Thermal modernisation of the primary school building in Kuźnica Grabowska (Q134793): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in 1 language: translated_label)
(‎Added qualifier: readability score (P590521): 0.001060009853059)
(16 intermediate revisions by 2 users not shown)
label / frlabel / fr
 
Thermomodernisation du bâtiment de l’école primaire à Kusnica Grabowska
label / delabel / de
 
Thermomodernisierung des Grundschulgebäudes in Kuźnica Grabowska
label / nllabel / nl
 
Thermomodernisering van het basisschoolgebouw in Kuźnica Grabowska
label / itlabel / it
 
Termomodernizzazione dell'edificio della scuola primaria a Kuźnica Grabowska
label / eslabel / es
 
Termomodernización del edificio de la Escuela Primaria en Kușnica Grabowska
label / dalabel / da
 
Termomodernisering af grundskolens bygning i Kuźnica Grabowska
label / ellabel / el
 
Θερμοεκσυγχρονισμός του κτιρίου του Δημοτικού Σχολείου στην Κουίντσα Γκραμπόφσκα
label / hrlabel / hr
 
Termomodernizacija zgrade Osnovne škole u Kuňnici Grabowska
label / rolabel / ro
 
Termomodernizarea clădirii școlii primare din Kuźnica Grabowska
label / sklabel / sk
 
Termomodernizácia budovy základnej školy v Kuźnici Grabowskej
label / mtlabel / mt
 
It-termomodernizzazzjoni tal-bini tal-Iskola Primarja f’Kuźnica Grabowska
label / ptlabel / pt
 
Termomodernização do edifício da Escola Primária em Kuźnica Grabowska
label / filabel / fi
 
Kuźnica Grabowskan peruskoulurakennuksen lämpömodernisointi
label / sllabel / sl
 
Termomodernizacija stavbe Osnovne šole v Kuźnici Grabowski
label / cslabel / cs
 
Termomodernizace budovy základní školy v Kuźnici Grabowska
label / ltlabel / lt
 
Kuźnica Grabowska pradinės mokyklos pastato termomodernizavimas
label / lvlabel / lv
 
Pamatskolas ēkas termomodernizācija Kusnicā Grabowska
label / bglabel / bg
 
Термомодернизация на сградата на началното училище в Кузница Грабовска
label / hulabel / hu
 
A Kuźnica Grabowskai Általános Iskola épületének termomodernizálása
label / galabel / ga
 
Teirmeodrú an fhoirgnimh Bunscoile i Ku nica Grabowska
label / svlabel / sv
 
Termomodernisering av grundskolans byggnad i Kuźnica Grabowska
label / etlabel / et
 
Kuźnica Grabowska algkooli hoone termomoderniseerimine
description / endescription / en
Project in Poland financed by DG Regio
Project Q134793 in Poland
description / pldescription / pl
Projekt w Polsce finansowany przez DG Regio
Projekt Q134793 w Polsce
description / bgdescription / bg
 
