Thermal modernisation of the Maria Konopnické Primary School in Skatach (Q132283): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Changed an Item)
Property / beneficiary
 
Property / beneficiary: Gmina Bisztynek / rank
 
Normal rank

Revision as of 23:02, 10 June 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Thermal modernisation of the Maria Konopnické Primary School in Skatach
Project in Poland financed by DG Regio

    Statements

    0 references
    998,104.19 zloty
    0 references
    239,545.00559999997 Euro
    13 January 2020
    0 references
    2,137,237.51 zloty
    0 references
    512,937.00239999994 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    12 August 2016
    0 references
    28 December 2018
    0 references
    GMINA BISZTYNEK
    0 references

    54°5'12.1"N, 20°54'31.7"E
    0 references
    Przedsięwzięcie realizowane będzie na budynku zlokalizowanym na działce o numerze ewidencyjnym 254/6, obręb ewidencyjny 11, jednostka ewidencyjna Sątopy. Planowana inwestycja polega na przeprowadzeniu termomodernizacji budynku użyteczności publicznej – Szkoły Podstawowej im. Marii Konopnickiej w Sątopach. W ramach termomodernizacji planowane jest wykonanie następujących prac modernizacyjnych, remontowych i montażowych: - wymiana stolarki okiennej i drzwiowej, - remont i docieplenie dachu, - docieplenie ścian zewnętrznych, - wymiana instalacji elektrycznej (gniazda, włączniki, wymiana oświetlenie na oświetlenie typu LED z czujnikami ruchu), - wymiana instalacji c.o. wraz z grzejnikami, - projektowanie i montaż ogrzewania gazowego, - projektowanie i montaż instalacji fotowoltaicznej, - rozbiórka starego komina. Projekt realizowany będzie w jednym etapie przez firmę wyłonioną zgodnie z PZP przez Wnioskodawcę. Projekt wpisuje się w założenia SzOOP RPO WiM poprzez spełnienie limitów i ograniczeń w realizacji projektów, w szczególności: - dobór działań i ich zakres oraz kwalifikowalność wydatków przeprowadzono na podstawie audytu energetycznego, - poziom efektywności energetycznej projektu mierzony spadkiem zapotrzebowania na energię na podstawie obliczeń ujętych w audycie energetycznym spadł o ponad 60%, - redukcja CO2 na skutek termomodernizacji oraz wymiany źródła ciepła wynosi ponad 85%, - wspierane urządzenia do ogrzewania charakteryzują się minimalnym poziomem efektywności energetycznej i normami emisji zanieczyszczeń, które zostały określone w środkach wykonawczych do dyrektywy 2009/125/WE z dnia 21 października 2009 r. ustanawiającej ogólne zasady ustalania wymogów dotyczących ekoprojektu dla produktów związanych z energią. (Polish)
    0 references
    The project will be carried out on a building located in a building located on a plot of land with the registration number 254/6, the Filing system area 11, the Sątopa registry unit. The planned investment consists of the thermal renovation of the public building — the Marie Konopnickne Primary School in Skatach. The following modernisation, refurbishment and assembly works are planned as part of the thermal modernisation: — replacement of window and door frames, renovation and insulation of the roof, — insulation of external walls, — replacement of electrical installations (sockets, switches, replacement lighting on LED with motion sensors), — replacement of a c.o system with radiators, — design and installation of gas heating systems, — design and installation of a photovoltaic installation, — demolition of an old stack. The project will be implemented at a single stage by the company selected in accordance with the PHP by the Applicant. The project is part of the establishment of the ROP WiM, by meeting the limits and limitations in the implementation of projects, in particular: — The selection of activities and their scope and eligibility of expenditure have been carried out on the basis of an energy audit, — the level of energy efficiency of the project, as measured by the decrease in energy demand on the basis of calculations included in the energy audit, has decreased by more than 60 %, — the CO2 reduction due to thermal modernisation and the replacement of the heat source is above 85 %, — the supported heating equipment is characterised by a minimum level of energy efficiency and pollutant emission standards, which are laid down in the implementing measures of Directive 2009/125/EC of 21 October 2009 establishing a framework for the setting of ecodesign requirements for energy-related products. (English)
    0 references

    Identifiers

    RPWM.04.03.01-28-0041/17
    0 references