Installation of a solar system on the warehouse buildings of Reál-M Kft. Phase I (Q3933645): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created a new Item: importing one item from Hungary)
 
(‎Set a claim value: summary (P836): O nosso fornecimento de eletricidade é obtido a partir de 2 transformadores separados através de 2 pontos de medição separados. Como parte da primeira fase, gostaríamos de instalar um sistema de 49,77 kWp no armazém em 026/302 (8441 Márkó, Iparos utca 1).)
 
(23 intermediate revisions by 2 users not shown)
label / enlabel / en
 
Installation of a solar system on the warehouse buildings of Reál-M Kft. Phase I
label / frlabel / fr
 
Installation d’un système solaire sur les entrepôts de Reál-M Kft. Phase I
label / delabel / de
 
Installation eines Solarsystems auf den Lagergebäuden von Reál-M Kft. Phase I
label / nllabel / nl
 
Installatie van een zonnestelsel op de magazijngebouwen van Reál-M Kft. Fase I
label / itlabel / it
 
Installazione di un impianto solare negli edifici di magazzino di Reál-M Kft. Fase I
label / eslabel / es
 
Instalación de un sistema solar en los edificios de almacén de Reál-M Kft. Fase I
label / etlabel / et
 
Päikesesüsteemi paigaldamine Reál-M Kft laohoonetele. I etapp
label / ltlabel / lt
 
Saulės sistemos įrengimas Reįl-M Kft sandėliuose. I etapas
label / hrlabel / hr
 
Ugradnja solarnog sustava na skladišne zgrade Reál-M Kft. Faza I.
label / ellabel / el
 
Εγκατάσταση ηλιακού συστήματος στις αποθήκες του Reál-M Kft. Φάση Ι
label / sklabel / sk
 
Inštalácia solárnej sústavy na skladové budovy Reál-M Kft. Fáza I
label / filabel / fi
 
Aurinkokunnan asentaminen Reál-M Kft:n varastorakennuksiin. Vaihe I
label / pllabel / pl
 
Instalacja układu słonecznego na budynkach magazynowych Reál-M Kft. Faza I
label / cslabel / cs
 
Instalace solární soustavy na skladových budovách Reál-M Kft. Fáze I
label / lvlabel / lv
 
Saules sistēmas uzstādīšana Reál-M Kft noliktavas ēkās. I posms
label / galabel / ga
 
Córas gréine a shuiteáil ar fhoirgnimh stórais Reál-M Kft. Céim I
label / sllabel / sl
 
Namestitev sončnega sistema na skladiščne stavbe Reál-M Kft. Faza I
label / bglabel / bg
 
Инсталиране на слънчева система в складовите сгради на Reál-M Kft. Фаза I
label / mtlabel / mt
 
Installazzjoni ta’ sistema solari fil-bini tal-maħżen ta’ Reál-M Kft. Fażi I
label / ptlabel / pt
 
Instalação de um sistema solar nos edifícios do armazém da Reál-M Kft. Fase I
label / dalabel / da
 
Installation af et solsystem på lagerbygningerne i Reál-M Kft. Fase I
label / rolabel / ro
 
Instalarea unui sistem solar pe clădirile depozitului Reál-M Kft. Etapa I
label / svlabel / sv
 
Installation av ett solsystem på lagerbyggnaderna i Reál-M Kft. Fas I
description / endescription / en
Project in Hungary 22050
Project Q3933645 in Hungary
description / bgdescription / bg
 
Проект Q3933645 в Унгария
description / hrdescription / hr
 
Projekt Q3933645 u Mađarskoj
description / hudescription / hu
 
Projekt Q3933645 Magyarországon
description / csdescription / cs
 
Projekt Q3933645 v Maďarsku
description / dadescription / da
 
Projekt Q3933645 i Ungarn
description / nldescription / nl
 
Project Q3933645 in Hongarije
description / etdescription / et
 
Projekt Q3933645 Ungaris
description / fidescription / fi
 
Projekti Q3933645 Unkarissa
description / frdescription / fr
 
Projet Q3933645 en Hongrie
description / dedescription / de
 
Projekt Q3933645 in Ungarn
description / eldescription / el
 
Έργο Q3933645 στην Ουγγαρία
description / gadescription / ga
 
Tionscadal Q3933645 san Ungáir
description / itdescription / it
 
Progetto Q3933645 in Ungheria
description / lvdescription / lv
 
Projekts Q3933645 Ungārijā
description / ltdescription / lt
 
Projektas Q3933645 Vengrijoje
description / mtdescription / mt
 
Proġett Q3933645 fl-Ungerija
description / pldescription / pl
 
Projekt Q3933645 na Węgrzech
description / ptdescription / pt
 
Projeto Q3933645 na Hungria
description / rodescription / ro
 
Proiectul Q3933645 în Ungaria
description / skdescription / sk
 
Projekt Q3933645 v Maďarsku
description / sldescription / sl
 
Projekt Q3933645 na Madžarskem
description / esdescription / es
 
Proyecto Q3933645 en Hungría
description / svdescription / sv
 
Projekt Q3933645 i Ungern
Property / co-financing rate
55.0 percent
Amount55.0 percent
Unitpercent
 
