdida, madankollu, ibbażata fuq bini eżistenti u art li tappartjeni lill-kumpaniji tal-imsieħba tal-proġett. Il-proġett jikkonċerna l-kostruzzjoni ta’ infrastruttura ġdida, madankollu, ibbażata fuq proprjetajiet eżistenti li huma proprjetà tal-kumpaniji tas-sħab tal-proġett. Dawn il-proprjetajiet jinsabu fil-muniċipalitajiet ta’ Mielec, Tuszyn Narodowy u Kolbuszowa. Is-suġġett tal-proġett huwa l-installazzjoni ta’ sistemi li jikkonsistu f’moduli polikristallini għall-produzzjoni tal-elettriku (b’kapaċità totali installata ta’ 0.19 MW). L-installazzjoni ppjanata tinkludi total ta’ 697 unità ta’ pannelli fotovoltajċi bil-qawwa ta’ pannell wieħed 280 W, flimkien ma’ struttura ta’ appoġġ, it-tagħmir kollu meħtieġ u l-wajers. Total ta’ sitt installazzjonijiet se jinbnew għal ħames entitajiet. L-installazzjonijiet se jkunu konnessi mal-grilja tal-elettriku eżistenti. L-elementi bażiċi tal-installazzjoni ppjanata huma: — Moduli fotovoltajċi, invertituri, sistemi ta’ mmuntar — saqaf u art, wajers, switchgear elettriku, kompartimenti ermetiċi, sistema ta’ monitoraġġ. L-enerġija totali installata hija s-somma tal-enerġija ta’ kull installazzjoni, li min-naħa tagħha hija l-prodott tan-numru ta’ pannelli u l-qawwa ta’ panel wieħed. RSM — Għadd ta’ moduli (140x 285W= 39.9 kWp). Miel MET — Numru ta’ moduli (123 x 325W = 39.97kWp). Forn Konieczny — Numru ta’ moduli (134 x 285 W= 38.19kWp). Hockey — Għadd ta’ moduli (70 x 285 W= 19.95 kWp). Karkut: Installazzjoni Nru 1 — Numru ta’ moduli (116 x 325 W= 37.70 kWp), Installazzjoni Nru 2 — Numru ta’ moduli (61 x 325 W= 19.82 kWp). L-installazzjonijiet kollha huma mikroinstallazzjonijiet. Dawn se jkunu konnessi mal-grilja tal-elettriku fi ħdan il-konnessjonijiet eżistenti għall-proprjetà. It-tlestija hija ppjanata għall-31.05. (Maltese) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: L-objettiv ġenerali tal-proġett huwa li tiżdied il-produzzjoni tal-elettriku minn sorsi rinnovabbli u b’hekk jitnaqqsu l-emissjonijiet tal-gassijiet serra fl-atmosfera. L-għanijiet dettaljati tal-proġett huma ppreżentati fit-taqsima 2.1 tal-istudju tal-fattibbiltà. Is-suġġett tal-proġett huwa l-kostruzzjoni ta’ infrastruttura ġdida, madankollu, ibbażata fuq bini eżistenti u art li tappartjeni lill-kumpaniji tal-imsieħba tal-proġett. Il-proġett jikkonċerna l-kostruzzjoni ta’ infrastruttura ġdida, madankollu, ibbażata fuq proprjetajiet eżistenti li huma proprjetà tal-kumpaniji tas-sħab tal-proġett. Dawn il-proprjetajiet jinsabu fil-muniċipalitajiet ta’ Mielec, Tuszyn Narodowy u Kolbuszowa. Is-suġġett tal-proġett huwa l-installazzjoni ta’ sistemi li jikkonsistu f’moduli polikristallini għall-produzzjoni tal-elettriku (b’kapaċità totali installata ta’ 0.19 MW). L-installazzjoni ppjanata tinkludi total ta’ 697 unità ta’ pannelli fotovoltajċi bil-qawwa ta’ pannell wieħed 280 W, flimkien ma’ struttura ta’ appoġġ, it-tagħmir kollu meħtieġ u l-wajers. Total ta’ sitt installazzjonijiet se jinbnew għal ħames entitajiet. L-installazzjonijiet se jkunu konnessi mal-grilja tal-elettriku eżistenti. L-elementi bażiċi tal-installazzjoni ppjanata huma: — Moduli fotovoltajċi, invertituri, sistemi ta’ mmuntar — saqaf u art, wajers, switchgear elettriku, kompartimenti ermetiċi, sistema ta’ monitoraġġ. L-enerġija totali installata hija s-somma tal-enerġija ta’ kull installazzjoni, li min-naħa tagħha hija l-prodott tan-numru ta’ pannelli u l-qawwa ta’ panel wieħed. RSM — Għadd ta’ moduli (140x 285W= 39.9 kWp). Miel MET — Numru ta’ moduli (123 x 325W = 39.97kWp). Forn Konieczny — Numru ta’ moduli (134 x 285 W= 38.19kWp). Hockey — Għadd ta’ moduli (70 x 285 W= 19.95 kWp). Karkut: Installazzjoni Nru 1 — Numru ta’ moduli (116 x 325 W= 37.70 kWp), Installazzjoni Nru 2 — Numru ta’ moduli (61 x 325 W= 19.82 kWp). L-installazzjonijiet kollha huma mikroinstallazzjonijiet. Dawn se jkunu konnessi mal-grilja tal-elettriku fi ħdan il-konnessjonijiet eżistenti għall-proprjetà. It-tlestija hija ppjanata għall-31.05. (Maltese) / qualifier | |||||||||||||||
point in time: 2 July 2022
| |||||||||||||||
Property / summary | |||||||||||||||
O objetivo geral do projeto é aumentar a produção de eletricidade a partir de fontes renováveis e, assim, reduzir as emissões de gases com efeito de estufa para a atmosfera. Os objetivos pormenorizados do projeto são apresentados na secção 2.1 do estudo de viabilidade. O objetivo do projeto é a construção de novas infraestruturas, no entanto, com base em edifícios existentes e terrenos pertencentes às empresas dos parceiros do projeto. O projeto diz respeito à construção de novas infraestruturas, no entanto, com base em propriedades existentes detidas pelos parceiros do projeto. Estas propriedades estão localizadas nos municípios de Mielec, Tuszyn Narodowy e Kolbuszowa. O projeto tem por objeto a montagem de sistemas constituídos por módulos policristalinos para a produção de eletricidade (com uma capacidade instalada total de 0,19 MW). A instalação prevista consiste num total de 697 módulos de painéis fotovoltaicos com um único painel de 280 W, juntamente com a estrutura de suporte, todos os acessórios e cablagem necessários. No total, serão criadas seis instalações para cinco entidades. As instalações serão ligadas à rede elétrica existente. Os elementos básicos da instalação planeada são: — Módulos fotovoltaicos, inversores, sistemas de montagem — tejadilho e terra, cablagem, comutadores elétricos, caixas herméticas, sistema de monitorização. A potência total instalada é a soma da potência de cada instalação, que por sua vez representa o produto do número de painéis e a potência de um único painel. MSE – Número de módulos (140x285 W= 39,9 kWp). Miel MET – Número de módulos (123 x 325 W = 39,97 kWp). Padaria Necessária – Número de módulos (134 x 285 W= 38,19kWp). Gancho – Número de módulos (70 x 285 W = 19,95 kWp). A carcaça: Instalação n.o 1 – Número de módulos (116 x 325 W = 37,70 kWp), Instalação n.o 2 – Número de módulos (61 x 325 W = 19,82 kWp). Todas as instalações são microinstalações. Eles serão ligados à rede energética dentro das conexões existentes para a propriedade. A conclusão da execução está prevista para 31.05. (Portuguese) | |||||||||||||||
Property / summary: O objetivo geral do projeto é aumentar a produção de eletricidade a partir de fontes renováveis e, assim, reduzir as emissões de gases com efeito de estufa para a atmosfera. Os objetivos pormenorizados do projeto são apresentados na secção 2.1 do estudo de viabilidade. O objetivo do projeto é a construção de novas infraestruturas, no entanto, com base em edifícios existentes e terrenos pertencentes às empresas dos parceiros do projeto. O projeto diz respeito à construção de novas infraestruturas, no entanto, com base em propriedades existentes detidas pelos parceiros do projeto. Estas propriedades estão localizadas nos municípios de Mielec, Tuszyn Narodowy e Kolbuszowa. O projeto tem por objeto a montagem de sistemas constituídos por módulos policristalinos para a produção de eletricidade (com uma capacidade instalada total de 0,19 MW). A instalação prevista consiste num total de 697 módulos de painéis fotovoltaicos com um único painel de 280 W, juntamente com a estrutura de suporte, todos os acessórios e cablagem necessários. No total, serão criadas seis instalações para cinco entidades. As instalações serão ligadas à rede elétrica existente. Os elementos básicos da instalação planeada são: — Módulos fotovoltaicos, inversores, sistemas de montagem — tejadilho e terra, cablagem, comutadores elétricos, caixas herméticas, sistema de monitorização. A potência total instalada é a soma da potência de cada instalação, que por sua vez representa o produto do número de painéis e a potência de um único painel. MSE – Número de módulos (140x285 W= 39,9 kWp). Miel MET – Número de módulos (123 x 325 W = 39,97 kWp). Padaria Necessária – Número de módulos (134 x 285 W= 38,19kWp). Gancho – Número de módulos (70 x 285 W = 19,95 kWp). A carcaça: Instalação n.o 1 – Número de módulos (116 x 325 W = 37,70 kWp), Instalação n.o 2 – Número de módulos (61 x 325 W = 19,82 kWp). Todas as instalações são microinstalações. Eles serão ligados à rede energética dentro das conexões existentes para a propriedade. A conclusão da execução está prevista para 31.05. (Portuguese) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: O objetivo geral do projeto é aumentar a produção de eletricidade a partir de fontes renováveis e, assim, reduzir as emissões de gases com efeito de estufa para a atmosfera. Os objetivos pormenorizados do projeto são apresentados na secção 2.1 do estudo de viabilidade. O objetivo do projeto é a construção de novas infraestruturas, no entanto, com base em edifícios existentes e terrenos pertencentes às empresas dos parceiros do projeto. O projeto diz respeito à construção de novas infraestruturas, no entanto, com base em propriedades existentes detidas pelos parceiros do projeto. Estas propriedades estão localizadas nos municípios de Mielec, Tuszyn Narodowy e Kolbuszowa. O projeto tem por objeto a montagem de sistemas constituídos por módulos policristalinos para a produção de eletricidade (com uma capacidade instalada total de 0,19 MW). A instalação prevista consiste num total de 697 módulos de painéis fotovoltaicos com um único painel de 280 W, juntamente com a estrutura de suporte, todos os acessórios e cablagem necessários. No total, serão criadas seis instalações para cinco entidades. As instalações serão ligadas à rede elétrica existente. Os elementos básicos da instalação planeada são: — Módulos fotovoltaicos, inversores, sistemas de montagem — tejadilho e terra, cablagem, comutadores elétricos, caixas herméticas, sistema de monitorização. A potência total instalada é a soma da potência de cada instalação, que por sua vez representa o produto do número de painéis e a potência de um único painel. MSE – Número de módulos (140x285 W= 39,9 kWp). Miel MET – Número de módulos (123 x 325 W = 39,97 kWp). Padaria Necessária – Número de módulos (134 x 285 W= 38,19kWp). Gancho – Número de módulos (70 x 285 W = 19,95 kWp). A carcaça: Instalação n.o 1 – Número de módulos (116 x 325 W = 37,70 kWp), Instalação n.o 2 – Número de módulos (61 x 325 W = 19,82 kWp). Todas as instalações são microinstalações. Eles serão ligados à rede energética dentro das conexões existentes para a propriedade. A conclusão da execução está prevista para 31.05. (Portuguese) / qualifier | |||||||||||||||
point in time: 2 July 2022
| |||||||||||||||
Property / summary | |||||||||||||||
Hankkeen yleisenä tavoitteena on lisätä sähköntuotantoa uusiutuvista energialähteistä ja siten vähentää kasvihuonekaasupäästöjä ilmakehään. Hankkeen yksityiskohtaiset tavoitteet esitetään toteutettavuustutkimuksen kohdassa 2.1. Hankkeen aiheena on kuitenkin uuden infrastruktuurin rakentaminen, joka perustuu olemassa oleviin rakennuksiin ja hankekumppaneiden yritysten omistamiin maa-alueisiin. Hanke koskee kuitenkin uuden infrastruktuurin rakentamista, joka perustuu hankekumppaneiden yritysten omistamiin olemassa oleviin kiinteistöihin. Nämä kiinteistöt sijaitsevat Mielecin, Tuszyn Narodowyn ja Kolbuszowan kunnissa. Hankkeen kohteena on monikiteisistä moduuleista koostuvien järjestelmien asentaminen sähköntuotantoon (kokonaiskapasiteetti 0,19 MW). Suunniteltu asennus sisältää yhteensä 697 yksikköä aurinkosähköpaneeleja, joissa on yhden paneelin 280 W teho, sekä tukirakenne, kaikki tarvittavat laitteet ja johdotus. Yhteensä kuusi laitosta rakennetaan viiteen yksikköön. Laitteistot liitetään olemassa olevaan sähköverkkoon. Suunnitellun asennuksen peruselementit ovat: — Aurinkosähkömoduulit, taajuusmuuttajat, asennusjärjestelmät – katto ja maa, johdotus, sähköiset kytkinlaitteet, hermeettiset kotelot, valvontajärjestelmä. Asennettu kokonaisteho on kunkin asennuksen tehon summa, joka puolestaan on paneelien lukumäärän ja yhden paneelin tehon tulo. RSM – moduulien määrä (140x 285W= 39,9 kWp). Miel MET – moduulien määrä (123 x 325W = 39,97 kWp). Leipomo Konieczny – moduulien määrä (134 x 285 W= 38,19kWp). Jääkiekko – moduulien lukumäärä (70 x 285 W= 19,95 kWp). Karkut: Asennus nro 1 – moduulien lukumäärä (116 x 325 W = 37,70 kWp), Asennusnumero 2 – moduulien lukumäärä (61 x 325 W = 19,82 kWp). Kaikki asennukset ovat mikrolaitoksia. Ne liitetään sähköverkkoon. kiinteistön olemassa olevien liitäntöjen sisällä. Valmistumisaika on 31.05. (Finnish) | |||||||||||||||
Property / summary: Hankkeen yleisenä tavoitteena on lisätä sähköntuotantoa uusiutuvista energialähteistä ja siten vähentää kasvihuonekaasupäästöjä ilmakehään. Hankkeen yksityiskohtaiset tavoitteet esitetään toteutettavuustutkimuksen kohdassa 2.1. Hankkeen aiheena on kuitenkin uuden infrastruktuurin rakentaminen, joka perustuu olemassa oleviin rakennuksiin ja hankekumppaneiden yritysten omistamiin maa-alueisiin. Hanke koskee kuitenkin uuden infrastruktuurin rakentamista, joka perustuu hankekumppaneiden yritysten omistamiin olemassa oleviin kiinteistöihin. Nämä kiinteistöt sijaitsevat Mielecin, Tuszyn Narodowyn ja Kolbuszowan kunnissa. Hankkeen kohteena on monikiteisistä moduuleista koostuvien järjestelmien asentaminen sähköntuotantoon (kokonaiskapasiteetti 0,19 MW). Suunniteltu asennus sisältää yhteensä 697 yksikköä aurinkosähköpaneeleja, joissa on yhden paneelin 280 W teho, sekä tukirakenne, kaikki tarvittavat laitteet ja johdotus. Yhteensä kuusi laitosta rakennetaan viiteen yksikköön. Laitteistot liitetään olemassa olevaan sähköverkkoon. Suunnitellun asennuksen peruselementit ovat: — Aurinkosähkömoduulit, taajuusmuuttajat, asennusjärjestelmät – katto ja maa, johdotus, sähköiset kytkinlaitteet, hermeettiset kotelot, valvontajärjestelmä. Asennettu kokonaisteho on kunkin asennuksen tehon summa, joka puolestaan on paneelien lukumäärän ja yhden paneelin tehon tulo. RSM – moduulien määrä (140x 285W= 39,9 kWp). Miel MET – moduulien määrä (123 x 325W = 39,97 kWp). Leipomo Konieczny – moduulien määrä (134 x 285 W= 38,19kWp). Jääkiekko – moduulien lukumäärä (70 x 285 W= 19,95 kWp). Karkut: Asennus nro 1 – moduulien lukumäärä (116 x 325 W = 37,70 kWp), Asennusnumero 2 – moduulien lukumäärä (61 x 325 W = 19,82 kWp). Kaikki asennukset ovat mikrolaitoksia. Ne liitetään sähköverkkoon. kiinteistön olemassa olevien liitäntöjen sisällä. Valmistumisaika on 31.05. (Finnish) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: Hankkeen yleisenä tavoitteena on lisätä sähköntuotantoa uusiutuvista energialähteistä ja siten vähentää kasvihuonekaasupäästöjä ilmakehään. Hankkeen yksityiskohtaiset tavoitteet esitetään toteutettavuustutkimuksen kohdassa 2.1. Hankkeen aiheena on kuitenkin uuden infrastruktuurin rakentaminen, joka perustuu olemassa oleviin rakennuksiin ja hankekumppaneiden yritysten omistamiin maa-alueisiin. Hanke koskee kuitenkin uuden infrastruktuurin rakentamista, joka perustuu hankekumppaneiden yritysten omistamiin olemassa oleviin kiinteistöihin. Nämä kiinteistöt sijaitsevat Mielecin, Tuszyn Narodowyn ja Kolbuszowan kunnissa. Hankkeen kohteena on monikiteisistä moduuleista koostuvien järjestelmien asentaminen sähköntuotantoon (kokonaiskapasiteetti 0,19 MW). Suunniteltu asennus sisältää yhteensä 697 yksikköä aurinkosähköpaneeleja, joissa on yhden paneelin 280 W teho, sekä tukirakenne, kaikki tarvittavat laitteet ja johdotus. Yhteensä kuusi laitosta rakennetaan viiteen yksikköön. Laitteistot liitetään olemassa olevaan sähköverkkoon. Suunnitellun asennuksen peruselementit ovat: — Aurinkosähkömoduulit, taajuusmuuttajat, asennusjärjestelmät – katto ja maa, johdotus, sähköiset kytkinlaitteet, hermeettiset kotelot, valvontajärjestelmä. Asennettu kokonaisteho on kunkin asennuksen tehon summa, joka puolestaan on paneelien lukumäärän ja yhden paneelin tehon tulo. RSM – moduulien määrä (140x 285W= 39,9 kWp). Miel MET – moduulien määrä (123 x 325W = 39,97 kWp). Leipomo Konieczny – moduulien määrä (134 x 285 W= 38,19kWp). Jääkiekko – moduulien lukumäärä (70 x 285 W= 19,95 kWp). Karkut: Asennus nro 1 – moduulien lukumäärä (116 x 325 W = 37,70 kWp), Asennusnumero 2 – moduulien lukumäärä (61 x 325 W = 19,82 kWp). Kaikki asennukset ovat mikrolaitoksia. Ne liitetään sähköverkkoon. kiinteistön olemassa olevien liitäntöjen sisällä. Valmistumisaika on 31.05. (Finnish) / qualifier | |||||||||||||||
