Development of multifunctional recreational infrastructure through the reconstruction of medieval bulkheads in Moryń and its adaptation to recreational and touristic activities — Stage II (Q138019): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Changed an Item)
Property / beneficiary
 
Property / beneficiary: Q2541549 / rank
 
Normal rank

Revision as of 00:03, 11 June 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Development of multifunctional recreational infrastructure through the reconstruction of medieval bulkheads in Moryń and its adaptation to recreational and touristic activities — Stage II
Project in Poland financed by DG Regio

    Statements

    0 references
    4,869,216.0 zloty
    0 references
    1,168,611.8399999999 Euro
    13 January 2020
    0 references
    6,086,520.0 zloty
    0 references
    1,460,764.8 Euro
    13 January 2020
    0 references
    80.0 percent
    0 references
    8 May 2019
    0 references
    31 December 2023
    0 references
    TOWARZYSTWO WSZECHSTRONNEGO ROZWOJU "COLLEGIUM"
    0 references
    0 references
    W wyniku projektu wnioskodawca utworzy nowy produkt turystyczny pn. „Oblężenie Zamku” oraz rozwinie istniejący produkt turystyczny pn. „Średniowieczny Moryń” - oba ukierunkowane na rekonstrukcję i odtwórstwo średniowiecznej historii miejsca i czasu średniowiecznego grodu warownego w Moryniu. W tym celu wnioskodawca zrealizuje następujące zadania: 1. REKONSTRUKCJA HISTORYCZNA MIEJSCA I CZASU ZAMKU, obejmująca: 1) Prace rekonstrukcyjne kamiennych i ceglanych reliktów zamku warownego oraz kurtynowego muru obwodowego na grodzie zamkowym. 2) Prace adoptujące do rekonstrukcji historycznej, tj: a) budowa tarasu widokowego na zamkowym budynku mieszkalnym, w miejscu dawnej wieży obserwacyjnej, b) budowa "Kuźni Płatnerskiej" – budynku wielofunkcyjnego, w miejscu historycznej kuźni zamkowej, c) budowa mostu nad suchą fosą, w miejscu historycznego mostu prowadzącego na majdan, d) budowa bramy, w miejscu historycznej bramy zamkowej, e) budowa podestu drewnianego na grzbiecie wału historycznej suchej fosy, po którym zostanie poprowadzony dydaktyczny szlak spacerowy. 2. REKONSTRUKCJA HISTORYCZNA MIEJSCA I CZASU OTOCZENIA ZAMKU, tj: 1) budowa bramy wjazdowej wraz z zabudową socjalno – magazynową na wjeździe do ośrodka 2) budowa budynku socjalno – warsztatowego „Szkutnik”, w strefie organizacji widowiska plenerowego. 3) budowa budynku magazynowego „Spichlerz”, na potrzeby widowiska plenerowego. 4) budowa 3 domków „Fechtunku” – zaplecza dla rekonstruktorów. 5) modernizacja ciągów komunikacyjnych do zamku. W efekcie realizacji projektu powstaną 3 nowe miejsca pracy. Dotychczasowe działania odtwórcze zostaną rozbudowane o sceny na zamku oraz kolejne legendy związane z grodem. Dotychczasowe formy edukacyjne, takie jak gry terenowe, gry symulacyjne, aktywne warsztaty, aktywne zwiedzanie, questing, geocaching, widowisko plenerowe, zostaną rozwinięte o lekcje muzealne, warsztaty z zakresu archeologii edukacyjnej oraz wirtualną podróż do XIV wieku. (Polish)
    0 references
    As a result of the project, the applicant will create a new tourist product: “siege of Zamku” and will develop the existing tourist product: “Middle Ages”, both focused on the reconstruction and preservation of the medieval history of the place and the medieval times of the warmed-up area in Moryń. To this end, the applicant will fulfil the following tasks: 1. Reconstruction of HISTORANY OF MIEJSCA AND CHASU zamku, including: 1) Works for the construction of stone and bricks of varicose castle and a courtesy wall for the castle’s bulkheads. 2) Adding to historical reconstruction works, tj: (a) construction of the apparent terrace on the castle of a residential building, in the place of an old observation tower, (b) construction of a “multifunctional house” — a combination of multifunctional buildings, in the historical location of the receiver, c) construction of a bridge over the dry stone, in a historical bridge running on Maidan Square, d) the construction of a gateway, at a historical gate, and (e) the construction of a wood platform on the backplate of the backshaft, followed by an educational tutoring trail. 2. Reconstruction of HISTORICAL OF MILITARY AND MONETARY OTSPACE, tj: (1) construction of an entrance gate with the social installation of the social storage facility on the entry into the centre (2) of the construction of the social building, the “Szkutnik” social building, in the area of the outdoor performance area. 3) construction of a storage building “plot”, for the purposes of outdoor performance. 4) construction of 3 cottages ‘fechtunku’ — reconstructors’ facilities. 5) modernisation of the transport routes to the castle. 3 new jobs will be created as a result of the project. The work done so far will be extended to include the castle of the castle and the subsequent legend of the bulkheads. Existing forms of education, such as field games, simulation games, active workshops, active tours, queasting, gecaching, outdoor experience, workshops for educational archaeology and a virtual tour to the 14th century will be developed. (English)
    0 references

    Identifiers

    RPZP.04.09.00-32-7005/18
    0 references