HEAD PROJECT — GROUP 1, ACTIVITY 3, ‘EVALUATION OF THE UNSTRUCUTRED N-TERMINAL’ — GS (Q1958515): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in fr, and other parts: Adding French translations) |
(Added qualifier: readability score (P590521): 0.00004899225649689162) |
||||||||||||||
(11 intermediate revisions by the same user not shown) | |||||||||||||||
label / nl | label / nl | ||||||||||||||
PROJECTLEIDER — GROEP 1, ACTIVITEIT 3, CHEQUE „EVALUATIE VAN DE NIET-GESTRUCTUREERDE N-TERMINAL” — GS | |||||||||||||||
label / de | label / de | ||||||||||||||
PROJEKTLEITER – GRUPPE 1, AKTIVITÄT 3, SCHECK „BEWERTUNG DES UNSTRUKTURIERTEN N-TERMINALS“ – GS | |||||||||||||||
label / es | label / es | ||||||||||||||
JEFE DE PROYECTO — GRUPO 1, ACTIVIDAD 3, CHEQUE «EVALUACIÓN DEL N-TERMINAL NO ESTRUCTURADO» — SG | |||||||||||||||
label / da | label / da | ||||||||||||||
HOVEDPROJEKT — GRUPPE 1, AKTIVITET 3, "EVALUERING AF UNSTRUCUTRED N-TERMINAL" — GS | |||||||||||||||
label / el | label / el | ||||||||||||||
ΕΠΙΚΕΦΑΛΉΣ ΈΡΓΟΥ — ΟΜΆΔΑ 1, ΔΡΑΣΤΗΡΙΌΤΗΤΑ 3, «ΑΞΙΟΛΌΓΗΣΗ ΤΟΥ ΜΗ ΤΕΡΜΑΤΙΚΟΎ ΣΤΑΘΜΟΎ UNSTRUCUTRED» — GS | |||||||||||||||
label / hr | label / hr | ||||||||||||||
GLAVNI PROJEKT – SKUPINA 1, AKTIVNOST 3, „EVALUACIJA UNSTRUCUTRED N-TERMINALA” – GS | |||||||||||||||
label / ro | label / ro | ||||||||||||||
PROIECT PRINCIPAL – GRUPA 1, ACTIVITATEA 3, „EVALUAREA N-TERMINALULUI UNSTRUCUTRED” – GS | |||||||||||||||
label / sk | label / sk | ||||||||||||||
HLAVNÝ PROJEKT – SKUPINA 1, ČINNOSŤ 3, „HODNOTENIE N-TERMINÁLU UNSTRUCUTRED“ – GS | |||||||||||||||
label / mt | label / mt | ||||||||||||||
PROĠETT PRINĊIPALI — GRUPP 1, ATTIVITÀ 3, “EVALWAZZJONI TAL-N-TERMINAL UNSTRUCUTRED” — GS | |||||||||||||||
label / pt | label / pt | ||||||||||||||
PROJETO PRINCIPAL — GRUPO 1, ATIVIDADE 3, «AVALIAÇÃO DO N-TERMINAL UNSTRUCUTRED» — GS | |||||||||||||||
label / fi | label / fi | ||||||||||||||
PÄÄHANKE – RYHMÄ 1, TOIMI 3, ”UNSTRUCUTRED N-TERMINAALIN ARVIOINTI” – GS | |||||||||||||||
label / pl | label / pl | ||||||||||||||
PROJEKT GŁÓWNY – GRUPA 1, DZIAŁANIE 3, „OCENA N-TERMINALU UNSTRUCUTRED” – GS | |||||||||||||||
label / sl | label / sl | ||||||||||||||
GLAVNI PROJEKT – SKUPINA 1, DEJAVNOST 3, „OCENA N-TERMINALA UNSTRUCUTRED“ – GS | |||||||||||||||
label / cs | label / cs | ||||||||||||||
HLAVNÍ PROJEKT – SKUPINA 1, ČINNOST 3, „HODNOCENÍ UNSTRUCUTRED N-TERMINAL“ – GS | |||||||||||||||
label / lt | label / lt | ||||||||||||||
PAGRINDINIS PROJEKTAS – 1 GRUPĖ, 3 VEIKLA, „UNSTRUCUTRED N-TERMINAL VERTINIMAS“ – GS | |||||||||||||||
label / lv | label / lv | ||||||||||||||
GALVENAIS PROJEKTS — 1. GRUPA, 3. DARBĪBA, “UNSTRUCUTRED N-TERMINAL NOVĒRTĒJUMS” — GS | |||||||||||||||