Проект Q134793 в Полша
description / hrdescription / hr
 
Projekt Q134793 u Poljskoj
description / hudescription / hu
 
Projekt Q134793 Lengyelországban
description / csdescription / cs
 
Projekt Q134793 v Polsku
description / dadescription / da
 
Projekt Q134793 i Polen
description / nldescription / nl
 
Project Q134793 in Polen
description / etdescription / et
 
Projekt Q134793 Poolas
description / fidescription / fi
 
Projekti Q134793 Puolassa
description / frdescription / fr
 
Projet Q134793 en Pologne
description / dedescription / de
 
Projekt Q134793 in Polen
description / eldescription / el
 
Έργο Q134793 στην Πολωνία
description / gadescription / ga
 
Tionscadal Q134793 sa Pholainn
description / itdescription / it
 
Progetto Q134793 in Polonia
description / lvdescription / lv
 
Projekts Q134793 Polijā
description / ltdescription / lt
 
Projektas Q134793 Lenkijoje
description / mtdescription / mt
 
Proġett Q134793 fil-Polonja
description / ptdescription / pt
 
Projeto Q134793 na Polônia
description / rodescription / ro
 
Proiectul Q134793 în Polonia
description / skdescription / sk
 
Projekt Q134793 v Poľsku
description / sldescription / sl
 
Projekt Q134793 na Poljskem
description / esdescription / es
 
Proyecto Q134793 en Polonia
description / svdescription / sv
 
Projekt Q134793 i Polen
Property / EU contributionProperty / EU contribution
254,359.43 Euro
Amount254,359.43 Euro
UnitEuro
235,600.42 Euro
Amount235,600.42 Euro
UnitEuro
Property / co-financing rate
85.0 percent
Amount85.0 percent
Unitpercent
 
Property / co-financing rate: 85.0 percent / rank
Normal rank
 
Property / summary: The interior of the interior design of the interior and the interior of the enclosed air-conditioning of the eccentricity of the eccentricity of the interior, the interior of the interior, the interior of the interior, the interior of the interior, the interior of the interior, the interior of the interior, the interior of the interior and the interior of the interior of the interior. (English) / qualifier
 
readability score: 0.001060009853059
Amount0.001060009853059
Unit1
Property / financed by
 
Property / financed by: Directorate-General for Regional and Urban Policy / rank
Normal rank
 
Property / budgetProperty / budget
299,246.39 Euro
Amount299,246.39 Euro
UnitEuro
277,176.97 Euro
Amount277,176.97 Euro
UnitEuro
Property / contained in Local Administrative Unit
 
Property / contained in Local Administrative Unit: Ostrzeszów / rank
 
Normal rank
Property / contained in Local Administrative Unit: Ostrzeszów / qualifier
 
Property / summary
 
The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (French)
Property / summary: The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (French) / rank
 
Normal rank
Property / summary: The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (French) / qualifier
 
point in time: 2 December 2021
Timestamp+2021-12-02T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (German)
Property / summary: The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (German) / rank
 
Normal rank
Property / summary: The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (German) / qualifier
 
point in time: 9 December 2021
Timestamp+2021-12-09T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Dutch)
Property / summary: The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Dutch) / rank
 
Normal rank
Property / summary: The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Dutch) / qualifier
 
point in time: 17 December 2021
Timestamp+2021-12-17T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Italian)
Property / summary: The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Italian) / rank
 
Normal rank
Property / summary: The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Italian) / qualifier
 
point in time: 15 January 2022
Timestamp+2022-01-15T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Spanish)
Property / summary: The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Spanish) / rank
 
Normal rank
Property / summary: The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Spanish) / qualifier
 
point in time: 18 January 2022
Timestamp+2022-01-18T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Danish)
Property / summary: The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Danish) / rank
 
Normal rank
Property / summary: The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Danish) / qualifier
 
point in time: 2 July 2022
Timestamp+2022-07-02T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Greek)
Property / summary: The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Greek) / rank
 
Normal rank
Property / summary: The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Greek) / qualifier
 
point in time: 2 July 2022
Timestamp+2022-07-02T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Croatian)
Property / summary: The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Croatian) / rank
 
Normal rank
Property / summary: The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Croatian) / qualifier
 
point in time: 2 July 2022
Timestamp+2022-07-02T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Romanian)
Property / summary: The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Romanian) / rank
 
Normal rank
Property / summary: The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Romanian) / qualifier
 
point in time: 2 July 2022
Timestamp+2022-07-02T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Slovak)
Property / summary: The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Slovak) / rank
 
Normal rank
Property / summary: The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Slovak) / qualifier
 
point in time: 2 July 2022
Timestamp+2022-07-02T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Maltese)
Property / summary: The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Maltese) / rank
 
Normal rank
Property / summary: The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Maltese) / qualifier
 
point in time: 2 July 2022
Timestamp+2022-07-02T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Portuguese)
Property / summary: The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Portuguese) / rank
 
Normal rank
Property / summary: The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Portuguese) / qualifier
 
point in time: 2 July 2022
Timestamp+2022-07-02T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Finnish)
Property / summary: The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Finnish) / rank
 
