Property / summary: THE WORKS CONSIST ESSENTIALLY IN THE THERMAL INSULATION OF THE EXTERNAL WALLS AND THE ROOF OF THE ENTIRE SCHOOL BUILDING, IN ADDITION TO THE REPLACEMENT OF THE FIXTURES, AS THE BUILDING DATING BACK TO THE EARLY 70S, BUILT WITH WALLS IN C.A., ROOFING IN BRICK-CONCRETE WITH OVERLAPPING SIMPLE SHEET PANELS, BUILDING SPLINTERED ON MORE? LEVELS, WITH GLAZED WALLS WITH NON-THERMAL-BREAK ALUMINUM WINDOWS AND SIMPLE 4 MM GLASSES, LEADS TO CONSIDERABLE HEAT DISPERSION. THE PRIMARY OBJECTIVE OF THE ENTIRE PROJECT? THE INTERVENTIONS, DIVIDED INTO 1A AND 2A, WILL BE CARRIED OUT SIMULTANEOUSLY DURING THE SUMMER SEASON, SO AS TO TAKE ADVANTAGE OF THE CLOSURE OF THE SCHOOL.INTERVENTO 1: POINT 1A: THERMAL INSULATION OF HORIZONTAL AND VERTICAL STRUCTURES. THE INTERVENTION IS DIVIDED BETWEEN THERMAL INSULATION OF WALLS AND COPERTS (English) / qualifier | |||||||
readability score: 0.1408284376506701
| |||||||
Property / contained in Local Administrative Unit | |||||||
Property / contained in Local Administrative Unit: Sinalunga / rank | |||||||
Normal rank |
Revision as of 16:04, 22 March 2024
Project Q4934426 in Italy
Language | Label | Description | Also known as |
---|---|---|---|
English | (10360.14072017.115000108) ENERGY EFFICIENCY SCHOOL IN VIA VASARI |
Project Q4934426 in Italy |
Statements
296,461.88 Euro
0 references
900,000.0 Euro
0 references
32.94 percent
0 references
7 March 2018
0 references
3 July 2021
0 references
COMUNE DI SINALUNGA
0 references
I LAVORI CONSISTONO ESSENZIALMENTE NELL'ISOLAMENTO TERMICO DELLE PARETI ESTERNE E DELLE COPERTURA DELL'INTERO EDIFICIO SCOLASTICO, OLTRE ALLA SOSTITUZIONE DEGLI INFISSI, IN QUANTO ESSENDO L'EDIFICIO RISALENTE AI PRIMI ANNI 70, COSTRUITO CON PARETI IN C.A., SOLAIO DI COPERTURA IN LATERO-CEMENTO CON SOVRAPPOSTI PANNELLI SEMPLICI IN LAMIERA, EDIFICIO SFALZATO SU PI? LIVELLI, CON PARETI FINESTRATE CON INFISSI IN ALLUMINIO NON A TAGLIO TERMICO E VETRI SEMPLICI DA 4 MM., COMPORTA UNA NOTEVOLE DISPERSIONE DI CALORE. L?OBBIETTIVO PRIMARIO DELL?INTERO PROGETTO ? QUINDI QUELLO DI RIDURRE LE EMISSIONI DI CO2 CON LA RIDUZIONE DELLE DISPERSIONI DI CALORE ATTRAVERSO I COMPONENTI OPACHI E TRASPARENTI.GLI INTERVENTI, SUDDIVISI IN 1A E 2A, SARANNO ESEGUITI IN CONTEMPORANEA DURANTE LA STAGIONE ESTIVA, IN MODO DA SFRUTTARE LA CHIUSURA DELLA SCUOLA.INTERVENTO 1: PUNTO 1A: ISOLAMENTO TERMICO DI STRUTTURE ORIZZONTALI E VERTICALI. L?INTERVENTO SI DIVIDE TRA ISOLAMENTO TERMICO DELLE PARETI E DELLE COPERT (Italian)