label / bg | label / bg | ||||||||||||||
ГЛАВЕН ПРОЕКТ — ГРУПА 1, ДЕЙНОСТ 3, „ОЦЕНКА НА N-ТЕРМИНАЛА UNSTRUCUTRED“ — GS | |||||||||||||||
label / hu | label / hu | ||||||||||||||
FŐPROJEKT – 1. CSOPORT, 3. TEVÉKENYSÉG, „AZ UNSTRUCUTRED N-TERMINÁL ÉRTÉKELÉSE” – GS | |||||||||||||||
label / ga | label / ga | ||||||||||||||
CEANNTHIONSCADAL — GRÚPA 1, GNÍOMHAÍOCHT 3, ‘MEASTÓIREACHT AR CHRÍOCHFORT N-TEIRMINÉAL UNSTRUCUTRED’ — GS | |||||||||||||||
label / sv | label / sv | ||||||||||||||
HUVUDPROJEKT – GRUPP 1, VERKSAMHET 3, UTVÄRDERING AV UNSTRUCUTRED N-TERMINALEN – GS | |||||||||||||||
label / et | label / et | ||||||||||||||
JUHTPROJEKT – 1. RÜHM, TEGEVUS 3, „ÜHENDUSE N-TERMINALI HINDAMINE“- GS | |||||||||||||||
description / bg | description / bg | ||||||||||||||
Проект Q1958515 в Италия | |||||||||||||||
description / hr | description / hr | ||||||||||||||
Projekt Q1958515 u Italiji | |||||||||||||||
description / hu | description / hu | ||||||||||||||
Projekt Q1958515 Olaszországban | |||||||||||||||
description / cs | description / cs | ||||||||||||||
Projekt Q1958515 v Itálii | |||||||||||||||
description / da | description / da | ||||||||||||||
Projekt Q1958515 i Italien | |||||||||||||||
description / nl | description / nl | ||||||||||||||
Project Q1958515 in Italië | |||||||||||||||
description / et | description / et | ||||||||||||||
Projekt Q1958515 Itaalias | |||||||||||||||
description / fi | description / fi | ||||||||||||||
Projekti Q1958515 Italiassa | |||||||||||||||
description / fr | description / fr | ||||||||||||||
Projet Q1958515 en Italie | |||||||||||||||
description / de | description / de | ||||||||||||||
Projekt Q1958515 in Italien | |||||||||||||||
description / el | description / el | ||||||||||||||
Έργο Q1958515 στην Ιταλία | |||||||||||||||
description / ga | description / ga | ||||||||||||||
Tionscadal Q1958515 san Iodáil | |||||||||||||||
description / lv | description / lv | ||||||||||||||
Projekts Q1958515 Itālijā | |||||||||||||||
description / lt | description / lt | ||||||||||||||
Projektas Q1958515 Italijoje | |||||||||||||||
description / mt | description / mt | ||||||||||||||
Proġett Q1958515 fl-Italja | |||||||||||||||
description / pl | description / pl | ||||||||||||||
Projekt Q1958515 we Włoszech | |||||||||||||||
description / pt | description / pt | ||||||||||||||
Projeto Q1958515 na Itália | |||||||||||||||
description / ro | description / ro | ||||||||||||||
Proiectul Q1958515 în Italia | |||||||||||||||
description / sk | description / sk | ||||||||||||||
Projekt Q1958515 v Taliansku | |||||||||||||||
description / sl | description / sl | ||||||||||||||
Projekt Q1958515 v Italiji | |||||||||||||||
