* bonding (Q2043973): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created claim: summary (P836): THE PROJECT IS PART OF A FOUR-YEAR BUSINESS PLAN WHICH IS DIVIDED INTO THE FOLLOWING STAGES: 1. Installation of an individual * of bonding PORT TO DUE EXISTS (2 SEMESTRE 2016) 2. THE ASSEMBLY OF THE FRAME ASSEMBLY UNIT IN A NEW PRODUCTION SITE AND THE RESULTING RECONFIGURATION OF THE PRODUCTION LAYOUT OF THE FINAL ASSEMBLY OF THE DOORS (1 SEMESTERS 2017) 3. REPLACEMENT OF ONE OF THE TWO EXISTING ROBOT-BONDING ISLANDS, Adding English summary)
(‎Changed an Item)
Property / fund
 
Property / fund: European Regional Development Fund / rank
 
Normal rank

Revision as of 20:21, 8 June 2020

Project in Italy financed by DG Regio
Language Label Description Also known as
English
* bonding
Project in Italy financed by DG Regio

    Statements

    0 references
    22,500.0 Euro
    0 references
    45,000.0 Euro
    0 references
    50.0 percent
    0 references
    1 October 2017
    0 references
    30 January 2019
    0 references
    28 June 2018
    0 references
    CISAPLAST S.P.A.
    0 references
    0 references

    44°59'30.73"N, 10°44'35.12"E
    0 references
    IL PROGETTO INSERITO ALLINTERNO DI UN PIANO INDUSTRIALE QUADRIENNALE ARTICOLATO NEI SEGUENTI PASSI:1. INSTALLAZIONE DI UNA *individuo* DI INCOLLAGGIO PORTE IN AGGIUNTA ALLE DUE ESISTENTI (2 SEMESTRE 2016)2. SPOSTAMENTO DEL REPARTO DI ASSEMBLAGGIO CORNICI IN UN NUOVO SITO PRODUTTIVO E CONSEGUENTE RICONFIGURAZIONE DEL LAYOUT PRODUTTIVO DEL REPARTO DI ASSEMBLAGGIO FINALE DELLE PORTE (1 SEMESTRE 2017)3. SOSTITUZIONE DI UNA DELLE DUE ISOLE ROBOTIZZATE DI INCOLLAGGIO GI ESISTENTI (Italian)
    0 references
    THE PROJECT IS PART OF A FOUR-YEAR BUSINESS PLAN WHICH IS DIVIDED INTO THE FOLLOWING STAGES: 1. Installation of an individual * of bonding PORT TO DUE EXISTS (2 SEMESTRE 2016) 2. THE ASSEMBLY OF THE FRAME ASSEMBLY UNIT IN A NEW PRODUCTION SITE AND THE RESULTING RECONFIGURATION OF THE PRODUCTION LAYOUT OF THE FINAL ASSEMBLY OF THE DOORS (1 SEMESTERS 2017) 3. REPLACEMENT OF ONE OF THE TWO EXISTING ROBOT-BONDING ISLANDS (English)
    0 references

    Identifiers

    E52B18001230006
    0 references