CONSTRUCTION OF CYCLE PATHS AND PEDESTRIAN ROUTES TO THE WEST LINK CENTRE/SOCIAL AND HEALTH EQUIPMENT TO WALLS (Q2878139): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Import item from Portugal)
(‎Added qualifier: readability score (P590521): 0.0004552682786801)
 
(3 intermediate revisions by 2 users not shown)
Property / beneficiary name (string)
MUNICIPIO DE AGUEDA
 
Property / beneficiary name (string): MUNICIPIO DE AGUEDA / rank
Normal rank
 
Property / summary: Temporal, physical and financial reprogramming, justified by the various time periods granted, the approval of 3 additional work maps, the final balance of the contract and the existence of price revisions of positive value. (English) / qualifier
 
readability score: 0.0004552682786801
Amount0.0004552682786801
Unit1
Property / location (string)
Águeda, União das freguesias de Águeda e Borralha
 
Property / location (string): Águeda, União das freguesias de Águeda e Borralha / rank
Normal rank
 
Property / coordinate location
40°34'41.66"N, 8°24'54.68"W
Latitude40.5782418
Longitude-8.4151922
Precision1.0E-5
Globehttp://www.wikidata.org/entity/Q2
 
Property / coordinate location: 40°34'41.66"N, 8°24'54.68"W / rank
Normal rank
 
Property / contained in NUTS
 
Property / contained in NUTS: Região de Aveiro / rank
Normal rank
 
Property / beneficiary
Q2991135 (Deleted Item)
 
Property / beneficiary: Q2991135 (Deleted Item) / rank
Normal rank
 
Property / contained in Local Administrative Unit
 
Property / contained in Local Administrative Unit: União das freguesias de Águeda e Borralha / rank
 
Normal rank
Property / thematic objective
 
Property / thematic objective: Low-carbon economy / rank
 
Normal rank
Property / location (string)
 
Águeda
Property / location (string): Águeda / rank
 
Normal rank
Property / coordinate location
 
40°34'42.60"N, 8°26'37.68"W
Latitude40.5785006
Longitude-8.4438017
Precision1.0E-5
Globehttp://www.wikidata.org/entity/Q2
Property / coordinate location: 40°34'42.60"N, 8°26'37.68"W / rank
 
Normal rank
Property / coordinate location: 40°34'42.60"N, 8°26'37.68"W / qualifier
 
Property / contained in NUTS
 
Property / contained in NUTS: Região de Aveiro / rank
 
Normal rank
Property / beneficiary
 
Property / beneficiary: MUNICIPIO DE AGUEDA / rank
 
Normal rank
Property / beneficiary name (string)
 
MUNICIPIO DE AGUEDA
Property / beneficiary name (string): MUNICIPIO DE AGUEDA / rank
 
Normal rank
Property / date of last update
 
14 November 2023
Timestamp+2023-11-14T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / date of last update: 14 November 2023 / rank
 
Normal rank

Latest revision as of 11:38, 23 March 2024

Project Q2878139 in Portugal
Language Label Description Also known as
English
CONSTRUCTION OF CYCLE PATHS AND PEDESTRIAN ROUTES TO THE WEST LINK CENTRE/SOCIAL AND HEALTH EQUIPMENT TO WALLS
Project Q2878139 in Portugal

    Statements

    0 references
    349,897.89 Euro
    0 references
    411,644.57 Euro
    0 references
    85.0 percent
    0 references
    23 October 2017
    0 references
    31 October 2019
    0 references
    MUNICIPIO DE AGUEDA
    0 references