0 references
РАБОТИТЕ СЕ СЪСТОЯТ ОСНОВНО В ТОПЛОИЗОЛАЦИЯТА НА ВЪНШНИТЕ СТЕНИ И ПОКРИВА НА ЦЯЛАТА УЧИЛИЩНА СГРАДА, В ДОПЪЛНЕНИЕ КЪМ ПОДМЯНАТА НА ОСВЕТИТЕЛНИТЕ ТЕЛА, КАТО СГРАДАТА, ДАТИРАЩА ОТ НАЧАЛОТО НА 70 Г., ПОСТРОЕНА СЪС СТЕНИ В АА, ПОКРИВ В ТУХЛЕНА БЕТОН С ПРИПОКРИВАЩИ СЕ ПРОСТИ ЛИСТОВИ ПАНЕЛИ, СГРАДА, РАЗДРОБЕНА НА ПОВЕЧЕ? НИВАТА, С ОСТЪКЛЕНИ СТЕНИ С АЛУМИНИЕВИ ПРОЗОРЦИ И ПРОСТИ 4 ММ СТЪКЛА, ВОДЯТ ДО ЗНАЧИТЕЛНО РАЗСЕЙВАНЕ НА ТОПЛИНАТА. ОСНОВНАТА ЦЕЛ НА ЦЕЛИЯ ПРОЕКТ? ИНТЕРВЕНЦИИТЕ, РАЗДЕЛЕНИ НА 1А И 2А, ЩЕ СЕ ИЗВЪРШВАТ ЕДНОВРЕМЕННО ПРЕЗ ЛЕТНИЯ СЕЗОН, ЗА ДА СЕ ВЪЗПОЛЗВАТ ОТ ЗАКРИВАНЕТО НА УЧИЛИЩЕТО.ИНТЕРВЕНТО 1: ТОЧКА 1А: ТОПЛОИЗОЛАЦИЯ НА ХОРИЗОНТАЛНИ И ВЕРТИКАЛНИ КОНСТРУКЦИИ. ИНТЕРВЕНЦИЯТА Е РАЗДЕЛЕНА МЕЖДУ ТОПЛОИЗОЛАЦИЯ НА СТЕНИ И КОПЕРТИ (Bulgarian)
0 references
PRÁCE SE SKLÁDAJÍ V PODSTATĚ V TEPELNÉ IZOLACI VNĚJŠÍCH STĚN A STŘECHY CELÉ ŠKOLNÍ BUDOVY, KROMĚ VÝMĚNY SVÍTIDEL, JAKO BUDOVA Z POČÁTKU 70S, POSTAVENÁ SE STĚNAMI V C.A., ZASTŘEŠENÍ V CIHLOVÉM BETONU S PŘEKRÝVAJÍCÍMI SE JEDNODUCHÝMI PLECHOVÝMI PANELY, BUDOVA TŘÍSKANÁ NA VÍCE? ÚROVNĚ S PROSKLENÝMI STĚNAMI S NETEPELNÝMI HLINÍKOVÝMI OKNY A JEDNODUCHÝMI 4 MM SKLENICEMI VEDE KE ZNAČNÉMU ROZPTYLU TEPLA. HLAVNÍ CÍL CELÉHO PROJEKTU? INTERVENCE, ROZDĚLENÉ NA 1A A 2A, BUDOU PROVÁDĚNY SOUČASNĚ BĚHEM LETNÍ SEZÓNY, ABY BYLO MOŽNÉ VYUŽÍT UZAVŘENÍ SCHOOL.INTERVENTO 1: BOD 1A: TEPELNÁ IZOLACE HORIZONTÁLNÍCH A VERTIKÁLNÍCH KONSTRUKCÍ. INTERVENCE JE ROZDĚLENA NA TEPELNOU IZOLACI STĚN A KORZETŮ (Czech)
0 references
ARBEJDERNE BESTÅR HOVEDSAGELIG I VARMEISOLERING AF YDERVÆGGENE OG TAGET AF HELE SKOLEBYGNINGEN, UD OVER UDSKIFTNING AF ARMATURER, SOM BYGNINGEN GÅR TILBAGE TIL BEGYNDELSEN AF 70S, BYGGET MED VÆGGE I C.A., TAGDÆKNING I MURSTEN-BETON MED OVERLAPPENDE ENKLE PLADEPANELER, BYGNING SPLINTRET PÅ MERE? NIVEAUER, MED GLASEREDE VÆGGE MED IKKE-TERMISK BRUD ALUMINIUM WINDOWS OG ENKLE 4 MM BRILLER, FØRER TIL BETYDELIG VARMESPREDNING. HOVEDFORMÅLET MED HELE PROJEKTET? INTERVENTIONERNE, OPDELT I 1A OG 2A, VIL BLIVE GENNEMFØRT SAMTIDIGT I SOMMERSÆSONEN FOR AT DRAGE FORDEL AF LUKNINGEN AF SCHOOL.INTERVENTO 1: PUNKT 1A: TERMISK ISOLERING AF HORISONTALE OG VERTIKALE STRUKTURER. INTERVENTIONEN ER DELT MELLEM VARMEISOLERING AF VÆGGE OG VANDHANER (Danish)
0 references
