9/4.5 ROAD SYSTEM OF AV. NO. OF FATIMA AND AV. General HUMBERTO DELGADO (Studies and Projects) (Q2878162): Difference between revisions
Jump to navigation
Jump to search
(BatchIngestion) |
(Added qualifier: readability score (P590521): 0.0009190085442127) |
||||||||||||||
(One intermediate revision by the same user not shown) | |||||||||||||||
Property / beneficiary name (string) | |||||||||||||||
Property / beneficiary name (string): MUNICÍPIO DE LEIRIA / rank | |||||||||||||||
Property / summary: The first amendment proposed by the promoter is of a temporal nature. It is intended to change the end date of the operation according to the physical execution of the workstation, with the consequent adjustment of the annual distribution of the eligible investment. (English) / qualifier | |||||||||||||||
readability score: 0.0009190085442127
| |||||||||||||||
Property / beneficiary | |||||||||||||||
Property / beneficiary: Q2990815 (Deleted Item) / rank | |||||||||||||||
Property / end time | |||||||||||||||
| |||||||||||||||
Property / end time: 30 June 2023 / rank | |||||||||||||||
Property / date of last update | |||||||||||||||
| |||||||||||||||
Property / date of last update: 23 May 2023 / rank | |||||||||||||||
Property / beneficiary | |||||||||||||||
Property / beneficiary: MUNICÍPIO DE LEIRIA / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / beneficiary name (string) | |||||||||||||||
MUNICÍPIO DE LEIRIA | |||||||||||||||
Property / beneficiary name (string): MUNICÍPIO DE LEIRIA / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / end time | |||||||||||||||
30 September 2023
| |||||||||||||||
Property / end time: 30 September 2023 / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / date of last update | |||||||||||||||
14 November 2023
| |||||||||||||||
Property / date of last update: 14 November 2023 / rank | |||||||||||||||
Normal rank |
Latest revision as of 09:55, 7 March 2024
Project Q2878162 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | 9/4.5 ROAD SYSTEM OF AV. NO. OF FATIMA AND AV. General HUMBERTO DELGADO (Studies and Projects) |
Project Q2878162 in Portugal |
Statements
1,734,344.68 Euro
0 references
2,040,405.5 Euro
0 references
85.0 percent
0 references
21 April 2017
0 references
30 September 2023
0 references
MUNICÍPIO DE LEIRIA
0 references
A primeira alteração proposta pelo promotor é de natureza temporal. Pretende-se alterar a data de fim da operação, de acordo com a execução física da empreitada de obra, com o consequente ajustamento da distribuição anual do investimento elegível. (Portuguese)
0 references
The first amendment proposed by the promoter is of a temporal nature. It is intended to change the end date of the operation according to the physical execution of the workstation, with the consequent adjustment of the annual distribution of the eligible investment. (English)
7 July 2021
0.0009190085442127
0 references
Le premier amendement proposé par le promoteur est de nature temporelle. L’objectif est de modifier la date de fin de l’opération, en fonction de l’exécution physique du marché de travaux, et d’adapter en conséquence la répartition annuelle de l’investissement éligible. (French)
4 December 2021
0 references
Der erste vom Projektträger vorgeschlagene Änderungsantrag ist zeitlicher Natur. Ziel ist es, das Enddatum des Vorhabens entsprechend der tatsächlichen Ausführung des Bauauftrags mit der entsprechenden Anpassung der jährlichen Verteilung der förderfähigen Investition zu ändern. (German)
13 December 2021
0 references
Het eerste door de initiatiefnemer voorgestelde amendement is tijdelijk van aard. Het doel is de einddatum van de actie te wijzigen, in overeenstemming met de fysieke uitvoering van de opdracht voor werken, met als gevolg een aanpassing van de jaarlijkse verdeling van de in aanmerking komende investering. (Dutch)
18 December 2021
0 references
Il primo emendamento proposto dal promotore ha carattere temporale. L'obiettivo è modificare la data di fine dell'operazione, in funzione dell'esecuzione fisica dell'appalto di lavori, con conseguente adeguamento della distribuzione annuale dell'investimento ammissibile. (Italian)
17 January 2022
0 references
La primera enmienda propuesta por el promotor es de carácter temporal. El objetivo es modificar la fecha de finalización de la operación, de acuerdo con la ejecución física del contrato de obras, con el consiguiente ajuste de la distribución anual de la inversión subvencionable. (Spanish)
20 January 2022
0 references
Projekti elluviija esimene muudatusettepanek on ajalist laadi. Projekti eesmärk on muuta tegevuse lõppkuupäeva vastavalt tööjaama füüsilisele teostamisele, kohandades sellest tulenevalt abikõlblike investeeringute iga-aastast jaotust. (Estonian)
