Thermal modernisation of the primary school building in Kuźnica Grabowska (Q134793): Difference between revisions
Jump to navigation
Jump to search
(Created claim: summary (P836): The project consists of a deep energy renovation of the public service building, the Primary School in Kuźnica Grabowska. the project is a result of the poor technical condition of the plant, linked to its low energy efficiency., Adding English summary) |
(Added qualifier: readability score (P590521): 0.001060009853059) |
||||||||||||||
(27 intermediate revisions by 2 users not shown) | |||||||||||||||
label / en | label / en | ||||||||||||||
Thermal modernisation of the | Thermal modernisation of the primary school building in Kuźnica Grabowska | ||||||||||||||
label / fr | label / fr | ||||||||||||||
Thermomodernisation du bâtiment de l’école primaire à Kusnica Grabowska | |||||||||||||||
label / de | label / de | ||||||||||||||
Thermomodernisierung des Grundschulgebäudes in Kuźnica Grabowska | |||||||||||||||
label / nl | label / nl | ||||||||||||||
Thermomodernisering van het basisschoolgebouw in Kuźnica Grabowska | |||||||||||||||
label / it | label / it | ||||||||||||||
Termomodernizzazione dell'edificio della scuola primaria a Kuźnica Grabowska | |||||||||||||||
label / es | label / es | ||||||||||||||
Termomodernización del edificio de la Escuela Primaria en Kușnica Grabowska | |||||||||||||||
label / da | label / da | ||||||||||||||
Termomodernisering af grundskolens bygning i Kuźnica Grabowska | |||||||||||||||
label / el | label / el | ||||||||||||||
Θερμοεκσυγχρονισμός του κτιρίου του Δημοτικού Σχολείου στην Κουίντσα Γκραμπόφσκα | |||||||||||||||
label / hr | label / hr | ||||||||||||||
Termomodernizacija zgrade Osnovne škole u Kuňnici Grabowska | |||||||||||||||
label / ro | label / ro | ||||||||||||||
Termomodernizarea clădirii școlii primare din Kuźnica Grabowska | |||||||||||||||
label / sk | label / sk | ||||||||||||||
Termomodernizácia budovy základnej školy v Kuźnici Grabowskej | |||||||||||||||
label / mt | label / mt | ||||||||||||||
It-termomodernizzazzjoni tal-bini tal-Iskola Primarja f’Kuźnica Grabowska | |||||||||||||||
label / pt | label / pt | ||||||||||||||
Termomodernização do edifício da Escola Primária em Kuźnica Grabowska | |||||||||||||||
label / fi | label / fi | ||||||||||||||
Kuźnica Grabowskan peruskoulurakennuksen lämpömodernisointi | |||||||||||||||
label / sl | label / sl | ||||||||||||||
Termomodernizacija stavbe Osnovne šole v Kuźnici Grabowski | |||||||||||||||
label / cs | label / cs | ||||||||||||||
Termomodernizace budovy základní školy v Kuźnici Grabowska | |||||||||||||||
label / lt | label / lt | ||||||||||||||
Kuźnica Grabowska pradinės mokyklos pastato termomodernizavimas | |||||||||||||||
label / lv | label / lv | ||||||||||||||
Pamatskolas ēkas termomodernizācija Kusnicā Grabowska | |||||||||||||||
label / bg | label / bg | ||||||||||||||
Термомодернизация на сградата на началното училище в Кузница Грабовска | |||||||||||||||
label / hu | label / hu | ||||||||||||||
A Kuźnica Grabowskai Általános Iskola épületének termomodernizálása | |||||||||||||||
label / ga | label / ga | ||||||||||||||
Teirmeodrú an fhoirgnimh Bunscoile i Ku nica Grabowska | |||||||||||||||
label / sv | label / sv | ||||||||||||||
Termomodernisering av grundskolans byggnad i Kuźnica Grabowska | |||||||||||||||
label / et | label / et | ||||||||||||||
Kuźnica Grabowska algkooli hoone termomoderniseerimine | |||||||||||||||
description / en | description / en | ||||||||||||||
Project in Poland | Project Q134793 in Poland | ||||||||||||||
description / pl | description / pl | ||||||||||||||
Projekt w Polsce | Projekt Q134793 w Polsce | ||||||||||||||
description / bg | description / bg | ||||||||||||||
Проект Q134793 в Полша | |||||||||||||||
description / hr | description / hr | ||||||||||||||
Projekt Q134793 u Poljskoj | |||||||||||||||
description / hu | description / hu | ||||||||||||||
Projekt Q134793 Lengyelországban | |||||||||||||||
description / cs | description / cs | ||||||||||||||
Projekt Q134793 v Polsku | |||||||||||||||
description / da | description / da | ||||||||||||||
Projekt Q134793 i Polen | |||||||||||||||
description / nl | description / nl | ||||||||||||||
Project Q134793 in Polen | |||||||||||||||
description / et | description / et | ||||||||||||||
Projekt Q134793 Poolas | |||||||||||||||
description / fi | description / fi | ||||||||||||||
Projekti Q134793 Puolassa | |||||||||||||||
description / fr | description / fr | ||||||||||||||
Projet Q134793 en Pologne | |||||||||||||||
description / de | description / de | ||||||||||||||
Projekt Q134793 in Polen | |||||||||||||||
description / el | description / el | ||||||||||||||
Έργο Q134793 στην Πολωνία | |||||||||||||||
description / ga | description / ga | ||||||||||||||
Tionscadal Q134793 sa Pholainn | |||||||||||||||
description / it | description / it | ||||||||||||||
Progetto Q134793 in Polonia | |||||||||||||||
description / lv | description / lv | ||||||||||||||
Projekts Q134793 Polijā | |||||||||||||||
description / lt | description / lt | ||||||||||||||
Projektas Q134793 Lenkijoje | |||||||||||||||
description / mt | description / mt | ||||||||||||||
Proġett Q134793 fil-Polonja | |||||||||||||||
description / pt | description / pt | ||||||||||||||
Projeto Q134793 na Polônia | |||||||||||||||
