* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * of the (Q2074816): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Changed an Item)
Property / fund
 
Property / fund: European Regional Development Fund / rank
 
Normal rank

Revision as of 01:27, 9 June 2020

Project in Italy financed by DG Regio
Language Label Description Also known as
English
* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * of the
Project in Italy financed by DG Regio

    Statements

    0 references
    13,050.0 Euro
    0 references
    26,100.0 Euro
    0 references
    50.0 percent
    0 references
    8 June 2018
    0 references
    17 September 2019
    0 references
    14 December 2018
    0 references
    PIROLLO DANILO
    0 references
    0 references

    45°36'27.07"N, 11°59'57.88"E
    0 references
    L'AZIENDA INTENDE ATTUARE UNA SERIE DI INTERVENTI FINALIZZATI AL CONTENIMENTO DI CONSUMI ENERGETICI DIVISI IN DUE GRANDI MACRO AREE; LA *individuo* A NUOVI MACCHINARI PER EFFICIENTARE IL PROCESSO PRODUTTIVO: - INSTALLAZIONE MAGAZINO AUTOMATICO CHE PERMETTE DI LIMITARE TUTTE LE OPERAZIONI FATTE CON MULETTI E GLI SPOSTAMENTI DI UTENSILI NON VOLUTI DOVUTI AD UN ERRATO STOCCAGGIO, - SOSTITUZIONE DELL'ODIERNO COMPRESSORE A VITE CON UNO AD INVERTER. LA SECONDA AREA E' RELATIVA ALL'EFFICENTAMENTO ENERGETICO EDIFICI PREVEDE L'INSTALLAZIONE DI UNA POMPA DI CALORE PER LA CLIMATIZZAZIONE DELL'AREA DI CONTROLLO E MISURA E L'INSTALLAZIONE DI UN SISTEMA DI ILLUMINAZIONE PER L'AREA DI CONTROLLO E MISURA E, INFINE, L'INSTALLAZIONE DI UN IMPIANTO FOTOVOLTAICO. (Italian)
    0 references
    THE COMPANY INTENDS TO IMPLEMENT A SERIES OF MEASURES AIMED AT CURBING ENERGY CONSUMPTION, DIVIDED INTO TWO BROAD MACRO-AREAS; * any individual * A new NEW MACHINERY TO BE PRODUCED PRODUtBOI: — AUTOMATIC MAGIC INSTALLATION ALLOWING TO LIMIT ALL OPERATIONS WITH MULES AND MOVEMENTS OF UNWANTED TOOLS DUE TO INCORRECT STORAGE, — REPLACEMENT OF TODAY’S COMPRESSOR BY MEANS OF INVERTER. THE SECOND AREA CONCERNS THE ENERGY EFFICIENCY OF THE BUILDINGS PROVIDED FOR IN THE INSTALLATION OF A HEAT PUMP FOR AIR CONDITIONING OF THE CONTROL AREA AND MEASUREMENT AND INSTALLATION OF A LIGHTING SYSTEM FOR THE CONTROL AREA AND MEASUREMENT AREA AND, FINALLY, THE INSTALLATION OF A PHOTOVOLTAIC INSTALLATION. (English)
    0 references

    Identifiers

    B47B18000050009
    0 references