description / es | description / es | ||||||||||||||
Proyecto Q1958515 en Italia | |||||||||||||||
description / sv | description / sv | ||||||||||||||
Projekt Q1958515 i Italien | |||||||||||||||
Property / EU contribution | |||||||||||||||
| |||||||||||||||
Property / EU contribution: 33,155.0 Euro / rank | |||||||||||||||
Property / budget | |||||||||||||||
| |||||||||||||||
Property / budget: 66,310.0 Euro / rank | |||||||||||||||
Property / co-financing rate | |||||||||||||||
| |||||||||||||||
Property / co-financing rate: 50.0 percent / rank | |||||||||||||||
Property / summary: HEAD PROJECT — GROUP 1, ACTIVITY 3, ‘EVALUATION OF THE UNSTRUCUTRED N-TERMINAL’ — GS (English) / qualifier | |||||||||||||||
readability score: 0.00004899225649689162
| |||||||||||||||
Property / summary | |||||||||||||||
PROJECTLEIDER — GROEP 1, ACTIVITEIT 3, CHEQUE „EVALUATIE VAN DE NIET-GESTRUCTUREERDE N-TERMINAL” — GS (Dutch) | |||||||||||||||
Property / summary: PROJECTLEIDER — GROEP 1, ACTIVITEIT 3, CHEQUE „EVALUATIE VAN DE NIET-GESTRUCTUREERDE N-TERMINAL” — GS (Dutch) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: PROJECTLEIDER — GROEP 1, ACTIVITEIT 3, CHEQUE „EVALUATIE VAN DE NIET-GESTRUCTUREERDE N-TERMINAL” — GS (Dutch) / qualifier | |||||||||||||||
point in time: 22 December 2021
| |||||||||||||||
Property / summary | |||||||||||||||
PROJEKTLEITER – GRUPPE 1, AKTIVITÄT 3, SCHECK „BEWERTUNG DES UNSTRUKTURIERTEN N-TERMINALS“ – GS (German) | |||||||||||||||
Property / summary: PROJEKTLEITER – GRUPPE 1, AKTIVITÄT 3, SCHECK „BEWERTUNG DES UNSTRUKTURIERTEN N-TERMINALS“ – GS (German) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: PROJEKTLEITER – GRUPPE 1, AKTIVITÄT 3, SCHECK „BEWERTUNG DES UNSTRUKTURIERTEN N-TERMINALS“ – GS (German) / qualifier | |||||||||||||||
point in time: 23 December 2021
| |||||||||||||||
Property / summary | |||||||||||||||
JEFE DE PROYECTO — GRUPO 1, ACTIVIDAD 3, CHEQUE «EVALUACIÓN DEL N-TERMINAL NO ESTRUCTURADO» — SG (Spanish) | |||||||||||||||
Property / summary: JEFE DE PROYECTO — GRUPO 1, ACTIVIDAD 3, CHEQUE «EVALUACIÓN DEL N-TERMINAL NO ESTRUCTURADO» — SG (Spanish) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: JEFE DE PROYECTO — GRUPO 1, ACTIVIDAD 3, CHEQUE «EVALUACIÓN DEL N-TERMINAL NO ESTRUCTURADO» — SG (Spanish) / qualifier | |||||||||||||||
point in time: 24 January 2022
| |||||||||||||||
Property / summary | |||||||||||||||
HOVEDPROJEKT — GRUPPE 1, AKTIVITET 3, "EVALUERING AF UNSTRUCUTRED N-TERMINAL" — GS (Danish) | |||||||||||||||
Property / summary: HOVEDPROJEKT — GRUPPE 1, AKTIVITET 3, "EVALUERING AF UNSTRUCUTRED N-TERMINAL" — GS (Danish) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: HOVEDPROJEKT — GRUPPE 1, AKTIVITET 3, "EVALUERING AF UNSTRUCUTRED N-TERMINAL" — GS (Danish) / qualifier | |||||||||||||||
