The Two-Creature Gas pipeline (Q86134): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Added qualifier: readability score (P590521): 0.5807561645152315)
(4 intermediate revisions by 2 users not shown)
Property / end time
30 September 2021
Timestamp+2021-09-30T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
 
Property / end time: 30 September 2021 / rank
Normal rank
 
Property / summary: The subject of the project is the construction of the DN1000 ILO 8.4MPa gas pipeline with a length of 55 km from the Tworóg node (implemented within the framework of the Kędzierzyn – Tworóg project: śląskie voivodship, Tarnogórski county) to the dam-off team of Tworzeń (Silesian Voivodeship, City of Dąbrowa Górnicza) together with infrastructure: 5 firewall systems along the pipeline route, cathode protection devices, communication and control system – fiber optic line, power connections. (English) / qualifier
 
readability score: 0.5807561645152315
Amount0.5807561645152315
Unit1
Property / coordinate location: 50°26'38.8"N, 19°7'26.8"E / qualifier
 
Property / coordinate location: 50°28'15.6"N, 19°13'54.8"E / qualifier
 
Property / coordinate location: 50°22'8.8"N, 19°17'23.6"E / qualifier
 
Property / coordinate location: 50°29'39.5"N, 18°57'51.1"E / qualifier
 
Property / coordinate location: 50°27'50.0"N, 19°2'34.1"E / qualifier
 
Property / coordinate location: 50°27'55.4"N, 18°50'1.0"E / qualifier
 
Property / coordinate location: 50°31'54.8"N, 18°43'7.3"E / qualifier
 
Property / contained in NUTS: Sosnowiecki / qualifier
 
Property / contained in NUTS: Bytomski / qualifier
 
Property / contained in Local Administrative Unit
 
Property / contained in Local Administrative Unit: Dąbrowa Górnicza / rank
 
Normal rank
Property / contained in Local Administrative Unit: Dąbrowa Górnicza / qualifier
 
Property / instance of
 
Property / instance of: Major Projects / rank
 
Normal rank
Property / thematic objective
 
Property / thematic objective: Network infrastructure in transport and energy / rank
 
Normal rank
Property / end time
 
31 December 2021
Timestamp+2021-12-31T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / end time: 31 December 2021 / rank
 
Normal rank
Property / date of last update
 
24 May 2023
Timestamp+2023-05-24T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / date of last update: 24 May 2023 / rank
 
Normal rank
Property / Major project CCI
 
2018PL16RFMP004
Property / Major project CCI: 2018PL16RFMP004 / rank
 
Normal rank

Revision as of 09:05, 23 March 2024

Project Q86134 in Poland
Language Label Description Also known as
English
The Two-Creature Gas pipeline
Project Q86134 in Poland

    Statements

    0 references
    0 references
    0 references
    218,673,195.0 zloty
    0 references
    48,611,051.25 Euro
    13 January 2020
    0 references
    332,357,978.56 zloty
    0 references
    73,883,178.63 Euro
    0 references
    65.79 percent
    0 references
    1 January 2014
    0 references
    31 December 2021
    0 references
    OPERATOR GAZOCIĄGÓW PRZESYŁOWYCH GAZ-SYSTEM S.A.
    0 references
    0 references

