Support for the use of renewable energy sources in the Roman Catholic St. Stanislaw Biskupa and Martyrs Brigade in the Czech Republic (Q104749): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Changed an Item)
Property / beneficiary
 
Property / beneficiary: Q2521923 / rank
 
Normal rank

Revision as of 12:31, 10 June 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Support for the use of renewable energy sources in the Roman Catholic St. Stanislaw Biskupa and Martyrs Brigade in the Czech Republic
Project in Poland financed by DG Regio

    Statements

    0 references
    380,887.73 zloty
    0 references
    91,413.05519999999 Euro
    13 January 2020
    0 references
    600,297.88 zloty
    0 references
    144,071.4912 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    21 April 2016
    0 references
    15 December 2018
    0 references
    PARAFIA RZYM.KAT. PW. ŚWIĘTEGO STANISŁAWA BISKUPA I MĘCZENNIKA W CZEMIERNIKACH
    0 references
    0 references
    Ideą proj. jest rozwój en. opartej na OZE co jest zgodne z ponadnarodowymi działaniami na rzecz ochrony klimatu. Gr. doc.: miesz. gm./parafianie i turyści. Cel gł.: zwiększone wykorzystanie OZE w gm. Czemierniki do 2017 r. Cele rezultatu: zwiększona zdolność wytwa. en. ze źródeł odn. Spadek emisji gazów ciepl. zwiększona prod. en. elektrycznej z nowo wybudow. inst. wykorzyst. OZE zwiększona prod. en. cieplnej z nowo wybudow. inst. wykorzyst. OZE: Wskaźniki 1. Dodatkowa zdolność wytwarz. en. ze źródeł odn. (CI30): 0,11 MW 2. Szacow. roczny spadek emisji gazów ciepl. (CI34): 38,50 t. ekw. CO2/rok 3. Produkcja en. elekt. z nowo wybudowanych/nowych mocy wytwórczych instalacji wykorz. OZE: 2,27 MWhe/rok 4. Produkcja en. cieplnej z nowo wybudowanych/nowych mocy wytwórczych instalacji wykorz. OZE: 135,82 MWht/rok Cele produktu: zwiększona l. wybud. jedn. wytwarz. en. elektr. z OZE zwiększona l. wybud. jedn. wytwarz. en. cieplnej z OZE Wskaźniki: 1. L. wybud. jedn. wytwarz. en. elektr. z OZE: 1szt. 2. L. wybud. jedn. wytwarz. en. ciepl. z OZE: 7 szt. Produkty: 3jedn. ciepl. (pompy ciepła) o mocach 11 (2szt.) i 9,4 kW (1szt.) w kościele; 3jedn. ciepl. (pompy ciepła) o mocach 7,51, 9,4 i 5,33 kW w Mansjonari; 1jedn. ciepl. (kocioł na biomasę, spalanie 12t pelletu/r.) o mocy 50 kW oraz 1 jedn. elektr. (p. fotowoltaiczne) o mocy DC: 2,08 kWp. Pompy ciepła: solanka-woda, gruntowe, pionowe wymienniki, 16 odwiertów do 100m. Zadania: SW; Dok. tech.; En. geot.: [Rob. bud. - montaż 3jedn. wytwarz. en. cieplnej z OZE (pompy ciepła)] 1x bud. kościoła i 1x Mansjonaria; Rob. bud. - montaż 1jedn. wytwarz. en. cieplnej z biomasy (bud. Parafialny); En. słoneczna: Dostawa i montaż 1jedn. wytwarz. en. elektrycznej (fotowoltaika), Doradztwo prawne w tym przygot. procedur przetarg., Nadzór inż. i Menadżer proj. Inwestycja jest zgodna z Programem ochrony powietrza dla strefy lubelskiej z XI. 2013 r. gdzie wśród działań naprawczych wskazano: ograniczenie emisji z indywid. systemów grzewczych. (Polish)
    0 references
    The idea behind this is the development of an “RES” based on renewable energy, which is in line with supranational climate action. GR. doc.: residential/parifhiation and tourists. Objective: increased use of RES in the course of the Czech measure by 2017. result (s) of the result: enhanced capacity en. from source (s). Reduction in gas emissions of insulated gases. Heat production from the newly built heat base. RES: Indicators 1. Additional capacity of en. from source. (CI30): 0.11 MW 2. Estimated annual decrease of thermal gas emissions. (CI34): 38,50 tonnes in. CO2/rok 3. Electrical production from newly built/new generating capacity of an installation. RES: 2,27 MWhe/4. Production of heat from newly built/new capacity of the installation. RES: 135,82 MWHT/year Objectives of the product: electricity produced from RES. 1. Manufacture of electricity from renewable energy sources: 1szt. 2. L. constructed. 1. from RES: 7 units Products: 3One heating. (heat pumps) with strengths of 11 (2szt.) and 9.4 kW (1s) in a church; 3One heating. (heat pumps) with strengths of 7,51, 9,4 and 5.33 kW at Manjonari; 1One heating. (biomass boiler, combustion of 12 elt/plant) with a power of 50 kW and 1 one. (P. photovoltaic), DC power: 2,08 kWp. Heat pumps: brine-to-water, ground, vertical plane, 16 wells to 100 m. Tasks: SW; Doc. tech.; En. geot.: [budget. Installation of the 3x unit of the Church and 1x Manjonaria. Rob. bud. Installation of 1 biomass heat production (budget). Para-tangible); Solar: Supply and installation of the 1.Electric (photovoltaic) electricity manufacture and equipment, legal advice including procedures for tender procedures. The investment shall be compatible with the air protection programme for Lubelskie of XI. 2013, where the corrective action was identified as follows: emission savings from heating systems. (English)
    0 references

    Identifiers

    RPLU.04.01.00-06-0157/16
    0 references