Removal from Fibrocement in School Buildings — School School No. 2 of Silvestre (Q3357339): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: co-financing rate (P837): 100.0 percentage)
(‎Added qualifier: readability score (P590521): 0.0434303929733435)
 
(4 intermediate revisions by 2 users not shown)
Property / budgetProperty / budget
13,244.0 Euro
Amount13,244.0 Euro
UnitEuro
12,553.4 Euro
Amount12,553.4 Euro
UnitEuro
Property / EU contributionProperty / EU contribution
13,244.0 Euro
Amount13,244.0 Euro
UnitEuro
12,553.4 Euro
Amount12,553.4 Euro
UnitEuro
Property / end time
31 May 2021
Timestamp+2021-05-31T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
 
Property / end time: 31 May 2021 / rank
Normal rank
 
Property / beneficiary name (string)
MUNICÍPIO DE COIMBRA
 
Property / beneficiary name (string): MUNICÍPIO DE COIMBRA / rank
Normal rank
 
Property / summary: In the intervention, it is intended to replace all the elements in asbestos-cement with panels of profiled sheet covering, with thermal insulation. Drop tubes will be cleared and pine cones will be placed in order to avoid future obstruction of the drop tubes. (English) / qualifier
 
readability score: 0.0434303929733435
Amount0.0434303929733435
Unit1
Property / location (string)
Coimbra, Região de Coimbra, Centro
 
Property / location (string): Coimbra, Região de Coimbra, Centro / rank
Normal rank
 
Property / beneficiary
 
Property / beneficiary: Q4339204 / rank
Normal rank
 
Property / contained in Local Administrative Unit
 
Property / contained in Local Administrative Unit: União das freguesias de Coimbra (Sé Nova, Santa Cruz, Almedina e São Bartolomeu) / rank
 
Normal rank
Property / priority axis
 
Property / priority axis: Developing Human Potential (APRENDER) / rank
 
Normal rank
Property / co-financing rate
 
100.0 percent
Amount100.0 percent
Unitpercent
Property / co-financing rate: 100.0 percent / rank
 
Normal rank
Property / thematic objective
 
Property / thematic objective: Educational and vocational training / rank
 
Normal rank
Property / end time
 
7 August 2021
Timestamp+2021-08-07T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / end time: 7 August 2021 / rank
 
Normal rank
Property / location (string)
 
Coimbra
Property / location (string): Coimbra / rank
 
Normal rank
Property / coordinate location
 
40°12'40.28"N, 8°25'46.06"W
Latitude40.2111931
Longitude-8.4294632
Precision1.0E-5
Globehttp://www.wikidata.org/entity/Q2
Property / coordinate location: 40°12'40.28"N, 8°25'46.06"W / rank
 
Normal rank
Property / coordinate location: 40°12'40.28"N, 8°25'46.06"W / qualifier
 
Property / contained in NUTS
 
Property / contained in NUTS: Coimbra Region / rank
 
Normal rank
Property / beneficiary
 
Property / beneficiary: MUNICÍPIO DE COIMBRA / rank
 
Normal rank
Property / beneficiary name (string)
 
MUNICÍPIO DE COIMBRA
Property / beneficiary name (string): MUNICÍPIO DE COIMBRA / rank
 
Normal rank
Property / date of last update
 
14 November 2023
Timestamp+2023-11-14T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / date of last update: 14 November 2023 / rank
 
Normal rank

Latest revision as of 10:58, 20 March 2024

Project Q3357339 in Portugal
Language Label Description Also known as
English
Removal from Fibrocement in School Buildings — School School No. 2 of Silvestre
Project Q3357339 in Portugal

    Statements

    0 references
    12,553.4 Euro
    0 references
    12,553.4 Euro
    0 references
    100.0 percent
    0 references
    17 December 2020
    0 references
    7 August 2021
    0 references
    MUNICÍPIO DE COIMBRA
    0 references