point in time: 2 July 2022
| |||||||||||||||
Property / summary | |||||||||||||||
Splošni cilj projekta je povečati proizvodnjo električne energije iz obnovljivih virov in tako zmanjšati emisije toplogrednih plinov v ozračje. Podrobni cilji projekta so predstavljeni v oddelku 2.1 študije izvedljivosti. Predmet projekta je gradnja nove infrastrukture, ki temelji na obstoječih zgradbah in zemljiščih, ki pripadajo podjetjem projektnih partnerjev. Projekt se nanaša na gradnjo nove infrastrukture, ki temelji na obstoječih nepremičninah, ki so v lasti podjetij projektnih partnerjev. Te nepremičnine se nahajajo v občinah Mielec, Tuszyn Narodowy in Kolbuszowa. Predmet projekta je namestitev sistemov, sestavljenih iz polikristalnih modulov za proizvodnjo električne energije (s skupno inštalirano zmogljivostjo 0,19 MW). Načrtovana namestitev vključuje skupno 697 enot fotonapetostnih plošč z močjo ene same plošče 280 W, skupaj s podporno strukturo, vso potrebno opremo in ožičenjem. Skupno bo zgrajenih šest naprav za pet subjektov. Naprave bodo priključene na obstoječe električno omrežje. Osnovni elementi načrtovane namestitve so: — Fotonapetostni moduli, pretvorniki, montažni sistemi – streha in tla, ožičenje, električne stikalne naprave, hermetična ohišja, nadzorni sistem. Skupna inštalirana moč je vsota moči vsake naprave, ki je rezultat števila plošč in moči ene plošče. RSM – število modulov (140 x 285 W = 39,9 kWp). Miel MET – število modulov (123 x 325W = 39,97 kWp). Pekarna Konieczny – število modulov (134 x 285 W = 38,19kWp). Hokej – število modulov (70 x 285 W = 19,95 kWp). Strani, ki se povezujejo na Karkut: Namestitev št. 1 – Število modulov (116 x 325 W = 37,70 kWp), Namestitev št. 2 – število modulov (61 x 325 W = 19,82 kWp). Vse naprave so mikroinštalacije. Priključeni bodo na električno omrežje. znotraj obstoječih priključkov za nepremičnino. Zaključek je načrtovan za 31.05. (Slovenian) | |||||||||||||||
Property / summary: Splošni cilj projekta je povečati proizvodnjo električne energije iz obnovljivih virov in tako zmanjšati emisije toplogrednih plinov v ozračje. Podrobni cilji projekta so predstavljeni v oddelku 2.1 študije izvedljivosti. Predmet projekta je gradnja nove infrastrukture, ki temelji na obstoječih zgradbah in zemljiščih, ki pripadajo podjetjem projektnih partnerjev. Projekt se nanaša na gradnjo nove infrastrukture, ki temelji na obstoječih nepremičninah, ki so v lasti podjetij projektnih partnerjev. Te nepremičnine se nahajajo v občinah Mielec, Tuszyn Narodowy in Kolbuszowa. Predmet projekta je namestitev sistemov, sestavljenih iz polikristalnih modulov za proizvodnjo električne energije (s skupno inštalirano zmogljivostjo 0,19 MW). Načrtovana namestitev vključuje skupno 697 enot fotonapetostnih plošč z močjo ene same plošče 280 W, skupaj s podporno strukturo, vso potrebno opremo in ožičenjem. Skupno bo zgrajenih šest naprav za pet subjektov. Naprave bodo priključene na obstoječe električno omrežje. Osnovni elementi načrtovane namestitve so: — Fotonapetostni moduli, pretvorniki, montažni sistemi – streha in tla, ožičenje, električne stikalne naprave, hermetična ohišja, nadzorni sistem. Skupna inštalirana moč je vsota moči vsake naprave, ki je rezultat števila plošč in moči ene plošče. RSM – število modulov (140 x 285 W = 39,9 kWp). Miel MET – število modulov (123 x 325W = 39,97 kWp). Pekarna Konieczny – število modulov (134 x 285 W = 38,19kWp). Hokej – število modulov (70 x 285 W = 19,95 kWp). Strani, ki se povezujejo na Karkut: Namestitev št. 1 – Število modulov (116 x 325 W = 37,70 kWp), Namestitev št. 2 – število modulov (61 x 325 W = 19,82 kWp). Vse naprave so mikroinštalacije. Priključeni bodo na električno omrežje. znotraj obstoječih priključkov za nepremičnino. Zaključek je načrtovan za 31.05. (Slovenian) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: Splošni cilj projekta je povečati proizvodnjo električne energije iz obnovljivih virov in tako zmanjšati emisije toplogrednih plinov v ozračje. Podrobni cilji projekta so predstavljeni v oddelku 2.1 študije izvedljivosti. Predmet projekta je gradnja nove infrastrukture, ki temelji na obstoječih zgradbah in zemljiščih, ki pripadajo podjetjem projektnih partnerjev. Projekt se nanaša na gradnjo nove infrastrukture, ki temelji na obstoječih nepremičninah, ki so v lasti podjetij projektnih partnerjev. Te nepremičnine se nahajajo v občinah Mielec, Tuszyn Narodowy in Kolbuszowa. Predmet projekta je namestitev sistemov, sestavljenih iz polikristalnih modulov za proizvodnjo električne energije (s skupno inštalirano zmogljivostjo 0,19 MW). Načrtovana namestitev vključuje skupno 697 enot fotonapetostnih plošč z močjo ene same plošče 280 W, skupaj s podporno strukturo, vso potrebno opremo in ožičenjem. Skupno bo zgrajenih šest naprav za pet subjektov. Naprave bodo priključene na obstoječe električno omrežje. Osnovni elementi načrtovane namestitve so: — Fotonapetostni moduli, pretvorniki, montažni sistemi – streha in tla, ožičenje, električne stikalne naprave, hermetična ohišja, nadzorni sistem. Skupna inštalirana moč je vsota moči vsake naprave, ki je rezultat števila plošč in moči ene plošče. RSM – število modulov (140 x 285 W = 39,9 kWp). Miel MET – število modulov (123 x 325W = 39,97 kWp). Pekarna Konieczny – število modulov (134 x 285 W = 38,19kWp). Hokej – število modulov (70 x 285 W = 19,95 kWp). Strani, ki se povezujejo na Karkut: Namestitev št. 1 – Število modulov (116 x 325 W = 37,70 kWp), Namestitev št. 2 – število modulov (61 x 325 W = 19,82 kWp). Vse naprave so mikroinštalacije. Priključeni bodo na električno omrežje. znotraj obstoječih priključkov za nepremičnino. Zaključek je načrtovan za 31.05. (Slovenian) / qualifier | |||||||||||||||
point in time: 2 July 2022
| |||||||||||||||
Property / summary | |||||||||||||||
Celkovým cílem projektu je zvýšit výrobu elektřiny z obnovitelných zdrojů a tím snížit emise skleníkových plynů do atmosféry. Podrobné cíle projektu jsou uvedeny v oddíle 2.1 studie proveditelnosti. Předmětem projektu je výstavba nové infrastruktury, která je však založena na stávajících budovách a pozemcích patřících firmám projektových partnerů. Projekt se však týká výstavby nové infrastruktury, založené na stávajících nemovitostech vlastněných společnostmi partnerů projektu. Tyto nemovitosti se nacházejí v obcích Mielec, Tuszyn Narodowy a Kolbuszowa. Předmětem projektu je instalace systémů sestávajících z polykrystalických modulů pro výrobu elektřiny (s celkovým instalovaným výkonem 0,19 MW). Plánovaná instalace zahrnuje celkem 697 jednotek fotovoltaických panelů s výkonem jednoho panelu 280 W, spolu s podpůrnou konstrukcí, veškerým potřebným vybavením a zapojením. Celkem bude postaveno šest zařízení pro pět subjektů. Zařízení budou připojena ke stávající elektrické síti. Základní prvky plánované instalace jsou: — Fotovoltaické moduly, měniče, montážní systémy – střecha a země, elektroinstalace, elektrické rozvaděče, hermetické skříně, monitorovací systém. Celkový instalovaný výkon je součtem výkonu každé instalace, což je zase součin počtu panelů a výkonu jednoho panelu. RSM – Počet modulů (140x 285W = 39,9 kWp). Miel MET – Počet modulů (123 x 325W = 39,97kWp). Pekárna Konieczny – Počet modulů (134 x 285 W= 38,19kWp). Hokej – počet modulů (70 x 285 W = 19,95 kWp). Karkut: Instalace č. 1 – Počet modulů (116 x 325 W = 37,70 kWp), Instalační č. 2 – Počet modulů (61 x 325 W= 19,82 kWp). Všechny instalace jsou mikroinstalace. Budou připojeny k elektrické síti. v rámci stávajících připojení k nemovitosti. Dokončení je plánováno na 31.05. (Czech) | |||||||||||||||
Property / summary: Celkovým cílem projektu je zvýšit výrobu elektřiny z obnovitelných zdrojů a tím snížit emise skleníkových plynů do atmosféry. Podrobné cíle projektu jsou uvedeny v oddíle 2.1 studie proveditelnosti. Předmětem projektu je výstavba nové infrastruktury, která je však založena na stávajících budovách a pozemcích patřících firmám projektových partnerů. Projekt se však týká výstavby nové infrastruktury, založené na stávajících nemovitostech vlastněných společnostmi partnerů projektu. Tyto nemovitosti se nacházejí v obcích Mielec, Tuszyn Narodowy a Kolbuszowa. Předmětem projektu je instalace systémů sestávajících z polykrystalických modulů pro výrobu elektřiny (s celkovým instalovaným výkonem 0,19 MW). Plánovaná instalace zahrnuje celkem 697 jednotek fotovoltaických panelů s výkonem jednoho panelu 280 W, spolu s podpůrnou konstrukcí, veškerým potřebným vybavením a zapojením. Celkem bude postaveno šest zařízení pro pět subjektů. Zařízení budou připojena ke stávající elektrické síti. Základní prvky plánované instalace jsou: — Fotovoltaické moduly, měniče, montážní systémy – střecha a země, elektroinstalace, elektrické rozvaděče, hermetické skříně, monitorovací systém. Celkový instalovaný výkon je součtem výkonu každé instalace, což je zase součin počtu panelů a výkonu jednoho panelu. RSM – Počet modulů (140x 285W = 39,9 kWp). Miel MET – Počet modulů (123 x 325W = 39,97kWp). Pekárna Konieczny – Počet modulů (134 x 285 W= 38,19kWp). Hokej – počet modulů (70 x 285 W = 19,95 kWp). Karkut: Instalace č. 1 – Počet modulů (116 x 325 W = 37,70 kWp), Instalační č. 2 – Počet modulů (61 x 325 W= 19,82 kWp). Všechny instalace jsou mikroinstalace. Budou připojeny k elektrické síti. v rámci stávajících připojení k nemovitosti. Dokončení je plánováno na 31.05. (Czech) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: Celkovým cílem projektu je zvýšit výrobu elektřiny z obnovitelných zdrojů a tím snížit emise skleníkových plynů do atmosféry. Podrobné cíle projektu jsou uvedeny v oddíle 2.1 studie proveditelnosti. Předmětem projektu je výstavba nové infrastruktury, která je však založena na stávajících budovách a pozemcích patřících firmám projektových partnerů. Projekt se však týká výstavby nové infrastruktury, založené na stávajících nemovitostech vlastněných společnostmi partnerů projektu. Tyto nemovitosti se nacházejí v obcích Mielec, Tuszyn Narodowy a Kolbuszowa. Předmětem projektu je instalace systémů sestávajících z polykrystalických modulů pro výrobu elektřiny (s celkovým instalovaným výkonem 0,19 MW). Plánovaná instalace zahrnuje celkem 697 jednotek fotovoltaických panelů s výkonem jednoho panelu 280 W, spolu s podpůrnou konstrukcí, veškerým potřebným vybavením a zapojením. Celkem bude postaveno šest zařízení pro pět subjektů. Zařízení budou připojena ke stávající elektrické síti. Základní prvky plánované instalace jsou: — Fotovoltaické moduly, měniče, montážní systémy – střecha a země, elektroinstalace, elektrické rozvaděče, hermetické skříně, monitorovací systém. Celkový instalovaný výkon je součtem výkonu každé instalace, což je zase součin počtu panelů a výkonu jednoho panelu. RSM – Počet modulů (140x 285W = 39,9 kWp). Miel MET – Počet modulů (123 x 325W = 39,97kWp). Pekárna Konieczny – Počet modulů (134 x 285 W= 38,19kWp). Hokej – počet modulů (70 x 285 W = 19,95 kWp). Karkut: Instalace č. 1 – Počet modulů (116 x 325 W = 37,70 kWp), Instalační č. 2 – Počet modulů (61 x 325 W= 19,82 kWp). Všechny instalace jsou mikroinstalace. Budou připojeny k elektrické síti. v rámci stávajících připojení k nemovitosti. Dokončení je plánováno na 31.05. (Czech) / qualifier | |||||||||||||||
point in time: 2 July 2022
| |||||||||||||||
Property / summary | |||||||||||||||
Bendras projekto tikslas – padidinti elektros energijos gamybą iš atsinaujinančių šaltinių ir taip sumažinti į atmosferą išmetamų šiltnamio efektą sukeliančių dujų kiekį. Išsamūs projekto tikslai pateikti galimybių studijos 2.1 skirsnyje. Projekto objektas – naujos infrastruktūros statyba, tačiau remiantis esamais pastatais ir projekto partnerių kompanijoms priklausančia žeme. Projektas susijęs su naujos infrastruktūros statyba, tačiau remiantis projekto partnerių bendrovėms priklausančiu esamu turtu. Šios apgyvendinimo įstaigos yra Mielec, Tuszyn Narodowy ir Kolbuszowa savivaldybėse. Projekto objektas – sistemų, kurias sudaro polikristaliniai elektros energijos gamybos moduliai (bendra įrengtoji galia – 0,19 MW), įrengimas. Planuojamas montavimas apima iš viso 697 vienetų fotovoltinių plokščių su vieno skydo galia 280 W, kartu su atramine konstrukcija, visa reikalinga įranga ir laidai. Iš viso bus pastatyti šeši įrenginiai penkiems subjektams. Įrenginiai bus prijungti prie esamo elektros tinklo. Pagrindiniai planuojamo įrenginio elementai yra šie: – Fotovoltiniai moduliai, keitikliai, montavimo sistemos – stogas ir gruntas, laidai, elektros skirstomieji įrenginiai, hermetiniai gaubtai, stebėjimo sistema. Bendra įdiegta galia yra kiekvieno įrenginio galios suma, kuri savo ruožtu yra plokščių skaičiaus ir vienos plokštės galios sandauga. RSM – modulių skaičius (140x 285W = 39,9 kWp). Miel MET – modulių skaičius (123 x 325W = 39,97kWp). Kepykla Konieczny – modulių skaičius (134 x 285 W = 38,19kWp). Ledo ritulys – modulių skaičius (70 x 285 W = 19,95 kWp). El. paštas: Instaliacija Nr. 1 – modulių skaičius (116 x 325 W = 37,70 kWp), instaliacija Nr. 2 – modulių skaičius (61 x 325 W = 19,82 kWp). Visi įrenginiai yra mikroįrenginiai. Jie bus prijungti prie elektros tinklo. per esamas jungtis už turtą. Užbaigimas planuojamas 31.05. (Lithuanian) | |||||||||||||||
