DOUBLING PALERMO-MESSINA ROUTE BETWEEN FIUMETORTO AND OGLIASTRILLO (Q2017403): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: info Regio url (P1742): https://ec.europa.eu/regional_policy/en/projects/europe/sicilys-fiumetorto-to-ogliastrillo-railway-line-converted-to-double-track, removed property P1742) |
(Changed label, description and/or aliases in pt) |
||||||||||||||
(9 intermediate revisions by 2 users not shown) | |||||||||||||||
label / pt | label / pt | ||||||||||||||
DUPLICAÇÃO DA VIA PALERMO-MESSINA ENTRE FIUMETORTO E OGLIASTRILLO | |||||||||||||||
Property / beneficiary name (string) | |||||||||||||||
Property / beneficiary name (string): RFI SPA - RETE FERROVIARIA ITALIANA / rank | |||||||||||||||
Property / beneficiary | |||||||||||||||
Property / beneficiary: Rete Ferroviaria Italiana / rank | |||||||||||||||
Property / summary: THE MEASURE ACCEPTED FOR FUNDING CONCERNS THE DOUBLING OF THE RAILWAY SECTION BETWEEN THE FIUMETORTO AND THE OGLIASTRILLO INTERCONNECTION STATIONS (BETWEEN KM 43 + 219 AND KM 62 + 900). (English) / qualifier | |||||||||||||||
readability score: 0.001174269557857
| |||||||||||||||
Property / summary | Property / summary | ||||||||||||||
A MEDIDA ACEITADA PARA FINANCIAMENTO RESPEITA À DOBRA DA SECÇÃO FERROVIÁRIA ENTRE O FIUMETORTO E AS ESTAÇÕES DE INTERCONEXÃO OGLIASTRILLO (entre KM 43 + 219 E KM 62 + 900). (Portuguese) | |||||||||||||||
Property / contained in Local Administrative Unit | |||||||||||||||
Property / contained in Local Administrative Unit: Messina / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / instance of | |||||||||||||||
Property / instance of: Major Projects / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / ID used by InfoRegio | |||||||||||||||
4388 | |||||||||||||||
Property / ID used by InfoRegio: 4388 / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / info Regio url | |||||||||||||||
Property / info Regio url: https://ec.europa.eu/regional_policy/projects/projects-database/sicilys-fiumetorto-to-ogliastrillo-railway-line-converted-to-double-track_en / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / beneficiary | |||||||||||||||
Property / beneficiary: Q4270735 / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / beneficiary name (string) | |||||||||||||||
RETE FERROVIARIA ITALIANA SOCIETA' PER AZIONI - RFI S.P.A. | |||||||||||||||
Property / beneficiary name (string): RETE FERROVIARIA ITALIANA SOCIETA' PER AZIONI - RFI S.P.A. / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / priority axis | |||||||||||||||
Property / priority axis: Supporting the creation of a single European multimodal transport area with investments in TEN-T / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / thematic objective | |||||||||||||||
Property / thematic objective: Network infrastructure in transport and energy / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / end time | |||||||||||||||
1 February 2021
| |||||||||||||||
Property / end time: 1 February 2021 / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / date of last update | |||||||||||||||
8 April 2023
| |||||||||||||||
Property / date of last update: 8 April 2023 / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / Call for proposal | |||||||||||||||
Property / Call for proposal: Decreto AdG Prot. n. 857 R.U. del 26/01/2017 / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / Major project CCI | |||||||||||||||
2017IT16RFMP010 | |||||||||||||||
Property / Major project CCI: 2017IT16RFMP010 / rank | |||||||||||||||
Normal rank |
Latest revision as of 19:14, 8 October 2024
Project Q2017403 in Italy
Language | Label | Description | Also known as |
---|---|---|---|
English | DOUBLING PALERMO-MESSINA ROUTE BETWEEN FIUMETORTO AND OGLIASTRILLO |
Project Q2017403 in Italy |
Statements
105,491,802.47 Euro
0 references
1,467,527,082.16 Euro
0 references
7.19 percent
0 references
22 January 2000
0 references
1 February 2021
0 references
31 December 2019
0 references
RETE FERROVIARIA ITALIANA SOCIETA' PER AZIONI - RFI S.P.A.