Property / co-financing rate: 55.0 percent / rank
Normal rank
 
Property / EU contribution
46,372.572 Euro
Amount46,372.572 Euro
UnitEuro
 
Property / EU contribution: 46,372.572 Euro / rank
Preferred rank
 
Property / EU contribution: 46,372.572 Euro / qualifier
exchange rate to Euro: 0.00276521 Euro
Amount0.00276521 Euro
UnitEuro
 
Property / EU contribution: 46,372.572 Euro / qualifier
point in time: 3 December 2021
Timestamp+2021-12-03T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
 
Property / EU contribution
16,770,000 forint
Amount16,770,000 forint
Unitforint
 
Property / EU contribution: 16,770,000 forint / rank
Normal rank
 
Property / contained in Local Administrative Unit
 
Property / contained in Local Administrative Unit: Márkó / rank
 
Normal rank
Property / coordinate location
 
47°8'33.40"N, 17°48'51.30"E
Latitude47.1426068
Longitude17.814252134527
Precision1.0E-5
Globehttp://www.wikidata.org/entity/Q2
Property / coordinate location: 47°8'33.40"N, 17°48'51.30"E / rank
 
Normal rank
Property / contained in NUTS
 
Property / contained in NUTS: Veszprém / rank
 
Normal rank
Property / beneficiary
 
Property / beneficiary: Q3967446 / rank
 
Normal rank
Property / summary
 
Villamos energia ellátásunkat 2 külön trafóról 2 külön mérési ponton keresztül valósítjuk meg. Az első ütem keretében a 026/302 hrsz-en (8441 Márkó, Iparos utca 1. szám) levő raktárra 49,77 kWp-os rendszert kívánunk telepíteni. (Hungarian)
Property / summary: Villamos energia ellátásunkat 2 külön trafóról 2 külön mérési ponton keresztül valósítjuk meg. Az első ütem keretében a 026/302 hrsz-en (8441 Márkó, Iparos utca 1. szám) levő raktárra 49,77 kWp-os rendszert kívánunk telepíteni. (Hungarian) / rank
 
Normal rank
Property / summary
 
Our electricity supply is achieved from 2 separate transformers through 2 separate measuring points. As part of the first phase, we would like to install a 49.77 kWp system on the warehouse at 026/302 (8441 Márkó, Iparos utca 1). (English)
Property / summary: Our electricity supply is achieved from 2 separate transformers through 2 separate measuring points. As part of the first phase, we would like to install a 49.77 kWp system on the warehouse at 026/302 (8441 Márkó, Iparos utca 1). (English) / rank
 
Normal rank
Property / summary: Our electricity supply is achieved from 2 separate transformers through 2 separate measuring points. As part of the first phase, we would like to install a 49.77 kWp system on the warehouse at 026/302 (8441 Márkó, Iparos utca 1). (English) / qualifier
 
point in time: 8 February 2022
Timestamp+2022-02-08T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary: Our electricity supply is achieved from 2 separate transformers through 2 separate measuring points. As part of the first phase, we would like to install a 49.77 kWp system on the warehouse at 026/302 (8441 Márkó, Iparos utca 1). (English) / qualifier
 
readability score: 0.0241977969809267
Amount0.0241977969809267
Unit1
Property / summary
 
Notre alimentation en électricité se fait à partir de 2 transformateurs séparés à travers 2 points de mesure distincts. Dans le cadre de la première phase, nous voudrions installer un système de 49,77 kWp sur l’entrepôt au 026/302 (8441 Márkó, Iparos utca 1). (French)
Property / summary: Notre alimentation en électricité se fait à partir de 2 transformateurs séparés à travers 2 points de mesure distincts. Dans le cadre de la première phase, nous voudrions installer un système de 49,77 kWp sur l’entrepôt au 026/302 (8441 Márkó, Iparos utca 1). (French) / rank
 
Normal rank
Property / summary: Notre alimentation en électricité se fait à partir de 2 transformateurs séparés à travers 2 points de mesure distincts. Dans le cadre de la première phase, nous voudrions installer un système de 49,77 kWp sur l’entrepôt au 026/302 (8441 Márkó, Iparos utca 1). (French) / qualifier
 
point in time: 10 February 2022
Timestamp+2022-02-10T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Meie elektrivarustus saavutatakse kahe eraldi trafoga kahe eraldi mõõtepunkti kaudu. Esimese etapi osana soovime paigaldada laohoonele kell 026/302 49,77 kWp süsteemi (8441 Márkó, Iparos utca 1). (Estonian)
Property / summary: Meie elektrivarustus saavutatakse kahe eraldi trafoga kahe eraldi mõõtepunkti kaudu. Esimese etapi osana soovime paigaldada laohoonele kell 026/302 49,77 kWp süsteemi (8441 Márkó, Iparos utca 1). (Estonian) / rank
 