Property / summary: Bendras projekto tikslas – padidinti elektros energijos gamybą iš atsinaujinančių šaltinių ir taip sumažinti į atmosferą išmetamų šiltnamio efektą sukeliančių dujų kiekį. Išsamūs projekto tikslai pateikti galimybių studijos 2.1 skirsnyje. Projekto objektas – naujos infrastruktūros statyba, tačiau remiantis esamais pastatais ir projekto partnerių kompanijoms priklausančia žeme. Projektas susijęs su naujos infrastruktūros statyba, tačiau remiantis projekto partnerių bendrovėms priklausančiu esamu turtu. Šios apgyvendinimo įstaigos yra Mielec, Tuszyn Narodowy ir Kolbuszowa savivaldybėse. Projekto objektas – sistemų, kurias sudaro polikristaliniai elektros energijos gamybos moduliai (bendra įrengtoji galia – 0,19 MW), įrengimas. Planuojamas montavimas apima iš viso 697 vienetų fotovoltinių plokščių su vieno skydo galia 280 W, kartu su atramine konstrukcija, visa reikalinga įranga ir laidai. Iš viso bus pastatyti šeši įrenginiai penkiems subjektams. Įrenginiai bus prijungti prie esamo elektros tinklo. Pagrindiniai planuojamo įrenginio elementai yra šie: – Fotovoltiniai moduliai, keitikliai, montavimo sistemos – stogas ir gruntas, laidai, elektros skirstomieji įrenginiai, hermetiniai gaubtai, stebėjimo sistema. Bendra įdiegta galia yra kiekvieno įrenginio galios suma, kuri savo ruožtu yra plokščių skaičiaus ir vienos plokštės galios sandauga. RSM – modulių skaičius (140x 285W = 39,9 kWp). Miel MET – modulių skaičius (123 x 325W = 39,97kWp). Kepykla Konieczny – modulių skaičius (134 x 285 W = 38,19kWp). Ledo ritulys – modulių skaičius (70 x 285 W = 19,95 kWp). El. paštas: Instaliacija Nr. 1 – modulių skaičius (116 x 325 W = 37,70 kWp), instaliacija Nr. 2 – modulių skaičius (61 x 325 W = 19,82 kWp). Visi įrenginiai yra mikroįrenginiai. Jie bus prijungti prie elektros tinklo. per esamas jungtis už turtą. Užbaigimas planuojamas 31.05. (Lithuanian) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: Bendras projekto tikslas – padidinti elektros energijos gamybą iš atsinaujinančių šaltinių ir taip sumažinti į atmosferą išmetamų šiltnamio efektą sukeliančių dujų kiekį. Išsamūs projekto tikslai pateikti galimybių studijos 2.1 skirsnyje. Projekto objektas – naujos infrastruktūros statyba, tačiau remiantis esamais pastatais ir projekto partnerių kompanijoms priklausančia žeme. Projektas susijęs su naujos infrastruktūros statyba, tačiau remiantis projekto partnerių bendrovėms priklausančiu esamu turtu. Šios apgyvendinimo įstaigos yra Mielec, Tuszyn Narodowy ir Kolbuszowa savivaldybėse. Projekto objektas – sistemų, kurias sudaro polikristaliniai elektros energijos gamybos moduliai (bendra įrengtoji galia – 0,19 MW), įrengimas. Planuojamas montavimas apima iš viso 697 vienetų fotovoltinių plokščių su vieno skydo galia 280 W, kartu su atramine konstrukcija, visa reikalinga įranga ir laidai. Iš viso bus pastatyti šeši įrenginiai penkiems subjektams. Įrenginiai bus prijungti prie esamo elektros tinklo. Pagrindiniai planuojamo įrenginio elementai yra šie: – Fotovoltiniai moduliai, keitikliai, montavimo sistemos – stogas ir gruntas, laidai, elektros skirstomieji įrenginiai, hermetiniai gaubtai, stebėjimo sistema. Bendra įdiegta galia yra kiekvieno įrenginio galios suma, kuri savo ruožtu yra plokščių skaičiaus ir vienos plokštės galios sandauga. RSM – modulių skaičius (140x 285W = 39,9 kWp). Miel MET – modulių skaičius (123 x 325W = 39,97kWp). Kepykla Konieczny – modulių skaičius (134 x 285 W = 38,19kWp). Ledo ritulys – modulių skaičius (70 x 285 W = 19,95 kWp). El. paštas: Instaliacija Nr. 1 – modulių skaičius (116 x 325 W = 37,70 kWp), instaliacija Nr. 2 – modulių skaičius (61 x 325 W = 19,82 kWp). Visi įrenginiai yra mikroįrenginiai. Jie bus prijungti prie elektros tinklo. per esamas jungtis už turtą. Užbaigimas planuojamas 31.05. (Lithuanian) / qualifier | |||||||||||||||
point in time: 2 July 2022
| |||||||||||||||
Property / summary | |||||||||||||||
Projekta vispārējais mērķis ir palielināt elektroenerģijas ražošanu no atjaunojamiem energoresursiem un tādējādi samazināt siltumnīcefekta gāzu emisijas atmosfērā. Sīki izklāstīti projekta mērķi ir izklāstīti priekšizpētes 2.1. iedaļā. Projekta priekšmets ir jaunas infrastruktūras būvniecība, tomēr, pamatojoties uz esošām ēkām un zemi, kas pieder projekta partneru uzņēmumiem. Tomēr projekts attiecas uz jaunas infrastruktūras būvniecību, pamatojoties uz esošajiem īpašumiem, kas pieder projekta partneru uzņēmumiem. Šie īpašumi atrodas Mielec, Tuszyn Narodowy un Kolbuszowa pašvaldībās. Projekta priekšmets ir tādu sistēmu uzstādīšana, kas sastāv no polikristāliskiem moduļiem elektroenerģijas ražošanai (ar kopējo uzstādīto jaudu 0,19 MW). Plānotā instalācija ietver kopumā 697 fotoelementu paneļu vienības ar viena paneļa 280 W jaudu, kopā ar atbalsta struktūru, visu nepieciešamo aprīkojumu un elektroinstalāciju. Kopumā tiks būvētas sešas iekārtas piecām vienībām. Iekārtas tiks pieslēgtas esošajam elektrotīklam. Plānotās iekārtas pamatelementi ir: — Fotoelektriskie moduļi, invertori, montāžas sistēmas — jumts un zeme, elektroinstalācijas, elektrības sadales iekārtas, hermētiski korpusi, uzraudzības sistēma. Kopējā uzstādītā jauda ir katras iekārtas jaudas summa, kas savukārt ir paneļu skaita un viena paneļa jaudas rezultāts. RSM — moduļu skaits (140x 285W = 39,9 kWp). Miel MET — moduļu skaits (123 x 325W = 39,97kWp). Maiznīca Konieczny — moduļu skaits (134 x 285 W= 38.19kWp). Hokejs — moduļu skaits (70 x 285 W = 19,95 kWp). Atrašanās vieta Karkut: Uzstādīšana Nr. 1 — moduļu skaits (116 x 325 W= 37,70 kWp), instalācija Nr. 2 — moduļu skaits (61 x 325 W = 19,82 kWp). Visas iekārtas ir mikroiekārtas. Tie tiks pieslēgti elektrotīklam. esošo īpašuma savienojumu ietvaros. Plānots pabeigt 31.05. (Latvian) | |||||||||||||||
Property / summary: Projekta vispārējais mērķis ir palielināt elektroenerģijas ražošanu no atjaunojamiem energoresursiem un tādējādi samazināt siltumnīcefekta gāzu emisijas atmosfērā. Sīki izklāstīti projekta mērķi ir izklāstīti priekšizpētes 2.1. iedaļā. Projekta priekšmets ir jaunas infrastruktūras būvniecība, tomēr, pamatojoties uz esošām ēkām un zemi, kas pieder projekta partneru uzņēmumiem. Tomēr projekts attiecas uz jaunas infrastruktūras būvniecību, pamatojoties uz esošajiem īpašumiem, kas pieder projekta partneru uzņēmumiem. Šie īpašumi atrodas Mielec, Tuszyn Narodowy un Kolbuszowa pašvaldībās. Projekta priekšmets ir tādu sistēmu uzstādīšana, kas sastāv no polikristāliskiem moduļiem elektroenerģijas ražošanai (ar kopējo uzstādīto jaudu 0,19 MW). Plānotā instalācija ietver kopumā 697 fotoelementu paneļu vienības ar viena paneļa 280 W jaudu, kopā ar atbalsta struktūru, visu nepieciešamo aprīkojumu un elektroinstalāciju. Kopumā tiks būvētas sešas iekārtas piecām vienībām. Iekārtas tiks pieslēgtas esošajam elektrotīklam. Plānotās iekārtas pamatelementi ir: — Fotoelektriskie moduļi, invertori, montāžas sistēmas — jumts un zeme, elektroinstalācijas, elektrības sadales iekārtas, hermētiski korpusi, uzraudzības sistēma. Kopējā uzstādītā jauda ir katras iekārtas jaudas summa, kas savukārt ir paneļu skaita un viena paneļa jaudas rezultāts. RSM — moduļu skaits (140x 285W = 39,9 kWp). Miel MET — moduļu skaits (123 x 325W = 39,97kWp). Maiznīca Konieczny — moduļu skaits (134 x 285 W= 38.19kWp). Hokejs — moduļu skaits (70 x 285 W = 19,95 kWp). Atrašanās vieta Karkut: Uzstādīšana Nr. 1 — moduļu skaits (116 x 325 W= 37,70 kWp), instalācija Nr. 2 — moduļu skaits (61 x 325 W = 19,82 kWp). Visas iekārtas ir mikroiekārtas. Tie tiks pieslēgti elektrotīklam. esošo īpašuma savienojumu ietvaros. Plānots pabeigt 31.05. (Latvian) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: Projekta vispārējais mērķis ir palielināt elektroenerģijas ražošanu no atjaunojamiem energoresursiem un tādējādi samazināt siltumnīcefekta gāzu emisijas atmosfērā. Sīki izklāstīti projekta mērķi ir izklāstīti priekšizpētes 2.1. iedaļā. Projekta priekšmets ir jaunas infrastruktūras būvniecība, tomēr, pamatojoties uz esošām ēkām un zemi, kas pieder projekta partneru uzņēmumiem. Tomēr projekts attiecas uz jaunas infrastruktūras būvniecību, pamatojoties uz esošajiem īpašumiem, kas pieder projekta partneru uzņēmumiem. Šie īpašumi atrodas Mielec, Tuszyn Narodowy un Kolbuszowa pašvaldībās. Projekta priekšmets ir tādu sistēmu uzstādīšana, kas sastāv no polikristāliskiem moduļiem elektroenerģijas ražošanai (ar kopējo uzstādīto jaudu 0,19 MW). Plānotā instalācija ietver kopumā 697 fotoelementu paneļu vienības ar viena paneļa 280 W jaudu, kopā ar atbalsta struktūru, visu nepieciešamo aprīkojumu un elektroinstalāciju. Kopumā tiks būvētas sešas iekārtas piecām vienībām. Iekārtas tiks pieslēgtas esošajam elektrotīklam. Plānotās iekārtas pamatelementi ir: — Fotoelektriskie moduļi, invertori, montāžas sistēmas — jumts un zeme, elektroinstalācijas, elektrības sadales iekārtas, hermētiski korpusi, uzraudzības sistēma. Kopējā uzstādītā jauda ir katras iekārtas jaudas summa, kas savukārt ir paneļu skaita un viena paneļa jaudas rezultāts. RSM — moduļu skaits (140x 285W = 39,9 kWp). Miel MET — moduļu skaits (123 x 325W = 39,97kWp). Maiznīca Konieczny — moduļu skaits (134 x 285 W= 38.19kWp). Hokejs — moduļu skaits (70 x 285 W = 19,95 kWp). Atrašanās vieta Karkut: Uzstādīšana Nr. 1 — moduļu skaits (116 x 325 W= 37,70 kWp), instalācija Nr. 2 — moduļu skaits (61 x 325 W = 19,82 kWp). Visas iekārtas ir mikroiekārtas. Tie tiks pieslēgti elektrotīklam. esošo īpašuma savienojumu ietvaros. Plānots pabeigt 31.05. (Latvian) / qualifier | |||||||||||||||
point in time: 2 July 2022
| |||||||||||||||
Property / summary | |||||||||||||||
Общата цел на проекта е да се увеличи производството на електроенергия от възобновяеми източници и по този начин да се намалят емисиите на парникови газове в атмосферата. Подробните цели на проекта са представени в раздел 2.1 от предпроектното проучване. Предмет на проекта е изграждането на нова инфраструктура, но въз основа на съществуващи сгради и терени, принадлежащи на фирмите на партньорите по проекта. Проектът обаче се отнася до изграждането на нова инфраструктура въз основа на съществуващи имоти, притежавани от компаниите на партньорите по проекта. Тези имоти се намират в общините Mielec, Tuszyn Narodowy и Kolbuszowa. Предмет на проекта е инсталирането на системи, състоящи се от поликристални модули за производство на електроенергия (с обща инсталирана мощност от 0,19 MW). Планираната инсталация включва общо 697 единици фотоволтаични панели с мощност от един панел 280 W, заедно с поддържаща конструкция, цялото необходимо оборудване и окабеляване. Общо шест инсталации ще бъдат изградени за пет обекта. Инсталациите ще бъдат свързани към съществуващата електрическа мрежа. Основните елементи на планираната инсталация са: — Фотоволтаични модули, инвертори, монтажни системи — покрив и земята, окабеляване, електрически комутационни апарати, херметични заграждения, система за наблюдение. Общата инсталирана мощност е сумата от мощността на всяка инсталация, която от своя страна е продукт на броя на панелите и мощността на един панел. RSM — Брой модули (140x 285W = 39,9 kWp). Miel MET — Брой модули (123 x 325W = 39,97kWp). Пекарна Konieczny — Брой модули (134 x 285 W = 38.19kWp). Хокей — Брой модули (70 x 285 W = 19,95 kWp). Каркут: Инсталация № 1 — Брой модули (116 x 325 W = 37,70 kWp), инсталация № 2 — Брой модули (61 x 325 W = 19,82 kWp). Всички инсталации са микроинсталации. Те ще бъдат свързани към електрическата мрежа. в рамките на съществуващите връзки за имота. Завършването е планирано за 31.05. (Bulgarian) | |||||||||||||||
Property / summary: Общата цел на проекта е да се увеличи производството на електроенергия от възобновяеми източници и по този начин да се намалят емисиите на парникови газове в атмосферата. Подробните цели на проекта са представени в раздел 2.1 от предпроектното проучване. Предмет на проекта е изграждането на нова инфраструктура, но въз основа на съществуващи сгради и терени, принадлежащи на фирмите на партньорите по проекта. Проектът обаче се отнася до изграждането на нова инфраструктура въз основа на съществуващи имоти, притежавани от компаниите на партньорите по проекта. Тези имоти се намират в общините Mielec, Tuszyn Narodowy и Kolbuszowa. Предмет на проекта е инсталирането на системи, състоящи се от поликристални модули за производство на електроенергия (с обща инсталирана мощност от 0,19 MW). Планираната инсталация включва общо 697 единици фотоволтаични панели с мощност от един панел 280 W, заедно с поддържаща конструкция, цялото необходимо оборудване и окабеляване. Общо шест инсталации ще бъдат изградени за пет обекта. Инсталациите ще бъдат свързани към съществуващата електрическа мрежа. Основните елементи на планираната инсталация са: — Фотоволтаични модули, инвертори, монтажни системи — покрив и земята, окабеляване, електрически комутационни апарати, херметични заграждения, система за наблюдение. Общата инсталирана мощност е сумата от мощността на всяка инсталация, която от своя страна е продукт на броя на панелите и мощността на един панел. RSM — Брой модули (140x 285W = 39,9 kWp). Miel MET — Брой модули (123 x 325W = 39,97kWp). Пекарна Konieczny — Брой модули (134 x 285 W = 38.19kWp). Хокей — Брой модули (70 x 285 W = 19,95 kWp). Каркут: Инсталация № 1 — Брой модули (116 x 325 W = 37,70 kWp), инсталация № 2 — Брой модули (61 x 325 W = 19,82 kWp). Всички инсталации са микроинсталации. Те ще бъдат свързани към електрическата мрежа. в рамките на съществуващите връзки за имота. Завършването е планирано за 31.05. (Bulgarian) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: Общата цел на проекта е да се увеличи производството на електроенергия от възобновяеми източници и по този начин да се намалят емисиите на парникови газове в атмосферата. Подробните цели на проекта са представени в раздел 2.1 от предпроектното проучване. Предмет на проекта е изграждането на нова инфраструктура, но въз основа на съществуващи сгради и терени, принадлежащи на фирмите на партньорите по проекта. Проектът обаче се отнася до изграждането на нова инфраструктура въз основа на съществуващи имоти, притежавани от компаниите на партньорите по проекта. Тези имоти се намират в общините Mielec, Tuszyn Narodowy и Kolbuszowa. Предмет на проекта е инсталирането на системи, състоящи се от поликристални модули за производство на електроенергия (с обща инсталирана мощност от 0,19 MW). Планираната инсталация включва общо 697 единици фотоволтаични панели с мощност от един панел 280 W, заедно с поддържаща конструкция, цялото необходимо оборудване и окабеляване. Общо шест инсталации ще бъдат изградени за пет обекта. Инсталациите ще бъдат свързани към съществуващата електрическа мрежа. Основните елементи на планираната инсталация са: — Фотоволтаични модули, инвертори, монтажни системи — покрив и земята, окабеляване, електрически комутационни апарати, херметични заграждения, система за наблюдение. Общата инсталирана мощност е сумата от мощността на всяка инсталация, която от своя страна е продукт на броя на панелите и мощността на един панел. RSM — Брой модули (140x 285W = 39,9 kWp). Miel MET — Брой модули (123 x 325W = 39,97kWp). Пекарна Konieczny — Брой модули (134 x 285 W = 38.19kWp). Хокей — Брой модули (70 x 285 W = 19,95 kWp). Каркут: Инсталация № 1 — Брой модули (116 x 325 W = 37,70 kWp), инсталация № 2 — Брой модули (61 x 325 W = 19,82 kWp). Всички инсталации са микроинсталации. Те ще бъдат свързани към електрическата мрежа. в рамките на съществуващите връзки за имота. Завършването е планирано за 31.05. (Bulgarian) / qualifier | |||||||||||||||
point in time: 2 July 2022
| |||||||||||||||
Property / summary | |||||||||||||||