DIE ARBEITEN BESTEHEN IM WESENTLICHEN IN DER WÄRMEDÄMMUNG DER AUSSENWÄNDE UND DES DACHES DES GESAMTEN SCHULGEBÄUDES, NEBEN DEM ERSATZ DER VORRICHTUNGEN, WIE DAS GEBÄUDE AUS DEM FRÜHEN 70S, GEBAUT MIT WÄNDEN IN C.A., ÜBERDACHUNG IN ZIEGELBETON MIT ÜBERLAPPENDEN EINFACHEN BLECHPLATTEN, GEBÄUDE ZERSPLITTERT AUF MEHR? EBENEN, MIT VERGLASTEN WÄNDEN MIT NICHT-THERMISCH-BRECHENDEN ALUMINIUMFENSTERN UND EINFACHEN 4 MM GLÄSERN, FÜHREN ZU EINER ERHEBLICHEN WÄRMESTREUUNG. DAS HAUPTZIEL DES GESAMTEN PROJEKTS? DIE IN 1A UND 2A UNTERTEILTEN INTERVENTIONEN WERDEN WÄHREND DER SOMMERSAISON GLEICHZEITIG DURCHGEFÜHRT, UM DIE SCHLIESSUNG DES SCHOOL.INTERVENTO 1: PUNKT 1A: WÄRMEDÄMMUNG VON HORIZONTALEN UND VERTIKALEN STRUKTUREN. DER EINGRIFF IST UNTERTEILT ZWISCHEN WÄRMEDÄMMUNG VON WÄNDEN UND COPERRTS (German)
0 references
ΤΑ ΈΡΓΑ ΑΠΟΤΕΛΟΎΝΤΑΙ ΚΥΡΊΩΣ ΑΠΌ ΤΗ ΘΕΡΜΟΜΌΝΩΣΗ ΤΩΝ ΕΞΩΤΕΡΙΚΏΝ ΤΟΊΧΩΝ ΚΑΙ ΤΗΣ ΟΡΟΦΉΣ ΟΛΌΚΛΗΡΟΥ ΤΟΥ ΣΧΟΛΙΚΟΎ ΚΤΙΡΊΟΥ, ΕΚΤΌΣ ΑΠΌ ΤΗΝ ΑΝΤΙΚΑΤΆΣΤΑΣΗ ΤΩΝ ΚΟΙΤΑΣΜΆΤΩΝ, ΌΠΩΣ ΤΟ ΚΤΊΡΙΟ ΠΟΥ ΧΡΟΝΟΛΟΓΕΊΤΑΙ ΑΠΌ ΤΙΣ ΑΡΧΈΣ ΤΗΣ ΔΕΚΑΕΤΊΑΣ ΤΟΥ 70, ΧΤΙΣΜΈΝΟ ΜΕ ΤΟΊΧΟΥΣ ΣΤΟ Κ.Α., ΣΤΈΓΕΣ ΑΠΌ ΤΟΎΒΛΟ- ΣΚΥΡΌΔΕΜΑ ΜΕ ΕΠΙΚΑΛΥΠΤΌΜΕΝΑ ΑΠΛΆ ΦΎΛΛΑ, ΚΤΊΡΙΟ ΔΙΑΣΠΑΣΜΈΝΟ ΠΆΝΩ; ΕΠΊΠΕΔΑ, ΜΕ ΥΑΛΟΠΊΝΑΚΕΣ ΜΕ ΑΛΟΥΜΙΝΈΝΙΑ ΠΑΡΆΘΥΡΑ ΧΩΡΊΣ ΘΕΡΜΙΚΌ ΣΠΆΣΙΜΟ ΚΑΙ ΑΠΛΆ ΓΥΑΛΙΆ 4 MM, ΟΔΗΓΟΎΝ ΣΕ ΣΗΜΑΝΤΙΚΉ ΔΙΑΣΠΟΡΆ ΘΕΡΜΌΤΗΤΑΣ. Ο ΠΡΩΤΑΡΧΙΚΌΣ ΣΤΌΧΟΣ ΟΛΌΚΛΗΡΟΥ ΤΟΥ ΈΡΓΟΥ; ΟΙ ΠΑΡΕΜΒΆΣΕΙΣ, ΧΩΡΙΣΜΈΝΕΣ ΣΕ 1Α ΚΑΙ 2Α, ΘΑ ΠΡΑΓΜΑΤΟΠΟΙΗΘΟΎΝ ΤΑΥΤΌΧΡΟΝΑ ΚΑΤΆ ΤΗ ΘΕΡΙΝΉ ΠΕΡΊΟΔΟ, ΏΣΤΕ ΝΑ ΕΠΩΦΕΛΗΘΟΎΝ ΑΠΌ ΤΟ ΚΛΕΊΣΙΜΟ ΤΟΥ SCHOOL.INTERVENTO 1: ΣΗΜΕΊΟ 1Α: ΘΕΡΜΟΜΌΝΩΣΗ ΟΡΙΖΌΝΤΙΩΝ ΚΑΙ ΚΑΤΑΚΌΡΥΦΩΝ ΔΟΜΏΝ. Η ΠΑΡΈΜΒΑΣΗ ΧΩΡΊΖΕΤΑΙ ΣΕ ΘΕΡΜΟΜΌΝΩΣΗ ΤΟΊΧΩΝ ΚΑΙ ΕΡΠΕΤΏΝ (Greek)
0 references
THE WORKS CONSIST ESSENTIALLY IN THE THERMAL INSULATION OF THE EXTERNAL WALLS AND THE ROOF OF THE ENTIRE SCHOOL BUILDING, IN ADDITION TO THE REPLACEMENT OF THE FIXTURES, AS THE BUILDING DATING BACK TO THE EARLY 70S, BUILT WITH WALLS IN C.A., ROOFING IN BRICK-CONCRETE WITH OVERLAPPING SIMPLE SHEET PANELS, BUILDING SPLINTERED ON MORE? LEVELS, WITH GLAZED WALLS WITH NON-THERMAL-BREAK ALUMINUM WINDOWS AND SIMPLE 4 MM GLASSES, LEADS TO CONSIDERABLE HEAT DISPERSION. THE PRIMARY OBJECTIVE OF THE ENTIRE PROJECT? THE INTERVENTIONS, DIVIDED INTO 1A AND 2A, WILL BE CARRIED OUT SIMULTANEOUSLY DURING THE SUMMER SEASON, SO AS TO TAKE ADVANTAGE OF THE CLOSURE OF THE SCHOOL.INTERVENTO 1: POINT 1A: THERMAL INSULATION OF HORIZONTAL AND VERTICAL STRUCTURES. THE INTERVENTION IS DIVIDED BETWEEN THERMAL INSULATION OF WALLS AND COPERTS (English)
0.1408284376506701
0 references