Normal rank
Property / summary: The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Finnish) / qualifier
 
point in time: 2 July 2022
Timestamp+2022-07-02T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Slovenian)
Property / summary: The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Slovenian) / rank
 
Normal rank
Property / summary: The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Slovenian) / qualifier
 
point in time: 2 July 2022
Timestamp+2022-07-02T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Czech)
Property / summary: The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Czech) / rank
 
Normal rank
Property / summary: The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Czech) / qualifier
 
point in time: 2 July 2022
Timestamp+2022-07-02T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Lithuanian)
Property / summary: The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Lithuanian) / rank
 
Normal rank
Property / summary: The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Lithuanian) / qualifier
 
point in time: 2 July 2022
Timestamp+2022-07-02T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Latvian)
Property / summary: The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Latvian) / rank
 
Normal rank
Property / summary: The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Latvian) / qualifier
 
point in time: 2 July 2022
Timestamp+2022-07-02T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Bulgarian)
Property / summary: The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Bulgarian) / rank
 
Normal rank
Property / summary: The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Bulgarian) / qualifier
 
point in time: 2 July 2022
Timestamp+2022-07-02T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Hungarian)
Property / summary: The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Hungarian) / rank
 
Normal rank
Property / summary: The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Hungarian) / qualifier
 
point in time: 2 July 2022
Timestamp+2022-07-02T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Irish)
Property / summary: The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Irish) / rank
 
Normal rank
Property / summary: The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Irish) / qualifier
 
point in time: 2 July 2022
Timestamp+2022-07-02T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Swedish)
Property / summary: The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Swedish) / rank
 
Normal rank
Property / summary: The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Swedish) / qualifier
 
point in time: 2 July 2022
Timestamp+2022-07-02T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Estonian)
Property / summary: The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Estonian) / rank
 
Normal rank
Property / summary: The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Estonian) / qualifier
 
point in time: 2 July 2022
Timestamp+2022-07-02T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / location (string)
 
WOJ.: WIELKOPOLSKIE, POW.: ostrzeszowski
Property / location (string): WOJ.: WIELKOPOLSKIE, POW.: ostrzeszowski / rank
 
Normal rank
Property / priority axis
 
Property / priority axis: Energy / rank
 
Normal rank
Property / co-financing rate
 
85.0 percent
Amount85.0 percent
Unitpercent
Property / co-financing rate: 85.0 percent / rank
 
Normal rank
Property / coordinate location
 
51°26'15.43"N, 17°58'29.21"E
Latitude51.43762425
Longitude17.974781588513
Precision1.0E-5
Globehttp://www.wikidata.org/entity/Q2
Property / coordinate location: 51°26'15.43"N, 17°58'29.21"E / rank
 
Normal rank
Property / coordinate location: 51°26'15.43"N, 17°58'29.21"E / qualifier
 
Property / contained in NUTS
 
Property / contained in NUTS: Kaliski / rank
 
Normal rank
Property / contained in NUTS: Kaliski / qualifier
 
Property / thematic objective
 
Property / thematic objective: Low-carbon economy / rank
 
Normal rank
Property / date of last update
 
24 May 2023
Timestamp+2023-05-24T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / date of last update: 24 May 2023 / rank
 
Normal rank

Revision as of 12:05, 22 March 2024

Project Q134793 in Poland
Language Label Description Also known as
English
Thermal modernisation of the primary school building in Kuźnica Grabowska
Project Q134793 in Poland

    Statements

    0 references
    1,059,830.96 zloty
    0 references
    235,600.42 Euro
    13 January 2020
    0 references
    1,246,859.96 zloty
    0 references
    277,176.97 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 February 2016
    0 references
    3 November 2017
    0 references
    GMINA KRASZEWICE
    0 references