A projekt általános célja a megújuló energiaforrásokból előállított villamos energia növelése és ezáltal az üvegházhatású gázok légkörbe történő kibocsátásának csökkentése. A projekt részletes célkitűzéseit a megvalósíthatósági tanulmány 2.1. szakasza ismerteti. A projekt tárgya azonban új infrastruktúra építése, amely a projektpartnerek vállalataihoz tartozó meglévő épületeken és földterületeken alapul. A projekt azonban új infrastruktúra építésére irányul, a projektpartnerek vállalatainak tulajdonában lévő meglévő ingatlanok alapján. Ezek az ingatlanok Mielec, Tuszyn Narodowy és Kolbuszowa településeken találhatók. A projekt tárgya villamos energia előállítására szolgáló polikristályos modulokból álló rendszerek telepítése (0,19 MW teljes beépített kapacitással). A tervezett telepítés összesen 697 egység fotovoltaikus panelt tartalmaz egyetlen panel 280 W teljesítményével, valamint egy tartószerkezettel, minden szükséges felszereléssel és vezetékezéssel. Összesen hat létesítmény épül öt szervezet számára. A létesítményeket a meglévő villamosenergia-hálózathoz fogják csatlakoztatni. A tervezett telepítés alapvető elemei a következők: – Fotovoltaikus modulok, inverterek, szerelési rendszerek – tető és föld, vezetékek, elektromos kapcsolóberendezések, hermetikus műszerdobozok, ellenőrző rendszer. A teljes beépített teljesítmény az egyes berendezések teljesítményének összege, amely viszont a panelek számának és egyetlen panel teljesítményének szorzata. RSM – modulok száma (140x 285W = 39,9 kWp). Miel MET – modulok száma (123 x 325W = 39,97kWp). Pékség Konieczny – modulok száma (134 x 285 W = 38,19kWp). Jégkorong – modulok száma (70 x 285 W = 19,95 kWp). Karkut: Telepítési szám – modulok száma (116 x 325 W= 37,70 kWp), 2. telepítési szám – modulok száma (61 x 325 W = 19,82 kWp). Minden berendezés mikrotelepülés. Csatlakoztatva lesznek az elektromos hálózathoz. az ingatlan meglévő kapcsolatain belül. Befejezését 31.05-re tervezik. (Hungarian) | |||||||||||||||
Property / summary: A projekt általános célja a megújuló energiaforrásokból előállított villamos energia növelése és ezáltal az üvegházhatású gázok légkörbe történő kibocsátásának csökkentése. A projekt részletes célkitűzéseit a megvalósíthatósági tanulmány 2.1. szakasza ismerteti. A projekt tárgya azonban új infrastruktúra építése, amely a projektpartnerek vállalataihoz tartozó meglévő épületeken és földterületeken alapul. A projekt azonban új infrastruktúra építésére irányul, a projektpartnerek vállalatainak tulajdonában lévő meglévő ingatlanok alapján. Ezek az ingatlanok Mielec, Tuszyn Narodowy és Kolbuszowa településeken találhatók. A projekt tárgya villamos energia előállítására szolgáló polikristályos modulokból álló rendszerek telepítése (0,19 MW teljes beépített kapacitással). A tervezett telepítés összesen 697 egység fotovoltaikus panelt tartalmaz egyetlen panel 280 W teljesítményével, valamint egy tartószerkezettel, minden szükséges felszereléssel és vezetékezéssel. Összesen hat létesítmény épül öt szervezet számára. A létesítményeket a meglévő villamosenergia-hálózathoz fogják csatlakoztatni. A tervezett telepítés alapvető elemei a következők: – Fotovoltaikus modulok, inverterek, szerelési rendszerek – tető és föld, vezetékek, elektromos kapcsolóberendezések, hermetikus műszerdobozok, ellenőrző rendszer. A teljes beépített teljesítmény az egyes berendezések teljesítményének összege, amely viszont a panelek számának és egyetlen panel teljesítményének szorzata. RSM – modulok száma (140x 285W = 39,9 kWp). Miel MET – modulok száma (123 x 325W = 39,97kWp). Pékség Konieczny – modulok száma (134 x 285 W = 38,19kWp). Jégkorong – modulok száma (70 x 285 W = 19,95 kWp). Karkut: Telepítési szám – modulok száma (116 x 325 W= 37,70 kWp), 2. telepítési szám – modulok száma (61 x 325 W = 19,82 kWp). Minden berendezés mikrotelepülés. Csatlakoztatva lesznek az elektromos hálózathoz. az ingatlan meglévő kapcsolatain belül. Befejezését 31.05-re tervezik. (Hungarian) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: A projekt általános célja a megújuló energiaforrásokból előállított villamos energia növelése és ezáltal az üvegházhatású gázok légkörbe történő kibocsátásának csökkentése. A projekt részletes célkitűzéseit a megvalósíthatósági tanulmány 2.1. szakasza ismerteti. A projekt tárgya azonban új infrastruktúra építése, amely a projektpartnerek vállalataihoz tartozó meglévő épületeken és földterületeken alapul. A projekt azonban új infrastruktúra építésére irányul, a projektpartnerek vállalatainak tulajdonában lévő meglévő ingatlanok alapján. Ezek az ingatlanok Mielec, Tuszyn Narodowy és Kolbuszowa településeken találhatók. A projekt tárgya villamos energia előállítására szolgáló polikristályos modulokból álló rendszerek telepítése (0,19 MW teljes beépített kapacitással). A tervezett telepítés összesen 697 egység fotovoltaikus panelt tartalmaz egyetlen panel 280 W teljesítményével, valamint egy tartószerkezettel, minden szükséges felszereléssel és vezetékezéssel. Összesen hat létesítmény épül öt szervezet számára. A létesítményeket a meglévő villamosenergia-hálózathoz fogják csatlakoztatni. A tervezett telepítés alapvető elemei a következők: – Fotovoltaikus modulok, inverterek, szerelési rendszerek – tető és föld, vezetékek, elektromos kapcsolóberendezések, hermetikus műszerdobozok, ellenőrző rendszer. A teljes beépített teljesítmény az egyes berendezések teljesítményének összege, amely viszont a panelek számának és egyetlen panel teljesítményének szorzata. RSM – modulok száma (140x 285W = 39,9 kWp). Miel MET – modulok száma (123 x 325W = 39,97kWp). Pékség Konieczny – modulok száma (134 x 285 W = 38,19kWp). Jégkorong – modulok száma (70 x 285 W = 19,95 kWp). Karkut: Telepítési szám – modulok száma (116 x 325 W= 37,70 kWp), 2. telepítési szám – modulok száma (61 x 325 W = 19,82 kWp). Minden berendezés mikrotelepülés. Csatlakoztatva lesznek az elektromos hálózathoz. az ingatlan meglévő kapcsolatain belül. Befejezését 31.05-re tervezik. (Hungarian) / qualifier | |||||||||||||||
point in time: 2 July 2022
| |||||||||||||||
Property / summary | |||||||||||||||
Is é cuspóir foriomlán an tionscadail táirgeadh leictreachais ó fhoinsí inathnuaite a mhéadú agus ar an gcaoi sin astaíochtaí gás ceaptha teasa isteach san atmaisféar a laghdú. Cuirtear cuspóirí mionsonraithe an tionscadail i láthair i roinn 2.1 den staidéar féidearthachta. Is é ábhar an tionscadail bonneagar nua a thógáil, áfach, bunaithe ar fhoirgnimh atá ann cheana agus ar thalamh de chuid chuideachtaí chomhpháirtithe an tionscadail. Baineann an tionscadal le bonneagar nua a thógáil, áfach, bunaithe ar mhaoin atá ann cheana atá faoi úinéireacht chuideachtaí chomhpháirtithe an tionscadail. Tá na hairíonna seo lonnaithe i mbardais Mielec, Tuszyn Narodowy agus Kolbuszowa. Is é is ábhar don tionscadal suiteáil córas ina bhfuil modúil pholachriostalacha chun leictreachas a tháirgeadh (ag a bhfuil acmhainn iomlán suiteáilte 0.19 MW). Áirítear ar an tsuiteáil atá beartaithe iomlán de 697 aonad de phainéil fhótavoltacha le cumhacht painéal amháin 280 W, mar aon le struchtúr tacaíochta, gach trealamh agus sreangú is gá. Tógfar sé shuiteáil san iomlán le haghaidh cúig eintiteas. Beidh na suiteálacha ceangailte leis an eangach chumhachta atá ann cheana. Is iad seo a leanas buneilimintí na suiteála atá beartaithe: — Modúil fhótavoltacha, inbhéartóirí, córais gléasta — díon agus talamh, sreangú, lascthrealamh leictreach, iatáin heirméiteacha, córas monatóireachta. Is é an chumhacht iomlán suiteáilte ná suim chumhacht gach suiteála, agus is é an toradh atá ar líon na bpainéal agus cumhacht painéil amháin i ndiaidh a chéile. RSM — Líon na modúl (140x 285W= 39.9 kWp). Miel MET — Líon na modúl (123 x 325W = 39.97kWp). Bácúis Konieczny — Líon na modúl (134 x 285 W= 38.19kWp). Haca — Líon na modúl (70 x 285 W = 19.95 kWp). Tá an méid seo a leanas fíor: Suiteáil Uimh. 1 — Líon na modúl (116 x 325 W= 37.70 kWp), Suiteáil Uimh. 2 — Líon na modúl (61 x 325 W= 19.82 kWp). Micreashuiteálacha is ea gach suiteáil. Beidh siad ceangailte leis an eangach cumhachta. laistigh de na naisc atá ann cheana don mhaoin. Tá sé beartaithe go gcríochnófar 31.05. (Irish) | |||||||||||||||
Property / summary: Is é cuspóir foriomlán an tionscadail táirgeadh leictreachais ó fhoinsí inathnuaite a mhéadú agus ar an gcaoi sin astaíochtaí gás ceaptha teasa isteach san atmaisféar a laghdú. Cuirtear cuspóirí mionsonraithe an tionscadail i láthair i roinn 2.1 den staidéar féidearthachta. Is é ábhar an tionscadail bonneagar nua a thógáil, áfach, bunaithe ar fhoirgnimh atá ann cheana agus ar thalamh de chuid chuideachtaí chomhpháirtithe an tionscadail. Baineann an tionscadal le bonneagar nua a thógáil, áfach, bunaithe ar mhaoin atá ann cheana atá faoi úinéireacht chuideachtaí chomhpháirtithe an tionscadail. Tá na hairíonna seo lonnaithe i mbardais Mielec, Tuszyn Narodowy agus Kolbuszowa. Is é is ábhar don tionscadal suiteáil córas ina bhfuil modúil pholachriostalacha chun leictreachas a tháirgeadh (ag a bhfuil acmhainn iomlán suiteáilte 0.19 MW). Áirítear ar an tsuiteáil atá beartaithe iomlán de 697 aonad de phainéil fhótavoltacha le cumhacht painéal amháin 280 W, mar aon le struchtúr tacaíochta, gach trealamh agus sreangú is gá. Tógfar sé shuiteáil san iomlán le haghaidh cúig eintiteas. Beidh na suiteálacha ceangailte leis an eangach chumhachta atá ann cheana. Is iad seo a leanas buneilimintí na suiteála atá beartaithe: — Modúil fhótavoltacha, inbhéartóirí, córais gléasta — díon agus talamh, sreangú, lascthrealamh leictreach, iatáin heirméiteacha, córas monatóireachta. Is é an chumhacht iomlán suiteáilte ná suim chumhacht gach suiteála, agus is é an toradh atá ar líon na bpainéal agus cumhacht painéil amháin i ndiaidh a chéile. RSM — Líon na modúl (140x 285W= 39.9 kWp). Miel MET — Líon na modúl (123 x 325W = 39.97kWp). Bácúis Konieczny — Líon na modúl (134 x 285 W= 38.19kWp). Haca — Líon na modúl (70 x 285 W = 19.95 kWp). Tá an méid seo a leanas fíor: Suiteáil Uimh. 1 — Líon na modúl (116 x 325 W= 37.70 kWp), Suiteáil Uimh. 2 — Líon na modúl (61 x 325 W= 19.82 kWp). Micreashuiteálacha is ea gach suiteáil. Beidh siad ceangailte leis an eangach cumhachta. laistigh de na naisc atá ann cheana don mhaoin. Tá sé beartaithe go gcríochnófar 31.05. (Irish) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: Is é cuspóir foriomlán an tionscadail táirgeadh leictreachais ó fhoinsí inathnuaite a mhéadú agus ar an gcaoi sin astaíochtaí gás ceaptha teasa isteach san atmaisféar a laghdú. Cuirtear cuspóirí mionsonraithe an tionscadail i láthair i roinn 2.1 den staidéar féidearthachta. Is é ábhar an tionscadail bonneagar nua a thógáil, áfach, bunaithe ar fhoirgnimh atá ann cheana agus ar thalamh de chuid chuideachtaí chomhpháirtithe an tionscadail. Baineann an tionscadal le bonneagar nua a thógáil, áfach, bunaithe ar mhaoin atá ann cheana atá faoi úinéireacht chuideachtaí chomhpháirtithe an tionscadail. Tá na hairíonna seo lonnaithe i mbardais Mielec, Tuszyn Narodowy agus Kolbuszowa. Is é is ábhar don tionscadal suiteáil córas ina bhfuil modúil pholachriostalacha chun leictreachas a tháirgeadh (ag a bhfuil acmhainn iomlán suiteáilte 0.19 MW). Áirítear ar an tsuiteáil atá beartaithe iomlán de 697 aonad de phainéil fhótavoltacha le cumhacht painéal amháin 280 W, mar aon le struchtúr tacaíochta, gach trealamh agus sreangú is gá. Tógfar sé shuiteáil san iomlán le haghaidh cúig eintiteas. Beidh na suiteálacha ceangailte leis an eangach chumhachta atá ann cheana. Is iad seo a leanas buneilimintí na suiteála atá beartaithe: — Modúil fhótavoltacha, inbhéartóirí, córais gléasta — díon agus talamh, sreangú, lascthrealamh leictreach, iatáin heirméiteacha, córas monatóireachta. Is é an chumhacht iomlán suiteáilte ná suim chumhacht gach suiteála, agus is é an toradh atá ar líon na bpainéal agus cumhacht painéil amháin i ndiaidh a chéile. RSM — Líon na modúl (140x 285W= 39.9 kWp). Miel MET — Líon na modúl (123 x 325W = 39.97kWp). Bácúis Konieczny — Líon na modúl (134 x 285 W= 38.19kWp). Haca — Líon na modúl (70 x 285 W = 19.95 kWp). Tá an méid seo a leanas fíor: Suiteáil Uimh. 1 — Líon na modúl (116 x 325 W= 37.70 kWp), Suiteáil Uimh. 2 — Líon na modúl (61 x 325 W= 19.82 kWp). Micreashuiteálacha is ea gach suiteáil. Beidh siad ceangailte leis an eangach cumhachta. laistigh de na naisc atá ann cheana don mhaoin. Tá sé beartaithe go gcríochnófar 31.05. (Irish) / qualifier | |||||||||||||||
point in time: 2 July 2022
| |||||||||||||||
Property / summary | |||||||||||||||
Det övergripande målet med projektet är att öka produktionen av el från förnybara källor och därmed minska utsläppen av växthusgaser i atmosfären. Projektets detaljerade mål presenteras i avsnitt 2.1 i genomförbarhetsstudien. Föremålet för projektet är byggandet av ny infrastruktur, dock baserat på befintliga byggnader och mark som tillhör projektpartnernas företag. Projektet avser dock byggande av ny infrastruktur baserat på befintliga fastigheter som ägs av projektpartnernas företag. Dessa fastigheter ligger i kommunerna Mielec, Tuszyn Narodowy och Kolbuszowa. Föremålet för projektet är installation av system som består av polykristallina moduler för elproduktion (med en total installerad kapacitet på 0,19 MW). Den planerade installationen omfattar totalt 697 solcellspaneler med kraften i en enda panel 280 W, tillsammans med en stödstruktur, all nödvändig utrustning och ledningar. Totalt kommer sex installationer att byggas för fem enheter. Anläggningarna kommer att anslutas till det befintliga elnätet. De grundläggande delarna av den planerade installationen är följande: — Solcellsmoduler, växelriktare, monteringssystem – tak och mark, ledningar, elektriska ställverk, hermetiska höljen, övervakningssystem. Den totala installerade effekten är summan av kraften i varje installation, vilket i sin tur är produkten av antalet paneler och kraften i en enda panel. RSM – Antal moduler (140x 285W= 39,9 kWp). Miel MET – Antal moduler (123 x 325W = 39,97 kWp). Bageri Konieczny – Antal moduler (134 x 285 W= 38,19kWp). Hockey – Antal moduler (70 x 285 W = 19,95 kWp). Karkut: Installation nr 1 – Antal moduler (116 x 325 W= 37,70 kWp), Installation nr 2 – Antal moduler (61 x 325 W = 19,82 kWp). Alla installationer är mikroinstallationer. De kommer att anslutas till elnätet. inom befintliga anslutningar för fastigheten. Slutförandet är planerat till 31.05. (Swedish) | |||||||||||||||