LAS OBRAS CONSISTEN ESENCIALMENTE EN EL AISLAMIENTO TÉRMICO DE LAS PAREDES EXTERIORES Y EL TECHO DE TODO EL EDIFICIO ESCOLAR, ADEMÁS DE LA SUSTITUCIÓN DE LOS ACCESORIOS, YA QUE EL EDIFICIO QUE DATA DE PRINCIPIOS DE LOS 70S, CONSTRUIDO CON PAREDES EN C.A., TECHADO EN LADRILLO-CONCRETO CON PANELES DE CHAPA SIMPLES SUPERPUESTOS, EDIFICIO ASTILLADO EN MÁS? LOS NIVELES, CON PAREDES ACRISTALADAS CON VENTANAS DE ALUMINIO NO TÉRMICAS Y VIDRIOS SIMPLES DE 4 MM, CONDUCEN A UNA CONSIDERABLE DISPERSIÓN DE CALOR. ¿EL OBJETIVO PRINCIPAL DE TODO EL PROYECTO? LAS INTERVENCIONES, DIVIDIDAS EN 1A Y 2A, SE LLEVARÁN A CABO SIMULTÁNEAMENTE DURANTE LA TEMPORADA DE VERANO, CON EL FIN DE APROVECHAR EL CIERRE DEL SCHOOL.INTERVENTO 1: PUNTO 1A: AISLAMIENTO TÉRMICO DE ESTRUCTURAS HORIZONTALES Y VERTICALES. LA INTERVENCIÓN SE DIVIDE ENTRE AISLAMIENTO TÉRMICO DE PAREDES Y COPERTS (Spanish)
0 references
TÖÖD KOOSNEVAD PEAMISELT VÄLISSEINTE SOOJUSISOLATSIOONIST JA KOGU KOOLIHOONE KATUSEST, LISAKS SEADMETE ASENDAMISELE, NAGU 70S-I ALGUSENI PÄRINEV HOONE, MIS ON EHITATUD C.A. SEINTEGA, KATUS TELLISBETOONIS KOOS KATTUVATE LIHTSATE LEHTPANEELIDEGA, HOONE LAGUNDATUD ROHKEM? TASEMED, MILLEL ON KLAASITUD SEINAD, MILLEL ON MITTETERMILINE PURUNEV ALUMIINIUMIST AKNAD JA LIHTSAD 4 MM KLAASID, VIIB MÄRKIMISVÄÄRSE SOOJUSE DISPERSIOONINI. KOGU PROJEKTI PÕHIEESMÄRK? SEKKUMISED, MIS JAGUNEVAD 1A JA 2A VAHEL, VIIAKSE LÄBI ÜHEAEGSELT SUVEHOOAJAL, ET KASUTADA ÄRA SCHOOL.INTERVENTO 1: PUNKT 1A: HORISONTAALSETE JA VERTIKAALSETE STRUKTUURIDE SOOJUSISOLATSIOON. SEKKUMINE ON JAGATUD SEINTE SOOJUSISOLATSIOONI JA MANÖÖVRITE VAHEL (Estonian)
0 references
TYÖT KOOSTUVAT PÄÄASIASSA ULKOSEINIEN LÄMPÖERISTYKSESTÄ JA KOKO KOULURAKENNUKSEN KATOSTA, SEN LISÄKSI, ETTÄ KALUSTEET KORVATAAN 70-LUVUN ALUSSA, RAKENNUS ON RAKENNETTU C.A.: N SEINILLÄ, KATTO TIILI-BETONI PÄÄLLEKKÄISTEN YKSINKERTAISTEN LEVYJEN KANSSA, RAKENNUS SIROTELTU ENEMMÄN? TASOT, JOISSA ON LASITETUT SEINÄT, JOISSA EI-LÄMPÖÄ RIKKOUTUVA ALUMIINI WINDOWS JA YKSINKERTAISET 4 MM LASIT, JOHTAVAT HUOMATTAVAAN LÄMMÖN HAJAANTUMISEEN. KOKO HANKKEEN ENSISIJAINEN TAVOITE? INTERVENTIOT, JOTKA ON JAETTU 1A JA 2A: IIN, TOTEUTETAAN SAMANAIKAISESTI KESÄKAUDELLA, JOTTA VOIDAAN HYÖDYNTÄÄ SCHOOL.INTERVENTO 1:N SULKEMISTA: 1A KOHTA: HORISONTAALISTEN JA PYSTYSUUNTAISTEN RAKENTEIDEN LÄMPÖERISTYS. INTERVENTIO ON JAETTU SEINIEN JA SELVIYTYJIEN LÄMPÖERISTYKSEEN (Finnish)
0 references