Normal rank
Property / summary: Meie elektrivarustus saavutatakse kahe eraldi trafoga kahe eraldi mõõtepunkti kaudu. Esimese etapi osana soovime paigaldada laohoonele kell 026/302 49,77 kWp süsteemi (8441 Márkó, Iparos utca 1). (Estonian) / qualifier
 
point in time: 13 August 2022
Timestamp+2022-08-13T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Mūsų elektros energijos tiekimas pasiekiamas iš 2 atskirų transformatorių per 2 atskirus matavimo taškus. Pirmajame etape norėtume įdiegti 49,77 kWp sistemą sandėlyje 026/302 (8441 Mįrkó, Iparos utca 1). (Lithuanian)
Property / summary: Mūsų elektros energijos tiekimas pasiekiamas iš 2 atskirų transformatorių per 2 atskirus matavimo taškus. Pirmajame etape norėtume įdiegti 49,77 kWp sistemą sandėlyje 026/302 (8441 Mįrkó, Iparos utca 1). (Lithuanian) / rank
 
Normal rank
Property / summary: Mūsų elektros energijos tiekimas pasiekiamas iš 2 atskirų transformatorių per 2 atskirus matavimo taškus. Pirmajame etape norėtume įdiegti 49,77 kWp sistemą sandėlyje 026/302 (8441 Mįrkó, Iparos utca 1). (Lithuanian) / qualifier
 
point in time: 13 August 2022
Timestamp+2022-08-13T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
La nostra fornitura di energia elettrica è ottenuta da 2 trasformatori separati attraverso 2 punti di misurazione separati. Come parte della prima fase, vorremmo installare un sistema di 49,77 kWp sul magazzino a 026/302 (8441 Márkó, Iparos utca 1). (Italian)
Property / summary: La nostra fornitura di energia elettrica è ottenuta da 2 trasformatori separati attraverso 2 punti di misurazione separati. Come parte della prima fase, vorremmo installare un sistema di 49,77 kWp sul magazzino a 026/302 (8441 Márkó, Iparos utca 1). (Italian) / rank
 
Normal rank
Property / summary: La nostra fornitura di energia elettrica è ottenuta da 2 trasformatori separati attraverso 2 punti di misurazione separati. Come parte della prima fase, vorremmo installare un sistema di 49,77 kWp sul magazzino a 026/302 (8441 Márkó, Iparos utca 1). (Italian) / qualifier
 
point in time: 13 August 2022
Timestamp+2022-08-13T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Naša opskrba električnom energijom postiže se iz 2 odvojena transformatora kroz 2 odvojene mjerne točke. Kao dio prve faze, željeli bismo instalirati 49,77 kWp sustav na skladištu 026/302 (8441 Márkó, Iparos utca 1). (Croatian)
Property / summary: Naša opskrba električnom energijom postiže se iz 2 odvojena transformatora kroz 2 odvojene mjerne točke. Kao dio prve faze, željeli bismo instalirati 49,77 kWp sustav na skladištu 026/302 (8441 Márkó, Iparos utca 1). (Croatian) / rank
 
Normal rank
Property / summary: Naša opskrba električnom energijom postiže se iz 2 odvojena transformatora kroz 2 odvojene mjerne točke. Kao dio prve faze, željeli bismo instalirati 49,77 kWp sustav na skladištu 026/302 (8441 Márkó, Iparos utca 1). (Croatian) / qualifier
 
point in time: 13 August 2022
Timestamp+2022-08-13T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Η παροχή ηλεκτρικής ενέργειας επιτυγχάνεται από 2 ξεχωριστούς μετασχηματιστές μέσω 2 ξεχωριστών σημείων μέτρησης. Στο πλαίσιο της πρώτης φάσης, θα θέλαμε να εγκαταστήσουμε ένα σύστημα 49,77 kWp στην αποθήκη στο 026/302 (8441 Márkó, Iparos utca 1). (Greek)
Property / summary: Η παροχή ηλεκτρικής ενέργειας επιτυγχάνεται από 2 ξεχωριστούς μετασχηματιστές μέσω 2 ξεχωριστών σημείων μέτρησης. Στο πλαίσιο της πρώτης φάσης, θα θέλαμε να εγκαταστήσουμε ένα σύστημα 49,77 kWp στην αποθήκη στο 026/302 (8441 Márkó, Iparos utca 1). (Greek) / rank
 
Normal rank
Property / summary: Η παροχή ηλεκτρικής ενέργειας επιτυγχάνεται από 2 ξεχωριστούς μετασχηματιστές μέσω 2 ξεχωριστών σημείων μέτρησης. Στο πλαίσιο της πρώτης φάσης, θα θέλαμε να εγκαταστήσουμε ένα σύστημα 49,77 kWp στην αποθήκη στο 026/302 (8441 Márkó, Iparos utca 1). (Greek) / qualifier
 
point in time: 13 August 2022
Timestamp+2022-08-13T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Naša dodávka elektrickej energie je zabezpečená z 2 samostatných transformátorov cez 2 samostatné meracie body. V rámci prvej fázy by sme chceli do skladu namontovať 49,77 kWp systém 026/302 (8441 Márkó, Iparos utca 1). (Slovak)
Property / summary: Naša dodávka elektrickej energie je zabezpečená z 2 samostatných transformátorov cez 2 samostatné meracie body. V rámci prvej fázy by sme chceli do skladu namontovať 49,77 kWp systém 026/302 (8441 Márkó, Iparos utca 1). (Slovak) / rank
 
