Green plant — production of energy from renewable energy sources for the benefit of residents (Q116779): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Changed an Item) |
||
Property / beneficiary | |||
Property / beneficiary: Gmina Zbójna / rank | |||
Normal rank |
Revision as of 18:10, 10 June 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Green plant — production of energy from renewable energy sources for the benefit of residents |
Project in Poland financed by DG Regio |
Statements
1,356,429.27 zloty
0 references
2,214,390.0 zloty
0 references
70.0 percent
0 references
13 February 2017
0 references
29 June 2018
0 references
GMINA ZBÓJNA
0 references
Zakres niniejszej inwestycji obejmuje wykonanie 120 prosumenckich instalacji fotowoltaicznych o mocy znamionowej 2,72 kWp każda na potrzeby produkcji energii elektrycznej dla 120 budynków mieszkalnych położonych na terenie gminy Zbójna. Łączna moc znamionowa zainstalowanych ogniw PV ma wynieść 326,4 kWp. Głównym celem wyznaczonym dla projektu jest zwiększenie udziału energii pochodzącej ze źródeł odnawialnych w wykorzystaniu i produkcji energii na terenie gminy Zbójna. Cele szczegółowe projektu to min. produkcja 333 MWh energii rocznie, zmniejszenie zużycia energii sieciowej, zmniejszenie kosztów z tytułu zużycia energii elektrycznej ponoszonych przez mieszkańców gminy Zbójna, zmniejszenie zużycia energii elektrycznej wytwarzanej z nieodnawialnych zasobów, a wykorzystywanej przez mieszkańców gminy Zbójna. W ramach projektu przewidziano 2 zadania, z których pierwsze to wykonanie dokumentacji technicznej i kosztorysowej, a drugie to wykonanie 120 prosumenckich instalacji fotowoltaicznych o mocy znamionowej 2,72 kWp każda. Główną grupą docelową zidentyfikowaną dla projektu są właściciele/dysponenci oraz mieszkańcy 120 budynków mieszkalnych z terenu gminy Zbójna, które zostaną wyposażone w instalacje PV. Dzięki wytwarzaniu energii z OZE ograniczona zostanie konsumpcja energii elektrycznej sieciowej. Mieszkańcy zyskają głównie dzięki obniżeniu kosztów z tytułu zużycia energii elektrycznej sieciowej. Ponadto zostaną dodatkowo zabezpieczeni w przypadku zakłóceń w dostawie energii elektrycznej sieciowej. Przewidywane efekty realizacji projektu określone jako wskaźniki produktu i rezultatu są następujące: 1. Dodatkowa zdolność wytwarzania energii elektrycznej ze źródeł odnawialnych: 0,33 MWe 2. Liczba wybudowanych jednostek wytwarzania energii elektrycznej z OZE: 120 szt. 3. Szacowany roczny spadek emisji gazów cieplarnianych: 270,58 ton równoważnika CO2 4. Produkcja energii elektrycznej z nowo wybudowanych instalacji wykorzystujących OZE: 333,23 MWhe/rok. (Polish)
0 references
The scope of this investment includes the performance of 120 ‘prosumers’ of photovoltaic installations with a nominal output of 2,72 kWp each for the production of electricity for 120 residential buildings located in the commune of Zbójna. The total rated installed capacity of the cells PV is expected to be 326,4 kWp. The main objective of the project is to increase the share of energy from renewable sources in the use and production of energy in the commune of Zbójna. The specific objectives of the project will be the production of 333 MWh of energy per year, a reduction in the use of network energy, a reduction in the cost of electricity consumed by the inhabitants of the municipality of ZCrimes, a reduction in the consumption of electricity produced from non-renewable resources, and the loss of electricity consumed by the inhabitants of the municipality of ZbMurna. The project provided for 2 tasks, the first being the execution of technical and financial documentation and the second the performance of 120 ‘prosumer’ PV installations with a nominal output of 2,72 kWp each. The main target group identified for the project is the owners/keepers, as well as the inhabitants of the 120 residential buildings of the municipality of Zbójna, which will be equipped with PV installations. The generation of energy from renewable energy sources will reduce the consumption of electricity from the grid. The inhabitants will benefit mainly from the cost savings of the electricity consumption of the network. In addition, they will be further protected in case of disruptions in the supply of grid electricity. The expected effects of the project, identified as output and result indicators, are as follows: 1. Additional capacity for generating electricity from renewable sources: 0,33 MWe 2. Number of newly built units producing electricity from RES: 120 units 3. Estimated annual decrease in greenhouse gas emissions: 270,58 tonnes of CO2 4 equivalent. Production of electricity from newly built RES installations: 333,23 MWhe/year. (English)
0 references
Identifiers
RPPD.05.01.00-20-0170/17