point in time: 4 July 2022
| |||||||||||||||
Property / summary | |||||||||||||||
ΕΠΙΚΕΦΑΛΉΣ ΈΡΓΟΥ — ΟΜΆΔΑ 1, ΔΡΑΣΤΗΡΙΌΤΗΤΑ 3, «ΑΞΙΟΛΌΓΗΣΗ ΤΟΥ ΜΗ ΤΕΡΜΑΤΙΚΟΎ ΣΤΑΘΜΟΎ UNSTRUCUTRED» — GS (Greek) | |||||||||||||||
Property / summary: ΕΠΙΚΕΦΑΛΉΣ ΈΡΓΟΥ — ΟΜΆΔΑ 1, ΔΡΑΣΤΗΡΙΌΤΗΤΑ 3, «ΑΞΙΟΛΌΓΗΣΗ ΤΟΥ ΜΗ ΤΕΡΜΑΤΙΚΟΎ ΣΤΑΘΜΟΎ UNSTRUCUTRED» — GS (Greek) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: ΕΠΙΚΕΦΑΛΉΣ ΈΡΓΟΥ — ΟΜΆΔΑ 1, ΔΡΑΣΤΗΡΙΌΤΗΤΑ 3, «ΑΞΙΟΛΌΓΗΣΗ ΤΟΥ ΜΗ ΤΕΡΜΑΤΙΚΟΎ ΣΤΑΘΜΟΎ UNSTRUCUTRED» — GS (Greek) / qualifier | |||||||||||||||
point in time: 4 July 2022
| |||||||||||||||
Property / summary | |||||||||||||||
GLAVNI PROJEKT – SKUPINA 1, AKTIVNOST 3, „EVALUACIJA UNSTRUCUTRED N-TERMINALA” – GS (Croatian) | |||||||||||||||
Property / summary: GLAVNI PROJEKT – SKUPINA 1, AKTIVNOST 3, „EVALUACIJA UNSTRUCUTRED N-TERMINALA” – GS (Croatian) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: GLAVNI PROJEKT – SKUPINA 1, AKTIVNOST 3, „EVALUACIJA UNSTRUCUTRED N-TERMINALA” – GS (Croatian) / qualifier | |||||||||||||||
point in time: 4 July 2022
| |||||||||||||||
Property / summary | |||||||||||||||
PROIECT PRINCIPAL – GRUPA 1, ACTIVITATEA 3, „EVALUAREA N-TERMINALULUI UNSTRUCUTRED” – GS (Romanian) | |||||||||||||||
Property / summary: PROIECT PRINCIPAL – GRUPA 1, ACTIVITATEA 3, „EVALUAREA N-TERMINALULUI UNSTRUCUTRED” – GS (Romanian) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: PROIECT PRINCIPAL – GRUPA 1, ACTIVITATEA 3, „EVALUAREA N-TERMINALULUI UNSTRUCUTRED” – GS (Romanian) / qualifier | |||||||||||||||
point in time: 4 July 2022
| |||||||||||||||
Property / summary | |||||||||||||||
HLAVNÝ PROJEKT – SKUPINA 1, ČINNOSŤ 3, „HODNOTENIE N-TERMINÁLU UNSTRUCUTRED“ – GS (Slovak) | |||||||||||||||
Property / summary: HLAVNÝ PROJEKT – SKUPINA 1, ČINNOSŤ 3, „HODNOTENIE N-TERMINÁLU UNSTRUCUTRED“ – GS (Slovak) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: HLAVNÝ PROJEKT – SKUPINA 1, ČINNOSŤ 3, „HODNOTENIE N-TERMINÁLU UNSTRUCUTRED“ – GS (Slovak) / qualifier | |||||||||||||||
point in time: 4 July 2022
| |||||||||||||||
Property / summary | |||||||||||||||
PROĠETT PRINĊIPALI — GRUPP 1, ATTIVITÀ 3, “EVALWAZZJONI TAL-N-TERMINAL UNSTRUCUTRED” — GS (Maltese) | |||||||||||||||
Property / summary: PROĠETT PRINĊIPALI — GRUPP 1, ATTIVITÀ 3, “EVALWAZZJONI TAL-N-TERMINAL UNSTRUCUTRED” — GS (Maltese) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: PROĠETT PRINĊIPALI — GRUPP 1, ATTIVITÀ 3, “EVALWAZZJONI TAL-N-TERMINAL UNSTRUCUTRED” — GS (Maltese) / qualifier | |||||||||||||||
point in time: 4 July 2022