Property / summary: Det övergripande målet med projektet är att öka produktionen av el från förnybara källor och därmed minska utsläppen av växthusgaser i atmosfären. Projektets detaljerade mål presenteras i avsnitt 2.1 i genomförbarhetsstudien. Föremålet för projektet är byggandet av ny infrastruktur, dock baserat på befintliga byggnader och mark som tillhör projektpartnernas företag. Projektet avser dock byggande av ny infrastruktur baserat på befintliga fastigheter som ägs av projektpartnernas företag. Dessa fastigheter ligger i kommunerna Mielec, Tuszyn Narodowy och Kolbuszowa. Föremålet för projektet är installation av system som består av polykristallina moduler för elproduktion (med en total installerad kapacitet på 0,19 MW). Den planerade installationen omfattar totalt 697 solcellspaneler med kraften i en enda panel 280 W, tillsammans med en stödstruktur, all nödvändig utrustning och ledningar. Totalt kommer sex installationer att byggas för fem enheter. Anläggningarna kommer att anslutas till det befintliga elnätet. De grundläggande delarna av den planerade installationen är följande: — Solcellsmoduler, växelriktare, monteringssystem – tak och mark, ledningar, elektriska ställverk, hermetiska höljen, övervakningssystem. Den totala installerade effekten är summan av kraften i varje installation, vilket i sin tur är produkten av antalet paneler och kraften i en enda panel. RSM – Antal moduler (140x 285W= 39,9 kWp). Miel MET – Antal moduler (123 x 325W = 39,97 kWp). Bageri Konieczny – Antal moduler (134 x 285 W= 38,19kWp). Hockey – Antal moduler (70 x 285 W = 19,95 kWp). Karkut: Installation nr 1 – Antal moduler (116 x 325 W= 37,70 kWp), Installation nr 2 – Antal moduler (61 x 325 W = 19,82 kWp). Alla installationer är mikroinstallationer. De kommer att anslutas till elnätet. inom befintliga anslutningar för fastigheten. Slutförandet är planerat till 31.05. (Swedish) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: Det övergripande målet med projektet är att öka produktionen av el från förnybara källor och därmed minska utsläppen av växthusgaser i atmosfären. Projektets detaljerade mål presenteras i avsnitt 2.1 i genomförbarhetsstudien. Föremålet för projektet är byggandet av ny infrastruktur, dock baserat på befintliga byggnader och mark som tillhör projektpartnernas företag. Projektet avser dock byggande av ny infrastruktur baserat på befintliga fastigheter som ägs av projektpartnernas företag. Dessa fastigheter ligger i kommunerna Mielec, Tuszyn Narodowy och Kolbuszowa. Föremålet för projektet är installation av system som består av polykristallina moduler för elproduktion (med en total installerad kapacitet på 0,19 MW). Den planerade installationen omfattar totalt 697 solcellspaneler med kraften i en enda panel 280 W, tillsammans med en stödstruktur, all nödvändig utrustning och ledningar. Totalt kommer sex installationer att byggas för fem enheter. Anläggningarna kommer att anslutas till det befintliga elnätet. De grundläggande delarna av den planerade installationen är följande: — Solcellsmoduler, växelriktare, monteringssystem – tak och mark, ledningar, elektriska ställverk, hermetiska höljen, övervakningssystem. Den totala installerade effekten är summan av kraften i varje installation, vilket i sin tur är produkten av antalet paneler och kraften i en enda panel. RSM – Antal moduler (140x 285W= 39,9 kWp). Miel MET – Antal moduler (123 x 325W = 39,97 kWp). Bageri Konieczny – Antal moduler (134 x 285 W= 38,19kWp). Hockey – Antal moduler (70 x 285 W = 19,95 kWp). Karkut: Installation nr 1 – Antal moduler (116 x 325 W= 37,70 kWp), Installation nr 2 – Antal moduler (61 x 325 W = 19,82 kWp). Alla installationer är mikroinstallationer. De kommer att anslutas till elnätet. inom befintliga anslutningar för fastigheten. Slutförandet är planerat till 31.05. (Swedish) / qualifier | |||||||||||||||
point in time: 2 July 2022
| |||||||||||||||
Property / summary | |||||||||||||||
Projekti üldeesmärk on suurendada taastuvatest energiaallikatest elektri tootmist ja seeläbi vähendada kasvuhoonegaaside heidet atmosfääri. Projekti üksikasjalikud eesmärgid on esitatud teostatavusuuringu punktis 2.1. Projekti teemaks on aga uue infrastruktuuri rajamine, mis põhineb projektipartnerite ettevõtetele kuuluvatel olemasolevatel hoonetel ja maa-alal. Projekt hõlmab aga uue infrastruktuuri ehitamist, mis põhineb projektipartnerite ettevõtete omandis olevatel olemasolevatel kinnistutel. Need kinnistud asuvad Mieleci, Tuszyn Narodowy ja Kolbuszowa kommuunides. Projekti objektiks on polükristalsetest moodulitest koosnevate süsteemide paigaldamine elektri tootmiseks (kogu installeeritud võimsus on 0,19 MW). Kavandatav paigaldus sisaldab kokku 697 ühikut fotogalvaanilisi paneelisid, millel on ühe paneeli võimsus 280 W, koos tugikonstruktsiooni, kõigi vajalike seadmete ja juhtmestikuga. Kokku ehitatakse viiele üksusele kuus rajatist. Käitised ühendatakse olemasoleva elektrivõrguga. Kavandatava käitise põhielemendid on: – Fotogalvaanilised moodulid, inverterid, paigaldussüsteemid – katus ja maa, juhtmestik, elektrijaoturid, hermeetilised korpused, seiresüsteem. Kogu paigaldatud võimsus on iga seadme võimsuse summa, mis omakorda on paneelide arvu ja ühe paneeli võimsuse korrutis. RSM – moodulite arv (140x 285W = 39,9 kWp). Miel MET – moodulite arv (123 x 325W = 39,97kWp). Pagaritöökoda Konieczny – moodulite arv (134 x 285 W= 38,19kWp). Jäähoki – moodulite arv (70 x 285 W = 19,95 kWp). Karkut: Paigaldus nr 1 – moodulite arv (116 x 325 W= 37,70 kWp), paigaldusnumber 2 – moodulite arv (61 x 325 W= 19,82 kWp). Kõik käitised on mikropaigaldised. Need ühendatakse elektrivõrguga. olemasolevates kinnistu ühendustes. Valmimine on planeeritud 31.05. (Estonian) | |||||||||||||||
Property / summary: Projekti üldeesmärk on suurendada taastuvatest energiaallikatest elektri tootmist ja seeläbi vähendada kasvuhoonegaaside heidet atmosfääri. Projekti üksikasjalikud eesmärgid on esitatud teostatavusuuringu punktis 2.1. Projekti teemaks on aga uue infrastruktuuri rajamine, mis põhineb projektipartnerite ettevõtetele kuuluvatel olemasolevatel hoonetel ja maa-alal. Projekt hõlmab aga uue infrastruktuuri ehitamist, mis põhineb projektipartnerite ettevõtete omandis olevatel olemasolevatel kinnistutel. Need kinnistud asuvad Mieleci, Tuszyn Narodowy ja Kolbuszowa kommuunides. Projekti objektiks on polükristalsetest moodulitest koosnevate süsteemide paigaldamine elektri tootmiseks (kogu installeeritud võimsus on 0,19 MW). Kavandatav paigaldus sisaldab kokku 697 ühikut fotogalvaanilisi paneelisid, millel on ühe paneeli võimsus 280 W, koos tugikonstruktsiooni, kõigi vajalike seadmete ja juhtmestikuga. Kokku ehitatakse viiele üksusele kuus rajatist. Käitised ühendatakse olemasoleva elektrivõrguga. Kavandatava käitise põhielemendid on: – Fotogalvaanilised moodulid, inverterid, paigaldussüsteemid – katus ja maa, juhtmestik, elektrijaoturid, hermeetilised korpused, seiresüsteem. Kogu paigaldatud võimsus on iga seadme võimsuse summa, mis omakorda on paneelide arvu ja ühe paneeli võimsuse korrutis. RSM – moodulite arv (140x 285W = 39,9 kWp). Miel MET – moodulite arv (123 x 325W = 39,97kWp). Pagaritöökoda Konieczny – moodulite arv (134 x 285 W= 38,19kWp). Jäähoki – moodulite arv (70 x 285 W = 19,95 kWp). Karkut: Paigaldus nr 1 – moodulite arv (116 x 325 W= 37,70 kWp), paigaldusnumber 2 – moodulite arv (61 x 325 W= 19,82 kWp). Kõik käitised on mikropaigaldised. Need ühendatakse elektrivõrguga. olemasolevates kinnistu ühendustes. Valmimine on planeeritud 31.05. (Estonian) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: Projekti üldeesmärk on suurendada taastuvatest energiaallikatest elektri tootmist ja seeläbi vähendada kasvuhoonegaaside heidet atmosfääri. Projekti üksikasjalikud eesmärgid on esitatud teostatavusuuringu punktis 2.1. Projekti teemaks on aga uue infrastruktuuri rajamine, mis põhineb projektipartnerite ettevõtetele kuuluvatel olemasolevatel hoonetel ja maa-alal. Projekt hõlmab aga uue infrastruktuuri ehitamist, mis põhineb projektipartnerite ettevõtete omandis olevatel olemasolevatel kinnistutel. Need kinnistud asuvad Mieleci, Tuszyn Narodowy ja Kolbuszowa kommuunides. Projekti objektiks on polükristalsetest moodulitest koosnevate süsteemide paigaldamine elektri tootmiseks (kogu installeeritud võimsus on 0,19 MW). Kavandatav paigaldus sisaldab kokku 697 ühikut fotogalvaanilisi paneelisid, millel on ühe paneeli võimsus 280 W, koos tugikonstruktsiooni, kõigi vajalike seadmete ja juhtmestikuga. Kokku ehitatakse viiele üksusele kuus rajatist. Käitised ühendatakse olemasoleva elektrivõrguga. Kavandatava käitise põhielemendid on: – Fotogalvaanilised moodulid, inverterid, paigaldussüsteemid – katus ja maa, juhtmestik, elektrijaoturid, hermeetilised korpused, seiresüsteem. Kogu paigaldatud võimsus on iga seadme võimsuse summa, mis omakorda on paneelide arvu ja ühe paneeli võimsuse korrutis. RSM – moodulite arv (140x 285W = 39,9 kWp). Miel MET – moodulite arv (123 x 325W = 39,97kWp). Pagaritöökoda Konieczny – moodulite arv (134 x 285 W= 38,19kWp). Jäähoki – moodulite arv (70 x 285 W = 19,95 kWp). Karkut: Paigaldus nr 1 – moodulite arv (116 x 325 W= 37,70 kWp), paigaldusnumber 2 – moodulite arv (61 x 325 W= 19,82 kWp). Kõik käitised on mikropaigaldised. Need ühendatakse elektrivõrguga. olemasolevates kinnistu ühendustes. Valmimine on planeeritud 31.05. (Estonian) / qualifier | |||||||||||||||
point in time: 2 July 2022
| |||||||||||||||
Property / programme | |||||||||||||||
Property / programme: Podkarpackie Voivodeship - ERDF/ESF / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / fund | |||||||||||||||
Property / fund: European Regional Development Fund / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / beneficiary | |||||||||||||||
Property / beneficiary: Q2527997 / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / budget | |||||||||||||||
761,124.0 zloty
| |||||||||||||||
Property / budget: 761,124.0 zloty / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / budget | |||||||||||||||
169,197.87 Euro
| |||||||||||||||
Property / budget: 169,197.87 Euro / rank | |||||||||||||||
Preferred rank | |||||||||||||||
Property / budget: 169,197.87 Euro / qualifier | |||||||||||||||
exchange rate to Euro: 0.24 Euro
| |||||||||||||||
Property / budget: 169,197.87 Euro / qualifier | |||||||||||||||
point in time: 13 January 2020
| |||||||||||||||
Property / location (string) | |||||||||||||||
WOJ.: PODKARPACKIE, POW.: kolbuszowski | |||||||||||||||
Property / location (string): WOJ.: PODKARPACKIE, POW.: kolbuszowski / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / location (string) | |||||||||||||||
WOJ.: PODKARPACKIE, POW.: mielecki | |||||||||||||||
Property / location (string): WOJ.: PODKARPACKIE, POW.: mielecki / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / priority axis | |||||||||||||||
Property / priority axis: CLEAN ENERGY / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / co-financing rate | |||||||||||||||
85.0 percent
| |||||||||||||||
Property / co-financing rate: 85.0 percent / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / coordinate location | |||||||||||||||
50°18'56.16"N, 21°46'20.46"E
| |||||||||||||||
Property / coordinate location: 50°18'56.16"N, 21°46'20.46"E / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / coordinate location: 50°18'56.16"N, 21°46'20.46"E / qualifier | |||||||||||||||
Property / coordinate location | |||||||||||||||
50°18'50.69"N, 21°23'51.00"E
| |||||||||||||||
Property / coordinate location: 50°18'50.69"N, 21°23'51.00"E / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / coordinate location: 50°18'50.69"N, 21°23'51.00"E / qualifier | |||||||||||||||
Property / contained in NUTS | |||||||||||||||
Property / contained in NUTS: Tarnobrzeski / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / contained in NUTS: Tarnobrzeski / qualifier | |||||||||||||||
Property / thematic objective | |||||||||||||||
Property / thematic objective: Multiple Thematic Objective / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / thematic objective: Multiple Thematic Objective / qualifier | |||||||||||||||
Property / thematic objective | |||||||||||||||
Property / thematic objective: Low-carbon economy / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / date of last update | |||||||||||||||
13 December 2023
| |||||||||||||||
Property / date of last update: 13 December 2023 / rank | |||||||||||||||
Normal rank |
Latest revision as of 06:16, 9 October 2024
Project Q118553 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | The construction of photovoltaic installations together with the infrastructure accompanying the companies of the project partners. |
Project Q118553 in Poland |
Statements
646,955.39 zloty
0 references
761,124.0 zloty
0 references
85.0 percent
0 references
1 October 2017
0 references
31 May 2019
0 references
ZAKŁAD PRODUKCJI MASZYN I URZĄDZEŃ RSM SPÓŁKA Z OGRANICZONA ODPOWIEDZIALNOŚCIĄ
0 references
Celem projektu jest wytwarzanie energii ze źródeł odnawialnych Ogólnym celem projektu jest zwiększenie produkcji energii elektrycznej ze źródeł odnawialnych a przez to zmniejszenie emisji gazów cieplarnianych do atmosfery. Szczegółowe cele projektu zostały przedstawione w części 2.1 Studium Wykonalności. Przedmiotem projektu jest budowa nowej infrastruktury jednak w oparciu o istniejące budynki i grunty należące do firm partnerów projektu. Projekt dotyczy budowy nowej infrastruktury jednak w oparciu o istniejące nieruchomości będących w posiadaniu firm partnerów projektu. Nieruchomości te są położone w gminach Mielec, Tuszyn Narodowy i Kolbuszowa. Przedmiotem projektu jest montaż systemów składających się z modułów polikrystalicznych do produkcji energii elektrycznej (o łącznej mocy zainstalowanej 0,19 MW). W skład planowanej instalacji wchodzi łącznie 697 szt. modułów paneli fotowoltaicznych o mocy pojedynczego panelu 280 W, wraz z konstrukcją wsporczą, całym niezbędnym osprzętem i okablowaniem. Łącznie powstanie sześć instalacji dla pięciu podmiotów. Instalacje zostaną przyłączone do istniejącej sieci energetycznej. Podstawowe elementy planowanej instalacji to: - Moduły fotowoltaiczne, falowniki, systemy montażowe – dachowe i gruntowe, okablowanie, rozdzielnice elektryczne, obudowy hermetyczne, system monitoringu. Łączna moc zainstalowana stanowi sumę moce każdej instalacji, która stanowi z kolei iloczyn liczby paneli i mocy pojedynczego panelu. RSM - Liczba modułów (140x 285W= 39,9 kWp). Miel MET - Liczba modułów (123 x 325W = 39,97kWp). Piekarnia Konieczny - Liczba modułów (134 x 285 W= 38,19kWp). Hoke - Liczba modułów (70 x 285 W= 19,95 kWp). Karkut: Instalacja nr 1 - Liczba modułów (116 x 325 W= 37,70 kWp), Instalacja nr 2 - Liczba modułów (61 x 325 W= 19,82 kWp). Wszystkie z instalacji są mikroinstalacjami. Zostaną przyłączone do sieci energ. w ramach już istniejących dla danej nieruchomości przyłączy. Zakończenie realizacji planowane jest na 31.05. (Polish)
0 references