    50°26'38.8"N, 19°7'26.8"E
    0 references

    50°28'15.6"N, 19°13'54.8"E
    0 references

    50°22'8.8"N, 19°17'23.6"E
    0 references

    50°29'39.5"N, 18°57'51.1"E
    0 references

    50°27'50.0"N, 19°2'34.1"E
    0 references

    50°27'55.4"N, 18°50'1.0"E
    0 references

    50°31'54.8"N, 18°43'7.3"E
    0 references
    Przedmiotem projektu jest budowa gazociągu DN1000 MOP 8,4MPa o długości 55 km na odcinku od projektowanego węzła Tworóg (realizowanego w ramach projektu Kędzierzyn – Tworóg: województwo śląskie, powiat tarnogórski) do zespołu zaporowo - upustowego Tworzeń (województwo śląskie, miasto Dąbrowa Górnicza) wraz z infrastrukturą: 5 zespołów zaporowo-upustowych na trasie gazociągu, urządzenia ochrony katodowej, system łączności i sterowania – linia światłowodowa, przyłącza energetyczne. (Polish)
    0 references
    The subject of the project is the construction of the DN1000 ILO 8.4MPa gas pipeline with a length of 55 km from the Tworóg node (implemented within the framework of the Kędzierzyn – Tworóg project: śląskie voivodship, Tarnogórski county) to the dam-off team of Tworzeń (Silesian Voivodeship, City of Dąbrowa Górnicza) together with infrastructure: 5 firewall systems along the pipeline route, cathode protection devices, communication and control system – fiber optic line, power connections. (English)
    14 October 2020
    0.5807561645152315
    0 references
    L’objet du projet est la construction du gazoduc DN1000 OIT 8.4MPa d’une longueur de 55 km de la jonction de Tworóg conçue (mise en œuvre dans le cadre du projet Kędzierzyn — Tworóg: Voïvodie de Silésie, district de Tarnogórskie) jusqu’au barrage de Tworzeń et au complexe de remises (Voïvodie silesienne, ville de Dąbrowa Górnicza) ainsi que les infrastructures suivantes: 5 unités d’amortissement le long de la route du pipeline, dispositifs de protection cathodique, système de communication et de contrôle — ligne de fibre optique, connexions d’alimentation. (French)
    30 November 2021
    0 references
    Gegenstand des Projekts ist der Bau der Gaspipeline DN1000 ILO 8.4MPa mit einer Länge von 55 km von der geplanten Anschlussstelle Tworóg (im Rahmen des Projekts Kędzierzyn – Tworóg: Schlesische Woiwodschaft, Bezirk Tarnogórskie) zum Staudamm von Tworzeń und zum Diskontkomplex (Woiwodschaft Schlesien, Stadt Dąbrowa Górnicza) zusammen mit folgender Infrastruktur: 5 Dämpfungseinheiten entlang der Rohrleitung, Kathodenschutzgeräte, Kommunikations- und Steuerungssystem – Glasfaserleitung, Stromanschlüsse. (German)
    7 December 2021
    0 references
    Het onderwerp van het project is de bouw van de DN1000 ILO 8.4MPa gaspijpleiding met een lengte van 55 km van de ontworpen splitsing Tworóg (uitgevoerd als onderdeel van het project Kędzierzyn — Tworóg: Silesian Voivodeship, Tarnogórskie District) naar de Tworzeń dam en discount complex (Silesian Voivodeship, Dąbrowa Górnicza City), samen met de volgende infrastructuur: 5 dempingseenheden langs de pijpleidingroute, kathodebeschermingsapparaten, communicatie- en controlesysteem — vezel optische lijn, machtsverbindingen. (Dutch)
    16 December 2021
    0 references
    Oggetto del progetto è la costruzione del gasdotto DN1000 ILO 8.4MPa con una lunghezza di 55 km dallo svincolo di Tworóg progettato (attuato nell'ambito del progetto Kędzierzyn — Tworóg: Voivodato della Slesia, distretto di Tarnogórskie) alla diga di Tworzeń e al complesso di sconti (vovodato della Slesia, città di Dąbrowa Górnicza) insieme alle seguenti infrastrutture: 5 unità di smorzamento lungo il percorso della conduttura, dispositivi di protezione catodico, sistema di comunicazione e controllo — linea a fibra ottica, collegamenti di alimentazione. (Italian)
