CONSTRUCTION OF AN ESTABLISHMENT OF THE NATURAL ENVIRONMENT IN CONJUNCTION WITH THE EXPANSION OF THE GOŁDAP SPA PLANT (Q132611): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Changed an Item)
Property / beneficiary
 
Property / beneficiary: Gmina Gołdap / rank
 
Normal rank

Revision as of 23:22, 10 June 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
CONSTRUCTION OF AN ESTABLISHMENT OF THE NATURAL ENVIRONMENT IN CONJUNCTION WITH THE EXPANSION OF THE GOŁDAP SPA PLANT
Project in Poland financed by DG Regio

    Statements

    0 references
    17,824,357.77 zloty
    0 references
    4,277,845.8648 Euro
    13 January 2020
    0 references
    29,057,752.34 zloty
    0 references
    6,973,860.5616 Euro
    13 January 2020
    0 references
    84.99 percent
    0 references
    27 April 2017
    0 references
    31 August 2020
    0 references
    GMINA GOŁDAP
    0 references
    0 references

    54°18'28.8"N, 22°18'6.8"E
    0 references
    Budowa Zakładu Przyrodoleczniczego wraz z rozbudową Promenady Zdrowej w Uzdrowisku Gołdap Funkcjonalności Zakładu-3 strefy: -gabinety przyrodolecznicze (peloido-, krioterapia, inhalatoria, masaże, gab. lekarski) -termoterapia (sauny, tepidarium) -hydroterapia (baseny rehabilitac.) Zakres robót budowlanych: 1) BUDYNEK: zabudowa: 2192,30m2, kubatura netto: 19846,00m3, wys:15,5 m, l. kondyg. nadziemnych: 2, podziemnych: 1 -bryła budynku- elementy konstrukcyjne, wykończeniowe, elewacja, stolarka okienna i drzwiowa -instalacje techn: sanitarne, elektr. -wyposażenie:gł. urządzenia do rehabilitacji -zagospodar. terenu: m.in. ciągi pieszo-jezdne, parking, mała architektura: ławki, kosze, stojaki na rowery, donice, nasadzenie zieleni, oświetlenie terenu, fragment. ogrodzenie, systemowa, zadaszona wiata na pojemniki na odpady, 2) PROMENADA: zagospodar. pow. działki: 11996,00 m2 Zamknięcie kinezyterapeut. pętli zdrojowej w Parku Zdrojowym Uzdrowiska Gołdap -ciągi pieszo- jezdne -parking -oświetlenie terenu Lokalizacja inwestycji: m.Gołdap- status uzdrowiska od 2000r Skala Proj. optymalna pod względem techn.–technolog, ekonom. i środowiskowym Etapy, sposób wdrażania proj: 1.Oprac. programu inwestycji, dokumentacji techn. i SW 2.Złożenie wniosku, umowa o dofinans. 3.Wybór wykonawców wg PZP– roboty budowlane, nadzór inwestorski, promocja 4.Realizacja prac wg harmonogramu rzecz.-finans. 5.Odbiór prac (protokoły) 6.Zakończ. proj. 7.Finans. rozliczenie proj. Proj. zgodny z SzOOP RPO WiM– cel temat.6 „Zachowanie i ochrona środowiska przyrodn. oraz (..)", priorytet inwest.6c: „Zachowanie,(..) i rozwój dziedzictwa naturalnego i kulturowego”, cel szczegółowy: Zwiększona atrakcyjność turyst. zasobów dziedzictwa natur. regionu poprzez rozwój publicznej infrastr. uzdrowiskowej, typ wspieranych proj., przyjętych wskaź: liczba wspartych jedn. infrastr. uzdrowiskowej, wzrost oczekiwanej liczby odwiedzin w (..) miejscach dziedzictwa kultur. i naturalnego (...) (Polish)
    0 references
    Construction of a plant for the nature of the nature of the nature of the plant together with the development of a promenade, healthy in the Gołdap SpA, operating within the zone: 3 zones: — friable cabinets (peloid-, cryotherapy, inhalation, massage, gab therapy) -thermotherapy (saunas, tepidarium) hydro-therapy (rehabilitation basins.) Scope of construction work: (1) BUILDING: construction: 2 192.30 m², net volume: 19 846.00 m³, wys:15,5 m, 2, underground: 1 Buildings — Building components, finishing elements, façades, window frames and door frames — technical facilities: sanitary, elektronr. Equipment for rehabilitation/management equipment: inter alia road/pedestrian, parking, small architecture: benches, baskets, bicycle racks, pots, greenery, land lighting, fragmented fencing, systemic effects on waste containers, 2) Promenada: land area: 11 996.00 m² Closure of kinesiuteruteu. loop in Zdrojowa Uzdrowisko Gołdap — parking area — parking space — parking space — site of the site Location of the investment: the Gołda- has the status of ‘Spa’ since 2000, which has been optimised in terms of techn. — technologist, economic and environmental stages, implementing proj: 1.Investment programme, technical documentation, and SW 2.Submission of applications, grant agreement. 3.Selection of contractors according to PZP- construction work, investor supervision, promotion 4.Implementation of the work in accordance with the schedule for funding. 5.Acceptance of the work (Protocols) 6.Completed. 7.Finance. For the purpose of the Thematic Objective 6 “Conservation and protection of the natural environment, and (...)”, priority for investment.6c: “Conservation, (..) and the development of natural and cultural heritage”, the specific objective: Increased attractiveness of the natural heritage of the natural heritage of the region through the development of public spa infrastructure, type supported by proj., adopted by: number of residential health resorts supported, increase in number of visits to (..) cultural and natural heritage sites (...) (English)
    0 references

    Identifiers

    RPWM.06.02.01-28-0002/17
    0 references