The aim of the project is to generate energy from renewable sources The general objective of the project is to increase the production of electricity from renewable sources and thus reduce greenhouse gas emissions into the atmosphere. Detailed objectives of the project are presented in section 2.1 of the Feasibility Study. The object of the project is the construction of new infrastructure, however, based on existing buildings and land belonging to the companies of the partners of the project. The project concerns the construction of new infrastructure, however, based on existing properties owned by the partners of the project. These properties are located in the municipalities of Mielec, Tuszyn Narodowy and Kolbuszowa. The subject of the project is the assembly of systems consisting of polycrystalline modules for the production of electricity (with a total installed capacity of 0,19 MW). The planned installation consists of a total of 697 modules of photovoltaic panel modules with a single 280 W panel, together with support structure, all necessary accessories and wiring. A total of six installations will be created for five entities. The installations will be connected to the existing power grid. The basic elements of the planned installation are: — Photovoltaic modules, inverters, mounting systems – roof and ground, wiring, electric switchgear, hermetic housings, monitoring system. The total installed power is the sum of the power of each installation, which in turn represents the product of the number of panels and the power of a single panel. RSM – Number of modules (140x 285 W= 39.9 kWp). Miel MET – Number of modules (123 x 325 W = 39,97kWp). Bakery Necessary – Number of modules (134 x 285 W= 38.19kWp). Hook – Number of modules (70 x 285 W = 19.95 kWp). The carcass: Installation No 1 – Number of modules (116 x 325 W = 37.70 kWp), Installation No 2 – Number of modules (61 x 325 W= 19,82 kWp). All of the installations are micro-installations. They will be connected to the energetic network within the existing connections for the property. Completion of the implementation is planned at 31.05. (English)
20 October 2020
0.8188334436128336
0 references
L’objectif général du projet est d’augmenter la production d’électricité à partir de sources renouvelables et de réduire ainsi les émissions de gaz à effet de serre dans l’atmosphère. Les objectifs détaillés du projet sont présentés à la section 2.1 de l’étude de faisabilité. L’objet du projet est cependant la construction de nouvelles infrastructures basées sur des bâtiments existants et des terrains appartenant aux entreprises des partenaires du projet. Le projet concerne cependant la construction de nouvelles infrastructures basées sur des propriétés existantes appartenant aux entreprises des partenaires du projet. Ces propriétés sont situées dans les municipalités de Mielec, Tuszyn Narodowy et Kolbuszowa. L’objet du projet est l’installation de systèmes constitués de modules polycristallins pour la production d’électricité (d’une capacité installée totale de 0,19 MW). L’installation prévue comprend un total de 697 unités de panneaux photovoltaïques avec la puissance d’un seul panneau 280 W, ainsi qu’une structure de support, tout l’équipement nécessaire et le câblage. Au total, six installations seront construites pour cinq entités. Les installations seront raccordées au réseau électrique existant. Les éléments de base de l’installation planifiée sont: — Modules photovoltaïques, onduleurs, systèmes de montage — toiture et sol, câblage, appareillage électrique, boîtiers hermétiques, système de surveillance. La puissance totale installée est la somme de la puissance de chaque installation, qui à son tour est le produit du nombre de panneaux et de la puissance d’un seul panneau. RSM — Nombre de modules (140x 285W = 39,9 kWc). Miel MET — Nombre de modules (123 x 325W = 39,97kWp). Boulangerie Konieczny — Nombre de modules (134 x 285 W= 38.19kWp). Hockey — Nombre de modules (70 x 285 W = 19,95 kWc). Karkut: Installation no 1 — Nombre de modules (116 x 325 W = 37,70 kWc), numéro d’installation 2 — Nombre de modules (61 x 325 W = 19,82 kWc). Toutes les installations sont des micro-installations. Ils seront connectés au réseau électrique. dans les connexions existantes pour la propriété. L’achèvement est prévu pour le 31.05. (French)
2 December 2021
0 references
Übergeordnetes Ziel des Projekts ist es, die Stromerzeugung aus erneuerbaren Quellen zu steigern und so die Treibhausgasemissionen in die Atmosphäre zu reduzieren. Die detaillierten Ziele des Projekts sind in Abschnitt 2.1 der Machbarkeitsstudie dargestellt. Gegenstand des Projekts ist jedoch der Bau neuer Infrastrukturen, die auf bestehenden Gebäuden und Grundstücken basieren, die den Unternehmen der Projektpartner gehören. Das Projekt betrifft jedoch den Bau neuer Infrastrukturen, die auf bestehenden Grundstücken basieren, die sich im Besitz der Unternehmen der Projektpartner befinden. Diese Liegenschaften befinden sich in den Gemeinden Mielec, Tuszyn Narodowy und Kolbuszowa. Gegenstand des Projekts ist die Installation von Systemen, die aus polykristallinen Modulen zur Stromerzeugung bestehen (mit einer installierten Gesamtleistung von 0,19 MW). Die geplante Installation umfasst insgesamt 697 Photovoltaik-Module mit der Leistung eines einzigen Panels 280 W, zusammen mit einer Stützstruktur, allen notwendigen Geräten und Verkabelungen. Insgesamt werden sechs Anlagen für fünf Einheiten gebaut. Die Anlagen werden an das bestehende Stromnetz angeschlossen. Die Grundelemente der geplanten Installation sind: — Photovoltaik-Module, Wechselrichter, Montagesysteme – Dach und Boden, Verdrahtung, elektrische Schaltanlagen, hermetische Gehäuse, Überwachungssystem. Die gesamte installierte Leistung ist die Summe der Leistung jeder Anlage, die wiederum das Produkt der Anzahl der Paneele und der Leistung eines einzelnen Panels ist. RSM – Anzahl der Module (140x 285W = 39,9 kWp). Miel MET – Anzahl der Module (123 x 325W = 39.97kWp). Bäckerei Konieczny – Anzahl der Module (134 x 285 W = 38.19kWp). Hockey – Anzahl der Module (70 x 285 W = 19,95 kWp). Karkut: Einbau Nr. 1 – Anzahl der Module (116 x 325 W = 37,70 kWp), Installation Nr. 2 – Anzahl der Module (61 x 325 W = 19,82 kWp). Alle Installationen sind Mikroinstallationen. Sie werden an das Stromnetz angeschlossen. innerhalb der bestehenden Anschlüsse für das Grundstück. Die Fertigstellung ist für 31.05. geplant. (German)
7 December 2021
0 references
De algemene doelstelling van het project is de productie van elektriciteit uit hernieuwbare bronnen te verhogen en zo de uitstoot van broeikasgassen in de atmosfeer te verminderen. De gedetailleerde doelstellingen van het project worden uiteengezet in punt 2.1 van de haalbaarheidsstudie. Het onderwerp van het project is echter de bouw van nieuwe infrastructuur op basis van bestaande gebouwen en grond die toebehoren aan de bedrijven van de projectpartners. Het project betreft echter de bouw van nieuwe infrastructuur op basis van bestaande panden die eigendom zijn van de bedrijven van de projectpartners. Deze woningen bevinden zich in de gemeenten Mielec, Tuszyn Narodowy en Kolbuszowa. Het onderwerp van het project is de installatie van systemen die bestaan uit polykristallijne modules voor de productie van elektriciteit (met een totaal geïnstalleerd vermogen van 0,19 MW). De geplande installatie omvat in totaal 697 eenheden fotovoltaïsche panelen met het vermogen van een enkel paneel 280 W, samen met een ondersteuningsstructuur, alle benodigde apparatuur en bedrading. Er zullen in totaal zes installaties worden gebouwd voor vijf entiteiten. De installaties zullen worden aangesloten op het bestaande elektriciteitsnet. De basiselementen van de geplande installatie zijn: — Fotovoltaïsche modules, omvormers, montagesystemen — dak en grond, bedrading, elektrische schakelinrichtingen, hermetische behuizingen, bewakingssysteem. Het totale geïnstalleerde vermogen is de som van het vermogen van elke installatie, dat op zijn beurt het product is van het aantal panelen en het vermogen van een enkel paneel. RSM — Aantal modules (140x 285W= 39,9 kWp). Miel MET — Aantal modules (123 x 325W = 39,97kWp). Bakkerij Konieczny — Aantal modules (134 x 285 W= 38.19kWp). Hockey — Aantal modules (70 x 285 W= 19,95 kWp). Karkut: Installatie nr. 1 — Aantal modules (116 x 325 W= 37,70 kWp), Installatie nr. 2 — Aantal modules (61 x 325 W= 19,82 kWp). Alle installaties zijn micro-installaties. Ze zullen worden aangesloten op het elektriciteitsnet. binnen de bestaande aansluitingen voor het pand. De voltooiing is gepland voor 31.05. (Dutch)
17 December 2021
0 references
L'obiettivo generale del progetto è aumentare la produzione di energia elettrica da fonti rinnovabili e quindi ridurre le emissioni di gas a effetto serra nell'atmosfera. Gli obiettivi dettagliati del progetto sono presentati nella sezione 2.1 dello studio di fattibilità. Oggetto del progetto è la costruzione di nuove infrastrutture, tuttavia, basate su edifici esistenti e terreni appartenenti alle aziende dei partner del progetto. Il progetto riguarda la costruzione di nuove infrastrutture, tuttavia, sulla base di immobili esistenti di proprietà delle società dei partner del progetto. Queste proprietà si trovano nei comuni di Mielec, Tuszyn Narodowy e Kolbuszowa. Oggetto del progetto è l'installazione di impianti costituiti da moduli policristallini per la produzione di energia elettrica (con una capacità installata totale di 0,19 MW). L'installazione prevista comprende un totale di 697 unità di pannelli fotovoltaici con la potenza di un singolo pannello 280 W, insieme a una struttura di supporto, tutte le attrezzature necessarie e cablaggio. Un totale di sei installazioni saranno costruite per cinque entità. Gli impianti saranno collegati alla rete elettrica esistente. Gli elementi di base dell'installazione prevista sono: — Moduli fotovoltaici, inverter, sistemi di montaggio — tetto e terra, cablaggio, quadri elettrici, custodie ermetiche, sistema di monitoraggio. La potenza totale installata è la somma della potenza di ogni installazione, che a sua volta è il prodotto del numero di pannelli e della potenza di un singolo pannello. RSM — Numero di moduli (140x 285W= 39,9 kWp). Miel MET — Numero di moduli (123 x 325W = 39.97kWp). Panetteria Konieczny — Numero di moduli (134 x 285 W= 38,19kWp). Hockey — Numero di moduli (70 x 285 W= 19,95 kWp). Karkut: Installazione n. 1 — Numero di moduli (116 x 325 W= 37,70 kWp), No. 2 — Numero di moduli (61 x 325 W= 19,82 kWp). Tutte le installazioni sono micro-installazioni. Saranno collegati alla rete elettrica all'interno delle connessioni esistenti per la proprietà. Il completamento è previsto per il 31.05. (Italian)
15 January 2022
0 references
El objetivo general del proyecto es aumentar la producción de electricidad a partir de fuentes renovables y reducir así las emisiones de gases de efecto invernadero a la atmósfera. Los objetivos detallados del proyecto se presentan en la sección 2.1 del estudio de viabilidad. El objeto del proyecto es la construcción de nuevas infraestructuras, sin embargo, basadas en edificios existentes y terrenos pertenecientes a las empresas de los socios del proyecto. El proyecto se refiere a la construcción de nuevas infraestructuras, sin embargo, sobre la base de las propiedades existentes propiedad de las empresas de los socios del proyecto. Estas propiedades se encuentran en los municipios de Mielec, Tuszyn Narodowy y Kolbuszowa. El objeto del proyecto es la instalación de sistemas consistentes en módulos policristalinos para la producción de electricidad (con una capacidad instalada total de 0,19 MW). La instalación prevista incluye un total de 697 unidades de paneles fotovoltaicos con la potencia de un solo panel 280 W, junto con una estructura de soporte, todos los equipos necesarios y cableado. Se construirán un total de seis instalaciones para cinco entidades. Las instalaciones estarán conectadas a la red eléctrica existente. Los elementos básicos de la instalación prevista son: — Módulos fotovoltaicos, inversores, sistemas de montaje — techo y tierra, cableado, conmutadores eléctricos, cerramientos herméticos, sistema de monitorización. La potencia instalada total es la suma de la potencia de cada instalación, que a su vez es el producto del número de paneles y la potencia de un solo panel. RSM — Número de módulos (140x 285W= 39,9 kWp). Miel MET — Número de módulos (123 x 325W = 39,97kWp). Panadería Konieczny — Número de módulos (134 x 285 W= 38,19kWp). Hockey — Número de módulos (70 x 285 W= 19,95 kWp). ¿Por qué? Instalación N.º 1 — Número de módulos (116 x 325 W= 37,70 kWp), Instalación n.º 2 — Número de módulos (61 x 325 W= 19,82 kWp). Todas las instalaciones son microinstalaciones. Se conectarán a la red eléctrica dentro de las conexiones existentes para la propiedad. La finalización está prevista para el 31.05. (Spanish)
18 January 2022
0 references
Projektets overordnede mål er at øge produktionen af elektricitet fra vedvarende energikilder og dermed reducere udledningen af drivhusgasser til atmosfæren. De detaljerede målsætninger for projektet er beskrevet i punkt 2.1 i gennemførlighedsundersøgelsen. Projektets emne er imidlertid opførelse af ny infrastruktur baseret på eksisterende bygninger og jord tilhørende projektpartnernes virksomheder. Projektet vedrører imidlertid opførelse af ny infrastruktur baseret på eksisterende ejendomme ejet af projektpartnernes virksomheder. Disse ejendomme er beliggende i kommunerne Mielec, Tuszyn Narodowy og Kolbuszowa. Projektets emne er installation af systemer bestående af polykrystallinske moduler til produktion af elektricitet (med en samlet installeret kapacitet på 0,19 MW). Den planlagte installation omfatter i alt 697 enheder af fotovoltaiske paneler med kraft af et enkelt panel 280 W, sammen med en støttestruktur, alt nødvendigt udstyr og ledninger. Der vil blive bygget i alt seks anlæg til fem enheder. Anlæggene vil blive tilsluttet det eksisterende elnet. De grundlæggende elementer i den planlagte installation er: — Fotovoltaiske moduler, invertere, monteringssystemer — tag og jord, ledninger, elektrisk koblingsudstyr, hermetiske kabinetter, overvågningssystem. Den samlede installerede effekt er summen af effekten af hvert anlæg, som igen er produktet af antallet af paneler og kraften i et enkelt panel. RSM — Antal moduler (140x 285W= 39,9 kWp). Miel MET — Antal moduler (123 x 325W = 39,97kWp). Bageri Konieczny — Antal moduler (134 x 285 W= 38,19kWp). Hockey — Antal moduler (70 x 285 W = 19,95 kWp). Hvad er Karkut? Installation nr. 1 — Antal moduler (116 x 325 W = 37,70 kWp), installation nr. 2 — Antal moduler (61 x 325 W = 19,82 kWp). Alle installationer er mikroinstallationer. De vil blive tilsluttet elnettet. inden for de eksisterende forbindelser til ejendommen. Færdiggørelsen er planlagt til 31.05. (Danish)
2 July 2022
0 references
Ο γενικός στόχος του έργου είναι η αύξηση της παραγωγής ηλεκτρικής ενέργειας από ανανεώσιμες πηγές και, ως εκ τούτου, η μείωση των εκπομπών αερίων του θερμοκηπίου στην ατμόσφαιρα. Οι λεπτομερείς στόχοι του έργου παρουσιάζονται στο τμήμα 2.1 της μελέτης σκοπιμότητας. Αντικείμενο του έργου είναι η κατασκευή νέων υποδομών, ωστόσο, με βάση υφιστάμενα κτίρια και οικόπεδα που ανήκουν στις εταιρείες των εταίρων του έργου. Το έργο αφορά την κατασκευή νέων υποδομών, ωστόσο, βάσει υφιστάμενων ακινήτων που ανήκουν στις εταιρείες των εταίρων του έργου. Τα ακίνητα αυτά βρίσκονται στους δήμους Mielec, Tuszyn Narodowy και Kolbuszowa. Αντικείμενο του έργου είναι η εγκατάσταση συστημάτων που αποτελούνται από πολυκρυσταλλικές μονάδες παραγωγής ηλεκτρικής ενέργειας (με συνολική εγκατεστημένη ισχύ 0,19 MW). Η σχεδιαζόμενη εγκατάσταση περιλαμβάνει συνολικά 697 μονάδες φωτοβολταϊκών πάνελ με την ισχύ ενός ενιαίου πάνελ 280 W, μαζί με δομή στήριξης, όλο τον απαραίτητο εξοπλισμό και καλωδίωση. Συνολικά θα κατασκευαστούν έξι εγκαταστάσεις για πέντε φορείς. Οι εγκαταστάσεις θα συνδεθούν με το υπάρχον δίκτυο ηλεκτρικής ενέργειας. Τα βασικά στοιχεία της σχεδιαζόμενης εγκατάστασης είναι: — Φωτοβολταϊκές μονάδες, αναστροφείς, συστήματα στερέωσης — στέγη και έδαφος, καλωδίωση, ηλεκτρικός μηχανισμός διανομής, ερμητικά περιβλήματα, σύστημα παρακολούθησης. Η συνολική εγκατεστημένη ισχύς είναι το άθροισμα της ισχύος κάθε εγκατάστασης, η οποία με τη σειρά της είναι το γινόμενο του αριθμού των πάνελ και της ισχύος ενός ενιαίου πίνακα. RSM — Αριθμός δομοστοιχείων (140x 285W= 39,9 kWp). MET Miel — Αριθμός δομοστοιχείων (123 x 325W = 39,97kWp). Αρτοποιείο Konieczny — Αριθμός μονάδων (134 x 285 W= 38.19kWp). Χόκεϊ — Αριθμός μονάδων (70 x 285 W= 19,95 kWp). Ο Καρκούτ: Εγκατάσταση αριθ. 1 — Αριθμός δομοστοιχείων (116 x 325 W= 37,70 kWp), εγκατάσταση αριθ. 2 — Αριθμός δομοστοιχείων (61 x 325 W= 19,82 kWp). Όλες οι εγκαταστάσεις είναι μικροεγκαταστάσεις. Θα συνδεθούν με το δίκτυο ηλεκτρικής ενέργειας. εντός των υφιστάμενων συνδέσεων για το ακίνητο. Η ολοκλήρωση έχει προγραμματιστεί για τις 31.05. (Greek)