| |||||||||||||||
Property / summary | |||||||||||||||
PROJETO PRINCIPAL — GRUPO 1, ATIVIDADE 3, «AVALIAÇÃO DO N-TERMINAL UNSTRUCUTRED» — GS (Portuguese) | |||||||||||||||
Property / summary: PROJETO PRINCIPAL — GRUPO 1, ATIVIDADE 3, «AVALIAÇÃO DO N-TERMINAL UNSTRUCUTRED» — GS (Portuguese) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: PROJETO PRINCIPAL — GRUPO 1, ATIVIDADE 3, «AVALIAÇÃO DO N-TERMINAL UNSTRUCUTRED» — GS (Portuguese) / qualifier | |||||||||||||||
point in time: 4 July 2022
| |||||||||||||||
Property / summary | |||||||||||||||
PÄÄHANKE – RYHMÄ 1, TOIMI 3, ”UNSTRUCUTRED N-TERMINAALIN ARVIOINTI” – GS (Finnish) | |||||||||||||||
Property / summary: PÄÄHANKE – RYHMÄ 1, TOIMI 3, ”UNSTRUCUTRED N-TERMINAALIN ARVIOINTI” – GS (Finnish) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: PÄÄHANKE – RYHMÄ 1, TOIMI 3, ”UNSTRUCUTRED N-TERMINAALIN ARVIOINTI” – GS (Finnish) / qualifier | |||||||||||||||
point in time: 4 July 2022
| |||||||||||||||
Property / summary | |||||||||||||||
PROJEKT GŁÓWNY – GRUPA 1, DZIAŁANIE 3, „OCENA N-TERMINALU UNSTRUCUTRED” – GS (Polish) | |||||||||||||||
Property / summary: PROJEKT GŁÓWNY – GRUPA 1, DZIAŁANIE 3, „OCENA N-TERMINALU UNSTRUCUTRED” – GS (Polish) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: PROJEKT GŁÓWNY – GRUPA 1, DZIAŁANIE 3, „OCENA N-TERMINALU UNSTRUCUTRED” – GS (Polish) / qualifier | |||||||||||||||
point in time: 4 July 2022
| |||||||||||||||
Property / summary | |||||||||||||||
GLAVNI PROJEKT – SKUPINA 1, DEJAVNOST 3, „OCENA N-TERMINALA UNSTRUCUTRED“ – GS (Slovenian) | |||||||||||||||
Property / summary: GLAVNI PROJEKT – SKUPINA 1, DEJAVNOST 3, „OCENA N-TERMINALA UNSTRUCUTRED“ – GS (Slovenian) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: GLAVNI PROJEKT – SKUPINA 1, DEJAVNOST 3, „OCENA N-TERMINALA UNSTRUCUTRED“ – GS (Slovenian) / qualifier | |||||||||||||||
point in time: 4 July 2022
| |||||||||||||||
Property / summary | |||||||||||||||
HLAVNÍ PROJEKT – SKUPINA 1, ČINNOST 3, „HODNOCENÍ UNSTRUCUTRED N-TERMINAL“ – GS (Czech) | |||||||||||||||
Property / summary: HLAVNÍ PROJEKT – SKUPINA 1, ČINNOST 3, „HODNOCENÍ UNSTRUCUTRED N-TERMINAL“ – GS (Czech) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: HLAVNÍ PROJEKT – SKUPINA 1, ČINNOST 3, „HODNOCENÍ UNSTRUCUTRED N-TERMINAL“ – GS (Czech) / qualifier | |||||||||||||||
point in time: 4 July 2022
| |||||||||||||||
Property / summary | |||||||||||||||
PAGRINDINIS PROJEKTAS – 1 GRUPĖ, 3 VEIKLA, „UNSTRUCUTRED N-TERMINAL VERTINIMAS“ – GS (Lithuanian) | |||||||||||||||
Property / summary: PAGRINDINIS PROJEKTAS – 1 GRUPĖ, 3 VEIKLA, „UNSTRUCUTRED N-TERMINAL VERTINIMAS“ – GS (Lithuanian) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: PAGRINDINIS PROJEKTAS – 1 GRUPĖ, 3 VEIKLA, „UNSTRUCUTRED N-TERMINAL VERTINIMAS“ – GS (Lithuanian) / qualifier | |||||||||||||||