LES TRAVAUX CONSISTENT ESSENTIELLEMENT DANS L’ISOLATION THERMIQUE DES MURS EXTÉRIEURS ET DU TOIT DE L’ENSEMBLE DU BÂTIMENT DE L’ÉCOLE, EN PLUS DU REMPLACEMENT DES LUMINAIRES, COMME LE BÂTIMENT DATANT DU DÉBUT DES ANNÉES 70, CONSTRUIT AVEC DES MURS EN C.A., TOITURE EN BÉTON DE BRIQUES AVEC DES PANNEAUX DE TÔLES SIMPLES QUI SE CHEVAUCHENT, BÂTIMENT ÉCLATÉ SUR PLUS? LES NIVEAUX, AVEC DES PAROIS VITRÉES AVEC DES FENÊTRES EN ALUMINIUM NON THERMIQUES ET DES VERRES SIMPLES DE 4 MM, CONDUISENT À UNE DISPERSION CONSIDÉRABLE DE LA CHALEUR. L’OBJECTIF PRINCIPAL DE L’ENSEMBLE DU PROJET? LES INTERVENTIONS, DIVISÉES EN 1A ET 2A, SERONT RÉALISÉES SIMULTANÉMENT PENDANT LA SAISON ESTIVALE, AFIN DE PROFITER DE LA FERMETURE DE LA SCHOOL.INTERVENTO 1: POINT 1A: ISOLATION THERMIQUE DES STRUCTURES HORIZONTALES ET VERTICALES. L’INTERVENTION EST DIVISÉE ENTRE ISOLATION THERMIQUE DES MURS ET COPERTS (French)
0 references
IS ÉARD ATÁ SNA HOIBREACHA GO BUNÚSACH NÁ INSLIÚ TEIRMEACH NA MBALLAÍ SEACHTRACHA AGUS DÍON FHOIRGNEAMH IOMLÁN NA SCOILE, CHOMH MAITH LEIS NA DAINGNEÁIN A ATHSHOLÁTHAR, MAR AN FOIRGNEAMH A THÉANN SIAR GO DTÍ AN 70S LUATH, TÓGTHA LE BALLAÍ I C.A., DÍON I GCOINCRÉITE BRÍCE LE FORLUÍ PAINÉIL BILEOGA SIMPLÍ, FOIRGNEAMH SPLINTERED AR NÍOS MÓ? MAR THORADH AR LEIBHÉIL, LE BALLAÍ GLOINITHE LE WINDOWS ALÚMANAM NEAMH-THEIRMEACH AGUS SPÉACLAÍ SIMPLÍ 4 MM, SCAIPEADH TEASA SUNTASACH. PRÍOMHCHUSPÓIR AN TIONSCADAIL AR FAD? DÉANFAR NA HIDIRGHABHÁLACHA, ROINNTE INA 1A AGUS 2A, A CHUR I GCRÍCH GO COMHUAINEACH LE LINN SHÉASÚR AN TSAMHRAIDH, CHUN LEAS A BHAINT AS DÚNADH SCHOOL.INTERVENTO 1: POINTE 1A: INSLIÚ TEIRMEACH AR STRUCHTÚIR CHOTHROMÁNACHA AGUS INGEARACHA. TÁ AN IDIRGHABHÁIL ROINNTE IDIR INSLIÚ TEIRMEACH BALLAÍ AGUS COPERTS (Irish)
0 references
RADOVI SE SASTOJE U SUŠTINI U TOPLINSKOJ IZOLACIJI VANJSKIH ZIDOVA I KROVA CIJELE ŠKOLSKE ZGRADE, OSIM ZAMJENE ČVORA, KAO ŠTO JE ZGRADA KOJA DATIRA IZ RANIH 70S, IZGRAĐENA SA ZIDOVIMA U C.A., KROVIŠTE U CIGLE-BETONU S PREKLAPANJEM JEDNOSTAVNIH PLOČA, ZGRADA RAZDIJELJENA NA VIŠE? RAZINE, SA OSTAKLJENIM ZIDOVIMA S NETERMINSKIM ALUMINIJSKIM PROZORIMA I JEDNOSTAVNIM 4 MM ČAŠAMA, DOVODE DO ZNATNE DISPERZIJE TOPLINE. GLAVNI CILJ CIJELOG PROJEKTA? INTERVENCIJE, PODIJELJENE U 1A I 2A, PROVODIT ĆE SE ISTODOBNO TIJEKOM LJETNE SEZONE, KAKO BI SE ISKORISTILO ZATVARANJE SCHOOL.INTERVENTO 1: TOČKA 1.A: TOPLINSKA IZOLACIJA HORIZONTALNIH I VERTIKALNIH KONSTRUKCIJA. INTERVENCIJA JE PODIJELJENA NA TOPLINSKU IZOLACIJU ZIDOVA I KOPLJE (Croatian)
0 references