description / ro | description / ro | ||||||||||||||
Proiectul Q134793 în Polonia | |||||||||||||||
description / sk | description / sk | ||||||||||||||
Projekt Q134793 v Poľsku | |||||||||||||||
description / sl | description / sl | ||||||||||||||
Projekt Q134793 na Poljskem | |||||||||||||||
description / es | description / es | ||||||||||||||
Proyecto Q134793 en Polonia | |||||||||||||||
description / sv | description / sv | ||||||||||||||
Projekt Q134793 i Polen | |||||||||||||||
Property / EU contribution | |||||||||||||||
| |||||||||||||||
Property / EU contribution: 254,359.43039999998 Euro / rank | |||||||||||||||
Property / EU contribution: 254,359.43039999998 Euro / qualifier | |||||||||||||||
| |||||||||||||||
Property / EU contribution: 254,359.43039999998 Euro / qualifier | |||||||||||||||
| |||||||||||||||
Property / budget | |||||||||||||||
| |||||||||||||||
Property / budget: 1,298,634.0 zloty / rank | |||||||||||||||
Property / budget | |||||||||||||||
| |||||||||||||||
Property / budget: 311,672.16 Euro / rank | |||||||||||||||
Property / budget: 311,672.16 Euro / qualifier | |||||||||||||||
| |||||||||||||||
Property / budget: 311,672.16 Euro / qualifier | |||||||||||||||
| |||||||||||||||
Property / co-financing rate | |||||||||||||||
| |||||||||||||||
Property / co-financing rate: 85.0 percent / rank | |||||||||||||||
Property / summary | |||||||||||||||
Property / summary: The project consists of a deep energy renovation of the public service building, the Primary School in Kuźnica Grabowska. the project is a result of the poor technical condition of the plant, linked to its low energy efficiency. (English) / rank | |||||||||||||||
Property / financed by | |||||||||||||||
Property / financed by: Directorate-General for Regional and Urban Policy / rank | |||||||||||||||
Property / contained in Local Administrative Unit | |||||||||||||||
Property / contained in Local Administrative Unit: Ostrzeszów / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / contained in Local Administrative Unit: Ostrzeszów / qualifier | |||||||||||||||
Property / EU contribution | |||||||||||||||
235,600.42 Euro
| |||||||||||||||
Property / EU contribution: 235,600.42 Euro / rank | |||||||||||||||
Preferred rank | |||||||||||||||
Property / EU contribution: 235,600.42 Euro / qualifier | |||||||||||||||
exchange rate to Euro: 0.24 Euro
| |||||||||||||||
Property / EU contribution: 235,600.42 Euro / qualifier | |||||||||||||||
point in time: 13 January 2020
| |||||||||||||||
Property / summary | |||||||||||||||
The interior of the interior design of the interior and the interior of the enclosed air-conditioning of the eccentricity of the eccentricity of the interior, the interior of the interior, the interior of the interior, the interior of the interior, the interior of the interior, the interior of the interior, the interior of the interior and the interior of the interior of the interior. (English) | |||||||||||||||
Property / summary: The interior of the interior design of the interior and the interior of the enclosed air-conditioning of the eccentricity of the eccentricity of the interior, the interior of the interior, the interior of the interior, the interior of the interior, the interior of the interior, the interior of the interior, the interior of the interior and the interior of the interior of the interior. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The interior of the interior design of the interior and the interior of the enclosed air-conditioning of the eccentricity of the eccentricity of the interior, the interior of the interior, the interior of the interior, the interior of the interior, the interior of the interior, the interior of the interior, the interior of the interior and the interior of the interior of the interior. (English) / qualifier | |||||||||||||||
point in time: 21 October 2020
| |||||||||||||||
Property / summary: The interior of the interior design of the interior and the interior of the enclosed air-conditioning of the eccentricity of the eccentricity of the interior, the interior of the interior, the interior of the interior, the interior of the interior, the interior of the interior, the interior of the interior, the interior of the interior and the interior of the interior of the interior. (English) / qualifier | |||||||||||||||
readability score: 0.001060009853059
| |||||||||||||||
Property / summary | |||||||||||||||
The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (French) | |||||||||||||||
Property / summary: The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (French) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (French) / qualifier | |||||||||||||||
point in time: 2 December 2021
| |||||||||||||||
Property / summary | |||||||||||||||
The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (German) | |||||||||||||||
Property / summary: The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (German) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (German) / qualifier | |||||||||||||||
point in time: 9 December 2021
| |||||||||||||||
Property / summary | |||||||||||||||
The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Dutch) | |||||||||||||||
Property / summary: The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Dutch) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Dutch) / qualifier | |||||||||||||||
