Property / start time | |||||||||||||||
| |||||||||||||||
Property / start time: 8 May 2017 / rank | |||||||||||||||
Property / end time | |||||||||||||||
| |||||||||||||||
Property / end time: 9 March 2020 / rank | |||||||||||||||
Property / beneficiary name (string) | |||||||||||||||
Property / beneficiary name (string): MUNICÍPIO DE VILA NOVA DE GAIA / rank | |||||||||||||||
Property / summary: The present application consists of the execution of the constructions of Retention of the Horto River, Alguidar de Retenção do Rio Horto – Architecture Landscape and Strengthening the Drainage Capacity of the Water Line of Santa Marinha, in the surroundings of Av. Ramos Pinto Santa Marinha. (English) / qualifier | |||||||||||||||
readability score: 0.0124480763552667
| |||||||||||||||
Property / location (string) | |||||||||||||||
Property / location (string): Vila Nova de Gaia, União das freguesias de Santa Marinha e São Pedro da Afurada / rank | |||||||||||||||
Property / coordinate location | |||||||||||||||
| |||||||||||||||
Property / coordinate location: 41°7'46.92"N, 8°37'12.47"W / rank | |||||||||||||||
Property / contained in NUTS | |||||||||||||||
Property / contained in NUTS: Metropolitan Area of Porto / rank | |||||||||||||||
Property / beneficiary | |||||||||||||||
Property / beneficiary: Q3000729 (Deleted Item) / rank | |||||||||||||||
Property / budget | Property / budget | ||||||||||||||
| 453,714.38 Euro
| ||||||||||||||
Property / EU contribution | Property / EU contribution | ||||||||||||||
| 388,460.44 Euro
| ||||||||||||||
Property / co-financing rate | |||||||||||||||
| |||||||||||||||
Property / co-financing rate: 85.59 percent / rank | |||||||||||||||
Property / contained in Local Administrative Unit | |||||||||||||||
Property / contained in Local Administrative Unit: União das freguesias de Santa Marinha e São Pedro da Afurada / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / priority axis | |||||||||||||||
Property / priority axis: Promoting climate change adaptation and risk prevention and management / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / co-financing rate | |||||||||||||||
85.62 percent
| |||||||||||||||
Property / co-financing rate: 85.62 percent / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / thematic objective | |||||||||||||||
Property / thematic objective: Climate change adaptation and risk prevention / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / start time | |||||||||||||||
5 August 2017
| |||||||||||||||
Property / start time: 5 August 2017 / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / end time | |||||||||||||||
3 September 2020
| |||||||||||||||
Property / end time: 3 September 2020 / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / location (string) | |||||||||||||||
Vila Nova de Gaia | |||||||||||||||
Property / location (string): Vila Nova de Gaia / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / coordinate location | |||||||||||||||
41°7'48.04"N, 8°36'21.02"W
| |||||||||||||||
Property / coordinate location: 41°7'48.04"N, 8°36'21.02"W / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / coordinate location: 41°7'48.04"N, 8°36'21.02"W / qualifier | |||||||||||||||
Property / contained in NUTS | |||||||||||||||
Property / contained in NUTS: Metropolitan Area of Porto / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / beneficiary | |||||||||||||||
Property / beneficiary: MUNICÍPIO DE VILA NOVA DE GAIA / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / beneficiary name (string) | |||||||||||||||
MUNICÍPIO DE VILA NOVA DE GAIA | |||||||||||||||
Property / beneficiary name (string): MUNICÍPIO DE VILA NOVA DE GAIA / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / date of last update | |||||||||||||||
14 November 2023
| |||||||||||||||