A MUNKÁLATOK LÉNYEGÉBEN A KÜLSŐ FALAK ÉS AZ EGÉSZ ISKOLAÉPÜLET TETEJE HŐSZIGETELÉSÉBŐL ÁLLNAK, A SZERELVÉNYEK CSERÉJÉN KÍVÜL, MIVEL A 70S ELEJÉRE NYÚLÓ ÉPÜLET, C.A. FALAKKAL ÉPÜLT, TÉGLABETON TETŐFEDŐ, ÁTFEDŐ EGYSZERŰ LEMEZPANELEKKEL, ÉPÜLET DARABOKRA TÖRVE? A NEM TERMIKUS ALUMÍNIUM ABLAKOKKAL ELLÁTOTT ÜVEGEZETT FALAK ÉS AZ EGYSZERŰ 4 MM-ES SZEMÜVEGEK JELENTŐS HŐELOSZLÁST EREDMÉNYEZNEK. AZ EGÉSZ PROJEKT ELSŐDLEGES CÉLJA? AZ 1A-RA ÉS 2A-RA OSZTOTT BEAVATKOZÁSOKAT A NYÁRI SZEZONBAN EGYIDEJŰLEG HAJTJÁK VÉGRE, HOGY KIHASZNÁLJÁK A SCHOOL.INTERVENTO 1 BEZÁRÁSÁT: 1A. PONT: VÍZSZINTES ÉS FÜGGŐLEGES SZERKEZETEK HŐSZIGETELÉSE. A BEAVATKOZÁS A FALAK ÉS A KOPERTEK HŐSZIGETELÉSE KÖZÖTT OSZLIK MEG. (Hungarian)
0 references
DARBAI IŠ ESMĖS SUSIDEDA IŠ IŠORINIŲ SIENŲ IR VISO MOKYKLOS PASTATO STOGO ŠILUMINĖS IZOLIACIJOS, BE ĮRANGOS PAKEITIMO, NES PASTATAS DATUOJAMAS 70S PRADŽIOJE, PASTATYTAS SU SIENOMIS C.A., STOGAS PLYTŲ BETONO SU PERSIDENGIANČIOMIS PAPRASTOMIS LAKŠTINĖMIS PLOKŠTĖMIS, PASTATAS SU DAUGIAU? LYGIAI, SU GLAZŪRUOTOMIS SIENOMIS SU NE TERMINIU PERTRAUKIMU ALIUMINIO LANGAIS IR PAPRASTAIS 4 MM AKINIAIS, SUKELIA DIDELĘ ŠILUMOS DISPERSIJĄ. PAGRINDINIS VISO PROJEKTO TIKSLAS? INTERVENCIJOS, SUSKIRSTYTOS Į 1A IR 2A, BUS VYKDOMOS VIENU METU VASAROS SEZONO METU, SIEKIANT PASINAUDOTI SCHOOL.INTERVENTO 1 UŽDARYMU: 1A PUNKTAS: ŠILUMOS IZOLIACIJA HORIZONTALIŲ IR VERTIKALIŲ KONSTRUKCIJŲ. INTERVENCIJA YRA PADALINTA TARP SIENŲ IR KOPĖČIŲ ŠILUMOS IZOLIACIJOS (Lithuanian)
0 references
DARBI SASTĀV GALVENOKĀRT NO ĀRSIENU SILTUMIZOLĀCIJAS UN VISAS SKOLAS ĒKAS JUMTA, PAPILDUS ĶERMEŅU NOMAIŅAI, JO ĒKA, KAS CELTA 70. GADU SĀKUMĀ, CELTA AR SIENĀM C.A., JUMTS ĶIEĢEĻU-BETONA AR PĀRKLĀJOŠIEM VIENKĀRŠIEM LOKŠŅU PANEĻIEM, ĒKA SAŠĶELTA VAIRĀK? LĪMEŅI, AR STIKLOTĀM SIENĀM AR BEZTERMIŅA ALUMĪNIJA LOGIEM UN VIENKĀRŠĀM 4 MM GLĀZĒM, RADA IEVĒROJAMU SILTUMA IZKLIEDI. VISA PROJEKTA GALVENAIS MĒRĶIS? INTERVENCES, KAS SADALĪTAS 1A UN 2A, TIKS VEIKTAS VIENLAIKUS VASARAS SEZONĀ, LAI IZMANTOTU SCHOOL.INTERVENTO 1 SLĒGŠANAS PRIEKŠROCĪBAS: 1.A PUNKTS: HORIZONTĀLO UN VERTIKĀLO KONSTRUKCIJU SILTUMIZOLĀCIJA. INTERVENCE IR SADALĪTA STARP SIENU SILTUMIZOLĀCIJU UN KVADRICIKLIEM (Latvian)
0 references
IX-XOGĦLIJIET JIKKONSISTU ESSENZJALMENT FL-IŻOLAMENT TERMALI TAL-ĦITAN ESTERNI U S-SAQAF TAL-BINI KOLLU TAL-ISKOLA, MINBARRA S-SOSTITUZZJONI TAL-MUNTAĠĠI, HEKK KIF IL-BINI JMUR LURA GĦALL-BIDU 70S, MIBNI B’ĦITAN F’C.A., TISQIF FIL-KONKRET TAL-BRIKS B’PANNELLI TAL-FOLJI SEMPLIĊI LI JIKKOINĊIDU, BINI MIFRUX FUQ AKTAR? LIVELLI, BIL-ĦITAN IGGLEJŻJAT MA MHUX TERMALI-KSUR ALUMINJU WINDOWS U SEMPLIĊI 4 MM NUĊĊALIJIET, TWASSAL GĦAL DISPERSJONI TAS-SĦANA KONSIDEREVOLI. L-OBJETTIV PRIMARJU TAL-PROĠETT KOLLU? L-INTERVENTI, MAQSUMA F’1A U 2A, SE JITWETTQU SIMULTANJAMENT MATUL L-ISTAĠUN TAS-SAJF, SABIEX JITTIEĦED VANTAĠĠ MILL-GĦELUQ TAL-SCOOL.INTERVENTO 1: PUNT 1A: IŻOLAMENT TERMALI TA’ STRUTTURI ORIZZONTALI U VERTIKALI. L-INTERVENT HUWA MAQSUM BEJN L-INSULAZZJONI TERMALI TAL-ĦITAN U L-KOPERTI (Maltese)