Normal rank
Property / summary: Naša dodávka elektrickej energie je zabezpečená z 2 samostatných transformátorov cez 2 samostatné meracie body. V rámci prvej fázy by sme chceli do skladu namontovať 49,77 kWp systém 026/302 (8441 Márkó, Iparos utca 1). (Slovak) / qualifier
 
point in time: 13 August 2022
Timestamp+2022-08-13T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Sähkömme saadaan kahdesta erillisestä muuntajasta kahden erillisen mittauspisteen kautta. Osana ensimmäistä vaihetta haluaisimme asentaa varastoon 49,77 kWp:n järjestelmän osoitteessa 026/302 (8441 Márkó, Iparos utca 1). (Finnish)
Property / summary: Sähkömme saadaan kahdesta erillisestä muuntajasta kahden erillisen mittauspisteen kautta. Osana ensimmäistä vaihetta haluaisimme asentaa varastoon 49,77 kWp:n järjestelmän osoitteessa 026/302 (8441 Márkó, Iparos utca 1). (Finnish) / rank
 
Normal rank
Property / summary: Sähkömme saadaan kahdesta erillisestä muuntajasta kahden erillisen mittauspisteen kautta. Osana ensimmäistä vaihetta haluaisimme asentaa varastoon 49,77 kWp:n järjestelmän osoitteessa 026/302 (8441 Márkó, Iparos utca 1). (Finnish) / qualifier
 
point in time: 13 August 2022
Timestamp+2022-08-13T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Nasze zasilanie elektryczne uzyskuje się z 2 oddzielnych transformatorów przez 2 oddzielne punkty pomiarowe. W ramach pierwszej fazy chcielibyśmy zainstalować system 49,77 kWp na magazynie przy 026/302 (8441 Márkó, Iparos utca 1). (Polish)
Property / summary: Nasze zasilanie elektryczne uzyskuje się z 2 oddzielnych transformatorów przez 2 oddzielne punkty pomiarowe. W ramach pierwszej fazy chcielibyśmy zainstalować system 49,77 kWp na magazynie przy 026/302 (8441 Márkó, Iparos utca 1). (Polish) / rank
 
Normal rank
Property / summary: Nasze zasilanie elektryczne uzyskuje się z 2 oddzielnych transformatorów przez 2 oddzielne punkty pomiarowe. W ramach pierwszej fazy chcielibyśmy zainstalować system 49,77 kWp na magazynie przy 026/302 (8441 Márkó, Iparos utca 1). (Polish) / qualifier
 
point in time: 13 August 2022
Timestamp+2022-08-13T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Onze stroomvoorziening wordt bereikt met 2 afzonderlijke transformatoren door middel van 2 afzonderlijke meetpunten. Als onderdeel van de eerste fase willen we een 49,77 kWp systeem installeren op het magazijn op 026/302 (8441 Márkó, Iparos utca 1). (Dutch)
Property / summary: Onze stroomvoorziening wordt bereikt met 2 afzonderlijke transformatoren door middel van 2 afzonderlijke meetpunten. Als onderdeel van de eerste fase willen we een 49,77 kWp systeem installeren op het magazijn op 026/302 (8441 Márkó, Iparos utca 1). (Dutch) / rank
 
Normal rank
Property / summary: Onze stroomvoorziening wordt bereikt met 2 afzonderlijke transformatoren door middel van 2 afzonderlijke meetpunten. Als onderdeel van de eerste fase willen we een 49,77 kWp systeem installeren op het magazijn op 026/302 (8441 Márkó, Iparos utca 1). (Dutch) / qualifier
 
point in time: 13 August 2022
Timestamp+2022-08-13T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Naše dodávky elektřiny jsou dosahovány ze 2 samostatných transformátorů prostřednictvím 2 samostatných měřicích bodů. V rámci první fáze bychom chtěli nainstalovat systém 49,77 kWp na sklad na 026/302 (8441 Márkó, Iparos utca 1). (Czech)
Property / summary: Naše dodávky elektřiny jsou dosahovány ze 2 samostatných transformátorů prostřednictvím 2 samostatných měřicích bodů. V rámci první fáze bychom chtěli nainstalovat systém 49,77 kWp na sklad na 026/302 (8441 Márkó, Iparos utca 1). (Czech) / rank
 
Normal rank
Property / summary: Naše dodávky elektřiny jsou dosahovány ze 2 samostatných transformátorů prostřednictvím 2 samostatných měřicích bodů. V rámci první fáze bychom chtěli nainstalovat systém 49,77 kWp na sklad na 026/302 (8441 Márkó, Iparos utca 1). (Czech) / qualifier
 
point in time: 13 August 2022
Timestamp+2022-08-13T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Mūsu elektroapgāde tiek nodrošināta no 2 atsevišķiem transformatoriem, izmantojot 2 atsevišķus mērīšanas punktus. Kā daļu no pirmā posma mēs vēlētos uzstādīt 49,77 kWp sistēmu noliktavā 026/302 (8441 Márkó, Iparos utca 1). (Latvian)
Property / summary: Mūsu elektroapgāde tiek nodrošināta no 2 atsevišķiem transformatoriem, izmantojot 2 atsevišķus mērīšanas punktus. Kā daļu no pirmā posma mēs vēlētos uzstādīt 49,77 kWp sistēmu noliktavā 026/302 (8441 Márkó, Iparos utca 1). (Latvian) / rank
 