point in time: 4 July 2022
| |||||||||||||||
Property / summary | |||||||||||||||
GALVENAIS PROJEKTS — 1. GRUPA, 3. DARBĪBA, “UNSTRUCUTRED N-TERMINAL NOVĒRTĒJUMS” — GS (Latvian) | |||||||||||||||
Property / summary: GALVENAIS PROJEKTS — 1. GRUPA, 3. DARBĪBA, “UNSTRUCUTRED N-TERMINAL NOVĒRTĒJUMS” — GS (Latvian) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: GALVENAIS PROJEKTS — 1. GRUPA, 3. DARBĪBA, “UNSTRUCUTRED N-TERMINAL NOVĒRTĒJUMS” — GS (Latvian) / qualifier | |||||||||||||||
point in time: 4 July 2022
| |||||||||||||||
Property / summary | |||||||||||||||
ГЛАВЕН ПРОЕКТ — ГРУПА 1, ДЕЙНОСТ 3, „ОЦЕНКА НА N-ТЕРМИНАЛА UNSTRUCUTRED“ — GS (Bulgarian) | |||||||||||||||
Property / summary: ГЛАВЕН ПРОЕКТ — ГРУПА 1, ДЕЙНОСТ 3, „ОЦЕНКА НА N-ТЕРМИНАЛА UNSTRUCUTRED“ — GS (Bulgarian) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: ГЛАВЕН ПРОЕКТ — ГРУПА 1, ДЕЙНОСТ 3, „ОЦЕНКА НА N-ТЕРМИНАЛА UNSTRUCUTRED“ — GS (Bulgarian) / qualifier | |||||||||||||||
point in time: 4 July 2022
| |||||||||||||||
Property / summary | |||||||||||||||
FŐPROJEKT – 1. CSOPORT, 3. TEVÉKENYSÉG, „AZ UNSTRUCUTRED N-TERMINÁL ÉRTÉKELÉSE” – GS (Hungarian) | |||||||||||||||
Property / summary: FŐPROJEKT – 1. CSOPORT, 3. TEVÉKENYSÉG, „AZ UNSTRUCUTRED N-TERMINÁL ÉRTÉKELÉSE” – GS (Hungarian) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: FŐPROJEKT – 1. CSOPORT, 3. TEVÉKENYSÉG, „AZ UNSTRUCUTRED N-TERMINÁL ÉRTÉKELÉSE” – GS (Hungarian) / qualifier | |||||||||||||||
point in time: 4 July 2022
| |||||||||||||||
Property / summary | |||||||||||||||
CEANNTHIONSCADAL — GRÚPA 1, GNÍOMHAÍOCHT 3, ‘MEASTÓIREACHT AR CHRÍOCHFORT N-TEIRMINÉAL UNSTRUCUTRED’ — GS (Irish) | |||||||||||||||
Property / summary: CEANNTHIONSCADAL — GRÚPA 1, GNÍOMHAÍOCHT 3, ‘MEASTÓIREACHT AR CHRÍOCHFORT N-TEIRMINÉAL UNSTRUCUTRED’ — GS (Irish) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: CEANNTHIONSCADAL — GRÚPA 1, GNÍOMHAÍOCHT 3, ‘MEASTÓIREACHT AR CHRÍOCHFORT N-TEIRMINÉAL UNSTRUCUTRED’ — GS (Irish) / qualifier | |||||||||||||||
point in time: 4 July 2022
| |||||||||||||||
Property / summary | |||||||||||||||
HUVUDPROJEKT – GRUPP 1, VERKSAMHET 3, UTVÄRDERING AV UNSTRUCUTRED N-TERMINALEN – GS (Swedish) | |||||||||||||||
Property / summary: HUVUDPROJEKT – GRUPP 1, VERKSAMHET 3, UTVÄRDERING AV UNSTRUCUTRED N-TERMINALEN – GS (Swedish) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: HUVUDPROJEKT – GRUPP 1, VERKSAMHET 3, UTVÄRDERING AV UNSTRUCUTRED N-TERMINALEN – GS (Swedish) / qualifier | |||||||||||||||
point in time: 4 July 2022
| |||||||||||||||