    40°12'40.28"N, 8°25'46.06"W
    0 references
    Na intervenção pretende-se substituir todos os elementos em fibrocimento por painéis de cobertura de chapa perfilada, com isolamento térmico. Serão desobstruídos os tubos de queda e será colocada pinha para evitar a futura obstrução dos tubos de queda. (Portuguese)
    0 references
    In the intervention, it is intended to replace all the elements in asbestos-cement with panels of profiled sheet covering, with thermal insulation. Drop tubes will be cleared and pine cones will be placed in order to avoid future obstruction of the drop tubes. (English)
    29 November 2021
    0.0434303929733435
    0 references
    Dans l’intervention, il est destiné à remplacer tous les éléments en amiante-ciment par des panneaux de revêtement en tôle profilée, par une isolation thermique. Les tubes de goutte seront nettoyés et les cônes de pin seront placés afin d’éviter l’obstruction future des tubes de goutte. (French)
    7 December 2021
    0 references
    Bei der Intervention sollen alle Elemente in Asbestzement durch Platten aus profilierten Blechen durch Wärmedämmung ersetzt werden. Tropfenröhren werden geräumt und Kiefernzapfen werden platziert, um zukünftige Behinderung der Tropfenrohre zu vermeiden. (German)
    16 December 2021
    0 references
    In de interventie is het bedoeld om alle elementen in asbestcement te vervangen door panelen van geprofileerde plaatbedekking, door thermische isolatie. Druppelbuizen worden ontruimd en dennenappels worden geplaatst om toekomstige obstructie van de druppelbuizen te voorkomen. (Dutch)
    20 December 2021
    0 references
    Nell'intervento, è destinato a sostituire tutti gli elementi in amianto-cemento con pannelli di rivestimento in lamiera profilata, con isolamento termico. I tubi goccia saranno sgomberati e le pigne saranno posizionate in modo da evitare futuri ostruzioni dei tubi di goccia. (Italian)
    18 January 2022
    0 references
    En la intervención, se pretende sustituir todos los elementos del amianto-cemento por paneles de revestimiento de chapa perfilada, por aislamiento térmico. Se limpiarán tubos de gota y se colocarán conos de pino para evitar la obstrucción futura de los tubos de caída. (Spanish)
    22 January 2022
    0 references
    Sekkumisel on ette nähtud asendada kõik asbesttsemendi elemendid profiilplekiga kaetud paneelidega soojusisolatsiooniga. Tilgutustorud tühjendatakse ja pannakse männikäbid, et vältida tulevikus kukkumistorude ummistumist. (Estonian)
    7 August 2022
    0 references
    Intervencijoje siekiama pakeisti visus asbesto cemento elementus profiliuotos lakštų dangos plokštėmis, šilumine izoliacija. Lašinimo vamzdžiai bus išvalyti ir pušies spurgai bus dedami, kad ateityje nebūtų kliūčių lašinimo vamzdeliams. (Lithuanian)
    7 August 2022
    0 references
    U intervenciji je namijenjen zamjeni svih elemenata u azbest-cementu s pločama profiliranog lima, s toplinskom izolacijom. Kap cijevi će biti izbrisani i borovi češeri će biti postavljeni kako bi se izbjeglo buduće opstrukcije kap cijevi. (Croatian)
    7 August 2022
    0 references
    Στην παρέμβαση, προορίζεται να αντικαταστήσει όλα τα στοιχεία του τσιμέντου αμιάντου με πάνελ από καλυμμένο φύλλο, με θερμομόνωση. Οι σωλήνες σταγόνας θα καθαριστούν και τα κουκουνάρια θα τοποθετηθούν προκειμένου να αποφευχθεί η μελλοντική απόφραξη των σωλήνων σταγόνας. (Greek)
    7 August 2022
    0 references
    Pri intervencii je určená na nahradenie všetkých prvkov azbestocementu panelmi z profilovaného plechu s tepelnou izoláciou. Kvapka rúrky budú vyčistené a borovicové šišky budú umiestnené, aby sa zabránilo budúcej obštrukcii kvapka trubice. (Slovak)
    7 August 2022
    0 references
