Expansion of the zone of economic activity in Andrychów by arming new investment areas and expansion and reconstruction of road infrastructure in the zone (Q111686): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Changed an Item)
Property / contained in Local Administrative Unit: Wadowice / qualifier
 
Property / contained in NUTS: Oświęcimski / qualifier
 

Revision as of 10:34, 15 January 2024

Project Q111686 in Poland
Language Label Description Also known as
English
Expansion of the zone of economic activity in Andrychów by arming new investment areas and expansion and reconstruction of road infrastructure in the zone
Project Q111686 in Poland

    Statements

    0 references
    9,404,082.0 zloty
    0 references
    2,256,979.8 Euro
    0 references
    12,650,096.0 zloty
    0 references
    3,036,023.0 Euro
    0 references
    74.34 percent
    0 references
    1 March 2017
    0 references
    31 December 2022
    0 references
    GMINA ANDRYCHÓW
    0 references

    49°53'29.72"N, 19°29'44.99"E
    0 references
    Projekt zakłada rozbudowę istniejącej Strefy Aktywności Gospodarczej w Andrychowie. Projektem objęte są tereny wydzielone pod rozbudowę Strefy Aktywności Gospodarczej w Andrychowie, obejmujące obszar położony pomiędzy ulicami: Strefową, Biała Droga, Przemysłową oraz rowem odwadniającym pomiędzy ul. Przemysłową i Strefową.Przedmiotem zamierzenia jest przygotowanie terenu inwestycyjnego umożliwiających realizację obiektów przemysłowych i usługowych wraz z dostępem do sieci infrastruktury technicznej i komunikacyjnej miasta, obejmujące:makroniwelację terenu w celu uzyskania spadków umożliwiających budowę wielkopowierzchniowych obiektów halowychprzebudowę części istniejącej drogi obsługowej ulica Strefowa z dostosowaniem parametrów do potrzeb transportu ciężkiego budowę wewnętrznej drogi dojazdowej umożliwiającej dojazd do wydzielonych działek inwestycyjnychrozbudowę sieci uzbrojenia terenu w sposób zapewniający dostęp do infrastruktury technicznej miasta:sieci wodociągowej kanalizacji sanitarnej i deszczowejsieci gazu ziemnegosieci elektroenergetycznej SN i NNbudowę podstacji transformatorowejsieci kanalizacji teleinformatycznejsieci oświetlenia zewnętrznegozabezpieczenie lub przebudowę odcinków sieci istniejących, kolidujących z planowanym zagospodarowaniem i uzbrojeniem terenu, w szczególności przebudowę ze zmianą trasy istniejącej, napowietrznej przesyłowej linii elektroenergetycznej WNuporządkowanie terenu po robotach budowlanych rekultywacja terenu po robotach ziemnych z przywróceniem warstwy humusuzagospodarowanie terenów przewidzianych na cele zieleni izolacyjnej. Powierzchnia przygotowanych terenów inwestycyjnych: 11,633 ha (Polish)
    0 references
    The project envisages the expansion of the existing Economic Activity Zone in Andrychów. The project includes areas separated for the expansion of the Economic Activity Zone in Andrychów, covering the area located between the streets: Złoowa, Biała Droga, Przemysłowa and a drainage ditch between ul. The object of the design is the preparation of the investment area enabling the implementation of industrial and service facilities together with access to the network of technical and communication infrastructure of the city, including: macro-nilisation of the area in order to obtain declines enabling the construction of large-surface hallways to rebuild part of the existing service route of the area of maintenance of the area of the zone with the adaptation of the parameters to the needs of transporting the internal access road enabling access to separate investment plots to the development of the infrastructure of the infrastructure of the land. Area of prepared investment areas: 11.633 ha (English)
    20 October 2020
    0 references
    Le projet comprend l’expansion de la zone d’activité économique existante à Andrychów. Le projet couvre les zones réservées à l’extension de la zone d’activité économique à Andrychów, couvrant la zone située entre les rues: Zonal, White Road, fossé industriel et de drainage entre ul. The purpose of the project is to prepare an investment area enabling the implementation of industrial and service facilities with access to the network of technical and communication infrastructure of the city, obejmujące:makroniwelację the area in order to obtain drops enabling the construction of large-area hall facilities to reconstruct part of the existing maintenance road Strefowa street with adaptation of parameters to the needs of heavy transport, construction of an internal access road enabling access to the separate investment plots, the extension of the network of the site’s armament in a way that provides access to the technical infrastructure: the water supply infrastructure, in particular the environmental protection of the building site, the restoration of the natural gas network of the natural gas network, and the reconstruction of the area from the outskills of the external illumination network, the protection of the existing infrastructure, in particular the rehabilitation of the construction of the building of the natural gas network, the rehabilitation of the area from the outskills of the area from the outskilling of the network, the protection of the existing infrastructure from the area’s mainland, the rehabilitation of the natural gas network, the modernisation of the area from the outskids of the area, the rehabilitation of the area from the outskirts of the area, the rehabilitation of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the rehabilitation of the infrastructure, the protection of the area from the outskirtment of the network, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area’s mainland, the mainland of the area, the protection of the area from the modernisation of the network of the area, the protection of the existing infrastructure from the construction of the mainland, in particular the protection of the area in the area, the restoration of the natural gas network, the modernisation of the network from the external network of the network, the protection of the area from the mainland of the area, the restoration of the mainland of the area, and the rehabilitation of the mainland from the outskills of the mainland of the area, Domaine des domaines d’investissement préparés: 11 633 ha (French)
