A comprehensive water supply system in the municipality of Międzyrzec Podlaski (Q105696): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Changed an Item)
Property / beneficiary
 
Property / beneficiary: Gmina Międzyrzec Podlaski / rank
 
Normal rank

Revision as of 14:32, 10 June 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
A comprehensive water supply system in the municipality of Międzyrzec Podlaski
Project in Poland financed by DG Regio

    Statements

    0 references
    1,939,937.67 zloty
    0 references
    465,585.04079999996 Euro
    13 January 2020
    0 references
    2,807,203.94 zloty
    0 references
    673,728.9456 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    2 November 2015
    0 references
    31 July 2018
    0 references
    GMINA MIĘDZYRZEC PODLASKI
    0 references
    Realizacja inwestycji przyniesie wymierny efekt w postaci poprawy stanu infrastruktury technicznej, a przez to pobudzenie rozwoju społeczno-gospodarczego poprzez stworzenie szans do rozwoju turystyki, wyeliminowanie ograniczeń wynikających z braku wody dobrej jakości oraz zanieczyszczenia środowiska i wyrównanie szans rozwojowych terenów wiejskich. Budowa wodociągów jest jednym z etapów długofalowej strategii rozwoju i modern. instalacji służących ochronie środ.na terenie Gminy. Rezultaty: -zapewnienie równowagi pomiędzy poborem a zasilaniem wód podziemnych, bezpieczeństwo stanu zdrowia ludności dzięki spożyciu wody właściwej jakości, -zabezpieczenie przeciwpożarowe dużych skupisk ludności na rozległym terenie, -utrzymanie i zwiększenie liczby korzystających z sieci wodociągowej o miejscowości: Kożuszki, Krzewica, Krzymoszyce, Wólka Krzymowska, Łuby, Łuniew, Łukowisko zasilanych obecnie z wodociągu Gminy Olszanka, SUW Próchenki, -likwidację okresowych nierównomierności niedoborów wody w 43 gospod. (które po realizacji projektu będą korzystały ze SUW w Halasach), -niezawodność automat. pracy urządzeń ujęcia wody o wydajności 1200m3, -zdalna kontrola obiektu i pracy ujęcia wody podniesie bezpiecz. wodne Gminy, ograniczenie czynnika błędu ludzkiego poprzez zautomatyzowanie i zabezpiecz. ujęcia w tzw. monitoring wody. Główne grupy działań: * Konstrukcja zbiornika wody uzdatnion. Vc=347m3 w m.Halasy działki numer 364,363 * Instalacje elektr.SUW, Instalacje AKPiA SUW, zbiornik retencyjno-uśredniający, przebudowa ujęcia wody podziemnej z przebudową, rozbudową SUW w m.Halasy działki numer 364,363 * Zagospod.terenu SUW Halasy, dz. 364, 363 * Budowę sieci wod. łączącej dwie miejs.Tłuściec i Krzewicę (bez przyłączy) na terenie gminy Międzyrzec Podl. Orientacyjna dł.sieci wod. wynosi ca 2630 m. * wykonanie inst. fotowoltaicznej na SUW w Halasach o mocy 25 kW. Nowi odbiorcy wody korzyst. ze SUW w Halasach, mają zapewnione prawidł. zagospod.ścieków (przydom.oczyszcz.ścieków). (Polish)
    0 references
    The implementation of the investment will have a measurable effect in terms of improving the state of the technical infrastructure and thus boosting economic and social development by creating opportunities for the development of tourism, eliminating the constraints imposed by the lack of good quality water and environmental pollution and levelling the development opportunities for the countryside. The construction of a water supply is one of the steps of a long-term strategy for the development and moderation of security installations in the municipality. Results: — to ensure the balance between abstraction and recharge of groundwater, the safety of the health of the population through the consumption of water of good quality, and the provision of fire protection for large population centres around large areas, maintaining and increasing the number of municipalities using the water supply network: Kojki, Kruszki, Krzyżoszyce, Wólka Krzywięska, haddock, Łunina, Łokoko, currently operating from the water supply of the Municipality of Olshanka, SUW Próchchenko, -ending the occasional imbalance of water scarcity in 43 gossypol. (which, after the project, will use the SUW SUMP in Hallogo), the reliability of the water treatment facilities with a capacity of 1 200 m³, the remote control of the facility and the water intake will increase the water of the municipality, reduce the human error factor through automation and protection. Main action groups: * Water treatment tank design. VC = 347 m³ in m.Halasa, plot number 364,363 * Installations for electricity, SARA SUW, retention/averaging tank, conversion of the underground water intake into the construction, extension of SUW in m.Halasa, plot number 364,363 * Zagospoby.SUW Halasa, dz. 364, 363 * The construction of a water network linking the site between two locations (without connection) in the municipality of Międzyrzec Podl. Based on the water network, is ca. 2 630 m. * Performance of the SUW SUW in Halma of 25 kW. The new customers of the water are guaranteed by the SUH SUMP and are in charge of the waste water (sewage treatment plant). (English)
    0 references

    Identifiers

    RPLU.06.04.00-06-0080/15
    0 references