Construction of integrated systems to assist and optimise the work and security of the SN switchboard on the basis of control and security automation (Q107898): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Changed an Item)
Property / beneficiary
 
Property / beneficiary: Q2511791 / rank
 
Normal rank

Revision as of 14:08, 10 June 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Construction of integrated systems to assist and optimise the work and security of the SN switchboard on the basis of control and security automation
Project in Poland financed by DG Regio

    Statements

    0 references
    3,269,084.75 zloty
    0 references
    784,580.34 Euro
    13 January 2020
    0 references
    5,175,768.08 zloty
    0 references
    1,242,184.3392 Euro
    13 January 2020
    0 references
    66.4 percent
    0 references
    1 July 2016
    0 references
    30 November 2018
    0 references
    ELEKTROMETAL ENERGETYKA SPÓŁKA AKCYJNA
    0 references
    0 references

    52°14'1.3"N, 21°4'17.0"E
    0 references
    Projekt polega na realizacji prac badawczych mających na celu przygotowaniu gotowych rozwiązań wspomagających działanie i eksploatację rozdzielnic SN(SN - Średniego Napięcia) w obszarze bezpieczeństwa, prewencji oraz wydajności. Projektowane narzędzia w momencie ich wdrożenia do produkcji będą oferowane klientom samodzielnie (kompletne rozdzielnice) jak również jako pojedyncze podzespoły kompatybilne z istniejącymi już na rynku rozdzielnicami. Dzięki sparametryzowanym funkcjonalnościom zapewnią niezawodność i bezpieczeństwo obsługi, a w przypadku nagłej awarii wyeliminują sytuacje związane z narażeniem życia operatorów. Oprócz ww. funkcjonalności pozwolą na pełną identyfikację zdarzeń i procesów zachodzących w trakcie pracy rozdzielnicy oraz uproszą nadzór, obsługę i konserwację urządzeń wspomagających rozdział energii elektrycznej. Dodatkowo zostaną wprowadzone rozwiązania zwiększające wydajność prądową rozdzielnic. Zakres prac stanowi odpowiedź na potrzeby rynku związane z aktualnym stanem infrastruktury energetycznej w Polsce i Świecie oraz dążeniem z zwiększania pewności zasilania, wydajności i sprawności urządzeń a także problemami z doświadczoną i wykwalifikowaną kadrą obsługującą rozdzielnice i sieć. Wprowadzone na rynek urządzenia będą w pełni przystosowane do pracy w sieciach SMART GRID. Prowadzone przez Konsorcjum (Elektrometal Energetyka, Instytut Elektrotechniki, PW SiMR) prace zakończą się zgłoszeniami patentowymi, a także uzyskaniem wzoru przemysłowego. Wskazane w projekcie obszary badawcze zostały opracowane na podstawie dotychczasowych doświadczeń członków oraz lidera konsorcjum, którego ostatnie wdrożone wyniki badań zostały nagrodzone min. Złotym Medalem targów ENERGETAB 2015 (np.: rodzina uniwersalnych sterowników polowych e2TANGO). W wyniku prac powstanie Zintegrowany system zabezpieczający sterowniczo-rozdzielczy (ZSZ). (Polish)
    0 references
    The project consists of the implementation of research to prepare ready solutions to support the operation and exploitation of the SN (SN) in the area of safety, prevention and efficiency. The proposed tools at the time of their deployment will be offered to customers on their own (complete distribution) as well as as single components compatible with the already existing ones on the market. These functionalities will ensure the reliability and safety of the service and, in the event of a sudden failure, will eliminate the situation of operators’ exposure. In addition to these functionalities, the events and processes involved in the operation of the switchgear and the simplification of the monitoring, operation and maintenance of equipment to assist the distribution of electricity will be fully identified. In addition, solutions will be introduced to increase the efficiency of the switchgear. The scope of the work is the response to the needs of the market related to the current state of energy infrastructure in Poland and Świecie and to the desire to improve the supply assurance, efficiency and efficiency of the equipment, as well as problems with experienced and qualified crews and the network. The equipment placed on the market will be fully adapted to the work of SMART GRID. The works carried out by the Consortium (Elektrometal Energetyka, Institute for Electrotechnical Standardisation, CI of SiMR) will complete the work of the patent applications as well as the obtaining of the industrial design. The research areas identified in the project have been drawn up on the basis of the experience gained so far and the consortium leader whose last implemented research results have been awarded the award of the ENERGY AB 2015 (for example: universal family control field e2TANGO). The work will result in the creation of an integrated system for the management of the control and control system (ZZZ). (English)
    0 references

    Identifiers

    RPMA.01.02.00-14-5676/16
    0 references