SMART POWER GRID RIBERA PROJECT (Q2017764): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Changed an Item) |
||
Property / fund | |||
Property / fund: European Regional Development Fund / rank | |||
Normal rank |
Revision as of 15:32, 8 June 2020
Project in Italy financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | SMART POWER GRID RIBERA PROJECT |
Project in Italy financed by DG Regio |
Statements
2,292,942.97 Euro
0 references
3,103,774.55 Euro
0 references
73.88 percent
0 references
26 March 2018
0 references
31 December 2020
0 references
E-DISTRIBUZIONE SPA
0 references
IL PROGETTO COMPRENDE INTERVENTI SIA DI STRUTTURA CHE DI IMPLEMENTAZIONE DELLE FUNZIONALITÃ SMART GRID. GLI INTERVENTI STRUTTURALI MIRANO A MODIFICARE LA CONFIGURAZIONE DELL'IMPIANTO AL FINE DI MIGLIORARNE LE CONDIZIONI DI ESERCIZIO E LE PRESTAZIONI.IL PROGETTO PREVEDE L'UTILIZZO DI DISPOSITIVI DI ULTIMA GENERAZIONE CHE PERMETTANO LA COMPLETA SMARTIZZAZIONE DELLA CABINA PRIMARIA E DELLE CABINE SECONDARIE SOTTESE. INOLTRE VERRANNO SOSTITUITE LE LINEE MT TRAMITE NUOVI CAVI IN ALLUMINIO E IN ALLUMINIO ELICORD.IL PROGETTO SI QUALIFICA COME SMART GRID IN QUANTO PREVEDE L'INSTALLAZIONE DI DISPOSITIVI TECNOLOGICI E DI APPARECCHIATURE INTELLIGENTI FINALIZZATE AD UNA GESTIONE EVOLUTA DELLA RETE ELETTRICA, CON L'OBIETTIVO DI AGEVOLARE L'INCREMENTO DELLA QUOTA DI FABBISOGNO ENERGETICO COPERTO DA GENERAZIONE DISTRIBUITA DA FONTI RINNOVABILI. IN TAL SENSO SI IMPLEMENTANO LE SEGUENTI FUNZIONALITÃ SMART: - SELETTIVITÃ LOGICA DEL TRONCO GUASTO- OSSERVABILITÃ DELLA RETE MT- CONTROLLO EVOLUTO DI TEN (Italian)
0 references
THE PROJECT COMPRISES BOTH STRUCTURAL AND OPERATIONAL MEASURES FOR SMART GRIDS. THE PURPOSE OF THE STRUCTURAL MEASURES IS TO CHANGE THE DESIGN OF THE PLANT IN ORDER TO IMPROVE THE CONDITIONS FOR OPERATION AND TO IMPROVE THE DESIGN OF THE INSTALLATION. THE DESIGN OF THE INSTALLATION SHALL CONSIST OF THE USE OF STATE-OF-THE-ART DEVICES ENABLING THE COMPLETE SMARTISATION OF THE PRIMARY CABIN AND THE UNDERLYING CABS. IN ADDITION, THE MT LINES WILL BE REPLACED BY NEW ALUMINIUM AND ALUMINIUM WIRE CABLES. THIS PROJECT QUALIFIES AS SMART GRIDS FOR THE INSTALLATION OF SMART TECHNOLOGY DEVICES AND APPLIANCES FOR THE IMPROVED MANAGEMENT OF THE ELECTRICITY GRID, WITH THE AIM OF FACILITATING THE INCREASE IN THE SHARE OF ENERGY DEMAND COVERED BY GENERATION FROM RENEWABLE SOURCES. TO THIS END, THE FOLLOWING TASKS SHALL BE SMART: — ATTENDEES LOGIC OF THE GDAW- OSERVABILITY NETWORK OF THE MT- ADVANCED CONTROL NETWORK OF TEN (English)
0 references
Identifiers
F91F18000000006
0 references