Normal rank
Property / summary: Mūsu elektroapgāde tiek nodrošināta no 2 atsevišķiem transformatoriem, izmantojot 2 atsevišķus mērīšanas punktus. Kā daļu no pirmā posma mēs vēlētos uzstādīt 49,77 kWp sistēmu noliktavā 026/302 (8441 Márkó, Iparos utca 1). (Latvian) / qualifier
 
point in time: 13 August 2022
Timestamp+2022-08-13T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Is é ár soláthar leictreachais a bhaint amach ó 2 claochladáin ar leith trí 2 phointe tomhais ar leith. Mar chuid den chéad chéim, ba mhaith linn córas 49.77 kWp a shuiteáil ar an stóras ag 026/302 (8441 Márkó, IPAROS utca 1). (Irish)
Property / summary: Is é ár soláthar leictreachais a bhaint amach ó 2 claochladáin ar leith trí 2 phointe tomhais ar leith. Mar chuid den chéad chéim, ba mhaith linn córas 49.77 kWp a shuiteáil ar an stóras ag 026/302 (8441 Márkó, IPAROS utca 1). (Irish) / rank
 
Normal rank
Property / summary: Is é ár soláthar leictreachais a bhaint amach ó 2 claochladáin ar leith trí 2 phointe tomhais ar leith. Mar chuid den chéad chéim, ba mhaith linn córas 49.77 kWp a shuiteáil ar an stóras ag 026/302 (8441 Márkó, IPAROS utca 1). (Irish) / qualifier
 
point in time: 13 August 2022
Timestamp+2022-08-13T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Naša oskrba z električno energijo je dosežena z 2 ločenima transformatorjema skozi 2 ločeni merilni točki. Kot del prve faze želimo na skladišče pri 026/302 (8441 Márkó, Iparos utca 1) namestiti sistem 49,77 kWp. (Slovenian)
Property / summary: Naša oskrba z električno energijo je dosežena z 2 ločenima transformatorjema skozi 2 ločeni merilni točki. Kot del prve faze želimo na skladišče pri 026/302 (8441 Márkó, Iparos utca 1) namestiti sistem 49,77 kWp. (Slovenian) / rank
 
Normal rank
Property / summary: Naša oskrba z električno energijo je dosežena z 2 ločenima transformatorjema skozi 2 ločeni merilni točki. Kot del prve faze želimo na skladišče pri 026/302 (8441 Márkó, Iparos utca 1) namestiti sistem 49,77 kWp. (Slovenian) / qualifier
 
point in time: 13 August 2022
Timestamp+2022-08-13T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Nuestro suministro de electricidad se logra a partir de 2 transformadores separados a través de 2 puntos de medición separados. Como parte de la primera fase, nos gustaría instalar un sistema de 49,77 kWp en el almacén a 026/302 (8441 Márkó, Iparos utca 1). (Spanish)
Property / summary: Nuestro suministro de electricidad se logra a partir de 2 transformadores separados a través de 2 puntos de medición separados. Como parte de la primera fase, nos gustaría instalar un sistema de 49,77 kWp en el almacén a 026/302 (8441 Márkó, Iparos utca 1). (Spanish) / rank
 
Normal rank
Property / summary: Nuestro suministro de electricidad se logra a partir de 2 transformadores separados a través de 2 puntos de medición separados. Como parte de la primera fase, nos gustaría instalar un sistema de 49,77 kWp en el almacén a 026/302 (8441 Márkó, Iparos utca 1). (Spanish) / qualifier
 
point in time: 13 August 2022
Timestamp+2022-08-13T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Нашето електрозахранване се постига от 2 отделни трансформатора през 2 отделни измервателни точки. Като част от първата фаза бихме искали да инсталираме 49,77 kWp система на склад 026/302 (8441 Márkó, Iparos utca 1). (Bulgarian)
Property / summary: Нашето електрозахранване се постига от 2 отделни трансформатора през 2 отделни измервателни точки. Като част от първата фаза бихме искали да инсталираме 49,77 kWp система на склад 026/302 (8441 Márkó, Iparos utca 1). (Bulgarian) / rank
 
Normal rank
Property / summary: Нашето електрозахранване се постига от 2 отделни трансформатора през 2 отделни измервателни точки. Като част от първата фаза бихме искали да инсталираме 49,77 kWp система на склад 026/302 (8441 Márkó, Iparos utca 1). (Bulgarian) / qualifier
 
point in time: 13 August 2022
Timestamp+2022-08-13T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Il-provvista tal-elettriku tagħna tinkiseb minn 2 transformers separati permezz ta’ żewġ punti separati tal-kejl. Bħala parti mill-ewwel fażi, nixtiequ ninstallaw sistema ta’ 49.77 kWp fuq il-maħżen fi 026/302 (8441 Márkó, Iparos utca 1). (Maltese)
Property / summary: Il-provvista tal-elettriku tagħna tinkiseb minn 2 transformers separati permezz ta’ żewġ punti separati tal-kejl. Bħala parti mill-ewwel fażi, nixtiequ ninstallaw sistema ta’ 49.77 kWp fuq il-maħżen fi 026/302 (8441 Márkó, Iparos utca 1). (Maltese) / rank
 
