PROCESS EFFICIENCY INNOVATION (Q2033265): Difference between revisions
Jump to navigation
Jump to search
(Created claim: summary (P836): THE PROPOSED CONSULTANCY PROCESS CONSISTS OF 4 STEPS AND ÃS GEARED TO THE DESIGN OF A PRODUCTION SYSTEM ACCORDING TO INDUSTRY 4.0 SCHEMES, ALLOWING EFFICIENCY RECOVERY BY MEANS OF ADVANCED SYSTEMS FOR CONTROL AND MANAGEMENT OF PRODUCTION OPERATIONS., Adding English summary) |
(Changed an Item) |
||
Property / fund | |||
Property / fund: European Regional Development Fund / rank | |||
Normal rank |
Revision as of 18:18, 8 June 2020
Project in Italy financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | PROCESS EFFICIENCY INNOVATION |
Project in Italy financed by DG Regio |
Statements
7,500.0 Euro
0 references
15,000.0 Euro
0 references
50.0 percent
0 references
25 September 2017
0 references
10 January 2019
0 references
31 March 2018
0 references
M. C. M. SRL
0 references
Q281674 (Deleted Item)
0 references
IL PERCORSO CONSULENZIALE PROPOSTO SI COMPONE DI 4 FASI ED Ê ORIENTATO ALLA CONFIGURAZIONE DI UN SISTEMA PRODUTTIVO SECONDO GLI SCHEMI DI INDUSTRIA 4.0 CHE PERMETTA ALL'AZIENDA UN RECUPERO DI EFFICIENZA GRAZIE A SISTEMI AVANZATI PER IL CONTROLLO E LA GESTIONE DELLE OPERAZIONI PRODUTTIVE. (Italian)
0 references
THE PROPOSED CONSULTANCY PROCESS CONSISTS OF 4 STEPS AND ÃS GEARED TO THE DESIGN OF A PRODUCTION SYSTEM ACCORDING TO INDUSTRY 4.0 SCHEMES, ALLOWING EFFICIENCY RECOVERY BY MEANS OF ADVANCED SYSTEMS FOR CONTROL AND MANAGEMENT OF PRODUCTION OPERATIONS. (English)
0 references
Identifiers
C89J17000270007
0 references