0 references
L'INTERVENTO AMMESSO A FINANZIAMENTO INTERESSA IL RADDOPPIO DEL TRATTO FERROVIARIO COMPRESO TRA LE STAZIONI DI FIUMETORTO E L'INTERCONNESSIONE OGLIASTRILLO, (TRA IL KM 43+219 E IL KM 62+900). (Italian)
0 references
THE MEASURE ACCEPTED FOR FUNDING CONCERNS THE DOUBLING OF THE RAILWAY SECTION BETWEEN THE FIUMETORTO AND THE OGLIASTRILLO INTERCONNECTION STATIONS (BETWEEN KM 43 + 219 AND KM 62 + 900). (English)
0.001174269557857
0 references
L’AIDE ÉLIGIBLE AU FINANCEMENT CONCERNE LE DOUBLEMENT DU TRONÇON FERROVIAIRE ENTRE LES GARES DE FIUMETORTO ET L’INTERCONNEXION D’OGLIASTRILLO (ENTRE LES KM 43+ 219 ET 62+ 900). (French)
14 December 2021
0 references
DE VOOR FINANCIERING IN AANMERKING KOMENDE STEUN BETREFT DE VERDUBBELING VAN HET SPOORWEGTRAJECT TUSSEN FIUMETORTO-STATIONS EN DE VERBINDING OGLIASTRILLO (TUSSEN KM 43+ 219 EN KM 62+ 900). (Dutch)
22 December 2021
0 references
DIE FÖRDERFÄHIGE UNTERSTÜTZUNG BETRIFFT DIE VERDOPPELUNG DES EISENBAHNABSCHNITTS ZWISCHEN DEN BAHNHÖFEN FIUMETORTO UND DEM VERBUND OGLIASTRILLO (ZWISCHEN KM 43+ 219 UND KM 62+ 900). (German)
24 December 2021
0 references
LA AYUDA SUBVENCIONABLE SE REFIERE A LA DUPLICACIÓN DEL TRAMO FERROVIARIO ENTRE LAS ESTACIONES DE FIUMETORTO Y LA INTERCONEXIÓN OGLIASTRILLO (ENTRE EL KM 43+ 219 Y EL KM 62+ 900). (Spanish)
24 January 2022
0 references
DEN FORANSTALTNING, DER ER GODKENDT TIL FINANSIERING, VEDRØRER FORDOBLINGEN AF JERNBANESTRÆKNINGEN MELLEM FIUMETORTO OG OGLIASTRILLO-SAMMENKOBLINGSSTATIONERNE (MELLEM KM 43 + 219 OG KM 62 + 900). (Danish)
4 July 2022
0 references
ΤΟ ΜΈΤΡΟ ΠΟΥ ΈΓΙΝΕ ΔΕΚΤΌ ΓΙΑ ΧΡΗΜΑΤΟΔΌΤΗΣΗ ΑΦΟΡΆ ΤΟΝ ΔΙΠΛΑΣΙΑΣΜΌ ΤΟΥ ΣΙΔΗΡΟΔΡΟΜΙΚΟΎ ΤΜΉΜΑΤΟΣ ΜΕΤΑΞΎ ΤΩΝ ΣΤΑΘΜΏΝ ΔΙΑΣΎΝΔΕΣΗΣ FIUMETORTO ΚΑΙ OGLIASTRILLO (ΜΕΤΑΞΎ KM 43 + 219 ΚΑΙ KM 62 + 900). (Greek)
4 July 2022
0 references
MJERA PRIHVAĆENA ZA FINANCIRANJE ODNOSI SE NA UDVOSTRUČENJE ŽELJEZNIČKE DIONICE IZMEĐU STANICA ZA MEĐUSOBNO POVEZIVANJE FIUMETORTO I OGLIASTRILLO (IZMEĐU KM 43 + 219 I KM 62 + 900). (Croatian)
4 July 2022
0 references
MĂSURA ACCEPTATĂ PENTRU FINANȚARE SE REFERĂ LA DUBLAREA TRONSONULUI FEROVIAR DINTRE STAȚIILE DE INTERCONECTARE FIUMETORTO ȘI OGLIASTRILLO (ÎNTRE KM 43 + 219 ȘI KM 62 + 900). (Romanian)
4 July 2022
0 references
OPATRENIE PRIJATÉ NA FINANCOVANIE SA TÝKA ZDVOJNÁSOBENIA ŽELEZNIČNÉHO ÚSEKU MEDZI PREPOJOVACÍMI STANICAMI FIUMETORTO A OGLIASTRILLO (OD 43 KM + 219 KM DO 62 + 900 KM). (Slovak)
4 July 2022
0 references
IL-MIŻURA AĊĊETTATA GĦALL-FINANZJAMENT TIKKONĊERNA L-IRDUPPJAR TAS-SEZZJONI FERROVJARJA BEJN L-ISTAZZJONIJIET TA’ INTERKONNESSJONI FIUMETORTO U OGLIASTRILLO (BEJN KM 43 + 219 U KM 62 + 900). (Maltese)
4 July 2022
0 references