    1 December 2021
    0 references
    Das Projekt beinhaltet die Erweiterung der bestehenden Wirtschaftszone in Andrychów. Das Projekt deckt die Bereiche ab, die für die Erweiterung der Wirtschaftszone in Andrychów vorgesehen sind und sich auf das zwischen den Straßen gelegene Gebiet erstrecken: Zoneal, White Road, Industrial und Drainage Graben zwischen ul. The purpose of the project is to prepare an investment area enabling the implementation of industrial and service facilities with access to the network of technical and communication infrastructure of the city, obejmujące:makroniwelację the area in order to obtain drops enabling the construction of large-area hall facilities to reconstruct part of the existing maintenance road Strefowa street with adaptation of parameters to the needs of heavy transport, construction of an internal access road enabling access to the separate investment plots, the extension of the network of the site’s armament in a way that provides access to the technical infrastructure: the water supply infrastructure, in particular the environmental protection of the building site, the restoration of the natural gas network of the natural gas network, and the reconstruction of the area from the outskills of the external illumination network, the protection of the existing infrastructure, in particular the rehabilitation of the construction of the building of the natural gas network, the rehabilitation of the area from the outskills of the area from the outskilling of the network, the protection of the existing infrastructure from the area’s mainland, the rehabilitation of the natural gas network, the modernisation of the area from the outskids of the area, the rehabilitation of the area from the outskirts of the area, the rehabilitation of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the rehabilitation of the infrastructure, the protection of the area from the outskirtment of the network, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area’s mainland, the mainland of the area, the protection of the area from the modernisation of the network of the area, the protection of the existing infrastructure from the construction of the mainland, in particular the protection of the area in the area, the restoration of the natural gas network, the modernisation of the network from the external network of the network, the protection of the area from the mainland of the area, the restoration of the mainland of the area, and the rehabilitation of the mainland from the outskills of the mainland of the area, Bereich der vorbereiteten Investitionsbereiche: 11,633 ha (German)
    7 December 2021
    0 references
    Het project omvat de uitbreiding van de bestaande economische activiteitenzone in Andrychów. Het project heeft betrekking op de gebieden die zijn gereserveerd voor de uitbreiding van de economische activiteitszone in Andrychów, die het gebied tussen de straten bestrijken: Zonal, White Road, Industrial en drainage sloot tussen ul. The purpose of the project is to prepare an investment area enabling the implementation of industrial and service facilities with access to the network of technical and communication infrastructure of the city, obejmujące:makroniwelację the area in order to obtain drops enabling the construction of large-area hall facilities to reconstruct part of the existing maintenance road Strefowa street with adaptation of parameters to the needs of heavy transport, construction of an internal access road enabling access to the separate investment plots, the extension of the network of the site’s armament in a way that provides access to the technical infrastructure: the water supply infrastructure, in particular the environmental protection of the building site, the restoration of the natural gas network of the natural gas network, and the reconstruction of the area from the outskills of the external illumination network, the protection of the existing infrastructure, in particular the rehabilitation of the construction of the building of the natural gas network, the rehabilitation of the area from the outskills of the area from the outskilling of the network, the protection of the existing infrastructure from the area’s mainland, the rehabilitation of the natural gas network, the modernisation of the area from the outskids of the area, the rehabilitation of the area from the outskirts of the area, the rehabilitation of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the rehabilitation of the infrastructure, the protection of the area from the outskirtment of the network, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area’s mainland, the mainland of the area, the protection of the area from the modernisation of the network of the area, the protection of the existing infrastructure from the construction of the mainland, in particular the protection of the area in the area, the restoration of the natural gas network, the modernisation of the network from the external network of the network, the protection of the area from the mainland of the area, the restoration of the mainland of the area, and the rehabilitation of the mainland from the outskills of the mainland of the area, Gebied van voorbereide investeringsgebieden: 11,633 ha (Dutch)
    17 December 2021
    0 references