Property / date of last update: 14 November 2023 / rank | |||||||||||||||
Normal rank |
Latest revision as of 12:42, 7 March 2024
Project Q2981676 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | RISK MANAGEMENT AND FLOOD CONTROL IN THE WATER NETWORK AREA OF THE URBAN AREA OF NEW VILLAGE OF GAIA |
Project Q2981676 in Portugal |
Statements
388,460.44 Euro
0 references
453,714.38 Euro
0 references
85.62 percent
0 references
5 August 2017
0 references
3 September 2020
0 references
MUNICÍPIO DE VILA NOVA DE GAIA
0 references
A presente candidatura consiste na execução das empreitadas Bacia de Retenção do Rio Horto, Bacia de Retenção do Rio Horto - Arquitetura Paisagista e Reforço da Capacidade de Drenagem da Linha de Água de Santa Marinha, na envolvente à Av. Ramos Pinto Santa Marinha. (Portuguese)
0 references
The present application consists of the execution of the constructions of Retention of the Horto River, Alguidar de Retenção do Rio Horto – Architecture Landscape and Strengthening the Drainage Capacity of the Water Line of Santa Marinha, in the surroundings of Av. Ramos Pinto Santa Marinha. (English)
9 July 2021
0.0124480763552667
0 references
Cette application consiste en l’exécution des travaux du bassin de rétention de la rivière Horto, du bassin de rétention de la rivière Horto — Architecture paysagère et du renforcement de la capacité de drainage de la ligne d’eau Santa Marinha, dans les environs de Av. Pinto Santa Marinha Branches. (French)
7 December 2021
0 references
Diese Anwendung besteht in der Ausführung der Arbeiten des Retentionsbeckens des Flusses Horto, des Retentionsbeckens des Flusses Horto – Landschaftsarchitektur und der Stärkung der Drainagekapazität der Wasserlinie Santa Marinha in der Umgebung von Av. Pinto Santa Marinha Niederlassungen. (German)
15 December 2021
0 references
Deze toepassing bestaat uit de uitvoering van de werken van het Retention Basin van de rivier de Horto, het Retention Basin van de Horto Rivier — Landschapsarchitectuur en Versterking van de Drainage Capaciteit van de Santa Marinha Waterlijn, in de omgeving van Av. Pinto Santa Marinha Branches. (Dutch)
20 December 2021
0 references
Questa applicazione consiste nell'esecuzione delle opere del bacino di conservazione del fiume Horto, il bacino di conservazione del fiume Horto — Architettura del paesaggio e rafforzare la capacità di drenaggio della linea d'acqua di Santa Marinha, nei dintorni di Av. Pinto Santa Marinha Branches. (Italian)
18 January 2022
0 references
Esta aplicación consiste en la ejecución de las obras de la Cuenca de Retención del Río Horto, la Cuenca de Retención del Río Horto — Arquitectura Paisajística y Fortalecimiento de la Capacidad de Drenaje de la Línea de Agua de Santa Marinha, en los alrededores de la Av. Ramas de Pinto Santa Marinha. (Spanish)
22 January 2022
0 references
Käesolev taotlus hõlmab Horto jõe säilitamise, alguidar de retenção do Rio Horto (arhitektuurne maastik) ja Santa Marinha veepiiri äravooluvõimsuse suurendamist Avi ümbruses. Ramos Pinto Santa Marinha. (Estonian)
3 August 2022
0 references
Šį prašymą sudaro Horto upės, alguidar de retenção do Rio Horto – architektūros kraštovaizdžio ir Santa Marinos vandens linijos drenažo pajėgumo stiprinimas Av apylinkėse, statybos vykdymas. Ramos Pinto Santa Marinha. (Lithuanian)
3 August 2022
0 references
Ova aplikacija sastoji se od izvršenja izgradnje zadržavanja rijeke Horto, alguidar de retenção do Rio Horto – Arhitektura krajolika i jačanje kapaciteta odvodnje vodne linije Santa Marinha, u okolici Av. Ramos Pinto Santa Marinha. (Croatian)
3 August 2022
0 references
Η παρούσα αίτηση συνίσταται στην εκτέλεση των κατασκευών της διατήρησης του ποταμού Horto, alguidar de retenção do Rio Horto — Αρχιτεκτονική Τοπίο και ενίσχυση της δυναμικότητας αποστράγγισης της υδάτινης γραμμής της Santa Marinha, στο περιβάλλον της Av. Ράμος Πίντο Σάντα Μαρίνα. (Greek)