Property / summary | |||||||||||||||
JUHTPROJEKT – 1. RÜHM, TEGEVUS 3, „ÜHENDUSE N-TERMINALI HINDAMINE“- GS (Estonian) | |||||||||||||||
Property / summary: JUHTPROJEKT – 1. RÜHM, TEGEVUS 3, „ÜHENDUSE N-TERMINALI HINDAMINE“- GS (Estonian) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: JUHTPROJEKT – 1. RÜHM, TEGEVUS 3, „ÜHENDUSE N-TERMINALI HINDAMINE“- GS (Estonian) / qualifier | |||||||||||||||
point in time: 4 July 2022
| |||||||||||||||
Property / location (string) | |||||||||||||||
TRIESTE | |||||||||||||||
Property / location (string): TRIESTE / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / budget | |||||||||||||||
66,298.82 Euro
| |||||||||||||||
Property / budget: 66,298.82 Euro / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / EU contribution | |||||||||||||||
33,146.4 Euro
| |||||||||||||||
Property / EU contribution: 33,146.4 Euro / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / co-financing rate | |||||||||||||||
50.0 percent
| |||||||||||||||
Property / co-financing rate: 50.0 percent / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / priority axis | |||||||||||||||
Property / priority axis: EDUCATION AND TRAINING / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / thematic objective | |||||||||||||||
Property / thematic objective: Educational and vocational training / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / end time | |||||||||||||||
31 July 2020
| |||||||||||||||
Property / end time: 31 July 2020 / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / date of last update | |||||||||||||||
8 April 2023
| |||||||||||||||
Property / date of last update: 8 April 2023 / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / Call for proposal | |||||||||||||||
Property / Call for proposal: progr.spec.25/15 282 01/02/2016 / rank | |||||||||||||||
Normal rank |
Revision as of 16:16, 12 March 2024
Project Q1958515 in Italy
Language | Label | Description | Also known as |
---|---|---|---|
English | HEAD PROJECT — GROUP 1, ACTIVITY 3, ‘EVALUATION OF THE UNSTRUCUTRED N-TERMINAL’ — GS |
Project Q1958515 in Italy |
Statements
33,146.4 Euro
0 references
66,298.82 Euro
0 references
50.0 percent
0 references
31 October 2017
0 references
31 July 2020
0 references
22 November 2019
0 references
SCUOLA INTERNAZIONALE SUPERIORE DI STUDI AVANZATI
0 references
PROGETTO HEAD - GRUPPO 1, ATTIVITA' 3, ASSEGNO ''EVALUATION OF THE UNSTRUCTURED N-TERMINAL' - GS (Italian)
0 references
HEAD PROJECT — GROUP 1, ACTIVITY 3, ‘EVALUATION OF THE UNSTRUCUTRED N-TERMINAL’ — GS (English)
0.00004899225649689162
0 references
CHEF DE PROJET — GROUPE 1, ACTIVITÉ 3, CHÈQUE «ÉVALUATION DU N-TERMINAL NON STRUCTURÉ» — GS (French)