Normal rank
Property / summary: Il-provvista tal-elettriku tagħna tinkiseb minn 2 transformers separati permezz ta’ żewġ punti separati tal-kejl. Bħala parti mill-ewwel fażi, nixtiequ ninstallaw sistema ta’ 49.77 kWp fuq il-maħżen fi 026/302 (8441 Márkó, Iparos utca 1). (Maltese) / qualifier
 
point in time: 13 August 2022
Timestamp+2022-08-13T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
O nosso fornecimento de eletricidade é obtido a partir de 2 transformadores separados através de 2 pontos de medição separados. Como parte da primeira fase, gostaríamos de instalar um sistema de 49,77 kWp no armazém em 026/302 (8441 Márkó, Iparos utca 1). (Portuguese)
Property / summary: O nosso fornecimento de eletricidade é obtido a partir de 2 transformadores separados através de 2 pontos de medição separados. Como parte da primeira fase, gostaríamos de instalar um sistema de 49,77 kWp no armazém em 026/302 (8441 Márkó, Iparos utca 1). (Portuguese) / rank
 
Normal rank
Property / summary: O nosso fornecimento de eletricidade é obtido a partir de 2 transformadores separados através de 2 pontos de medição separados. Como parte da primeira fase, gostaríamos de instalar um sistema de 49,77 kWp no armazém em 026/302 (8441 Márkó, Iparos utca 1). (Portuguese) / qualifier
 
point in time: 13 August 2022
Timestamp+2022-08-13T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Vores elforsyning opnås fra 2 separate transformatorer gennem 2 separate målepunkter. Som en del af første fase vil vi gerne installere et 49.77 kWp-system på lageret 026/302 (8441 Márkó, Iparos utca 1). (Danish)
Property / summary: Vores elforsyning opnås fra 2 separate transformatorer gennem 2 separate målepunkter. Som en del af første fase vil vi gerne installere et 49.77 kWp-system på lageret 026/302 (8441 Márkó, Iparos utca 1). (Danish) / rank
 
Normal rank
Property / summary: Vores elforsyning opnås fra 2 separate transformatorer gennem 2 separate målepunkter. Som en del af første fase vil vi gerne installere et 49.77 kWp-system på lageret 026/302 (8441 Márkó, Iparos utca 1). (Danish) / qualifier
 
point in time: 13 August 2022
Timestamp+2022-08-13T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Alimentarea noastră cu energie electrică se realizează de la 2 transformatoare separate prin 2 puncte de măsurare separate. Ca parte a primei faze, am dori să instalăm un sistem de 49,77 kWp pe depozit la 026/302 (8441 Márkó, Iparos utca 1). (Romanian)
Property / summary: Alimentarea noastră cu energie electrică se realizează de la 2 transformatoare separate prin 2 puncte de măsurare separate. Ca parte a primei faze, am dori să instalăm un sistem de 49,77 kWp pe depozit la 026/302 (8441 Márkó, Iparos utca 1). (Romanian) / rank
 
Normal rank
Property / summary: Alimentarea noastră cu energie electrică se realizează de la 2 transformatoare separate prin 2 puncte de măsurare separate. Ca parte a primei faze, am dori să instalăm un sistem de 49,77 kWp pe depozit la 026/302 (8441 Márkó, Iparos utca 1). (Romanian) / qualifier
 
point in time: 13 August 2022
Timestamp+2022-08-13T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Unsere Stromversorgung erfolgt von 2 separaten Transformatoren über 2 separate Messstellen. Im Rahmen der ersten Phase möchten wir ein 49,77 kWp-System am Lager 026/302 (8441 Márkó, Iparos utca 1) installieren. (German)
Property / summary: Unsere Stromversorgung erfolgt von 2 separaten Transformatoren über 2 separate Messstellen. Im Rahmen der ersten Phase möchten wir ein 49,77 kWp-System am Lager 026/302 (8441 Márkó, Iparos utca 1) installieren. (German) / rank
 
Normal rank
Property / summary: Unsere Stromversorgung erfolgt von 2 separaten Transformatoren über 2 separate Messstellen. Im Rahmen der ersten Phase möchten wir ein 49,77 kWp-System am Lager 026/302 (8441 Márkó, Iparos utca 1) installieren. (German) / qualifier
 
point in time: 13 August 2022
Timestamp+2022-08-13T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Vår elförsörjning uppnås från 2 separata transformatorer genom 2 separata mätpunkter. Som en del av den första fasen vill vi installera ett 49,77 kWp-system på lagret på 026/302 (8441 Márkó, Iparos utca 1). (Swedish)
Property / summary: Vår elförsörjning uppnås från 2 separata transformatorer genom 2 separata mätpunkter. Som en del av den första fasen vill vi installera ett 49,77 kWp-system på lagret på 026/302 (8441 Márkó, Iparos utca 1). (Swedish) / rank
 
Normal rank
Property / summary: Vår elförsörjning uppnås från 2 separata transformatorer genom 2 separata mätpunkter. Som en del av den första fasen vill vi installera ett 49,77 kWp-system på lagret på 026/302 (8441 Márkó, Iparos utca 1). (Swedish) / qualifier
 
point in time: 13 August 2022
Timestamp+2022-08-13T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / co-financing rate
 