    16 January 2022
    0 references
    El objeto del proyecto es la construcción del gasoducto DN1000 ILO 8,4MPa con una longitud de 55 km desde el cruce Tworóg diseñado (implementado como parte del proyecto Kędzierzyn — Tworóg: Voivodato de Silesia, Distrito de Tarnogórskie) a la presa de Tworzeń y complejo de descuentos (Voivodato Silesiano, Ciudad de Dąbrowa Górnicza) junto con las siguientes infraestructuras: 5 unidades de amortiguación a lo largo de la ruta de la tubería, dispositivos de protección de cátodo, sistema de comunicación y control — línea de fibra óptica, conexiones de energía. (Spanish)
    19 January 2022
    0 references
    Emnet for projektet er opførelsen af DN1000 ILO 8.4MPa gasrørledningen med en længde på 55 km fra det designede Tworóg-kryds (gennemført som led i projektet Kędzierzyn — Tworóg: Silesian Voivodeship, Tarnogórskie-distriktet) til Tworzeń-dæmningen og rabatkomplekset (Silesian Voivodeship, Dąbrowa Górnicza City) sammen med følgende infrastruktur: 5 dæmpning enheder langs rørledningen rute, katode beskyttelse enheder, kommunikation og styresystem — fiberoptisk linje, strømforbindelser. (Danish)
    26 July 2022
    0 references
    Αντικείμενο του έργου είναι η κατασκευή του αγωγού αερίου DN1000 ILO 8.4MPa μήκους 55 χλμ. από τη σχεδιαζόμενη διασταύρωση Tworóg (υλοποιείται στο πλαίσιο του έργου Kędzierzyn — Tworóg: Voivodeship της Σιλεσίας, περιφέρεια Tarnogórskie) στο φράγμα Tworzeń και στο συγκρότημα εκπτώσεων (Βοεβοδάτο της Σικελίας, πόλη Dąbrowa Górnicza) μαζί με τις ακόλουθες υποδομές: 5 μονάδες απόσβεσης κατά μήκος της διαδρομής σωληνώσεων, συσκευές προστασίας καθόδων, σύστημα επικοινωνίας και ελέγχου — γραμμή οπτικών ινών, συνδέσεις δύναμης. (Greek)
    26 July 2022
    0 references
    Predmet projekta je izgradnja plinovoda DN1000 ILO 8.4MPa duljine 55 km od projektiranog čvora Tworóg (koji se provodi u okviru projekta Kędzierzyn – Tworóg: Silezijansko vojvodstvo, okrug Tarnogórskie) do brane Tworzeń i kompleksa s popustima (Silezijsko vojvodstvo, grad Dąbrowa Górnicza) zajedno sa sljedećom infrastrukturom: 5 prigušivači duž cjevovoda, katodni uređaji za zaštitu, komunikacijski i upravljački sustav – svjetlovodna linija, strujni priključci. (Croatian)
    26 July 2022
    0 references
    Obiectul proiectului este construirea conductei de gaz DN1000 ILO 8.4MPa, cu o lungime de 55 km de joncțiunea proiectată Tworóg (implementată ca parte a proiectului Kędzierzyn – Tworóg: Voievodatul Silezia, districtul Tarnogórskie) la barajul și complexul de reduceri Tworzeń (Voievodatul Silezia, orașul Dąbrowa Górnicza), împreună cu următoarea infrastructură: 5 unități de amortizare de-a lungul traseului conductei, dispozitive de protecție catodică, sistem de comunicare și control – linie de fibră optică, conexiuni de alimentare. (Romanian)
    26 July 2022
    0 references
    Predmetom projektu je výstavba plynovodu DN1000 ILO 8,4MPa s dĺžkou 55 km od navrhnutého spojenia Tworóg (realizované v rámci projektu Kędzierzyn – Tworóg: Sliezske vojvodstvo, okres Tarnogórskie) k priehrade Tworzeń a diskontnému komplexu (sliezske vojvodstvo, mesto Dąbrowa Górnicza) spolu s touto infraštruktúrou: 5 tlmiacich jednotiek pozdĺž potrubnej trasy, zariadenia na ochranu katód, komunikačný a riadiaci systém – optické vedenie, elektrické pripojenie. (Slovak)