0 references
DE WERKEN BESTAAN IN WEZEN IN DE THERMISCHE ISOLATIE VAN DE BUITENMUREN EN HET DAK VAN HET HELE SCHOOLGEBOUW, IN AANVULLING OP DE VERVANGING VAN DE ARMATUREN, ALS HET GEBOUW DATEERT UIT DE VROEGE JAREN 70, GEBOUWD MET MUREN IN C.A., DAKBEDEKKING IN BAKSTEEN-BETON MET OVERLAPPENDE EENVOUDIGE PLAATPANELEN, GEBOUW VERSPLINTERD OP MEER? NIVEAUS, MET GEGLAZUURDE WANDEN MET NIET-THERMISCH-BREEK ALUMINIUM RAMEN EN EENVOUDIGE 4 MM GLAZEN, LEIDT TOT AANZIENLIJKE WARMTEDISPERSIE. HET HOOFDDOEL VAN HET HELE PROJECT? DE INTERVENTIES, VERDEELD IN 1A EN 2A, ZULLEN TIJDENS HET ZOMERSEIZOEN GELIJKTIJDIG WORDEN UITGEVOERD OM TE PROFITEREN VAN DE SLUITING VAN DE SCHOOL.INTERVENTO 1: PUNT 1A: THERMISCHE ISOLATIE VAN HORIZONTALE EN VERTICALE STRUCTUREN. DE INTERVENTIE IS VERDEELD TUSSEN THERMISCHE ISOLATIE VAN MUREN EN COPERTS (Dutch)
0 references
AS OBRAS CONSISTEM ESSENCIALMENTE NO ISOLAMENTO TÉRMICO DAS PAREDES EXTERNAS E DO TELHADO DE TODO O EDIFÍCIO DA ESCOLA, ALÉM DA SUBSTITUIÇÃO DOS EQUIPAMENTOS, COMO O EDIFÍCIO QUE REMONTA AO INÍCIO DOS ANOS 70S, CONSTRUÍDO COM PAREDES EM C.A., TELHADOS EM TIJOLO-CONCRETO COM SOBREPOSIÇÃO DE PAINÉIS DE CHAPA SIMPLES, EDIFÍCIO FRAGMENTADO EM MAIS? NÍVEIS, COM PAREDES VITRIFICADAS COM JANELAS DE ALUMÍNIO NÃO-QUEBRA TÉRMICA E VIDROS SIMPLES DE 4 MM, LEVAM A UMA DISPERSÃO DE CALOR CONSIDERÁVEL. O OBJETIVO PRINCIPAL DE TODO O PROJETO? AS INTERVENÇÕES, DIVIDIDAS EM 1A E 2A, SERÃO REALIZADAS SIMULTANEAMENTE DURANTE A ÉPOCA DE VERÃO, DE MODO A APROVEITAR O ENCERRAMENTO DO SCHOOL.INTERVENTO 1: PONTO 1A: ISOLAMENTO TÉRMICO DE ESTRUTURAS HORIZONTAIS E VERTICAIS. A INTERVENÇÃO É DIVIDIDA ENTRE ISOLAMENTO TÉRMICO DE PAREDES E COPERTS (Portuguese)
0 references
LUCRĂRILE CONSTAU ÎN ESENȚĂ ÎN IZOLAREA TERMICĂ A PEREȚILOR EXTERIORI ȘI A ACOPERIȘULUI ÎNTREGII CLĂDIRI ȘCOLARE, ÎN PLUS FAȚĂ DE ÎNLOCUIREA CORPURILOR DE ILUMINAT, CA CLĂDIRE DATÂND DE LA ÎNCEPUTUL ANILOR 70S, CONSTRUITĂ CU PEREȚI ÎN C.A., ACOPERIȘURI ÎN BETON DE CĂRĂMIDĂ CU PANOURI SIMPLE SUPRAPUSE, CLĂDIRE RUPTĂ PE MAI MULTE? NIVELELE, CU PEREȚI VITRATE CU FERESTRE DIN ALUMINIU FĂRĂ RUPERE TERMICĂ ȘI OCHELARI SIMPLI DE 4 MM, DUC LA O DISPERSIE CONSIDERABILĂ A CĂLDURII. OBIECTIVUL PRINCIPAL AL ÎNTREGULUI PROIECT? INTERVENȚIILE, ÎMPĂRȚITE ÎN 1A ȘI 2A, VOR FI EFECTUATE SIMULTAN ÎN TIMPUL SEZONULUI DE VARĂ, ASTFEL ÎNCÂT SĂ SE PROFITE DE ÎNCHIDEREA SCHOOL.INTERVENTO 1: PUNCTUL 1A: IZOLAREA TERMICĂ A STRUCTURILOR ORIZONTALE ȘI VERTICALE. INTERVENTIA ESTE IMPARTITA INTRE IZOLAREA TERMICA A PERETILOR SI COPERTSILOR (Romanian)