55.0 percent
Amount55.0 percent
Unitpercent
Property / co-financing rate: 55.0 percent / rank
 
Normal rank
Property / budget
 
16,770,000.0 forint
Amount16,770,000.0 forint
Unitforint
Property / budget: 16,770,000.0 forint / rank
 
Normal rank
Property / budget
 
47,408.79 Euro
Amount47,408.79 Euro
UnitEuro
Property / budget: 47,408.79 Euro / rank
 
Preferred rank
Property / budget: 47,408.79 Euro / qualifier
 
exchange rate to Euro: 0.002827 Euro
Amount0.002827 Euro
UnitEuro
Property / budget: 47,408.79 Euro / qualifier
 
point in time: 14 February 2022
Timestamp+2022-02-14T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / EU contribution
 
9,223,500.0 forint
Amount9,223,500.0 forint
Unitforint
Property / EU contribution: 9,223,500.0 forint / rank
 
Normal rank
Property / EU contribution
 
26,074.83 Euro
Amount26,074.83 Euro
UnitEuro
Property / EU contribution: 26,074.83 Euro / rank
 
Preferred rank
Property / EU contribution: 26,074.83 Euro / qualifier
 
exchange rate to Euro: 0.002827 Euro
Amount0.002827 Euro
UnitEuro
Property / EU contribution: 26,074.83 Euro / qualifier
 
point in time: 14 February 2022
Timestamp+2022-02-14T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Latest revision as of 04:16, 9 October 2024

Project Q3933645 in Hungary
Language Label Description Also known as
English
Installation of a solar system on the warehouse buildings of Reál-M Kft. Phase I
Project Q3933645 in Hungary

    Statements

    0 references
    9,223,500.0 forint
    0 references
    26,074.83 Euro
    0.002827 Euro
    14 February 2022
    0 references
    16,770,000.0 forint
    0 references
    47,408.79 Euro
    0.002827 Euro
    14 February 2022
    0 references
    55.0 percent
    0 references
    17 November 2020
    0 references
    26 February 2021
    0 references
    REÁL-M Kereskedelmi és Szolgáltató Korlátolt Felelősségű Társaság
    0 references
    0 references