    Il progetto prevede l'ampliamento della zona di attività economica esistente ad Andrychów. Il progetto copre le aree destinate all'ampliamento della zona di attività economica di Andrychów, coprendo l'area situata tra le strade: Zonale, strada bianca, industriale e fossato di drenaggio tra ul. The purpose of the project is to prepare an investment area enabling the implementation of industrial and service facilities with access to the network of technical and communication infrastructure of the city, obejmujące:makroniwelację the area in order to obtain drops enabling the construction of large-area hall facilities to reconstruct part of the existing maintenance road Strefowa street with adaptation of parameters to the needs of heavy transport, construction of an internal access road enabling access to the separate investment plots, the extension of the network of the site’s armament in a way that provides access to the technical infrastructure: the water supply infrastructure, in particular the environmental protection of the building site, the restoration of the natural gas network of the natural gas network, and the reconstruction of the area from the outskills of the external illumination network, the protection of the existing infrastructure, in particular the rehabilitation of the construction of the building of the natural gas network, the rehabilitation of the area from the outskills of the area from the outskilling of the network, the protection of the existing infrastructure from the area’s mainland, the rehabilitation of the natural gas network, the modernisation of the area from the outskids of the area, the rehabilitation of the area from the outskirts of the area, the rehabilitation of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the rehabilitation of the infrastructure, the protection of the area from the outskirtment of the network, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area’s mainland, the mainland of the area, the protection of the area from the modernisation of the network of the area, the protection of the existing infrastructure from the construction of the mainland, in particular the protection of the area in the area, the restoration of the natural gas network, the modernisation of the network from the external network of the network, the protection of the area from the mainland of the area, the restoration of the mainland of the area, and the rehabilitation of the mainland from the outskills of the mainland of the area, Area dei settori di investimento preparati: 11,633 ha (Italian)
    15 January 2022
    0 references
    El proyecto implica la ampliación de la Zona de Actividad Económica existente en Andrychów. El proyecto abarca las áreas reservadas para la ampliación de la Zona de Actividad Económica en Andrychów, cubriendo la zona situada entre las calles: Zonal, White Road, Industrial y zanja de drenaje entre ul. The purpose of the project is to prepare an investment area enabling the implementation of industrial and service facilities with access to the network of technical and communication infrastructure of the city, obejmujące:makroniwelację the area in order to obtain drops enabling the construction of large-area hall facilities to reconstruct part of the existing maintenance road Strefowa street with adaptation of parameters to the needs of heavy transport, construction of an internal access road enabling access to the separate investment plots, the extension of the network of the site’s armament in a way that provides access to the technical infrastructure: the water supply infrastructure, in particular the environmental protection of the building site, the restoration of the natural gas network of the natural gas network, and the reconstruction of the area from the outskills of the external illumination network, the protection of the existing infrastructure, in particular the rehabilitation of the construction of the building of the natural gas network, the rehabilitation of the area from the outskills of the area from the outskilling of the network, the protection of the existing infrastructure from the area’s mainland, the rehabilitation of the natural gas network, the modernisation of the area from the outskids of the area, the rehabilitation of the area from the outskirts of the area, the rehabilitation of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the rehabilitation of the infrastructure, the protection of the area from the outskirtment of the network, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area’s mainland, the mainland of the area, the protection of the area from the modernisation of the network of the area, the protection of the existing infrastructure from the construction of the mainland, in particular the protection of the area in the area, the restoration of the natural gas network, the modernisation of the network from the external network of the network, the protection of the area from the mainland of the area, the restoration of the mainland of the area, and the rehabilitation of the mainland from the outskills of the mainland of the area, Área de áreas de inversión preparadas: 11,633 ha (Spanish)
    18 January 2022
    0 references