0 references
PRÁCE SPOČÍVAJÚ PREDOVŠETKÝM V TEPELNEJ IZOLÁCII VONKAJŠÍCH STIEN A STRECHY CELEJ ŠKOLSKEJ BUDOVY, OKREM VÝMENY SVIETIDIEL, AKO JE BUDOVA POCHÁDZAJÚCA ZO ZAČIATKU 70S, POSTAVENÁ SO STENAMI V C.A., STREŠNÁ KRYTINA V TEHLOVOM BETÓNE S PREKRÝVAJÚCIMI SA JEDNODUCHÝMI TABUĽAMI, BUDOVA ROZŠTIEPENÁ NA VIAC? ÚROVNE SO ZASKLENÝMI STENAMI S HLINÍKOVÝMI OKNAMI, KTORÉ NIE SÚ TEPELNE ROZBITÉ A JEDNODUCHÉ 4 MM OKULIARE, VEDÚ K ZNAČNÉMU ROZPTYLU TEPLA. HLAVNÝ CIEĽ CELÉHO PROJEKTU? INTERVENCIE, ROZDELENÉ NA 1A A 2A, SA BUDÚ VYKONÁVAŤ SÚČASNE POČAS LETNEJ SEZÓNY, ABY SA VYUŽILO ZATVORENIE SCHOOL.INTERVENTO 1: BOD 1A: TEPELNÁ IZOLÁCIA HORIZONTÁLNYCH A VERTIKÁLNYCH KONŠTRUKCIÍ. INTERVENCIA JE ROZDELENÁ MEDZI TEPELNÚ IZOLÁCIU STIEN A ZÁHYBOV (Slovak)
0 references
DELA SO V BISTVU SESTAVLJENA IZ TOPLOTNE IZOLACIJE ZUNANJIH STEN IN STREHE CELOTNE ŠOLSKE STAVBE, POLEG ZAMENJAVE NAPELJAV, SAJ JE STAVBA IZ ZGODNJIH 70S, ZGRAJENA S STENAMI V C.A., STREŠNA KRITINA V OPEČNI BETON S PREKRIVAJOČIMI SE ENOSTAVNIMI PLOČEVINAMI, STAVBA RAZREZANA NA VEČ? RAVNI, Z ZASTEKLJENIMI STENAMI Z NETERMIČNIMI ALUMINIJASTIMI OKNI IN PREPROSTIMI 4 MM OČALI, VODIJO DO PRECEJŠNJE RAZPRŠITVE TOPLOTE. GLAVNI CILJ CELOTNEGA PROJEKTA? INTERVENCIJE, RAZDELJENE NA 1A IN 2A, SE BODO IZVAJALE HKRATI V POLETNI SEZONI, DA BI IZKORISTILI ZAPRTJE SCHOOL.INTERVENTO 1: TOČKA 1A: TOPLOTNA IZOLACIJA VODORAVNIH IN VERTIKALNIH STRUKTUR. POSEG JE RAZDELJEN NA TOPLOTNO IZOLACIJO STEN IN KOPALIŠČ. (Slovenian)
0 references
ARBETENA BESTÅR HUVUDSAKLIGEN I VÄRMEISOLERING AV YTTERVÄGGARNA OCH TAKET PÅ HELA SKOLBYGGNADEN, FÖRUTOM UTBYTET AV FIXTURER, SOM BYGGNADEN GÅR TILLBAKA TILL BÖRJAN AV 70S, BYGGD MED VÄGGAR I AA, TAK I TEGELBETONG MED ÖVERLAPPANDE ENKLA PLÅTPANELER, BYGGNAD SPLINTERED PÅ MER? NIVÅER, MED GLASERADE VÄGGAR MED ICKE-TERMISK-BREAK ALUMINIUM FÖNSTER OCH ENKLA 4 MM GLAS, LEDER TILL BETYDANDE VÄRMESPRIDNING. HUVUDSYFTET MED HELA PROJEKTET? INTERVENTIONERNA, UPPDELADE I 1A OCH 2A, KOMMER ATT GENOMFÖRAS SAMTIDIGT UNDER SOMMARSÄSONGEN, FÖR ATT DRA NYTTA AV STÄNGNINGEN AV SCHOOL.INTERVENTO 1: PUNKT 1A: VÄRMEISOLERING AV HORISONTELLA OCH VERTIKALA STRUKTURER. INGREPPET ÄR UPPDELAT MELLAN VÄRMEISOLERING AV VÄGGAR OCH COPERTS (Swedish)
0 references
SINALUNGA
0 references
10 April 2023