ENERGY CONSUMPTION REDUCTION PROJECT CMA SPA (Q2074088): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Changed an Item) |
||
Property / fund | |||
Property / fund: European Regional Development Fund / rank | |||
Normal rank |
Revision as of 01:20, 9 June 2020
Project in Italy financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | ENERGY CONSUMPTION REDUCTION PROJECT CMA SPA |
Project in Italy financed by DG Regio |
Statements
75,000.0 Euro
0 references
150,000.0 Euro
0 references
50.0 percent
0 references
27 November 2017
0 references
5 September 2018
0 references
16 July 2018
0 references
C.M.A. S.P.A.
0 references
PER RIDURRE I CONSUMI ENERGETICI LEGATI AL CICLO PRODUTTIVO AZIENDALE L'AZIENDA HA INTENZIONE DI ATTUARE VARI INTERVENTI SUGGERITI DALLA DIAGNOSI ENERGETICA REALIZZATA. TRA LE DIVERSE SOLUZIONI ANALIZZATE IN FASE DI DIAGNOSI ENERGETICA, L'AZIENDA HA VALUTATO LA POSSIBILITA' DI INSTALLARE UN IMPIANTO SOLARE FOTOVOLTAICO IN GRADO DI GENERARE ENERGIA E DI METTERLA A COMPLETA DISPOSIZIONE DELL'AZIENDA E DEI SUOI PROCESSI, ANDANDO A POTENZIARE L'IMPIANTO FOTOVOLTAICO GIA' ESISTENTE. QUESTO PERMETTE UN NOTEVOLE RISPARMIO DI ENERGIA ELETTRICA PRELEVATA DALLA RETE NAZIONALE CON I RELATIVI BENEFICI AMBIENTALI. INOLTRE VI E' LA NECESSITA' DI RIAMMODERNARE COMPLETAMENTE GLI IMPIANTI QUALI L'ARIA COMPRESSA CHE PRESENTA MACCHINE NON A RISPARMIO ENERGETICO, L'IMPIANTO DI VERNICIATURA E SABBIATURA CON DIMINUZIONE DELLE POTENZE INSTALLATE, L'IMPIANTO DI ILLUMINAZIONE PER ABBATTERE IL CONSUMO DEL 50%, OLTRE AI MACCHINARI DIRETTAMENTE INTERESSATI ALLA PRODUZIONE. (Italian)
0 references
IN ORDER TO REDUCE ENERGY CONSUMPTION LINKED TO THE FARM PRODUCTION CYCLE, THE COMPANY INTENDS TO IMPLEMENT A NUMBER OF ACTIONS SUGGESTED BY THE ENERGY AUDIT. AMONG THE VARIOUS SOLUTIONS ANALYSED DURING THE ENERGY AUDIT, THE COMPANY ASSESSED THE POSSIBILITY OF INSTALLING A SOLAR PHOTOVOLTAIC SYSTEM CAPABLE OF GENERATING ENERGY AND PUTTING IT AT THE FULL DISPOSAL OF THE COMPANY AND ITS PROCESSES, REINFORCING THE EXISTING PHOTOVOLTAIC SYSTEM. THIS ALLOWS SIGNIFICANT ELECTRICITY SAVINGS FROM THE NATIONAL GRID WITH THE ASSOCIATED ENVIRONMENTAL BENEFITS. IN ADDITION, IT IS NECESSARY TO FULLY COMPLY WITH INSTALLATIONS SUCH AS COMPRESSED AIR WITH NON-ENERGY-SAVING MACHINERY, THE PAINTING AND BLASTING PLANT WITH A DECREASE IN INSTALLED POWERS, THE LIGHTING SYSTEM TO REDUCE THE CONSUMPTION OF 50 %, IN ADDITION TO THE MACHINERY DIRECTLY INVOLVED IN PRODUCTION. (English)
0 references
Identifiers
B22E17002240007
0 references