THERMAL MODERNISATION OF THE PRIMARY SCHOOL BUILDING IN PERLEJEWIE (Q117040): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Changed an Item)
Property / beneficiary
 
Property / beneficiary: Gmina Perlejewo / rank
 
Normal rank

Revision as of 18:41, 10 June 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
THERMAL MODERNISATION OF THE PRIMARY SCHOOL BUILDING IN PERLEJEWIE
Project in Poland financed by DG Regio

    Statements

    0 references
    2,097,298.17 zloty
    0 references
    503,351.5608 Euro
    13 January 2020
    0 references
    2,468,885.62 zloty
    0 references
    592,532.5488 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    12 December 2018
    0 references
    24 December 2020
    0 references
    GMINA PERLEJEWO
    0 references

    52°34'8.4"N, 22°33'45.0"E
    0 references
    W ramach projektu planowana jest termomodernizacja budynku Szkoły Podstawowej w Perlejewie obejmująca: * docieplenie przegród zewnętrznych i oddzielających pomieszczenia ogrzewane i nieogrzewane, * wymianę stolarki otworowej, * wymianę starego kotła olejowego na nowoczesny kocioł olejowy kondensacyjny o sprawności zapewniającej ponad 30-procentową redukcję emisji dwutlenku węgla w porównaniu z dotychczasowym, * modernizację wewnętrznej instalacji c.o. i c.w.u., * wymianę oświetlenia na energooszczędne typu LED, * wykonanie instalacji PV o mocy 15 kWp na potrzeby oświetlenia wbudowanego. Obecnie przegrody zewnętrzne nie spełniają wymogów dotyczących współczynników przenikania ciepła. Instalacja c.o. jest nieefektywna (niska sprawność), m.in. ze względu na kocioł olejowy starego typu o niskiej sprawności. Do wysokiego zużycia energii elektrycznej przyczynia się z kolei energochłonne oświetlenie wewnętrzne starego typu. Zgodnie z szacunkami zawartymi w audycie ergetycznym każdego roku na ogrzewanie budynku i przygotowanie ciepłej wody zużywanych jest 3.129 GJ ciepła, co przekłada się na wydatki rzędu 205 tys. zł. Ze względu na niedocieplone ściany, niską sprawność instalacji c.o. marnotrawiona jest energia na poziomie 2.296 GJ. Jeżeli uwzględnić także potencjał ograniczenia energochłonności tkwiący w działaniu polegającym na modernizacji oświetlenia wbudowanego w połączeniu z instalacją paneli fotowoltaicznych, oszczędności mogą sięgnąć 2.332 GJ, co stanowi ok. 68% energii końcowej zużywanej obecnie (2.780 GJ i ok. 64% w przypadku energii pierwotnej). Kwotowo daje to sumę w granicach 161 tys. zł, co jest wielkością niebagatelną w skali budżetu Wnioskodawcy. (Polish)
    0 references
    As part of the project, a thermal renovation of the building of the Primary School in Perlejewo is planned, including: * insulation of the building envelope and separation of heated and unheated spaces, * replacement of core joinery, * replacement of the old oil boiler with a modern oil-condensing boiler with a CO2 saving of more than 30 % compared to the previous, * modernisation of the internal heating and hot water installations, * replacement of lighting on an energy-efficient LED, * installation of a 15kWp installation for built-in lighting. Currently, the building envelope does not meet the requirements of the heat transfer coefficients. The system is inefficient (low efficiency), inter alia on account of an old low-efficiency overhead oil boiler. In contrast, the energy-intensive internal lighting of the old type contributes to high electricity consumption. According to the estimates made in the ergeogenic audit every year, 3.129 GJ of heat is used for heating the building and the hot water to be used, which translates into expenditure in the order of PLN 205. Due to the lack of insulation of walls, the low efficiency of the installation has been wasted at 2.296 GJ. If account is also taken of the energy efficiency potential inherent in the modernisation of the lighting embedded in conjunction with the installation of solar panels, the savings can reach 2.332 GJ, which is ca. 68 % of the final energy consumed today (2.780 GJ and ca. 64 % in the case of primary energy). This amounts to an amount of up to PLN 161 in amount, which is the size of the Applicant’s budget. (English)
    0 references

    Identifiers

    RPPD.05.03.01-20-0179/18
    0 references