29 July 2022
0 references
Pirmasis projekto rengėjo pasiūlytas pakeitimas yra laikinas. Ketinama pakeisti operacijos pabaigos datą atsižvelgiant į fizinį darbo vietos vykdymą ir atitinkamai pakoreguoti reikalavimus atitinkančių investicijų metinį paskirstymą. (Lithuanian)
29 July 2022
0 references
Prva izmjena koju je predložio promotor vremenske je prirode. Svrha mu je promijeniti datum završetka operacije u skladu s fizičkim izvršenjem radne stanice, uz posljedičnu prilagodbu godišnje raspodjele prihvatljivog ulaganja. (Croatian)
29 July 2022
0 references
Η πρώτη τροποποίηση που προτείνει ο ανάδοχος έχει προσωρινό χαρακτήρα. Αποσκοπεί στην αλλαγή της ημερομηνίας λήξης της πράξης ανάλογα με τη φυσική εκτέλεση του σταθμού εργασίας, με την επακόλουθη προσαρμογή της ετήσιας κατανομής της επιλέξιμης επένδυσης. (Greek)
29 July 2022
0 references
Prvá zmena, ktorú navrhuje navrhovateľ, má dočasný charakter. Je určená na zmenu dátumu ukončenia operácie podľa fyzického výkonu pracovnej stanice s následnou úpravou ročnej distribúcie oprávnenej investície. (Slovak)
29 July 2022
0 references
Hankkeen toteuttajan ehdottama ensimmäinen muutos on luonteeltaan ajallinen. Tarkoituksena on muuttaa toimen päättymispäivää työpisteen fyysisen toteutuksen mukaan, jolloin tukikelpoisen investoinnin vuosijakaumaa mukautetaan. (Finnish)
29 July 2022
0 references
Pierwsza poprawka zaproponowana przez promotora ma charakter czasowy. Ma ona na celu zmianę daty zakończenia operacji w zależności od fizycznej realizacji stanowiska pracy, a następnie dostosowanie rocznego podziału kwalifikującej się inwestycji. (Polish)
29 July 2022
0 references
A projektgazda által javasolt első módosítás időbeli jellegű. Célja, hogy a munkaállomás fizikai kivitelezésének függvényében megváltoztassa a művelet befejezésének időpontját, és ennek megfelelően kiigazítsa a támogatható beruházás éves elosztását. (Hungarian)
29 July 2022
0 references
První změna navržená navrhovatelem je časově omezená. Cílem je změnit datum ukončení provozu v závislosti na fyzickém provedení pracoviště s následnou úpravou ročního rozdělení způsobilé investice. (Czech)
29 July 2022
0 references
Pirmais projekta virzītāja ierosinātais grozījums ir īslaicīgs. Ir paredzēts mainīt darbības beigu datumu atbilstoši darba vietas fiziskajai izpildei, attiecīgi koriģējot attiecināmā ieguldījuma gada sadalījumu. (Latvian)
29 July 2022
0 references
Is leasú de chineál ama é an chéad leasú a mhol an tionscnóir. Tá sé beartaithe dáta deiridh na hoibríochta a athrú de réir chur i gcrích fisiciúil an stáisiúin oibre, agus dáileadh bliantúil na hinfheistíochta incháilithe a choigeartú dá réir. (Irish)
29 July 2022
0 references
Prva sprememba, ki jo predlaga predlagatelj, je časovne narave. Njegov namen je spremeniti končni datum operacije glede na fizično izvedbo delovne postaje, s posledično prilagoditvijo letne razdelitve upravičene naložbe. (Slovenian)
29 July 2022
0 references
Първото изменение, предложено от организатора на проекта, има времеви характер. Той е предназначен за промяна на крайната дата на операцията в зависимост от физическото изпълнение на работното място, като вследствие на това се коригира годишното разпределение на допустимата инвестиция. (Bulgarian)
29 July 2022
0 references
L-ewwel emenda proposta mill-promotur hija ta’ natura temporali. Huwa maħsub li tinbidel id-data tat-tmiem tal-operazzjoni skont l-eżekuzzjoni fiżika tal-istazzjon tax-xogħol, bl-aġġustament konsegwenti tad-distribuzzjoni annwali tal-investiment eliġibbli. (Maltese)
29 July 2022
0 references
Den første ændring, som initiativtageren har foreslået, er af tidsmæssig karakter. Det er hensigten at ændre slutdatoen for operationen i henhold til den fysiske udførelse af arbejdsstationen med den deraf følgende justering af den årlige fordeling af den støtteberettigede investering. (Danish)
29 July 2022
0 references
Primul amendament propus de promotor este de natură temporală. Se intenționează modificarea datei de încheiere a operațiunii în funcție de execuția fizică a stației de lucru, cu ajustarea ulterioară a distribuției anuale a investiției eligibile. (Romanian)
29 July 2022
0 references
Den första ändring som förslagsställaren föreslår är tidsmässig. Avsikten är att ändra slutdatumet för insatsen i förhållande till det fysiska genomförandet av arbetsstationen, med en efterföljande justering av den årliga fördelningen av den stödberättigande investeringen. (Swedish)
29 July 2022
0 references
Leiria
0 references
14 November 2023
0 references
Identifiers
CENTRO-09-1406-FEDER-000037
0 references