3 August 2022
0 references
Táto žiadosť pozostáva z realizácie stavieb zadržiavania rieky Horto, alguidar de retenção do Rio Horto – Architektúra Krajina a posilnenie odvodňovacej kapacity vodného vedenia Santa Marinha v okolí Av. Ramos Pinto Santa Marinha. (Slovak)
3 August 2022
0 references
Tämä hakemus koostuu Hortojoen, alguidar de retenção do Rio Horton – Arkkitehtuurimaiseman ja Santa Marinhan vesilinjan kuivatuskapasiteetin vahvistamisesta Avin ympäristössä. Ramos Pinto Santa Marinha. (Finnish)
3 August 2022
0 references
Niniejszy wniosek polega na wykonaniu konstrukcji retencji rzeki Horto, alguidar de retenção do Rio Horto – krajobrazu architektonicznego i wzmocnieniu zdolności drenażowej linii wodnej Santa Marinha, w otoczeniu Av. Ramos Pinto Santa Marinha. (Polish)
3 August 2022
0 references
A jelen kérelem a Horto folyó, az alguidar de retenção do Rio Horto – építészeti táj építésének kivitelezésére és a Santa Marinha vízvezeték vízelvezető képességének megerősítésére irányul Av környezetében. Ramos Pinto Santa Marinha. (Hungarian)
3 August 2022
0 references
Tato žádost spočívá v provedení staveb Restaurace řeky Horto, alguidar de retenção do Rio Horto – Architektura krajiny a posílení kapacity odvodnění vodní linky Santa Marinha, v okolí Av. Ramos Pinto Santa Marinha. (Czech)
3 August 2022
0 references
Šis pieteikums attiecas uz Horto upes, alguidar de retenção do Rio Horto — Arhitektūras ainavu un Santa Marinhas ūdenslīnijas nosusināšanas kapacitātes stiprināšanu Av apkārtnē. Ramos Pinto Santa Marinha. (Latvian)
3 August 2022
0 references
Is éard atá san iarratas seo ná na tógálacha Coinneála ar Abhainn Horto, Alguidar de Retenção do Rio Horto — Tírdhreach Ailtireachta a fhorghníomhú agus Cumas Draenála Líne Uisce Santa Marinha a Neartú, i dtimpeallacht Av. Video comhrá Santa Marinha. (Irish)
3 August 2022
0 references
Ta vloga je sestavljena iz izvedbe objektov zadrževanja reke Horto, alguidar de retenção do Rio Horto – Arhitektura krajine in krepitev odtočne zmogljivosti vodne linije Santa Marinha v okolici Av. Ramos Pinto Santa Marinha. (Slovenian)
3 August 2022
0 references
Настоящото заявление се състои в изпълнението на конструкциите за задържане на река Horto, alguidar de retenção do Rio Horto — Архитектурен пейзаж и укрепване на капацитета за отводняване на водната линия на Санта Марина, в околностите на Av. Рамос Пинто Санта Марина. (Bulgarian)
3 August 2022
0 references
Din l-applikazzjoni tikkonsisti fl-eżekuzzjoni tal-kostruzzjonijiet taż-Żamma tax-Xmara Horto, alguidar de retenção do Rio Horto — Pajsaġġ tal-Arkitettura u Tisħiħ tal-Kapaċità tad-Dranaġġ tal-Linja tal-Ilma ta’ Santa Marinha, fl-inħawi ta’ Av. Ramos Pinto Santa Marinha. (Maltese)
3 August 2022
0 references
Nærværende ansøgning består i udførelse af opførelsen af Retention af Horto-floden, alguidar de retenção do Rio Horto — Arkitekturlandskab og styrkelse af afløbskapaciteten i vandlinjen Santa Marinha i nærheden af Av. Ramos Pinto Santa Marinha. (Danish)
3 August 2022
0 references
Prezenta cerere constă în executarea construcțiilor de menținere a râului Horto, alguidar de retenção do Rio Horto – Arhitectură Peisaj și consolidarea capacității de drenaj a liniei de apă Santa Marinha, în împrejurimile Av. Ramos Pinto Santa Marinha. (Romanian)
3 August 2022
0 references
Denna ansökan består av genomförandet av byggnaderna för bevarande av Hortofloden, alguidar de retenção do Rio Horto – Arkitekturlandskap och förstärkning av avrinningskapaciteten i Santa Marinhas vattenlinje, i närheten av Av. Ramos Pinto Santa Marinha. (Swedish)
3 August 2022
0 references
Vila Nova de Gaia
0 references
14 November 2023
0 references
Identifiers
POSEUR-02-1810-FC-000387
0 references