point in time: 17 December 2021
| |||||||||||||||
Property / summary | |||||||||||||||
The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Italian) | |||||||||||||||
Property / summary: The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Italian) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Italian) / qualifier | |||||||||||||||
point in time: 15 January 2022
| |||||||||||||||
Property / summary | |||||||||||||||
The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Spanish) | |||||||||||||||
Property / summary: The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Spanish) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Spanish) / qualifier | |||||||||||||||
point in time: 18 January 2022
| |||||||||||||||
Property / summary | |||||||||||||||
The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Danish) | |||||||||||||||
Property / summary: The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Danish) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Danish) / qualifier | |||||||||||||||
point in time: 2 July 2022
| |||||||||||||||
Property / summary | |||||||||||||||
The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Greek) | |||||||||||||||
Property / summary: The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Greek) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Greek) / qualifier | |||||||||||||||
point in time: 2 July 2022
| |||||||||||||||
Property / summary | |||||||||||||||
The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Croatian) | |||||||||||||||
Property / summary: The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Croatian) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Croatian) / qualifier | |||||||||||||||
point in time: 2 July 2022
| |||||||||||||||
Property / summary | |||||||||||||||
The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Romanian) | |||||||||||||||
Property / summary: The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Romanian) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Romanian) / qualifier | |||||||||||||||
point in time: 2 July 2022
| |||||||||||||||
Property / summary | |||||||||||||||
The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Slovak) | |||||||||||||||
Property / summary: The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Slovak) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Slovak) / qualifier | |||||||||||||||
point in time: 2 July 2022
| |||||||||||||||
Property / summary | |||||||||||||||
The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Maltese) | |||||||||||||||
Property / summary: The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Maltese) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Maltese) / qualifier | |||||||||||||||
point in time: 2 July 2022
| |||||||||||||||
Property / summary | |||||||||||||||
The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Portuguese) | |||||||||||||||
Property / summary: The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Portuguese) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Portuguese) / qualifier | |||||||||||||||
point in time: 2 July 2022
| |||||||||||||||
Property / summary | |||||||||||||||
The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Finnish) | |||||||||||||||
Property / summary: The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Finnish) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Finnish) / qualifier | |||||||||||||||
point in time: 2 July 2022
| |||||||||||||||
Property / summary | |||||||||||||||
The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Slovenian) | |||||||||||||||
Property / summary: The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Slovenian) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Slovenian) / qualifier | |||||||||||||||
point in time: 2 July 2022
| |||||||||||||||
Property / summary | |||||||||||||||
The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Czech) | |||||||||||||||
Property / summary: The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Czech) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Czech) / qualifier | |||||||||||||||
point in time: 2 July 2022
| |||||||||||||||
Property / summary | |||||||||||||||
The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Lithuanian) | |||||||||||||||
Property / summary: The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Lithuanian) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Lithuanian) / qualifier | |||||||||||||||
point in time: 2 July 2022
| |||||||||||||||
Property / summary | |||||||||||||||
The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Latvian) | |||||||||||||||
Property / summary: The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Latvian) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Latvian) / qualifier | |||||||||||||||
point in time: 2 July 2022
| |||||||||||||||
Property / summary | |||||||||||||||
The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Bulgarian) | |||||||||||||||
Property / summary: The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Bulgarian) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Bulgarian) / qualifier | |||||||||||||||
point in time: 2 July 2022
| |||||||||||||||
Property / summary | |||||||||||||||
The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Hungarian) | |||||||||||||||
