Protection and requalification of the coastline in Porto Pim and the Port of Feteira (Q2853779): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,)
(‎Added qualifier: readability score (P590521): 0.0539768163773815)
 
(4 intermediate revisions by 2 users not shown)
Property / summary: The present project includes two interventions on the island of Faial, with a view to coastal protection, in particular at the Port of Pim and the Port of Feteira. The first intervention consists of the repair of the locations and the execution of a protection adherent to the wall, through the execution of a single-range screwing prism of 10 to 20 kN, based on the natural terrain adherent to the existing wall.The second intervention consists of the cleanliness (English) / qualifier
 
readability score: 0.0539768163773815
Amount0.0539768163773815
Unit1
Property / budgetProperty / budget
105,769.0 Euro
Amount105,769.0 Euro
UnitEuro
105,768.54 Euro
Amount105,768.54 Euro
UnitEuro
Property / EU contributionProperty / EU contribution
89,903.0 Euro
Amount89,903.0 Euro
UnitEuro
89,903.26 Euro
Amount89,903.26 Euro
UnitEuro
Property / co-financing rate
85.0 percent
Amount85.0 percent
Unitpercent
 
Property / co-financing rate: 85.0 percent / rank
Normal rank
 
Property / contained in Local Administrative Unit
 
Property / contained in Local Administrative Unit: Horta (Matriz) / rank
 
Normal rank
Property / priority axis
 
Property / priority axis: Climate change and risk prevention and management / rank
 
Normal rank
Property / co-financing rate
 
85.0 percent
Amount85.0 percent
Unitpercent
Property / co-financing rate: 85.0 percent / rank
 
Normal rank
Property / thematic objective
 
Property / thematic objective: Climate change adaptation and risk prevention / rank
 
Normal rank
Property / date of last update
 
23 May 2023
Timestamp+2023-05-23T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / date of last update: 23 May 2023 / rank
 
Normal rank

Latest revision as of 14:10, 12 March 2024

Project Q2853779 in Portugal
Language Label Description Also known as
English
Protection and requalification of the coastline in Porto Pim and the Port of Feteira
Project Q2853779 in Portugal

    Statements

    0 references
    0 references
    89,903.26 Euro
    0 references
    105,768.54 Euro
    0 references
    85.0 percent
    0 references
    14 October 2014
    0 references
    30 June 2016
    0 references
    SECRETARIA REGIONAL DO MAR E DAS PESCAS
    0 references
    0 references