13 December 2021
0 references
PROJECTLEIDER — GROEP 1, ACTIVITEIT 3, CHEQUE „EVALUATIE VAN DE NIET-GESTRUCTUREERDE N-TERMINAL” — GS (Dutch)
22 December 2021
0 references
PROJEKTLEITER – GRUPPE 1, AKTIVITÄT 3, SCHECK „BEWERTUNG DES UNSTRUKTURIERTEN N-TERMINALS“ – GS (German)
23 December 2021
0 references
JEFE DE PROYECTO — GRUPO 1, ACTIVIDAD 3, CHEQUE «EVALUACIÓN DEL N-TERMINAL NO ESTRUCTURADO» — SG (Spanish)
24 January 2022
0 references
HOVEDPROJEKT — GRUPPE 1, AKTIVITET 3, "EVALUERING AF UNSTRUCUTRED N-TERMINAL" — GS (Danish)
4 July 2022
0 references
ΕΠΙΚΕΦΑΛΉΣ ΈΡΓΟΥ — ΟΜΆΔΑ 1, ΔΡΑΣΤΗΡΙΌΤΗΤΑ 3, «ΑΞΙΟΛΌΓΗΣΗ ΤΟΥ ΜΗ ΤΕΡΜΑΤΙΚΟΎ ΣΤΑΘΜΟΎ UNSTRUCUTRED» — GS (Greek)
4 July 2022
0 references
GLAVNI PROJEKT – SKUPINA 1, AKTIVNOST 3, „EVALUACIJA UNSTRUCUTRED N-TERMINALA” – GS (Croatian)
4 July 2022
0 references
PROIECT PRINCIPAL – GRUPA 1, ACTIVITATEA 3, „EVALUAREA N-TERMINALULUI UNSTRUCUTRED” – GS (Romanian)
4 July 2022
0 references
HLAVNÝ PROJEKT – SKUPINA 1, ČINNOSŤ 3, „HODNOTENIE N-TERMINÁLU UNSTRUCUTRED“ – GS (Slovak)
4 July 2022
0 references
PROĠETT PRINĊIPALI — GRUPP 1, ATTIVITÀ 3, “EVALWAZZJONI TAL-N-TERMINAL UNSTRUCUTRED” — GS (Maltese)
4 July 2022
0 references
PROJETO PRINCIPAL — GRUPO 1, ATIVIDADE 3, «AVALIAÇÃO DO N-TERMINAL UNSTRUCUTRED» — GS (Portuguese)
4 July 2022
0 references
PÄÄHANKE – RYHMÄ 1, TOIMI 3, ”UNSTRUCUTRED N-TERMINAALIN ARVIOINTI” – GS (Finnish)
4 July 2022
0 references
PROJEKT GŁÓWNY – GRUPA 1, DZIAŁANIE 3, „OCENA N-TERMINALU UNSTRUCUTRED” – GS (Polish)
4 July 2022
0 references
GLAVNI PROJEKT – SKUPINA 1, DEJAVNOST 3, „OCENA N-TERMINALA UNSTRUCUTRED“ – GS (Slovenian)
4 July 2022
0 references
HLAVNÍ PROJEKT – SKUPINA 1, ČINNOST 3, „HODNOCENÍ UNSTRUCUTRED N-TERMINAL“ – GS (Czech)
4 July 2022
0 references
PAGRINDINIS PROJEKTAS – 1 GRUPĖ, 3 VEIKLA, „UNSTRUCUTRED N-TERMINAL VERTINIMAS“ – GS (Lithuanian)
4 July 2022
0 references
GALVENAIS PROJEKTS — 1. GRUPA, 3. DARBĪBA, “UNSTRUCUTRED N-TERMINAL NOVĒRTĒJUMS” — GS (Latvian)
4 July 2022
0 references
ГЛАВЕН ПРОЕКТ — ГРУПА 1, ДЕЙНОСТ 3, „ОЦЕНКА НА N-ТЕРМИНАЛА UNSTRUCUTRED“ — GS (Bulgarian)
4 July 2022
0 references
FŐPROJEKT – 1. CSOPORT, 3. TEVÉKENYSÉG, „AZ UNSTRUCUTRED N-TERMINÁL ÉRTÉKELÉSE” – GS (Hungarian)
4 July 2022
0 references
CEANNTHIONSCADAL — GRÚPA 1, GNÍOMHAÍOCHT 3, ‘MEASTÓIREACHT AR CHRÍOCHFORT N-TEIRMINÉAL UNSTRUCUTRED’ — GS (Irish)
4 July 2022
0 references
HUVUDPROJEKT – GRUPP 1, VERKSAMHET 3, UTVÄRDERING AV UNSTRUCUTRED N-TERMINALEN – GS (Swedish)
4 July 2022
0 references
JUHTPROJEKT – 1. RÜHM, TEGEVUS 3, „ÜHENDUSE N-TERMINALI HINDAMINE“- GS (Estonian)
4 July 2022
0 references
TRIESTE
0 references
8 April 2023
0 references
Identifiers
G13C17000000009
0 references