2 July 2022
0 references
Opći cilj projekta je povećati proizvodnju električne energije iz obnovljivih izvora i time smanjiti emisije stakleničkih plinova u atmosferu. Detaljni ciljevi projekta prikazani su u odjeljku 2.1. studije izvedivosti. Predmet projekta je izgradnja nove infrastrukture, međutim, na temelju postojećih zgrada i zemljišta koje pripadaju tvrtkama projektnih partnera. Međutim, projekt se odnosi na izgradnju nove infrastrukture na temelju postojećih nekretnina u vlasništvu tvrtki projektnih partnera. Te nekretnine nalaze se u općinama Mielec, Tuszyn Narodowy i Kolbuszowa. Predmet projekta je instalacija sustava koji se sastoje od polikristalnih modula za proizvodnju električne energije (ukupnog instaliranog kapaciteta 0,19 MW). Planirana instalacija uključuje ukupno 697 jedinica fotonaponskih panela snage jedne ploče 280 W, zajedno s potpornom strukturom, sve potrebne opreme i ožičenja. Ukupno će biti izgrađeno šest postrojenja za pet entiteta. Postrojenja će biti priključena na postojeću elektroenergetsku mrežu. Osnovni elementi planirane instalacije su: — Fotonaponski moduli, pretvarači, sustavi za montažu – krov i tlo, ožičenje, električna rasklopna postrojenja, hermetička kućišta, sustav nadzora. Ukupna instalirana snaga je zbroj snage svake instalacije, što je zauzvrat umnožak broja ploča i snage jedne ploče. RSM – Broj modula (140x 285W= 39,9 kWp). Miel MET – Broj modula (123 x 325W = 39,97kWp). Pekara Konieczny – Broj modula (134 x 285 W=38,19kWp). Hokej – broj modula (70 x 285 W = 19,95 kWp). Što se događa? Ugradnja br. 1 – Broj modula (116 x 325 W=37,70 kWp), Instalacija br. 2 – Broj modula (61 x 325 W= 19,82 kWp). Sve instalacije su mikroinstalacije. Oni će biti priključeni na elektroenergetsku mrežu. unutar postojećih priključaka za nekretninu. Završetak je planiran za 31.05. (Croatian)
2 July 2022
0 references
Obiectivul general al proiectului este de a crește producția de energie electrică din surse regenerabile și, astfel, de a reduce emisiile de gaze cu efect de seră în atmosferă. Obiectivele detaliate ale proiectului sunt prezentate în secțiunea 2.1 a studiului de fezabilitate. Obiectul proiectului este construirea de noi infrastructuri, cu toate acestea, pe baza clădirilor existente și a terenurilor aparținând companiilor partenerilor de proiect. Proiectul se referă însă la construirea de noi infrastructuri, pe baza proprietăților existente deținute de companiile partenerilor de proiect. Aceste proprietăți sunt situate în municipalitățile Mielec, Tuszyn Narodowy și Kolbuszowa. Obiectul proiectului este instalarea de sisteme compuse din module policristaline pentru producția de energie electrică (cu o capacitate totală instalată de 0,19 MW). Instalarea planificată include un total de 697 de unități de panouri fotovoltaice cu puterea unui singur panou 280 W, împreună cu o structură de sprijin, toate echipamentele necesare și cablajul. Un total de șase instalații vor fi construite pentru cinci entități. Instalațiile vor fi conectate la rețeaua electrică existentă. Elementele de bază ale instalației planificate sunt: Module fotovoltaice, invertoare, sisteme de montare – acoperiș și sol, cabluri, întrerupătoare electrice, incinte ermetice, sistem de monitorizare. Puterea totală instalată este suma puterii fiecărei instalații, care, la rândul său, este produsul numărului de panouri și a puterii unui singur panou. RSM – Număr de module (140x 285W= 39,9 kWp). Miel MET – Număr de module (123 x 325W = 39,97kWp). Brutărie Konieczny – Număr de module (134 x 285 W= 38,19kWp). Hochei – Numărul de module (70 x 285 W = 19,95 kWp). În Karkut: Instalarea nr. 1 – Numărul de module (116 x 325 W = 37,70 kWp), instalația nr. 2 – Număr de module (61 x 325 W = 19,82 kWp). Toate instalațiile sunt microinstalații. Acestea vor fi conectate la rețeaua electrică. în cadrul conexiunilor existente pentru proprietate. Finalizarea este planificată pentru 31.05. (Romanian)
2 July 2022
0 references
Celkovým cieľom projektu je zvýšiť výrobu elektrickej energie z obnoviteľných zdrojov, a tým znížiť emisie skleníkových plynov do atmosféry. Podrobné ciele projektu sú uvedené v oddiele 2.1 štúdie uskutočniteľnosti. Predmetom projektu je však výstavba novej infraštruktúry na základe existujúcich budov a pozemkov patriacich spoločnostiam partnerov projektu. Projekt sa však týka výstavby novej infraštruktúry na základe existujúcich nehnuteľností vlastnených spoločnosťami partnerov projektu. Tieto nehnuteľnosti sa nachádzajú v obciach Mielec, Tuszyn Narodowy a Kolbuszowa. Predmetom projektu je inštalácia systémov pozostávajúcich z polykryštalických modulov na výrobu elektrickej energie (s celkovým inštalovaným výkonom 0,19 MW). Plánovaná inštalácia zahŕňa celkom 697 jednotiek fotovoltaických panelov s výkonom jedného panela 280 W, spolu s nosnou konštrukciou, všetkým potrebným vybavením a elektroinštaláciou. Celkovo sa vybuduje šesť zariadení pre päť subjektov. Zariadenia budú pripojené k existujúcej elektrickej rozvodnej sieti. Základné prvky plánovanej inštalácie sú: — Fotovoltaické moduly, meniče, montážne systémy – strecha a zem, rozvody, elektrické rozvádzače, hermetické skrine, monitorovací systém. Celkový inštalovaný výkon je súčet výkonu každej inštalácie, čo je výsledok počtu panelov a výkonu jedného panelu. RSM – Počet modulov (140x 285W= 39,9 kWp). Miel MET – Počet modulov (123 x 325W = 39,97kWp). Pekáreň Konieczny – Počet modulov (134 x 285 W= 38.19kWp). Hokej – Počet modulov (70 x 285 W = 19,95 kWp). Kľúčové slová: Inštalácia č. 1 – Počet modulov (116 x 325 W= 37,70 kWp), inštalácia č. 2 – Počet modulov (61 x 325 W = 19,82 kWp). Všetky zariadenia sú mikrozariadenia. Budú pripojené k elektrickej sieti. v rámci existujúcich pripojení k nehnuteľnosti. Dokončenie je naplánované na 31.05. (Slovak)
2 July 2022
0 references
L-objettiv ġenerali tal-proġett huwa li tiżdied il-produzzjoni tal-elettriku minn sorsi rinnovabbli u b’hekk jitnaqqsu l-emissjonijiet tal-gassijiet serra fl-atmosfera. L-għanijiet dettaljati tal-proġett huma ppreżentati fit-taqsima 2.1 tal-istudju tal-fattibbiltà. Is-suġġett tal-proġett huwa l-kostruzzjoni ta’ infrastruttura ġdida, madankollu, ibbażata fuq bini eżistenti u art li tappartjeni lill-kumpaniji tal-imsieħba tal-proġett. Il-proġett jikkonċerna l-kostruzzjoni ta’ infrastruttura ġdida, madankollu, ibbażata fuq proprjetajiet eżistenti li huma proprjetà tal-kumpaniji tas-sħab tal-proġett. Dawn il-proprjetajiet jinsabu fil-muniċipalitajiet ta’ Mielec, Tuszyn Narodowy u Kolbuszowa. Is-suġġett tal-proġett huwa l-installazzjoni ta’ sistemi li jikkonsistu f’moduli polikristallini għall-produzzjoni tal-elettriku (b’kapaċità totali installata ta’ 0.19 MW). L-installazzjoni ppjanata tinkludi total ta’ 697 unità ta’ pannelli fotovoltajċi bil-qawwa ta’ pannell wieħed 280 W, flimkien ma’ struttura ta’ appoġġ, it-tagħmir kollu meħtieġ u l-wajers. Total ta’ sitt installazzjonijiet se jinbnew għal ħames entitajiet. L-installazzjonijiet se jkunu konnessi mal-grilja tal-elettriku eżistenti. L-elementi bażiċi tal-installazzjoni ppjanata huma: — Moduli fotovoltajċi, invertituri, sistemi ta’ mmuntar — saqaf u art, wajers, switchgear elettriku, kompartimenti ermetiċi, sistema ta’ monitoraġġ. L-enerġija totali installata hija s-somma tal-enerġija ta’ kull installazzjoni, li min-naħa tagħha hija l-prodott tan-numru ta’ pannelli u l-qawwa ta’ panel wieħed. RSM — Għadd ta’ moduli (140x 285W= 39.9 kWp). Miel MET — Numru ta’ moduli (123 x 325W = 39.97kWp). Forn Konieczny — Numru ta’ moduli (134 x 285 W= 38.19kWp). Hockey — Għadd ta’ moduli (70 x 285 W= 19.95 kWp). Karkut: Installazzjoni Nru 1 — Numru ta’ moduli (116 x 325 W= 37.70 kWp), Installazzjoni Nru 2 — Numru ta’ moduli (61 x 325 W= 19.82 kWp). L-installazzjonijiet kollha huma mikroinstallazzjonijiet. Dawn se jkunu konnessi mal-grilja tal-elettriku fi ħdan il-konnessjonijiet eżistenti għall-proprjetà. It-tlestija hija ppjanata għall-31.05. (Maltese)
2 July 2022
0 references
O objetivo geral do projeto é aumentar a produção de eletricidade a partir de fontes renováveis e, assim, reduzir as emissões de gases com efeito de estufa para a atmosfera. Os objetivos pormenorizados do projeto são apresentados na secção 2.1 do estudo de viabilidade. O objetivo do projeto é a construção de novas infraestruturas, no entanto, com base em edifícios existentes e terrenos pertencentes às empresas dos parceiros do projeto. O projeto diz respeito à construção de novas infraestruturas, no entanto, com base em propriedades existentes detidas pelos parceiros do projeto. Estas propriedades estão localizadas nos municípios de Mielec, Tuszyn Narodowy e Kolbuszowa. O projeto tem por objeto a montagem de sistemas constituídos por módulos policristalinos para a produção de eletricidade (com uma capacidade instalada total de 0,19 MW). A instalação prevista consiste num total de 697 módulos de painéis fotovoltaicos com um único painel de 280 W, juntamente com a estrutura de suporte, todos os acessórios e cablagem necessários. No total, serão criadas seis instalações para cinco entidades. As instalações serão ligadas à rede elétrica existente. Os elementos básicos da instalação planeada são: — Módulos fotovoltaicos, inversores, sistemas de montagem — tejadilho e terra, cablagem, comutadores elétricos, caixas herméticas, sistema de monitorização. A potência total instalada é a soma da potência de cada instalação, que por sua vez representa o produto do número de painéis e a potência de um único painel. MSE – Número de módulos (140x285 W= 39,9 kWp). Miel MET – Número de módulos (123 x 325 W = 39,97 kWp). Padaria Necessária – Número de módulos (134 x 285 W= 38,19kWp). Gancho – Número de módulos (70 x 285 W = 19,95 kWp). A carcaça: Instalação n.o 1 – Número de módulos (116 x 325 W = 37,70 kWp), Instalação n.o 2 – Número de módulos (61 x 325 W = 19,82 kWp). Todas as instalações são microinstalações. Eles serão ligados à rede energética dentro das conexões existentes para a propriedade. A conclusão da execução está prevista para 31.05. (Portuguese)
2 July 2022
0 references
Hankkeen yleisenä tavoitteena on lisätä sähköntuotantoa uusiutuvista energialähteistä ja siten vähentää kasvihuonekaasupäästöjä ilmakehään. Hankkeen yksityiskohtaiset tavoitteet esitetään toteutettavuustutkimuksen kohdassa 2.1. Hankkeen aiheena on kuitenkin uuden infrastruktuurin rakentaminen, joka perustuu olemassa oleviin rakennuksiin ja hankekumppaneiden yritysten omistamiin maa-alueisiin. Hanke koskee kuitenkin uuden infrastruktuurin rakentamista, joka perustuu hankekumppaneiden yritysten omistamiin olemassa oleviin kiinteistöihin. Nämä kiinteistöt sijaitsevat Mielecin, Tuszyn Narodowyn ja Kolbuszowan kunnissa. Hankkeen kohteena on monikiteisistä moduuleista koostuvien järjestelmien asentaminen sähköntuotantoon (kokonaiskapasiteetti 0,19 MW). Suunniteltu asennus sisältää yhteensä 697 yksikköä aurinkosähköpaneeleja, joissa on yhden paneelin 280 W teho, sekä tukirakenne, kaikki tarvittavat laitteet ja johdotus. Yhteensä kuusi laitosta rakennetaan viiteen yksikköön. Laitteistot liitetään olemassa olevaan sähköverkkoon. Suunnitellun asennuksen peruselementit ovat: — Aurinkosähkömoduulit, taajuusmuuttajat, asennusjärjestelmät – katto ja maa, johdotus, sähköiset kytkinlaitteet, hermeettiset kotelot, valvontajärjestelmä. Asennettu kokonaisteho on kunkin asennuksen tehon summa, joka puolestaan on paneelien lukumäärän ja yhden paneelin tehon tulo. RSM – moduulien määrä (140x 285W= 39,9 kWp). Miel MET – moduulien määrä (123 x 325W = 39,97 kWp). Leipomo Konieczny – moduulien määrä (134 x 285 W= 38,19kWp). Jääkiekko – moduulien lukumäärä (70 x 285 W= 19,95 kWp). Karkut: Asennus nro 1 – moduulien lukumäärä (116 x 325 W = 37,70 kWp), Asennusnumero 2 – moduulien lukumäärä (61 x 325 W = 19,82 kWp). Kaikki asennukset ovat mikrolaitoksia. Ne liitetään sähköverkkoon. kiinteistön olemassa olevien liitäntöjen sisällä. Valmistumisaika on 31.05. (Finnish)
2 July 2022
0 references
Splošni cilj projekta je povečati proizvodnjo električne energije iz obnovljivih virov in tako zmanjšati emisije toplogrednih plinov v ozračje. Podrobni cilji projekta so predstavljeni v oddelku 2.1 študije izvedljivosti. Predmet projekta je gradnja nove infrastrukture, ki temelji na obstoječih zgradbah in zemljiščih, ki pripadajo podjetjem projektnih partnerjev. Projekt se nanaša na gradnjo nove infrastrukture, ki temelji na obstoječih nepremičninah, ki so v lasti podjetij projektnih partnerjev. Te nepremičnine se nahajajo v občinah Mielec, Tuszyn Narodowy in Kolbuszowa. Predmet projekta je namestitev sistemov, sestavljenih iz polikristalnih modulov za proizvodnjo električne energije (s skupno inštalirano zmogljivostjo 0,19 MW). Načrtovana namestitev vključuje skupno 697 enot fotonapetostnih plošč z močjo ene same plošče 280 W, skupaj s podporno strukturo, vso potrebno opremo in ožičenjem. Skupno bo zgrajenih šest naprav za pet subjektov. Naprave bodo priključene na obstoječe električno omrežje. Osnovni elementi načrtovane namestitve so: — Fotonapetostni moduli, pretvorniki, montažni sistemi – streha in tla, ožičenje, električne stikalne naprave, hermetična ohišja, nadzorni sistem. Skupna inštalirana moč je vsota moči vsake naprave, ki je rezultat števila plošč in moči ene plošče. RSM – število modulov (140 x 285 W = 39,9 kWp). Miel MET – število modulov (123 x 325W = 39,97 kWp). Pekarna Konieczny – število modulov (134 x 285 W = 38,19kWp). Hokej – število modulov (70 x 285 W = 19,95 kWp). Strani, ki se povezujejo na Karkut: Namestitev št. 1 – Število modulov (116 x 325 W = 37,70 kWp), Namestitev št. 2 – število modulov (61 x 325 W = 19,82 kWp). Vse naprave so mikroinštalacije. Priključeni bodo na električno omrežje. znotraj obstoječih priključkov za nepremičnino. Zaključek je načrtovan za 31.05. (Slovenian)
2 July 2022
0 references