    26 July 2022
    0 references
    Is-suġġett tal-proġett huwa l-kostruzzjoni tal-pipeline tal-gass DN1000 ILO 8.4MPa b’tul ta’ 55 km mill-ġunzjoni mfassla ta’ Tworóg (implimentata bħala parti mill-proġett Kędzierzyn — Tworóg: Silesian Voivodeship, Distrett ta’ Tarnogórskie) għad-diga ta’ Tworzeń u l-kumpless ta’ skont (il-Voivodeship tas-Silesja, il-Belt ta’ Dąbrowa Górnicza) flimkien mal-infrastruttura li ġejja: 5 unitajiet ta ‘damping tul ir-rotta tal-pipeline, apparat ta’ protezzjoni tal-katodu, sistema ta ‘komunikazzjoni u kontroll — linja ottika tal-fibra, konnessjonijiet tal-enerġija. (Maltese)
    26 July 2022
    0 references
    O objeto do projeto é a construção do gasoduto DN1000 OIT 8.4MPa com um comprimento de 55 km da junção de Tworóg projetada (implementada no âmbito do projeto Kędzierzyn — Tworóg: Voivodia da Silésia, distrito de Tarnogórskie) para a barragem de Tworzeń e para o complexo de descontos (voivodia silesiana, cidade de Dąbrowa Górnicza), juntamente com as seguintes infraestruturas: 5 unidades de amortecimento ao longo da rota da tubulação, dispositivos de proteção do cátodo, comunicação e sistema de controle — linha de fibra ótica, conexões de energia. (Portuguese)
    26 July 2022
    0 references
    Hankkeen kohteena on DN1000 ILO 8,4MPa -kaasuputken rakentaminen, jonka pituus on 55 kilometriä suunnitellusta Tworóg-liittymästä (toteutettu osana Kędzierzyn – Tworóg -hanketta: Sleesian voivodikunta, Tarnogórskien piiri) Tworzeńin padolle ja alennuskompleksille (Silesian Voivodeship, Dąbrowa Górniczan kaupunki) yhdessä seuraavan infrastruktuurin kanssa: 5 vaimennusyksikköä pitkin putkilinjaa, katodisuojauslaitteita, viestintä- ja ohjausjärjestelmää – valokuitulinjaa, virtaliitäntöjä. (Finnish)
    26 July 2022
    0 references
    Predmet projekta je gradnja plinovoda DN1000 MOD 8.4MPa z dolžino 55 km od načrtovanega križišča Tworóg (izvedeno v okviru projekta Kędzierzyn – Tworóg: Silesian Voivodeship, Tarnogórskie okrožje) do jezu Tworzeń in diskontnega kompleksa (Silesian Voivodeship, Dąbrowa Górnicza City) skupaj z naslednjo infrastrukturo: 5 dušilnih enot vzdolž cevovodne poti, katodne zaščitne naprave, komunikacijski in kontrolni sistem – optičnih vlaken, napajalne povezave. (Slovenian)
    26 July 2022
    0 references
    Předmětem projektu je výstavba plynovodu DN1000 ILO 8.4MPa o délce 55 km od navrhovaného spojení Tworóg (realizovaného v rámci projektu Kędzierzyn – Tworóg: Slezské vojvodství, okres Tarnogórskie) k přehradě Tworzeń a diskontnímu komplexu (Slezské vojvodství, Dąbrowa Górnicza City) společně s následující infrastrukturou: 5 tlumící jednotky podél trasy potrubí, zařízení na ochranu katod, komunikační a řídicí systém – vláknová optická linka, napájecí připojení. (Czech)
    26 July 2022
    0 references
    Projekto objektas – 55 km ilgio dujotiekio DN1000 ILO 8.4MPa tiesimas (įgyvendintas įgyvendinant Kędzierzyn- Tworóg projektą: Silezijos vaivadija, Tarnogórskie rajonas) iki Tworzeń užtvankos ir nuolaidų komplekso (Silesian Voivodeship, Dąbrowa Górnicza City) kartu su šia infrastruktūra: 5 slopinimo įrenginiai palei vamzdyno maršrutą, katodo apsaugos įtaisai, ryšių ir valdymo sistema – optinio pluošto linija, elektros jungtys. (Lithuanian)
    26 July 2022
    0 references