    38°32'12.48"N, 28°37'48.40"W
    0 references
    O presente projeto contempla duas intervenções a realizar na ilha do Faial, tendo em vista a proteção costeira, designadamente em Porto de Pim e no Porto da Feteira. A primeira intervenção consiste na reparação das locas e na execução de uma proteção aderente à muralha, através da execução de um prisma de enrocamento de gama única de 10 a 20 kN, assente sob o terreno natural aderente à muralha existente.A segunda intervenção consiste na limpe (Portuguese)
    0 references
    The present project includes two interventions on the island of Faial, with a view to coastal protection, in particular at the Port of Pim and the Port of Feteira. The first intervention consists of the repair of the locations and the execution of a protection adherent to the wall, through the execution of a single-range screwing prism of 10 to 20 kN, based on the natural terrain adherent to the existing wall.The second intervention consists of the cleanliness (English)
    6 July 2021
    0.0539768163773815
    0 references
    Ce projet comprend deux interventions à mener sur l’île de Faial, en vue de la protection des côtes, à savoir Porto de Pim et Porto da Feteira. La première intervention consiste en la réparation des locaux et la mise en œuvre d’une protection attachée au mur, par l’exécution d’un prisme tordu à une seule portée de 10 à 20 kN, basé sur le terrain naturel adhérant au mur existant.La seconde intervention consiste en un nettoyage (French)
    4 December 2021
    0 references
    Dieses Projekt umfasst zwei Maßnahmen, die auf der Insel Faial im Hinblick auf den Küstenschutz durchgeführt werden sollen, nämlich in Porto de Pim und Porto da Feteira. Die erste Intervention besteht in der Instandsetzung der Räumlichkeiten und der Durchführung eines an der Wand befestigten Schutzes durch die Durchführung eines einstufigen Twisting Prismens von 10 bis 20 kN, basierend auf dem natürlichen Gelände, das an der bestehenden Wand festhält.Die zweite Intervention besteht in der Reinigung (German)
    13 December 2021
    0 references
    Dit project omvat twee interventies op het eiland Faial met het oog op de bescherming van de kust, namelijk in Porto de Pim en Porto da Feteira. De eerste interventie bestaat uit de reparatie van het pand en de uitvoering van een aan de muur bevestigde bescherming, door het uitvoeren van een enkel bereik draaiend prisma van 10 tot 20 kN, gebaseerd op het natuurlijke terrein dat aan de bestaande muur vastzit.De tweede interventie bestaat uit reiniging (Dutch)
    18 December 2021
    0 references
    Questo progetto comprende due interventi da realizzare sull'isola di Faial, in vista della protezione costiera, vale a dire a Porto de Pim e Porto da Feteira. Il primo intervento consiste nella riparazione dei locali e nella realizzazione di una protezione fissata alla parete, effettuando un prisma torsione monogamma di 10-20 kN, basato sul terreno naturale aderente alla parete esistente.Il secondo intervento consiste nella pulizia (Italian)
    17 January 2022
    0 references
    Este proyecto incluye dos intervenciones que se llevarán a cabo en la isla de Faial, con vistas a la protección costera, a saber, Porto de Pim y Porto da Feteira. La primera intervención consiste en la reparación de los locales y la aplicación de una protección unida a la pared, mediante la realización de un prisma torcido de una sola gama de 10 a 20 kN, basado en el terreno natural adherido a la pared existente.La segunda intervención consiste en la limpieza (Spanish)
    20 January 2022
    0 references
    Käesolev projekt hõlmab kahte sekkumist Faiali saarel, et kaitsta rannikut, eelkõige Pimi sadamas ja Feteira sadamas. Esimene sekkumine koosneb remont kohtades ja täitmise kaitse kinnitun seina läbi täitmise ühe vahemiku kruvi prisma 10 kuni 20 kN, mis põhineb loodusliku maastikuga seotud olemasoleva seina.Teine sekkumine koosneb puhtusest (Estonian)
    29 July 2022
    0 references
    Šis projektas apima dvi intervencijas Faialo saloje, siekiant apsaugoti pakrantes, visų pirma Pimo uoste ir Feteiros uoste. Pirmasis įsikišimas susideda iš vietų remonto ir apsaugos prilipusio prie sienos vykdymo, per vieno diapazono varžtų prizmę nuo 10 iki 20 kN, remiantis natūraliu vietovės prilipusiu prie esamos sienos.Antrasis įsikišimas susideda iš švaros (Lithuanian)
    29 July 2022
    0 references
    Ovaj projekt uključuje dvije intervencije na otoku Faialu s ciljem zaštite obale, posebno u luci Pim i luci Feteira. Prva intervencija sastoji se od popravka lokacija i izvođenja zaštite prianjanja na zid, kroz izvođenje jednostupanjske vijčane prizma od 10 do 20 kN, na temelju prirodnog terena prianjajućeg na postojeći zid.Druga intervencija sastoji se od čistoće (Croatian)
    29 July 2022
    0 references
    Το παρόν σχέδιο περιλαμβάνει δύο παρεμβάσεις στη νήσο Faial, με στόχο την προστασία των ακτών, ιδίως στον λιμένα Pim και στον λιμένα Feteira. Η πρώτη παρέμβαση συνίσταται στην επισκευή των τοποθεσιών και στην εκτέλεση προστασίας προσκολλημένης στο τοίχωμα, μέσω της εκτέλεσης ενός μόνου εύρους βιδώματος πρίσματος 10 έως 20 kN, με βάση το φυσικό έδαφος προσκολλημένο στο υπάρχον τείχος.Η δεύτερη παρέμβαση συνίσταται στην καθαριότητα (Greek)
    29 July 2022
    0 references
    Súčasný projekt zahŕňa dve intervencie na ostrove Faial s cieľom ochrany pobrežia, najmä v prístave Pim a v prístave Feteira. Prvý zásah sa skladá z opravy miest a vykonávanie ochrany priľnavý k stene, prostredníctvom vykonávania jedného rozsahu skrutkovanie hranol 10 až 20 kN, na základe prírodného terénu priľnavé k existujúcej stene.Druhý zásah sa skladá z čistoty (Slovak)
