(A19_093_2016_0930116_1118) UPGRADING OF ENERGY INSTALLATIONS (Q2066522): Difference between revisions
Jump to navigation
Jump to search
(Created claim: summary (P836): ACTION 1: IS THERE A RADICAL SUBSTITUTION OF AN OVERSIZED HEAT GENERATOR AND REFURBISHMENT OF THE WHOLE OF THE DISTRIBUTION SYSTEM, WHICH IS NOW DILAPIDATED AND UNECONOMIC. THE HEAT GENERATOR SARA OF THE MURAL TYPE, SEALED, FORCED, CONDENSING, HIGH-YIELD HEAT, AND SARA INSTALLED IN A TOILET INSIDE THE HEATED CONSTRUCTION? CONSTERA’S DISTRIBUTION OF: RETURN PIPE FROM THE BOILER, FLOOR COLLECTORS, PILLAR COLUMN, ZONE VALVES, RETURN PIPING MADE OF...) |
(Changed an Item) |
||
Property / fund | |||
Property / fund: European Regional Development Fund / rank | |||
Normal rank |
Revision as of 00:29, 9 June 2020
Project in Italy financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | (A19_093_2016_0930116_1118) UPGRADING OF ENERGY INSTALLATIONS |
Project in Italy financed by DG Regio |
Statements
4,560.0 Euro
0 references
9,120.0 Euro
0 references
50.0 percent
0 references
15 September 2016
0 references
11 December 2018
0 references
15 September 2018
0 references
FONTANINI SOCIETA' PER AZIONI
0 references
INTERVENTO 1: E PREVISTO UN INTERVENTO RADICALE DI SOSTITUZIONE DI UN GENERATORE DI CALORE SOVRADIMENSIONATO E IL RIFACIMENTO DI TUTTO L?IMPIANTO DELLA DISTRIBUZIONE ORMAI FATISCENTE ED ANTIECONOMICO. IL GENERATORE DI CALORE SARA DEL TIPO MURALE, A CAMERA STAGNA, TIRAGGIO FORZATO, A CONDENSAZIONE, AD ALTO RENDIMENTO, E SARA INSTALLATO IN UN SERVIZIO IGIENICO ALL?INTERNO DELL?EDIFICIO RISCALDATO. LA DISTRIBUZIONE CONSTERA DI: TUBAZIONE DI ANDATA E RITORNO DALLA CALDAIA, COLLETTORI DI PIANO, COLONNA MONTANTE, VALVOLE DI ZONA, TUBAZIONI DI ANDATA E RITORNO IN MATERIALE PLASTICO COIBENTATO, POSTO A VISTA ALL?INTERNO DEI LOCALI RISCALDATI, ED ELEMENTI RADIANTI DIMENSIONATI OPPORTUNAMENTE. LA REGOLAZIONE DELLA POTENZA AVVERRA IN FUNZIONE DI UNA SONDA ESTERNA POSTA NELLA PARETE NORD DEGLI UFFICI E DALLA TEMPERATURA AMBIENTE. GLI OBIETTIVI CHE SONO ALLA BASE DEL PROGETTO PREVEDONO UNA IMPORTANTE RIDUZIONE DEL CONSUMO ANNUO DI COMBUSTIBILE E QUINDI UNA RIDUZIONE DELL?EMISSIONE DI CO2 ED UN RISP (Italian)
0 references
ACTION 1: IS THERE A RADICAL SUBSTITUTION OF AN OVERSIZED HEAT GENERATOR AND REFURBISHMENT OF THE WHOLE OF THE DISTRIBUTION SYSTEM, WHICH IS NOW DILAPIDATED AND UNECONOMIC. THE HEAT GENERATOR SARA OF THE MURAL TYPE, SEALED, FORCED, CONDENSING, HIGH-YIELD HEAT, AND SARA INSTALLED IN A TOILET INSIDE THE HEATED CONSTRUCTION? CONSTERA’S DISTRIBUTION OF: RETURN PIPE FROM THE BOILER, FLOOR COLLECTORS, PILLAR COLUMN, ZONE VALVES, RETURN PIPING MADE OF INSULATED PLASTIC MATERIAL AT THE POINT OF VIEW OF THE PREMISES OF THE HEATED PREMISES AND THE APPROPRIATE RADIAN ELEMENTS. THE AVTRERA POWER CONTROL AS A FUNCTION OF AN EXTERNAL PROBE IN THE NORTH WALL OF THE OFFICES AND AMBIENT TEMPERATURE. THE UNDERLYING OBJECTIVES OF THE PROJECT INCLUDE A SIGNIFICANT REDUCTION IN ANNUAL FUEL CONSUMPTION AND THEREFORE A REDUCTION OF THE CO2 EMISSION AND A RISP (English)
0 references
Identifiers
D58I16002550009
0 references