RENOVATION OF PUBLIC BUILDINGS IN THE MUNICIPALITY OF KRASNOBREN (Q105309): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Changed an Item)
Property / beneficiary
 
Property / beneficiary: Gmina Krasnobród / rank
 
Normal rank

Revision as of 12:49, 10 June 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
RENOVATION OF PUBLIC BUILDINGS IN THE MUNICIPALITY OF KRASNOBREN
Project in Poland financed by DG Regio

    Statements

    0 references
    1,008,224.04 zloty
    0 references
    241,973.7696 Euro
    13 January 2020
    0 references
    1,848,288.01 zloty
    0 references
    443,589.1224 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    2 January 2019
    0 references
    31 October 2022
    0 references
    GMINA KRASNOBRÓD
    0 references
    Zakres projektu obejmuje termomod. 2 bud. użyteczności publicznej (Budynek PES przy ul. Rynek 12 w Krasnobrodzie oraz Budynek ZS w Krasnobrodzie Segment A i B przy ul. Lelewela 37 w Krasnobrodzie.) w gminie Krasnobród. ZAKRES PROJEKTU: - ZS: Wymiana instalacji c.o. w segm. A i B, Wdrożenie systemu zarz. Energią., Docieplenie stropu poddasza, Dociepl. ścian, Docieplenie ścian piwnic, Dociepl. ścian w gruncie piwnic, Wymiana drzwi stalowych, Wymiana drzwi drewnianych, Roboty dodatkowe związane z termo budynku: Odtw. Instal. odgromowej (niekw.), Wykończenie opaski (koszt kwalifi. ze względu na podpiwniczenie obiektu), Instalacja fotowolt., odtworz. Inst. odgrom. Koszty kwalif - 857 927,00 zł netto - PES: Wymiana instalacji c.o. (grzejniki), Grzejnik w pomieszczeniu wod., Wyk. Instal. c.w., Wdroż. syst. zarządz. Energią, Dociepl. stropu poddasza, Dociepl. ścian, Dociepl. stropu piwnic, Wym. okien, Wym. drzwi, Wym. okien w piwnicach, Roboty dodatkowe związane z term. Bud., w tym: Rob. ziem. związane z dociepl. Fund., Izol. Przeciwwilg. oraz dociepl. ścian fundamentów i piwnic, Roboty murowe (dost kominów), Instal. oświetleniowa. Koszty niekwalif. nie obj. audytem energt. wraz dostawą schodołazu, w tym m.in..: Montaż kotła gaz., Instalacja gazowa, roboty murowe (dostos. kominów). Koszty kwalif - 241 878,96 zł netto CELE PROJEKTU to: - zwiększenie efektyw. energet. 2 budynków uż. publicznej w gm. Kr.; - popr. jakości środ. Przyrodn. poprzez wdroż. rozwiązań wpływ. na zmniejsz. emisji gazów ciepl. i łagodzenie skutków zmian klimatu; - zmniejsz. kosztów ekspl. budynków poddanych termomod.; - poprawa warunków nauki i pracy. Wskaźniki - Produktu: Liczba zmoder. Energet. budynków- 2; Pow. użytkowa bud. poddanych termomod. - 3 482,92 m2; Rezultatu: Ilość zaoszcz. En. ciepl. - 895,30 GJ/rok; Zmniejsz. rocznego zużycia en. pierwot. w bud. publ. (CI32) - 321 900,00 kWh/rok; Szac. roczny spadek emisji gazów c. (CI34) -76 t/rok. GRUPY DOCELOWE: mieszk. gm. Kr. (Polish)
    0 references
    The scope of the project includes a thermomod. 2 Public utilities (PES Building at ul. Market 12 in Krasnobroz and the ‘ZS Building’ in Krasnobroz Segment A and B at ul. Lelewela 37, Krasnobrozie.) in the municipality of Krasnwzled. SCOPE OF THE PROJECT: — ZS: Replacing a c.o system in segm. A and B, Implementation of the management system. Energy., insulation of floor walls, insulation of basement walls, cooking walls in the basement, replacement of steel doors, replacement of wooden doors, roof works related to the termo building: The Retw. Installation of a from-drop (unkw.) installation, packaging finishing (cost of classification of the plant), photo installation., replacement. Debunter. Eligible costs — net PLN 857 927,00 — PES: Replacement of the heating system (radiators), Grzegorz indoor wd., Wyk. Installers. Energy, insulation, wall, wall, basement of the basement, windows, doors, windows in the cellars, auxiliary works related to the term. Of which: Raw material related to thermal insulation. Fund., Izole. On the face of the walls of the foundation and basement, the work of the walls (best chimneys), installation of lighting. Costs which are not eligible, do not exceed the volume of the security audit and the delivery of the stairs, including, but not limited to: Installation of a gas boiler, gas system, masonry robots (adaptation chimneys). Eligible costs — PLN 241 878,96 net of PROJECT: Increase energy efficiency. 2 public buildings, including Kr.; Amendment to the quality of the sign. The nature of the environment through the implementation of measures to reduce the emissions of heat and to mitigate the effects of climate change; — reduced costs of buildings subjected to thermometers; Improving learning and working conditions. Indicators — Product: Number zmodem. Energinet.dk — 2; Formulation used. 3 482.92 m²; Result: The volume of the valve. Thermal. 895,30 GJ/year; Annual consumption (CI32) — 321 900.00 kWh/year; Estimated. annual decrease in gaseous emissions c. (CI34) -76 t/year. THE TARGET GROUPS: residential Kr. (English)
    0 references

    Identifiers

    RPLU.05.02.00-06-0040/19
    0 references