    Projekta priekšmets ir SDO DN1000 8.4MPa gāzes cauruļvada būvniecība 55 km attālumā no projektētā Tworóg savienojuma (īstenots Kędzierzyn — Tworóg projekta ietvaros: Silēzijas vojevodiste, Tarnogórskie rajons) uz Tworzeń aizsprostu un atlaižu kompleksu (Silēzijas vojevodiste, Dąbrowa Górnicza pilsēta) kopā ar šādu infrastruktūru: 5 slāpēšanas vienības gar cauruļvada maršrutu, katoda aizsardzības ierīces, sakaru un vadības sistēma — optiskās šķiedras līnija, strāvas pieslēgumi. (Latvian)
    26 July 2022
    0 references
    Предмет на проекта е изграждането на газопровода DN1000 ILO 8,4MPa с дължина 55 km от проектирания възел Tworóg (изпълнен като част от проекта Kędzierzyn — Tworóg: Силезийски войводство, област Тарногорско) до язовира Tworzeń и дисконтовия комплекс (Silesian Voivodeship, Dąbrowa Górnicza City) заедно със следната инфраструктура: 5 амортисьори по трасето на тръбопровода, катодни защитни устройства, комуникационна и контролна система — оптична линия, захранващи връзки. (Bulgarian)
    26 July 2022
    0 references
    A projekt tárgya a tervezett Tworóg csomóponttól 55 km hosszú DN1000 ILO 8.4MPa gázvezeték megépítése (amely a Kędzierzyn – Tworóg projekt részeként valósult meg: Sziléziai vajdaság, Tarnogórskie kerület) a Tworzeń-gát és a diszkontkomplexum (Sziléziai vajdaság, Dąbrowa Górnicza város) mellett a következő infrastruktúrával: 5 csillapító egység a csővezeték-útvonal mentén, katódvédelmi eszközök, kommunikációs és vezérlőrendszer – száloptikai vonal, hálózati csatlakozások. (Hungarian)
    26 July 2022
    0 references
    Is é ábhar an tionscadail ná píblíne gáis DN1000 ILO 8.4MPa a thógáil le fad 55 km ó acomhal deartha Tworóg (curtha chun feidhme mar chuid de thionscadal Kędzierzyn — Tworóg: Voivodeship Silesian, Ceantar Tarnogórskie) chuig damba Tworzeń agus chuig an gcoimpléasc lascaine (Voivodeship Silesian, Cathair D°browa Górnicza) mar aon leis an mbonneagar seo a leanas: Aonaid 5 damping feadh an bhealaigh phíblíne, feistí cosanta catóide, córas cumarsáide agus rialaithe — líne snáthoptaice, naisc chumhachta. (Irish)
    26 July 2022
    0 references
    Syftet med projektet är byggandet av gasledningen DN1000 ILO 8.4MPa med en längd på 55 km från den konstruerade Tworóg-korsningen (som genomförs som en del av projektet Kędzierzyn – Tworóg: Schlesiska vojvodskapet, distriktet Tarnogórskie) till dammen i Tworzeń och rabattkomplexet (Silesian Voivodeship, Dąbrowa Górnicza City) tillsammans med följande infrastruktur: 5 dämpningsenheter längs rörledningsvägen, katodskyddsanordningar, kommunikations- och styrsystem – fiberoptisk linje, strömanslutningar. (Swedish)
    26 July 2022
    0 references
    Projekti eesmärk on ehitada DN1000 ILO 8,4MPa gaasijuhe, mille pikkus on 55 km kavandatud Tworógi ristmikust (rakendatakse Kędzierzyni- Tworógi projekti raames: Sileesia vojevoodkond, Tarnogórskie piirkond) Tworzeńi tammi ja soodushinnaga kompleksi (Sileesia vojevoodkond, Dąbrowa Górnicza linn) koos järgmise infrastruktuuriga: 5 summutusüksused piki torujuhtme marsruuti, katoodkaitseseadmed, side- ja juhtimissüsteem – kiudoptiline liin, toiteühendused. (Estonian)
    26 July 2022
    0 references
    WOJ.: ŚLĄSKIE, POW.: Dąbrowa Górnicza
    0 references
    WOJ.: ŚLĄSKIE, POW.: będziński
    0 references
    WOJ.: ŚLĄSKIE, POW.: tarnogórski
    0 references
    24 May 2023
    0 references

    Identifiers

    POIS.07.01.00-00-0016/17
    0 references
    5129
    0 references
    2018PL16RFMP004
    0 references