Property / summary: The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Hungarian) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Hungarian) / qualifier | |||||||||||||||
point in time: 2 July 2022
| |||||||||||||||
Property / summary | |||||||||||||||
The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Irish) | |||||||||||||||
Property / summary: The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Irish) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Irish) / qualifier | |||||||||||||||
point in time: 2 July 2022
| |||||||||||||||
Property / summary | |||||||||||||||
The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Swedish) | |||||||||||||||
Property / summary: The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Swedish) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Swedish) / qualifier | |||||||||||||||
point in time: 2 July 2022
| |||||||||||||||
Property / summary | |||||||||||||||
The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Estonian) | |||||||||||||||
Property / summary: The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Estonian) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Estonian) / qualifier | |||||||||||||||
point in time: 2 July 2022
| |||||||||||||||
Property / programme | |||||||||||||||
Property / programme: Wielkopolskie Voivodeship - ERDF/ESF / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / fund | |||||||||||||||
Property / fund: European Regional Development Fund / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / beneficiary | |||||||||||||||
Property / beneficiary: Gmina Kraszewice / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / budget | |||||||||||||||
1,246,859.96 zloty
| |||||||||||||||
Property / budget: 1,246,859.96 zloty / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / budget | |||||||||||||||
277,176.97 Euro
| |||||||||||||||
Property / budget: 277,176.97 Euro / rank | |||||||||||||||
Preferred rank | |||||||||||||||
Property / budget: 277,176.97 Euro / qualifier | |||||||||||||||
exchange rate to Euro: 0.24 Euro
| |||||||||||||||
Property / budget: 277,176.97 Euro / qualifier | |||||||||||||||
point in time: 13 January 2020
| |||||||||||||||
Property / location (string) | |||||||||||||||
WOJ.: WIELKOPOLSKIE, POW.: ostrzeszowski | |||||||||||||||
Property / location (string): WOJ.: WIELKOPOLSKIE, POW.: ostrzeszowski / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / priority axis | |||||||||||||||
Property / priority axis: Energy / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / co-financing rate | |||||||||||||||
85.0 percent
| |||||||||||||||
Property / co-financing rate: 85.0 percent / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / coordinate location | |||||||||||||||
51°26'15.43"N, 17°58'29.21"E
| |||||||||||||||
Property / coordinate location: 51°26'15.43"N, 17°58'29.21"E / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / coordinate location: 51°26'15.43"N, 17°58'29.21"E / qualifier | |||||||||||||||
Property / contained in NUTS | |||||||||||||||
Property / contained in NUTS: Kaliski / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / contained in NUTS: Kaliski / qualifier | |||||||||||||||
Property / thematic objective | |||||||||||||||
Property / thematic objective: Low-carbon economy / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / date of last update | |||||||||||||||
24 May 2023
| |||||||||||||||
Property / date of last update: 24 May 2023 / rank | |||||||||||||||
Normal rank |
Revision as of 12:05, 22 March 2024
Project Q134793 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Thermal modernisation of the primary school building in Kuźnica Grabowska |
Project Q134793 in Poland |
Statements
1,059,830.96 zloty
0 references
1,246,859.96 zloty
0 references
85.0 percent
0 references
1 February 2016
0 references
3 November 2017
0 references
GMINA KRASZEWICE
0 references
Przedmiotem projektu jest głęboka modernizacja energetyczna budynku użyteczności publicznej tj.Szkoły Podstawowej w Kuźnicy Grabowskiej w woj.wlkp.Potrzeba realizacji projektu wynika ze złego stanu technicznego obiektu,związanego z jego niską efektywnością energetyczną.Projekt obejmuje swym zakresem:1.Prace przygotowawcze tj.opracowanie Studium Wykonalności2.Roboty budowlane-termomodernizacja budynku SP poprzez docieplenie warstwą styropianu ścian zewn.oraz fundamentowych do poziomu opaski wokół budynku(płyty gr.20cm)oraz docieplenie dachu natryskową pianką PUR.Prace obejmują także roboty odtworzeniowe,wykonanie obróbek blacharskich,orynnowania,wymianę stolarki okiennej i drzwiowej,zmianę pokrycia dachowego z płyt eternitowych na blachodachówkę,docieplenie zadaszenia nad wejściem do kotłowni styropianem gr.5cm,montaż instalacji odgromowej i remont instalacji wewnętrznych w budynku3.Modernizacja źródła ciepła poprzez:wymianę instalacji centralnego ogrzewania wraz z źródłem ciepła i instalacji ciepłej wody użytkowej,w tym:-zmiana kotła na nowoczesny kocioł na pellet-montaż nowej instalacji przesyłowej wraz z izolacją-montaż nowych grzejników z głowicami termostatycznymi i zaworów termostatycznych wraz z automatyką-wymiana instalacji CWU z przyłączeniem do nowego źródła ciepła4.Instalacje elektryczne poprzez wymianę oświetlenia wewnętrznego na nowe typu LED oraz wykonanie instalacji odgromowejPrace pozwolą osiągnąć zakładane produkty projektu tj:liczba zmodernizowanych energetycznie budynków-1szt,dodatkowa zdolność wytwarzania energii cieplnej ze źródeł odnawialnych:0,1500MWt,liczba zmodernizowanych źródeł ciepła-1szt,powierzchnia użytkowa budynku poddanego termomodernizacji:1049,80m2,liczba wybudowanych jednostek wytwarzania energii cieplnej z OZE-1szt.Zakładana oszczędność energii cieplnej i elektrycznej osiągnięta w wyniku realizacji projektu-204,92MWh/rok,tj.72,63%Prace będą realizowane zgodnie z dokumentacją projektową,co pozwoli na zachowanie jakości i trwałości. (Polish)