    51°26'15.43"N, 17°58'29.21"E
    0 references
    Przedmiotem projektu jest głęboka modernizacja energetyczna budynku użyteczności publicznej tj.Szkoły Podstawowej w Kuźnicy Grabowskiej w woj.wlkp.Potrzeba realizacji projektu wynika ze złego stanu technicznego obiektu,związanego z jego niską efektywnością energetyczną.Projekt obejmuje swym zakresem:1.Prace przygotowawcze tj.opracowanie Studium Wykonalności2.Roboty budowlane-termomodernizacja budynku SP poprzez docieplenie warstwą styropianu ścian zewn.oraz fundamentowych do poziomu opaski wokół budynku(płyty gr.20cm)oraz docieplenie dachu natryskową pianką PUR.Prace obejmują także roboty odtworzeniowe,wykonanie obróbek blacharskich,orynnowania,wymianę stolarki okiennej i drzwiowej,zmianę pokrycia dachowego z płyt eternitowych na blachodachówkę,docieplenie zadaszenia nad wejściem do kotłowni styropianem gr.5cm,montaż instalacji odgromowej i remont instalacji wewnętrznych w budynku3.Modernizacja źródła ciepła poprzez:wymianę instalacji centralnego ogrzewania wraz z źródłem ciepła i instalacji ciepłej wody użytkowej,w tym:-zmiana kotła na nowoczesny kocioł na pellet-montaż nowej instalacji przesyłowej wraz z izolacją-montaż nowych grzejników z głowicami termostatycznymi i zaworów termostatycznych wraz z automatyką-wymiana instalacji CWU z przyłączeniem do nowego źródła ciepła4.Instalacje elektryczne poprzez wymianę oświetlenia wewnętrznego na nowe typu LED oraz wykonanie instalacji odgromowejPrace pozwolą osiągnąć zakładane produkty projektu tj:liczba zmodernizowanych energetycznie budynków-1szt,dodatkowa zdolność wytwarzania energii cieplnej ze źródeł odnawialnych:0,1500MWt,liczba zmodernizowanych źródeł ciepła-1szt,powierzchnia użytkowa budynku poddanego termomodernizacji:1049,80m2,liczba wybudowanych jednostek wytwarzania energii cieplnej z OZE-1szt.Zakładana oszczędność energii cieplnej i elektrycznej osiągnięta w wyniku realizacji projektu-204,92MWh/rok,tj.72,63%Prace będą realizowane zgodnie z dokumentacją projektową,co pozwoli na zachowanie jakości i trwałości. (Polish)
    0 references
    The interior of the interior design of the interior and the interior of the enclosed air-conditioning of the eccentricity of the eccentricity of the interior, the interior of the interior, the interior of the interior, the interior of the interior, the interior of the interior, the interior of the interior, the interior of the interior and the interior of the interior of the interior. (English)
    21 October 2020
    0.001060009853059
    0 references
    The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (French)
    2 December 2021
    0 references
    The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (German)
    9 December 2021
    0 references
    The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Dutch)
    17 December 2021
    0 references
    The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Italian)
    15 January 2022
    0 references
    The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Spanish)
    18 January 2022
    0 references
    The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Danish)
    2 July 2022
    0 references
    The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Greek)
    2 July 2022
    0 references
    The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Croatian)
    2 July 2022
    0 references
    The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Romanian)
    2 July 2022
    0 references
    The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Slovak)
    2 July 2022
    0 references
    The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Maltese)
    2 July 2022
    0 references
    The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Portuguese)
    2 July 2022
    0 references
    The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Finnish)
    2 July 2022
    0 references
    The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Slovenian)
    2 July 2022
    0 references
    The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Czech)
    2 July 2022
    0 references
    The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Lithuanian)
    2 July 2022
    0 references
    The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Latvian)
    2 July 2022
    0 references
    The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Bulgarian)
    2 July 2022
    0 references
    The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Hungarian)
    2 July 2022
    0 references
    The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Irish)
    2 July 2022
    0 references
    The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Swedish)
    2 July 2022
    0 references
    The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Estonian)
    2 July 2022
    0 references
    WOJ.: WIELKOPOLSKIE, POW.: ostrzeszowski
    0 references
    0 references
    24 May 2023
    0 references

    Identifiers

    RPWP.03.02.01-30-0045/15
    0 references