TRINCERONE EST (Q2023321): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Changed an Item) |
||
Property / fund | |||
Property / fund: European Regional Development Fund / rank | |||
Normal rank |
Revision as of 16:17, 8 June 2020
Project in Italy financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | TRINCERONE EST |
Project in Italy financed by DG Regio |
Statements
4,763,864.55 Euro
0 references
6,351,819.4 Euro
0 references
75.0 percent
0 references
4 August 2006
0 references
2 November 2018
0 references
COMUNE DI SALERNO
0 references
L'INTERVENTO PROGETTUALE IN QUESTIONE SI CONFIGURA COME LOGICA PROSECUZIONE DELLA COPERTURA DELLA TRINCEA FERROVIARIA OGGI ESISTENTE, FINALIZZATO A DOTARE IL CENTRO CITTADINO DI ULTERIORI SPAZI RISERVATI AI PEDONI, RICUCIRE LE MAGLIE DELLA RETE VIARIA OVE INTERROTTE PER LA PRESENZA DELLA TRINCEA FERROVIARIA, E REALIZZARE UN EFFICACE COLLEGAMENTO FRA IL CENTRO CITTADINO E LA VIABILITÃ DI SCORRIMENTO, CON CONSEGUENTE RIDUZIONE DEI VOLUMI DI TRAFFICO.LA REALIZZAZIONE DI UN'OPERA INFRASTRUTTURALE, COMPLESSA E ARTICOLATA COME QUELLA IN OGGETTO, PRESENTA PROBLEMATICHE CARATTERIZZATE DA ELEVATI E COMPLESSI VALORI FUNZIONALI, SOCIALI ED URBANISTICI (Italian)
0 references
THE PROJECT IN QUESTION IS A LOGICAL CONTINUATION OF THE EXISTING RAIL TRENCH COVERAGE WHICH IS NOW IN PLACE, WITH THE AIM OF PROVIDING THE TOWN CENTRE WITH ADDITIONAL AREAS RESERVED FOR PEDESTRIANS, WHICH BREAKS DOWN THE AREAS OF THE ROAD NETWORK, WHERE IT IS STOPPED BECAUSE OF THE RAIL TRENCH, AND TO ESTABLISH AN EFFECTIVE LINK BETWEEN THE CITY CENTRE AND THE VIABILITS OF THE FLOW, WITH A CONSEQUENT REDUCTION IN THE VOLUMES OF TRAFFICO.LA’S CONSTRUCTION OF AN INFRASTRUCTURE, COMPLEX AND COMPLEX, SUCH AS THE ONE IN QUESTION, CHARACTERISED BY HIGH AND COMPLEX FUNCTIONAL, SOCIAL AND URBAN VALUES. (English)
0 references
Identifiers
I56G08000210006
0 references