A MEDIDA ACEITADA PARA FINANCIAMENTO RESPEITA À DOBRA DA SECÇÃO FERROVIÁRIA ENTRE O FIUMETORTO E AS ESTAÇÕES DE INTERCONEXÃO OGLIASTRILLO (entre KM 43 + 219 E KM 62 + 900). (Portuguese)
4 July 2022
0 references
RAHOITETTAVAKSI HYVÄKSYTTY TOIMENPIDE KOSKEE FIUMETORTON JA OGLIASTRILLON YHTEENLIITÄNTÄASEMIEN VÄLISEN RAUTATIEOSUUDEN KAKSINKERTAISTAMISTA (43 + 219 KM:N JA 62 + 900 KM:N VÄLILLÄ). (Finnish)
4 July 2022
0 references
ŚRODEK PRZYJĘTY DO FINANSOWANIA DOTYCZY PODWOJENIA ODCINKA KOLEJOWEGO MIĘDZY FIUMETORTO A STACJAMI POŁĄCZEŃ MIĘDZYSYSTEMOWYCH OGLIASTRILLO (OD 43 KM+219 DO 62 + 900 KM). (Polish)
4 July 2022
0 references
UKREP, ODOBREN ZA FINANCIRANJE, SE NANAŠA NA PODVOJITEV ŽELEZNIŠKEGA ODSEKA MED POVEZOVALNIMA POSTAJAMA FIUMETORTO IN OGLIASTRILLO (MED KM 43 +219 IN KM 62 +900). (Slovenian)
4 July 2022
0 references
OPATŘENÍ PŘIJATÉ K FINANCOVÁNÍ SE TÝKÁ ZDVOJNÁSOBENÍ ŽELEZNIČNÍHO ÚSEKU MEZI FIUMETORTO A PROPOJOVACÍMI STANICEMI OGLIASTRILLO (MEZI KILOMETRY 43 + 219 A 62 + 900 KM). (Czech)
4 July 2022
0 references
PRIEMONĖ, KURIAI PRITARTA, SUSIJUSI SU GELEŽINKELIO RUOŽO TARP FIUMETORTO IR OGLIASTRILLO SUJUNGIMO STOČIŲ PADVIGUBINIMU (NUO 43 KM + 219 KM IKI 62 + 900 KM). (Lithuanian)
4 July 2022
0 references
FINANSĒJUMA SAŅEMŠANAI APSTIPRINĀTAIS PASĀKUMS ATTIECAS UZ DZELZCEĻA POSMA DIVKĀRŠOŠANU STARP FIUMETORTO UN OGLIASTRILLO STARPSAVIENOJUMA STACIJĀM (STARP 43 + 219 KM UN 62 + 900 KM). (Latvian)
4 July 2022
0 references
МЯРКАТА, ПРИЕТА ЗА ФИНАНСИРАНЕ, СЕ ОТНАСЯ ДО УДВОЯВАНЕ НА ЖЕЛЕЗОПЪТНАТА ОТСЕЧКА МЕЖДУ МЕЖДУСИСТЕМНИТЕ СТАНЦИИ FIUMETORTO И OGLIASTRILLO (МЕЖДУ KM 43 + 219 И KM 62 + 900). (Bulgarian)
4 July 2022
0 references
A FINANSZÍROZÁSRA ELFOGADOTT INTÉZKEDÉS A FIUMETORTO ÉS AZ OGLIASTRILLO RENDSZERÖSSZEKÖTŐ ÁLLOMÁSOK KÖZÖTTI VASÚTI SZAKASZ MEGKÉTSZEREZÉSÉRE VONATKOZIK (43 + 219 KM ÉS 62 + 900 KM KÖZÖTT). (Hungarian)
4 July 2022
0 references
BAINEANN AN BEART AR GLACADH LEIS LE HAGHAIDH MAOINITHE LE DÚBAILT NA ROINNE IARNRÓID IDIR NA STÁISIÚIN IDIRNAISC FIUMETORTO AGUS OGLIASTRILLO (IDIR KM 43 + 219 AGUS KM 62 + 900). (Irish)
4 July 2022
0 references
DEN ÅTGÄRD SOM GODKÄNTS FÖR FINANSIERING AVSER EN FÖRDUBBLING AV JÄRNVÄGSSTRÄCKAN MELLAN FIUMETORTO OCH OGLIASTRILLOS SAMMANLÄNKNINGSSTATIONER (MELLAN KM 43 + 219 OCH KM 62 + 900). (Swedish)
4 July 2022
0 references
RAHASTAMISEKS HEAKS KIIDETUD MEEDE PUUDUTAB FIUMETORTO JA OGLIASTRILLO ÜHENDUSJAAMADE VAHELISE RAUDTEELÕIGU KAHEKORDISTAMIST (KM 43 + 219 KUNI KM 62 + 900). (Estonian)
4 July 2022
0 references
CAMPOFELICE DI ROCCEL
0 references
CEFALÙ
0 references
LASCARI
0 references
PALERMO
0 references
TERMINI IMERESE
0 references
MESSINA
0 references
8 April 2023
0 references
Identifiers
J57I09000060007
0 references
4388
0 references
2017IT16RFMP010
0 references