0 references
The interior of the interior design of the interior and the interior of the enclosed air-conditioning of the eccentricity of the eccentricity of the interior, the interior of the interior, the interior of the interior, the interior of the interior, the interior of the interior, the interior of the interior, the interior of the interior and the interior of the interior of the interior. (English)
21 October 2020
0.001060009853059
0 references
The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (French)
2 December 2021
0 references
The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (German)
9 December 2021
0 references
The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Dutch)
17 December 2021
0 references
The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Italian)
15 January 2022
0 references
The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Spanish)
18 January 2022
0 references
The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Danish)
2 July 2022
0 references
The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Greek)
2 July 2022
0 references
The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Croatian)
2 July 2022
0 references
The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Romanian)
2 July 2022
0 references
The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Slovak)
2 July 2022
0 references
The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Maltese)
2 July 2022
0 references
The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Portuguese)
2 July 2022
0 references
The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Finnish)
2 July 2022
0 references
The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Slovenian)
2 July 2022
0 references
The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Czech)
2 July 2022
0 references
The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Lithuanian)
2 July 2022
0 references
The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Latvian)
2 July 2022
0 references
The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Bulgarian)
2 July 2022
0 references
The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Hungarian)
2 July 2022
0 references
The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Irish)
2 July 2022
0 references
The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Swedish)
2 July 2022
0 references
The subject of the project is a deep modernisation of the public utility building, i.e. Primary school in Kuźnica Grabowska in the province ofwlkp.The need for the implementation of the project results from poor technical condition of the building, due to its low energy efficiency.The design includes its zakresem:1.Prace preparation, i.e. the development of a study of the feasibility of the building2.Construction works — construction works — modernisation of the building’s building, thermal modernisation of the building through insulation with a layer of polystyrene walls, and foundations to the level of the installation of the building (furniture of the main heating system) and the heat source of the building, as well as the entrance of the roof with a roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the work of the installation of the kitchen, as well as the installation of the fireworks, as well as the installation of the roof, as well as the work of the installation of the roof, also the work of the work of the installation of the fireworks, the installation of the boiler with the installation of the fireworks, the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the fireworks, as well as the installation of the furnaces, as well as the installation of the kitchen, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, as well as the installation of the roof, the work also works with the installation of the fireworks, the installation of the interior of the building, the entrance to the heating system, the entrance to the installation of the boiler, the installation of the roof and the installation of the roof, as well as the work of the installation of the fireworks, the installation of the interiors of the building will be equipped with the installation of the power source, the installation of the building, the installation of the boiler, the installation of the roof and the installation of the roof, as well as the installation of the roof, also the work of the installation of the building will be equipped with the installation of a new source of power.Information of the power source, the heat exchange of the building, and the boiler with the access to the roof, as well as the installation of the roof, as well as the installation of the roof, as well as the work of the installation of the building, as well as the installation of the mains of the building. (Estonian)
2 July 2022
0 references
WOJ.: WIELKOPOLSKIE, POW.: ostrzeszowski
0 references
24 May 2023
0 references
Identifiers
RPWP.03.02.01-30-0045/15
0 references