MODERNISATION OF THE EXISTING STRUCTURE FOR IMPROVED ATTRACTIVITY THROUGH AN ENVIRONMENTALLY SUSTAINABLE INVESTMENT (Q2075426): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Changed an Item) |
||
Property / fund | |||
Property / fund: European Regional Development Fund / rank | |||
Normal rank |
Revision as of 01:33, 9 June 2020
Project in Italy financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | MODERNISATION OF THE EXISTING STRUCTURE FOR IMPROVED ATTRACTIVITY THROUGH AN ENVIRONMENTALLY SUSTAINABLE INVESTMENT |
Project in Italy financed by DG Regio |
Statements
75,686.99 Euro
0 references
151,373.97 Euro
0 references
50.0 percent
0 references
31 July 2019
0 references
1 April 2021
0 references
ALBERGO RISTORANTE AL GARIBALDINO DI DALL'OSTO PAOLA E RENATA S.N.C.
0 references
IL PROGETTO MIRA AL RAGGIUNGIMENTO DELLA TERZA STELLA CON UN PERCORSO ECOSOSTENIBILE MIRATO EFFICIENZA DEI COSTI AZIENDALI ED EFFICACIA DEI SERVIZI OFFERTI ALLA CLIENTELA. SARANNO REALIZZATI GLI INTERVENTI DI SEGUITO ELENCATI. -IMPLEMENTAZIONE DELLA STRUTTURA CON: A.UN LOCALE ADIBITO A PALESTRA; B.UN LOCALE SAUNA E RELATIVE DOCCE; C.UNA ZONA SOLARIUM; D.UNO SPOGLIATOIO DEDICATO; E.UNA ZONA RISTORI ESTERNA PER IL SERVIZIO DI PASTI ALL¿APERTO; F.UNA ZONA FITNESS; G. UN GIARDINO PER EVENTI ESTERNI; H.UNA RETE WI-FI IN TUTTI I LOCALI; -INSTALLAZIONE DI: A. UNA COLONNINA DI RICARICA AD ALIMENTAZIONE ELETTRICA PER VEICOLI; B. UN IMPIANTO FOTOVOLTAICO; C. UN PUNTO DI RICARICA PROTETTO PER E-BIKE; D. CENTRALINO TELEFONICO -RISTRUTTURAZIONE: A. GENERALE DELLA STRUTTURA ESTERNA; B. DELLE CAMERE CON NUOVE TINTEGGIATURE INTERNE, NUOVI SERRAMENTI, NUOVO MOBILIO, E NUOVI ARREDI BAGNO; C. DELL¿IMPIANTO ELETTRICO ED IDRAULICO D. DEL PARCHEGGIO. VERRA' IMPLEMENTATA L¿AREA ESISTE (Italian)
0 references
THE PROJECT AIMS TO ACHIEVE THE THIRD STAR WITH AN ENVIRONMENTALLY SUSTAINABLE PATH OF EFFICIENCY OF THE BUSINESS COSTS AND EFFECTIVENESS OF THE SERVICES OFFERED TO CUSTOMERS. THE FOLLOWING ACTIONS WILL BE CARRIED OUT: — IMPLEMENTATION OF THE STRUCTURE WITH: A.A GYM ROOM; LOCAL SAUNA AND SHOWERS; C.A SOLARIUM AREA; DUNO DEDICATED; E.A OUTDOOR DINING AREA FOR SELF-SERVICE MEALS; F.A FITNESS ZONE; G. A GARDEN FOR EXTERNAL EVENTS; H.A WI-FI NETWORK IN ALL ROOMS; — INSTALLATION OF: A. A RECHARGING COLUMN FOR ELECTRIC POWER SUPPLY FOR VEHICLES; B. A PHOTOVOLTAIC SYSTEM; C. A SECURE RECHARGING POINT FOR E-BIKES; D. TELEPHONE SWITCHBOARD — RESTRUCTURING: A. GENERAL OF THE EXTERNAL STRUCTURE; B. ROOMS WITH NEW INTERIOR DRIERS, NEW WINDOWS, NEW FURNITURE, AND NEW FURNISHINGS; C. DELÂ OF THE ELECTRIC AND HYDRAULIC SYSTEMS OF THE PARKING SYSTEM. THAT AREA HAS BEEN IMPLEMENTED (English)
0 references
Identifiers
B31G19000130009
0 references