Celkovým cílem projektu je zvýšit výrobu elektřiny z obnovitelných zdrojů a tím snížit emise skleníkových plynů do atmosféry. Podrobné cíle projektu jsou uvedeny v oddíle 2.1 studie proveditelnosti. Předmětem projektu je výstavba nové infrastruktury, která je však založena na stávajících budovách a pozemcích patřících firmám projektových partnerů. Projekt se však týká výstavby nové infrastruktury, založené na stávajících nemovitostech vlastněných společnostmi partnerů projektu. Tyto nemovitosti se nacházejí v obcích Mielec, Tuszyn Narodowy a Kolbuszowa. Předmětem projektu je instalace systémů sestávajících z polykrystalických modulů pro výrobu elektřiny (s celkovým instalovaným výkonem 0,19 MW). Plánovaná instalace zahrnuje celkem 697 jednotek fotovoltaických panelů s výkonem jednoho panelu 280 W, spolu s podpůrnou konstrukcí, veškerým potřebným vybavením a zapojením. Celkem bude postaveno šest zařízení pro pět subjektů. Zařízení budou připojena ke stávající elektrické síti. Základní prvky plánované instalace jsou: — Fotovoltaické moduly, měniče, montážní systémy – střecha a země, elektroinstalace, elektrické rozvaděče, hermetické skříně, monitorovací systém. Celkový instalovaný výkon je součtem výkonu každé instalace, což je zase součin počtu panelů a výkonu jednoho panelu. RSM – Počet modulů (140x 285W = 39,9 kWp). Miel MET – Počet modulů (123 x 325W = 39,97kWp). Pekárna Konieczny – Počet modulů (134 x 285 W= 38,19kWp). Hokej – počet modulů (70 x 285 W = 19,95 kWp). Karkut: Instalace č. 1 – Počet modulů (116 x 325 W = 37,70 kWp), Instalační č. 2 – Počet modulů (61 x 325 W= 19,82 kWp). Všechny instalace jsou mikroinstalace. Budou připojeny k elektrické síti. v rámci stávajících připojení k nemovitosti. Dokončení je plánováno na 31.05. (Czech)
2 July 2022
0 references
Bendras projekto tikslas – padidinti elektros energijos gamybą iš atsinaujinančių šaltinių ir taip sumažinti į atmosferą išmetamų šiltnamio efektą sukeliančių dujų kiekį. Išsamūs projekto tikslai pateikti galimybių studijos 2.1 skirsnyje. Projekto objektas – naujos infrastruktūros statyba, tačiau remiantis esamais pastatais ir projekto partnerių kompanijoms priklausančia žeme. Projektas susijęs su naujos infrastruktūros statyba, tačiau remiantis projekto partnerių bendrovėms priklausančiu esamu turtu. Šios apgyvendinimo įstaigos yra Mielec, Tuszyn Narodowy ir Kolbuszowa savivaldybėse. Projekto objektas – sistemų, kurias sudaro polikristaliniai elektros energijos gamybos moduliai (bendra įrengtoji galia – 0,19 MW), įrengimas. Planuojamas montavimas apima iš viso 697 vienetų fotovoltinių plokščių su vieno skydo galia 280 W, kartu su atramine konstrukcija, visa reikalinga įranga ir laidai. Iš viso bus pastatyti šeši įrenginiai penkiems subjektams. Įrenginiai bus prijungti prie esamo elektros tinklo. Pagrindiniai planuojamo įrenginio elementai yra šie: – Fotovoltiniai moduliai, keitikliai, montavimo sistemos – stogas ir gruntas, laidai, elektros skirstomieji įrenginiai, hermetiniai gaubtai, stebėjimo sistema. Bendra įdiegta galia yra kiekvieno įrenginio galios suma, kuri savo ruožtu yra plokščių skaičiaus ir vienos plokštės galios sandauga. RSM – modulių skaičius (140x 285W = 39,9 kWp). Miel MET – modulių skaičius (123 x 325W = 39,97kWp). Kepykla Konieczny – modulių skaičius (134 x 285 W = 38,19kWp). Ledo ritulys – modulių skaičius (70 x 285 W = 19,95 kWp). El. paštas: Instaliacija Nr. 1 – modulių skaičius (116 x 325 W = 37,70 kWp), instaliacija Nr. 2 – modulių skaičius (61 x 325 W = 19,82 kWp). Visi įrenginiai yra mikroįrenginiai. Jie bus prijungti prie elektros tinklo. per esamas jungtis už turtą. Užbaigimas planuojamas 31.05. (Lithuanian)
2 July 2022
0 references
Projekta vispārējais mērķis ir palielināt elektroenerģijas ražošanu no atjaunojamiem energoresursiem un tādējādi samazināt siltumnīcefekta gāzu emisijas atmosfērā. Sīki izklāstīti projekta mērķi ir izklāstīti priekšizpētes 2.1. iedaļā. Projekta priekšmets ir jaunas infrastruktūras būvniecība, tomēr, pamatojoties uz esošām ēkām un zemi, kas pieder projekta partneru uzņēmumiem. Tomēr projekts attiecas uz jaunas infrastruktūras būvniecību, pamatojoties uz esošajiem īpašumiem, kas pieder projekta partneru uzņēmumiem. Šie īpašumi atrodas Mielec, Tuszyn Narodowy un Kolbuszowa pašvaldībās. Projekta priekšmets ir tādu sistēmu uzstādīšana, kas sastāv no polikristāliskiem moduļiem elektroenerģijas ražošanai (ar kopējo uzstādīto jaudu 0,19 MW). Plānotā instalācija ietver kopumā 697 fotoelementu paneļu vienības ar viena paneļa 280 W jaudu, kopā ar atbalsta struktūru, visu nepieciešamo aprīkojumu un elektroinstalāciju. Kopumā tiks būvētas sešas iekārtas piecām vienībām. Iekārtas tiks pieslēgtas esošajam elektrotīklam. Plānotās iekārtas pamatelementi ir: — Fotoelektriskie moduļi, invertori, montāžas sistēmas — jumts un zeme, elektroinstalācijas, elektrības sadales iekārtas, hermētiski korpusi, uzraudzības sistēma. Kopējā uzstādītā jauda ir katras iekārtas jaudas summa, kas savukārt ir paneļu skaita un viena paneļa jaudas rezultāts. RSM — moduļu skaits (140x 285W = 39,9 kWp). Miel MET — moduļu skaits (123 x 325W = 39,97kWp). Maiznīca Konieczny — moduļu skaits (134 x 285 W= 38.19kWp). Hokejs — moduļu skaits (70 x 285 W = 19,95 kWp). Atrašanās vieta Karkut: Uzstādīšana Nr. 1 — moduļu skaits (116 x 325 W= 37,70 kWp), instalācija Nr. 2 — moduļu skaits (61 x 325 W = 19,82 kWp). Visas iekārtas ir mikroiekārtas. Tie tiks pieslēgti elektrotīklam. esošo īpašuma savienojumu ietvaros. Plānots pabeigt 31.05. (Latvian)
2 July 2022
0 references
Общата цел на проекта е да се увеличи производството на електроенергия от възобновяеми източници и по този начин да се намалят емисиите на парникови газове в атмосферата. Подробните цели на проекта са представени в раздел 2.1 от предпроектното проучване. Предмет на проекта е изграждането на нова инфраструктура, но въз основа на съществуващи сгради и терени, принадлежащи на фирмите на партньорите по проекта. Проектът обаче се отнася до изграждането на нова инфраструктура въз основа на съществуващи имоти, притежавани от компаниите на партньорите по проекта. Тези имоти се намират в общините Mielec, Tuszyn Narodowy и Kolbuszowa. Предмет на проекта е инсталирането на системи, състоящи се от поликристални модули за производство на електроенергия (с обща инсталирана мощност от 0,19 MW). Планираната инсталация включва общо 697 единици фотоволтаични панели с мощност от един панел 280 W, заедно с поддържаща конструкция, цялото необходимо оборудване и окабеляване. Общо шест инсталации ще бъдат изградени за пет обекта. Инсталациите ще бъдат свързани към съществуващата електрическа мрежа. Основните елементи на планираната инсталация са: — Фотоволтаични модули, инвертори, монтажни системи — покрив и земята, окабеляване, електрически комутационни апарати, херметични заграждения, система за наблюдение. Общата инсталирана мощност е сумата от мощността на всяка инсталация, която от своя страна е продукт на броя на панелите и мощността на един панел. RSM — Брой модули (140x 285W = 39,9 kWp). Miel MET — Брой модули (123 x 325W = 39,97kWp). Пекарна Konieczny — Брой модули (134 x 285 W = 38.19kWp). Хокей — Брой модули (70 x 285 W = 19,95 kWp). Каркут: Инсталация № 1 — Брой модули (116 x 325 W = 37,70 kWp), инсталация № 2 — Брой модули (61 x 325 W = 19,82 kWp). Всички инсталации са микроинсталации. Те ще бъдат свързани към електрическата мрежа. в рамките на съществуващите връзки за имота. Завършването е планирано за 31.05. (Bulgarian)
2 July 2022
0 references
A projekt általános célja a megújuló energiaforrásokból előállított villamos energia növelése és ezáltal az üvegházhatású gázok légkörbe történő kibocsátásának csökkentése. A projekt részletes célkitűzéseit a megvalósíthatósági tanulmány 2.1. szakasza ismerteti. A projekt tárgya azonban új infrastruktúra építése, amely a projektpartnerek vállalataihoz tartozó meglévő épületeken és földterületeken alapul. A projekt azonban új infrastruktúra építésére irányul, a projektpartnerek vállalatainak tulajdonában lévő meglévő ingatlanok alapján. Ezek az ingatlanok Mielec, Tuszyn Narodowy és Kolbuszowa településeken találhatók. A projekt tárgya villamos energia előállítására szolgáló polikristályos modulokból álló rendszerek telepítése (0,19 MW teljes beépített kapacitással). A tervezett telepítés összesen 697 egység fotovoltaikus panelt tartalmaz egyetlen panel 280 W teljesítményével, valamint egy tartószerkezettel, minden szükséges felszereléssel és vezetékezéssel. Összesen hat létesítmény épül öt szervezet számára. A létesítményeket a meglévő villamosenergia-hálózathoz fogják csatlakoztatni. A tervezett telepítés alapvető elemei a következők: – Fotovoltaikus modulok, inverterek, szerelési rendszerek – tető és föld, vezetékek, elektromos kapcsolóberendezések, hermetikus műszerdobozok, ellenőrző rendszer. A teljes beépített teljesítmény az egyes berendezések teljesítményének összege, amely viszont a panelek számának és egyetlen panel teljesítményének szorzata. RSM – modulok száma (140x 285W = 39,9 kWp). Miel MET – modulok száma (123 x 325W = 39,97kWp). Pékség Konieczny – modulok száma (134 x 285 W = 38,19kWp). Jégkorong – modulok száma (70 x 285 W = 19,95 kWp). Karkut: Telepítési szám – modulok száma (116 x 325 W= 37,70 kWp), 2. telepítési szám – modulok száma (61 x 325 W = 19,82 kWp). Minden berendezés mikrotelepülés. Csatlakoztatva lesznek az elektromos hálózathoz. az ingatlan meglévő kapcsolatain belül. Befejezését 31.05-re tervezik. (Hungarian)
2 July 2022
0 references
Is é cuspóir foriomlán an tionscadail táirgeadh leictreachais ó fhoinsí inathnuaite a mhéadú agus ar an gcaoi sin astaíochtaí gás ceaptha teasa isteach san atmaisféar a laghdú. Cuirtear cuspóirí mionsonraithe an tionscadail i láthair i roinn 2.1 den staidéar féidearthachta. Is é ábhar an tionscadail bonneagar nua a thógáil, áfach, bunaithe ar fhoirgnimh atá ann cheana agus ar thalamh de chuid chuideachtaí chomhpháirtithe an tionscadail. Baineann an tionscadal le bonneagar nua a thógáil, áfach, bunaithe ar mhaoin atá ann cheana atá faoi úinéireacht chuideachtaí chomhpháirtithe an tionscadail. Tá na hairíonna seo lonnaithe i mbardais Mielec, Tuszyn Narodowy agus Kolbuszowa. Is é is ábhar don tionscadal suiteáil córas ina bhfuil modúil pholachriostalacha chun leictreachas a tháirgeadh (ag a bhfuil acmhainn iomlán suiteáilte 0.19 MW). Áirítear ar an tsuiteáil atá beartaithe iomlán de 697 aonad de phainéil fhótavoltacha le cumhacht painéal amháin 280 W, mar aon le struchtúr tacaíochta, gach trealamh agus sreangú is gá. Tógfar sé shuiteáil san iomlán le haghaidh cúig eintiteas. Beidh na suiteálacha ceangailte leis an eangach chumhachta atá ann cheana. Is iad seo a leanas buneilimintí na suiteála atá beartaithe: — Modúil fhótavoltacha, inbhéartóirí, córais gléasta — díon agus talamh, sreangú, lascthrealamh leictreach, iatáin heirméiteacha, córas monatóireachta. Is é an chumhacht iomlán suiteáilte ná suim chumhacht gach suiteála, agus is é an toradh atá ar líon na bpainéal agus cumhacht painéil amháin i ndiaidh a chéile. RSM — Líon na modúl (140x 285W= 39.9 kWp). Miel MET — Líon na modúl (123 x 325W = 39.97kWp). Bácúis Konieczny — Líon na modúl (134 x 285 W= 38.19kWp). Haca — Líon na modúl (70 x 285 W = 19.95 kWp). Tá an méid seo a leanas fíor: Suiteáil Uimh. 1 — Líon na modúl (116 x 325 W= 37.70 kWp), Suiteáil Uimh. 2 — Líon na modúl (61 x 325 W= 19.82 kWp). Micreashuiteálacha is ea gach suiteáil. Beidh siad ceangailte leis an eangach cumhachta. laistigh de na naisc atá ann cheana don mhaoin. Tá sé beartaithe go gcríochnófar 31.05. (Irish)
2 July 2022
0 references
Det övergripande målet med projektet är att öka produktionen av el från förnybara källor och därmed minska utsläppen av växthusgaser i atmosfären. Projektets detaljerade mål presenteras i avsnitt 2.1 i genomförbarhetsstudien. Föremålet för projektet är byggandet av ny infrastruktur, dock baserat på befintliga byggnader och mark som tillhör projektpartnernas företag. Projektet avser dock byggande av ny infrastruktur baserat på befintliga fastigheter som ägs av projektpartnernas företag. Dessa fastigheter ligger i kommunerna Mielec, Tuszyn Narodowy och Kolbuszowa. Föremålet för projektet är installation av system som består av polykristallina moduler för elproduktion (med en total installerad kapacitet på 0,19 MW). Den planerade installationen omfattar totalt 697 solcellspaneler med kraften i en enda panel 280 W, tillsammans med en stödstruktur, all nödvändig utrustning och ledningar. Totalt kommer sex installationer att byggas för fem enheter. Anläggningarna kommer att anslutas till det befintliga elnätet. De grundläggande delarna av den planerade installationen är följande: — Solcellsmoduler, växelriktare, monteringssystem – tak och mark, ledningar, elektriska ställverk, hermetiska höljen, övervakningssystem. Den totala installerade effekten är summan av kraften i varje installation, vilket i sin tur är produkten av antalet paneler och kraften i en enda panel. RSM – Antal moduler (140x 285W= 39,9 kWp). Miel MET – Antal moduler (123 x 325W = 39,97 kWp). Bageri Konieczny – Antal moduler (134 x 285 W= 38,19kWp). Hockey – Antal moduler (70 x 285 W = 19,95 kWp). Karkut: Installation nr 1 – Antal moduler (116 x 325 W= 37,70 kWp), Installation nr 2 – Antal moduler (61 x 325 W = 19,82 kWp). Alla installationer är mikroinstallationer. De kommer att anslutas till elnätet. inom befintliga anslutningar för fastigheten. Slutförandet är planerat till 31.05. (Swedish)
2 July 2022
0 references
Projekti üldeesmärk on suurendada taastuvatest energiaallikatest elektri tootmist ja seeläbi vähendada kasvuhoonegaaside heidet atmosfääri. Projekti üksikasjalikud eesmärgid on esitatud teostatavusuuringu punktis 2.1. Projekti teemaks on aga uue infrastruktuuri rajamine, mis põhineb projektipartnerite ettevõtetele kuuluvatel olemasolevatel hoonetel ja maa-alal. Projekt hõlmab aga uue infrastruktuuri ehitamist, mis põhineb projektipartnerite ettevõtete omandis olevatel olemasolevatel kinnistutel. Need kinnistud asuvad Mieleci, Tuszyn Narodowy ja Kolbuszowa kommuunides. Projekti objektiks on polükristalsetest moodulitest koosnevate süsteemide paigaldamine elektri tootmiseks (kogu installeeritud võimsus on 0,19 MW). Kavandatav paigaldus sisaldab kokku 697 ühikut fotogalvaanilisi paneelisid, millel on ühe paneeli võimsus 280 W, koos tugikonstruktsiooni, kõigi vajalike seadmete ja juhtmestikuga. Kokku ehitatakse viiele üksusele kuus rajatist. Käitised ühendatakse olemasoleva elektrivõrguga. Kavandatava käitise põhielemendid on: – Fotogalvaanilised moodulid, inverterid, paigaldussüsteemid – katus ja maa, juhtmestik, elektrijaoturid, hermeetilised korpused, seiresüsteem. Kogu paigaldatud võimsus on iga seadme võimsuse summa, mis omakorda on paneelide arvu ja ühe paneeli võimsuse korrutis. RSM – moodulite arv (140x 285W = 39,9 kWp). Miel MET – moodulite arv (123 x 325W = 39,97kWp). Pagaritöökoda Konieczny – moodulite arv (134 x 285 W= 38,19kWp). Jäähoki – moodulite arv (70 x 285 W = 19,95 kWp). Karkut: Paigaldus nr 1 – moodulite arv (116 x 325 W= 37,70 kWp), paigaldusnumber 2 – moodulite arv (61 x 325 W= 19,82 kWp). Kõik käitised on mikropaigaldised. Need ühendatakse elektrivõrguga. olemasolevates kinnistu ühendustes. Valmimine on planeeritud 31.05. (Estonian)
2 July 2022
0 references
WOJ.: PODKARPACKIE, POW.: kolbuszowski
0 references
WOJ.: PODKARPACKIE, POW.: mielecki
0 references
13 December 2023
0 references
Identifiers
RPPK.03.01.00-18-0381/17
0 references