    Interventiossa on tarkoitus korvata kaikki asbestisementin elementit profiloidun levyn pinnoitteilla lämpöeristyksen avulla. Pudota putket tyhjennetään ja mänty käpyjä sijoitetaan, jotta vältetään tulevaisuudessa tukkeutuminen pudota putkia. (Finnish)
    7 August 2022
    0 references
    W ramach interwencji ma ona na celu zastąpienie wszystkich elementów azbestowo-cementowymi panelami profilowanych pokryć blach, z izolacją cieplną. Rury kroplowe zostaną oczyszczone, a szyszki sosnowe zostaną umieszczone w celu uniknięcia w przyszłości zablokowania rurek kroplowych. (Polish)
    7 August 2022
    0 references
    A beavatkozás során az azbesztcement valamennyi elemét fel kell váltani profilozott lemezburkolattal, hőszigeteléssel. Csepp csövek lesz megtisztítva, és fenyő kúpok kerül elhelyezésére annak érdekében, hogy elkerüljék a jövőben akadálya a csepp csövek. (Hungarian)
    7 August 2022
    0 references
    V intervenci je určen k nahrazení všech prvků v azbestocementu panely profilovaného plechového krytu s tepelnou izolací. Drop trubky budou vymazány a piniové kužely budou umístěny, aby se zabránilo budoucí obstrukce kapkové trubky. (Czech)
    7 August 2022
    0 references
    Intervence paredz aizstāt visus azbestcementa elementus ar profilētu lokšņu pārklājumu ar siltumizolāciju. Piliens caurules tiks notīrīti un priedes konusi tiks novietoti, lai izvairītos no turpmākas nosprostojums piliens caurules. (Latvian)
    7 August 2022
    0 references
    San idirghabháil, tá sé beartaithe painéil chlúdaigh leatháin phróifílithe a chur in ionad na n-eilimintí go léir i stroighin aispeiste, le insliú teirmeach. Déanfar feadáin titim a ghlanadh agus cuirfear cóin péine d’fhonn bac a chur ar na feadáin titim amach anseo. (Irish)
    7 August 2022
    0 references
    V intervenciji je namenjena zamenjavi vseh elementov azbestnega cementa s ploščami iz profilirane pločevine s toplotno izolacijo. Spust cevi bodo očiščene in bor stožci bodo nameščeni, da se prepreči prihodnje oviranje kapljic cevi. (Slovenian)
    7 August 2022
    0 references
    При интервенцията той е предназначен да замени всички елементи на азбестоцимент с панели от профилирани листови покрития, с топлоизолация. Падащите тръби ще бъдат изчистени и ще бъдат поставени борови шишарки, за да се избегне бъдещо запушване на капковите тръби. (Bulgarian)
    7 August 2022
    0 references
    Fl-intervent, huwa maħsub li l-elementi kollha fis-siment ta’ l-asbestos jiġu sostitwiti b’pannelli ta’ folji profilati, b’insulazzjoni termali. Tubi drop se jiġu kklerjati u koni arżnu se jitqiegħdu sabiex jiġi evitat ostruzzjoni fil-futur tat-tubi drop. (Maltese)
    7 August 2022
    0 references
    I interventionen er det beregnet til at erstatte alle elementerne i asbestcement med paneler af profileret pladebelægning, med varmeisolering. Drop rør vil blive ryddet og pine kegler vil blive placeret for at undgå fremtidig obstruktion af drop rør. (Danish)
    7 August 2022
    0 references
    În cadrul intervenției, se intenționează înlocuirea tuturor elementelor din azbociment cu panouri de acoperire a foilor profilate, cu izolație termică. Tuburi picătură vor fi eliminate și conuri de pin vor fi plasate în scopul de a evita obstrucția viitoare a tuburilor picătură. (Romanian)
    7 August 2022
    0 references
    I ingreppet är avsikten att ersätta alla element i asbestcement med paneler av profilerad plåtbeläggning, med värmeisolering. Dropprör kommer att rensas och tallkottar kommer att placeras för att undvika framtida obstruktion av dropprören. (Swedish)
    7 August 2022
    0 references
    Coimbra
    0 references
    14 November 2023
    0 references

    Identifiers

    CENTRO-03-5673-FEDER-000246
    0 references