    29 July 2022
    0 references
    Tähän hankkeeseen sisältyy kaksi toimenpidettä Faialin saarella rannikkojen suojelemiseksi, erityisesti Pimin satamassa ja Feteiran satamassa. Ensimmäinen toimenpide koostuu korjaus sijainnit ja toteutus suojaus kiinni seinään, suorittamalla yhden kantaman ruuvatus prisma 10–20 kN, joka perustuu luonnon maasto kiinni olemassa olevaan seinään.Toinen toimenpide koostuu puhtauden (Finnish)
    29 July 2022
    0 references
    Niniejszy projekt obejmuje dwie interwencje na wyspie Faial, mające na celu ochronę wybrzeża, w szczególności w porcie Pim i w porcie Feteira. Pierwsza interwencja polega na naprawie lokalizacji i wykonaniu ochrony przylegającej do ściany, poprzez wykonanie jednozakresowego pryzmatu śrubowego od 10 do 20 kN, w oparciu o naturalny teren przylegający do istniejącej ściany.Druga interwencja polega na czystości (Polish)
    29 July 2022
    0 references
    Ez a projekt két beavatkozást foglal magában Faial szigetén, a partvédelem érdekében, különösen Pim kikötőjében és Feteira kikötőjében. Az első beavatkozás a helyszínek javításából és a falhoz tapadó védelem végrehajtásából áll, egy hatótávolságú, 10–20 kN-os csavarozási prizma végrehajtásával, amely a meglévő falhoz tapadó természetes terepen alapul.A második beavatkozás a tisztaságból áll. (Hungarian)
    29 July 2022
    0 references
    Tento projekt zahrnuje dva zásahy na ostrově Faial s cílem chránit pobřeží, zejména v přístavu Pim a přístavu Feteira. První zásah spočívá v opravě míst a provedení ochrany přilnavé ke stěně provedením jednorozměrného šroubovacího hranolu 10 až 20 kN, na základě přírodního terénu přilnutého ke stávající stěně.Druhý zásah se skládá z čistoty (Czech)
    29 July 2022
    0 references
    Šis projekts ietver divus intervences pasākumus Faialas salā, lai nodrošinātu piekrastes aizsardzību, jo īpaši Pimas ostā un Feteiras ostā. Pirmā iejaukšanās sastāv no remonta vietās un izpildi aizsardzības piekritējs pie sienas, izpildot viena diapazona skrūvēšanas prizmas 10 līdz 20 kN, pamatojoties uz dabas reljefa pielipušo esošo sienu.Otra iejaukšanās sastāv no tīrības (Latvian)
    29 July 2022
    0 references
    Áirítear leis an tionscadal seo dhá idirghabháil ar oileán Faial, d’fhonn cosaint cósta, go háirithe ag Calafort Pim agus Calafort Feteira. Is éard atá sa chéad idirghabháil ná deisiú na suíomhanna agus cur i gcrích cosanta a chloíonn leis an mballa, trí priosma scriú aon-raoin de 10 go 20 kN a fhorghníomhú, bunaithe ar an tír-raon nádúrtha a chloíonn leis an mballa atá ann cheana. (Irish)
    29 July 2022
    0 references
    Ta projekt vključuje dve intervenciji na otoku Faial za zaščito obale, zlasti v pristanišču Pim in pristanišču Feteira. Prvi poseg je sestavljen iz popravila lokacij in izvedbe zaščite, pritrjene na steno, z izvedbo enosmerne vijačne prizme od 10 do 20 kN, ki temelji na naravnem terenu, pritrjenem na obstoječo steno.Drugi poseg je sestavljen iz čistoče (Slovenian)
    29 July 2022
    0 references
    Настоящият проект включва две интервенции на остров Faial с оглед на опазването на бреговете, по-специално на пристанище Pim и пристанище Feteira. Първата интервенция се състои в ремонт на местоположенията и изпълнение на защита, прилепнала към стената, чрез изпълнение на еднообхватна винтова призма от 10 до 20 kN, базирана на естествения терен, прилепнал към съществуващата стена.Втората намеса се състои от чистотата (Bulgarian)
    29 July 2022
    0 references
    Il-proġett preżenti jinkludi żewġ interventi fuq il-gżira ta’ Faial, bil-ħsieb ta’ protezzjoni kostali, b’mod partikolari fil-Port ta’ Pim u l-Port ta’ Feteira. L-ewwel intervent jikkonsisti fit-tiswija tal-postijiet u l-eżekuzzjoni ta’ protezzjoni li teħel mal-ħajt, permezz tal-eżekuzzjoni ta’ priża tal-vit b’firxa waħda ta’ 10 sa 20 kN, ibbażata fuq it-terren naturali li jeħel mal-ħajt eżistenti. It-tieni intervent jikkonsisti fl-indafa (Maltese)
    29 July 2022
    0 references
    Dette projekt omfatter to interventioner på øen Faial med henblik på kystbeskyttelse, navnlig i havnen i Pim og havnen i Feteira. Den første intervention består i reparation af de steder og udførelse af en beskyttelse fastgjort til væggen, gennem udførelse af en enkelt-range skrue prisme på 10 til 20 kN, baseret på det naturlige terræn fastgjort til den eksisterende væg.Den anden intervention består af renlighed (Danish)
    29 July 2022
    0 references
    Prezentul proiect include două intervenții pe insula Faial, în vederea protejării zonelor de coastă, în special în portul Pim și în portul Feteira. Prima intervenție constă în repararea locațiilor și executarea unui aderent de protecție la perete, prin executarea unei prisme de înșurubare cu o singură rază de 10 până la 20 kN, pe baza terenului natural aderent la peretele existent.A doua intervenție constă în curățenia (Romanian)
    29 July 2022
    0 references
    Detta projekt omfattar två insatser på ön Faial i syfte att skydda kusterna, särskilt vid hamnen i Pim och hamnen i Feteira. Den första åtgärden består av reparation av platserna och utförandet av ett skydd som är fäst vid väggen, genom utförande av en skruvprisma med enkel räckvidd på 10 till 20 kN, baserat på den naturliga terrängen som är fäst vid den befintliga väggen.Den andra åtgärden består av renlighet (Swedish)
    29 July 2022
    0 references
    Horta
    0 references
    23 May 2023
    0 references

    Identifiers

    ACORES-05-1809-FEDER-000006
    0 references