    47°8'33.40"N, 17°48'51.30"E
    0 references
    Villamos energia ellátásunkat 2 külön trafóról 2 külön mérési ponton keresztül valósítjuk meg. Az első ütem keretében a 026/302 hrsz-en (8441 Márkó, Iparos utca 1. szám) levő raktárra 49,77 kWp-os rendszert kívánunk telepíteni. (Hungarian)
    0 references
    Our electricity supply is achieved from 2 separate transformers through 2 separate measuring points. As part of the first phase, we would like to install a 49.77 kWp system on the warehouse at 026/302 (8441 Márkó, Iparos utca 1). (English)
    8 February 2022
    0.0241977969809267
    0 references
    Notre alimentation en électricité se fait à partir de 2 transformateurs séparés à travers 2 points de mesure distincts. Dans le cadre de la première phase, nous voudrions installer un système de 49,77 kWp sur l’entrepôt au 026/302 (8441 Márkó, Iparos utca 1). (French)
    10 February 2022
    0 references
    Meie elektrivarustus saavutatakse kahe eraldi trafoga kahe eraldi mõõtepunkti kaudu. Esimese etapi osana soovime paigaldada laohoonele kell 026/302 49,77 kWp süsteemi (8441 Márkó, Iparos utca 1). (Estonian)
    13 August 2022
    0 references
    Mūsų elektros energijos tiekimas pasiekiamas iš 2 atskirų transformatorių per 2 atskirus matavimo taškus. Pirmajame etape norėtume įdiegti 49,77 kWp sistemą sandėlyje 026/302 (8441 Mįrkó, Iparos utca 1). (Lithuanian)
    13 August 2022
    0 references
    La nostra fornitura di energia elettrica è ottenuta da 2 trasformatori separati attraverso 2 punti di misurazione separati. Come parte della prima fase, vorremmo installare un sistema di 49,77 kWp sul magazzino a 026/302 (8441 Márkó, Iparos utca 1). (Italian)
    13 August 2022
    0 references
    Naša opskrba električnom energijom postiže se iz 2 odvojena transformatora kroz 2 odvojene mjerne točke. Kao dio prve faze, željeli bismo instalirati 49,77 kWp sustav na skladištu 026/302 (8441 Márkó, Iparos utca 1). (Croatian)
    13 August 2022
    0 references
    Η παροχή ηλεκτρικής ενέργειας επιτυγχάνεται από 2 ξεχωριστούς μετασχηματιστές μέσω 2 ξεχωριστών σημείων μέτρησης. Στο πλαίσιο της πρώτης φάσης, θα θέλαμε να εγκαταστήσουμε ένα σύστημα 49,77 kWp στην αποθήκη στο 026/302 (8441 Márkó, Iparos utca 1). (Greek)
    13 August 2022
    0 references
    Naša dodávka elektrickej energie je zabezpečená z 2 samostatných transformátorov cez 2 samostatné meracie body. V rámci prvej fázy by sme chceli do skladu namontovať 49,77 kWp systém 026/302 (8441 Márkó, Iparos utca 1). (Slovak)
    13 August 2022
    0 references
    Sähkömme saadaan kahdesta erillisestä muuntajasta kahden erillisen mittauspisteen kautta. Osana ensimmäistä vaihetta haluaisimme asentaa varastoon 49,77 kWp:n järjestelmän osoitteessa 026/302 (8441 Márkó, Iparos utca 1). (Finnish)
    13 August 2022
    0 references
    Nasze zasilanie elektryczne uzyskuje się z 2 oddzielnych transformatorów przez 2 oddzielne punkty pomiarowe. W ramach pierwszej fazy chcielibyśmy zainstalować system 49,77 kWp na magazynie przy 026/302 (8441 Márkó, Iparos utca 1). (Polish)
    13 August 2022
    0 references
    Onze stroomvoorziening wordt bereikt met 2 afzonderlijke transformatoren door middel van 2 afzonderlijke meetpunten. Als onderdeel van de eerste fase willen we een 49,77 kWp systeem installeren op het magazijn op 026/302 (8441 Márkó, Iparos utca 1). (Dutch)
    13 August 2022
    0 references
    Naše dodávky elektřiny jsou dosahovány ze 2 samostatných transformátorů prostřednictvím 2 samostatných měřicích bodů. V rámci první fáze bychom chtěli nainstalovat systém 49,77 kWp na sklad na 026/302 (8441 Márkó, Iparos utca 1). (Czech)
    13 August 2022
    0 references
    Mūsu elektroapgāde tiek nodrošināta no 2 atsevišķiem transformatoriem, izmantojot 2 atsevišķus mērīšanas punktus. Kā daļu no pirmā posma mēs vēlētos uzstādīt 49,77 kWp sistēmu noliktavā 026/302 (8441 Márkó, Iparos utca 1). (Latvian)
    13 August 2022
    0 references
    Is é ár soláthar leictreachais a bhaint amach ó 2 claochladáin ar leith trí 2 phointe tomhais ar leith. Mar chuid den chéad chéim, ba mhaith linn córas 49.77 kWp a shuiteáil ar an stóras ag 026/302 (8441 Márkó, IPAROS utca 1). (Irish)
    13 August 2022
    0 references
    Naša oskrba z električno energijo je dosežena z 2 ločenima transformatorjema skozi 2 ločeni merilni točki. Kot del prve faze želimo na skladišče pri 026/302 (8441 Márkó, Iparos utca 1) namestiti sistem 49,77 kWp. (Slovenian)
    13 August 2022
    0 references
    Nuestro suministro de electricidad se logra a partir de 2 transformadores separados a través de 2 puntos de medición separados. Como parte de la primera fase, nos gustaría instalar un sistema de 49,77 kWp en el almacén a 026/302 (8441 Márkó, Iparos utca 1). (Spanish)
    13 August 2022
    0 references
    Нашето електрозахранване се постига от 2 отделни трансформатора през 2 отделни измервателни точки. Като част от първата фаза бихме искали да инсталираме 49,77 kWp система на склад 026/302 (8441 Márkó, Iparos utca 1). (Bulgarian)
    13 August 2022
    0 references
    Il-provvista tal-elettriku tagħna tinkiseb minn 2 transformers separati permezz ta’ żewġ punti separati tal-kejl. Bħala parti mill-ewwel fażi, nixtiequ ninstallaw sistema ta’ 49.77 kWp fuq il-maħżen fi 026/302 (8441 Márkó, Iparos utca 1). (Maltese)
    13 August 2022
    0 references
    O nosso fornecimento de eletricidade é obtido a partir de 2 transformadores separados através de 2 pontos de medição separados. Como parte da primeira fase, gostaríamos de instalar um sistema de 49,77 kWp no armazém em 026/302 (8441 Márkó, Iparos utca 1). (Portuguese)
    13 August 2022
    0 references
    Vores elforsyning opnås fra 2 separate transformatorer gennem 2 separate målepunkter. Som en del af første fase vil vi gerne installere et 49.77 kWp-system på lageret 026/302 (8441 Márkó, Iparos utca 1). (Danish)
    13 August 2022
    0 references
    Alimentarea noastră cu energie electrică se realizează de la 2 transformatoare separate prin 2 puncte de măsurare separate. Ca parte a primei faze, am dori să instalăm un sistem de 49,77 kWp pe depozit la 026/302 (8441 Márkó, Iparos utca 1). (Romanian)
    13 August 2022
    0 references
    Unsere Stromversorgung erfolgt von 2 separaten Transformatoren über 2 separate Messstellen. Im Rahmen der ersten Phase möchten wir ein 49,77 kWp-System am Lager 026/302 (8441 Márkó, Iparos utca 1) installieren. (German)
    13 August 2022
    0 references
    Vår elförsörjning uppnås från 2 separata transformatorer genom 2 separata mätpunkter. Som en del av den första fasen vill vi installera ett 49,77 kWp-system på lagret på 026/302 (8441 Márkó, Iparos utca 1). (Swedish)
    13 August 2022
    0 references
    Márkó, Veszprém
    0 references

    Identifiers

    GINOP-4.1.4-19-2019-00050
    0 references