    40°34'42.60"N, 8°26'37.68"W
    0 references
    Reprogramação temporal, física e financeira, justificada pelas várias prorrogações de prazo concedidas, pela aprovação de 3 mapas de trabalhos adicionais, pelo saldo final da empreitada e pela existência de revisões de preços de valor positivo. (Portuguese)
    0 references
    Temporal, physical and financial reprogramming, justified by the various time periods granted, the approval of 3 additional work maps, the final balance of the contract and the existence of price revisions of positive value. (English)
    7 July 2021
    0.0004552682786801
    0 references
    Reprogrammation temporelle, physique et financière, justifiée par les différentes prolongations de temps accordées, l’approbation de 3 cartes de travaux supplémentaires, le solde final du marché et l’existence de révisions de prix positives. (French)
    4 December 2021
    0 references
    Zeitliche, physische und finanzielle Neuprogrammierung, gerechtfertigt durch die verschiedenen Fristenverlängerungen, die Genehmigung von drei zusätzlichen Bauplänen, die endgültige Vertragsbilanz und das Vorhandensein positiver Preisanpassungen. (German)
    13 December 2021
    0 references
    Temporele, fysieke en financiële herprogrammering, gerechtvaardigd door de verschillende toegestane tijdsverlengingen, de goedkeuring van 3 extra werkkaarten, het eindsaldo van het contract en het bestaan van positieve prijsherzieningen. (Dutch)
    18 December 2021
    0 references
    Riprogrammazione temporale, fisica e finanziaria, giustificata dalle diverse proroghe dei tempi concessi, dall'approvazione di 3 cartine di opere aggiuntive, dal saldo finale del contratto e dall'esistenza di revisioni positive dei prezzi. (Italian)
    17 January 2022
    0 references
    Reprogramación temporal, física y financiera, justificada por las diversas prórrogas de tiempo concedidas, la aprobación de tres mapas de obras adicionales, el saldo final del contrato y la existencia de revisiones de precios positivas. (Spanish)
    20 January 2022
    0 references
    Ajaline, füüsiline ja rahaline ümberplaneerimine, mida õigustavad erinevad antud ajavahemikud, kolme täiendava töökaardi heakskiitmine, lepingu lõppsaldo ja positiivse väärtusega hinnaparanduste olemasolu. (Estonian)
    29 July 2022
    0 references
    Laikinas, fizinis ir finansinis perprogramavimas, pagrįstas įvairiais nustatytais laikotarpiais, 3 papildomų darbų žemėlapių patvirtinimu, galutiniu sutarties balansu ir teigiamos vertės kainų pataisymais. (Lithuanian)
    29 July 2022
    0 references
    Vremensku, fizičku i financijsku reprogramiranje, opravdano različitim dodijeljenim vremenskim razdobljima, odobrenje triju dodatnih karata rada, konačni saldo ugovora i postojanje promjena cijene pozitivne vrijednosti. (Croatian)
    29 July 2022
    0 references
    Χρονικός, φυσικός και οικονομικός αναπρογραμματισμός, που δικαιολογείται από τις διάφορες παραχωρηθείσες χρονικές περιόδους, την έγκριση 3 πρόσθετων χαρτών εργασίας, την τελική ισορροπία της σύμβασης και την ύπαρξη αναθεωρήσεων τιμών θετικής αξίας. (Greek)
    29 July 2022
    0 references
    Časové, fyzické a finančné preprogramovanie odôvodnené rôznymi poskytnutými lehotami, schválenie troch dodatočných pracovných máp, konečná bilancia zmluvy a existencia cenových revízií kladnej hodnoty. (Slovak)
    29 July 2022
    0 references
    Ajallinen, fyysinen ja taloudellinen uudelleenkohdentaminen, joka on perusteltua eri ajanjaksojen perusteella, kolmen ylimääräisen työkartan hyväksyminen, sopimuksen loppusaldo ja positiivisten hintatarkistusten olemassaolo. (Finnish)
    29 July 2022
    0 references
    Czasowe, fizyczne i finansowe przeprogramowanie, uzasadnione różnymi przyznanymi terminami, zatwierdzeniem 3 dodatkowych map prac, ostateczną równowagą umowy oraz istnieniem korekt cen o wartości dodatniej. (Polish)
    29 July 2022
    0 references
    Időbeli, fizikai és pénzügyi átprogramozás, amelyet a különböző megadott határidők, 3 további munkatérkép jóváhagyása, a szerződés végső egyenlege és a pozitív értékű ármódosítások megléte indokol. (Hungarian)
    29 July 2022
    0 references
    Časové, fyzické a finanční změny odůvodněné různými poskytnutými lhůtami, schválením tří dodatečných pracovních map, konečným zůstatkem smlouvy a existencí revizí cen kladné hodnoty. (Czech)
    29 July 2022
    0 references
    Laika, fiziska un finansiāla pārplānošana, ko pamato dažādie piešķirtie laikposmi, trīs papildu darba karšu apstiprināšana, līguma galīgais saldo un cenu pārskatīšana ar pozitīvu vērtību. (Latvian)
    29 July 2022
    0 references
    Athchlárú ama, fisiceach agus airgeadais, a bhfuil údar leis i ngeall ar na tréimhsí ama éagsúla a dheonaítear, formheas 3 léarscáil oibre bhreise, iarmhéid deiridh an chonartha agus athbhreithnithe praghais ar luach deimhneach a bheith ann. (Irish)
    29 July 2022
    0 references
    Časovno, fizično in finančno reprogramiranje, utemeljeno z različnimi dodeljenimi časovnimi obdobji, odobritev treh dodatnih delovnih zemljevidov, končno stanje pogodbe in obstoj sprememb cen pozitivne vrednosti. (Slovenian)
    29 July 2022
    0 references
    Времево, физическо и финансово препрограмиране, обосновано от различните предоставени срокове, одобрението на 3 допълнителни работни карти, окончателното салдо по договора и наличието на ревизии на цените с положителна стойност. (Bulgarian)
    29 July 2022
    0 references
    Riprogrammazzjoni temporali, fiżika u finanzjarja, ġustifikata mid-diversi perjodi ta’ żmien mogħtija, l-approvazzjoni ta’ 3 mapep ta’ ħidma addizzjonali, il-bilanċ finali tal-kuntratt u l-eżistenza ta’ reviżjonijiet tal-prezzijiet ta’ valur pożittiv. (Maltese)
    29 July 2022
    0 references
    Tidsmæssig, fysisk og finansiel omprogrammering, der er begrundet i de forskellige tildelte frister, godkendelsen af tre supplerende arbejdskort, kontraktens endelige saldo og eksistensen af prisændringer af positiv værdi. (Danish)
    29 July 2022
    0 references
    Reprogramarea temporală, fizică și financiară, justificată de diferitele perioade acordate, aprobarea a 3 hărți de lucru suplimentare, soldul final al contractului și existența unor revizuiri de preț cu valoare pozitivă. (Romanian)
    29 July 2022
    0 references
    Tidsmässig, fysisk och finansiell omfördelning, som motiveras av de olika tidsperioder som beviljats, godkännandet av ytterligare tre arbetskartor, slutsaldot för kontraktet och förekomsten av prisjusteringar av positivt värde. (Swedish)
    29 July 2022
    0 references
    Águeda
    0 references
    14 November 2023
    0 references

    Identifiers

    CENTRO-09-1406-FEDER-000011
    0 references