    Projektet indebærer udvidelse af den eksisterende økonomiske aktivitetszone i Andrychów. Projektet dækker de områder, der er afsat til udvidelse af den økonomiske aktivitetszone i Andrychów, der dækker området mellem gaderne: Zoneal, White Road, Industrial og dræning grøft mellem ul. The purpose of the project is to prepare an investment area enabling the implementation of industrial and service facilities with access to the network of technical and communication infrastructure of the city, obejmujące:makroniwelację the area in order to obtain drops enabling the construction of large-area hall facilities to reconstruct part of the existing maintenance road Strefowa street with adaptation of parameters to the needs of heavy transport, construction of an internal access road enabling access to the separate investment plots, the extension of the network of the site’s armament in a way that provides access to the technical infrastructure: the water supply infrastructure, in particular the environmental protection of the building site, the restoration of the natural gas network of the natural gas network, and the reconstruction of the area from the outskills of the external illumination network, the protection of the existing infrastructure, in particular the rehabilitation of the construction of the building of the natural gas network, the rehabilitation of the area from the outskills of the area from the outskilling of the network, the protection of the existing infrastructure from the area’s mainland, the rehabilitation of the natural gas network, the modernisation of the area from the outskids of the area, the rehabilitation of the area from the outskirts of the area, the rehabilitation of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the rehabilitation of the infrastructure, the protection of the area from the outskirtment of the network, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area’s mainland, the mainland of the area, the protection of the area from the modernisation of the network of the area, the protection of the existing infrastructure from the construction of the mainland, in particular the protection of the area in the area, the restoration of the natural gas network, the modernisation of the network from the external network of the network, the protection of the area from the mainland of the area, the restoration of the mainland of the area, and the rehabilitation of the mainland from the outskills of the mainland of the area, Område med forberedte investeringsområder: 11,633 ha (Danish)
    2 July 2022
    0 references
    Το έργο περιλαμβάνει την επέκταση της υφιστάμενης Ζώνης Οικονομικής Δραστηριότητας στο Andrychów. Το έργο καλύπτει τις περιοχές που προορίζονται για την επέκταση της ζώνης οικονομικής δραστηριότητας στο Andrychów, καλύπτοντας την περιοχή που βρίσκεται μεταξύ των οδών: Ζώνη, Λευκός Δρόμος, Βιομηχανική και αποστράγγιση τάφρος μεταξύ ul. The purpose of the project is to prepare an investment area enabling the implementation of industrial and service facilities with access to the network of technical and communication infrastructure of the city, obejmujące:makroniwelację the area in order to obtain drops enabling the construction of large-area hall facilities to reconstruct part of the existing maintenance road Strefowa street with adaptation of parameters to the needs of heavy transport, construction of an internal access road enabling access to the separate investment plots, the extension of the network of the site’s armament in a way that provides access to the technical infrastructure: the water supply infrastructure, in particular the environmental protection of the building site, the restoration of the natural gas network of the natural gas network, and the reconstruction of the area from the outskills of the external illumination network, the protection of the existing infrastructure, in particular the rehabilitation of the construction of the building of the natural gas network, the rehabilitation of the area from the outskills of the area from the outskilling of the network, the protection of the existing infrastructure from the area’s mainland, the rehabilitation of the natural gas network, the modernisation of the area from the outskids of the area, the rehabilitation of the area from the outskirts of the area, the rehabilitation of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the rehabilitation of the infrastructure, the protection of the area from the outskirtment of the network, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area’s mainland, the mainland of the area, the protection of the area from the modernisation of the network of the area, the protection of the existing infrastructure from the construction of the mainland, in particular the protection of the area in the area, the restoration of the natural gas network, the modernisation of the network from the external network of the network, the protection of the area from the mainland of the area, the restoration of the mainland of the area, and the rehabilitation of the mainland from the outskills of the mainland of the area, Τομέας των καταρτισμένων επενδυτικών τομέων: 11.633 εκτάρια (Greek)
    2 July 2022
    0 references
    Projekt uključuje proširenje postojeće zone gospodarske aktivnosti u Andrychówu. Projektom su obuhvaćena područja predviđena za proširenje zone gospodarske aktivnosti u Andrychówu, koja obuhvaća područje između ulica: Zonal, Bijela cesta, Industrijski i drenažni jarak između ul. The purpose of the project is to prepare an investment area enabling the implementation of industrial and service facilities with access to the network of technical and communication infrastructure of the city, obejmujące:makroniwelację the area in order to obtain drops enabling the construction of large-area hall facilities to reconstruct part of the existing maintenance road Strefowa street with adaptation of parameters to the needs of heavy transport, construction of an internal access road enabling access to the separate investment plots, the extension of the network of the site’s armament in a way that provides access to the technical infrastructure: the water supply infrastructure, in particular the environmental protection of the building site, the restoration of the natural gas network of the natural gas network, and the reconstruction of the area from the outskills of the external illumination network, the protection of the existing infrastructure, in particular the rehabilitation of the construction of the building of the natural gas network, the rehabilitation of the area from the outskills of the area from the outskilling of the network, the protection of the existing infrastructure from the area’s mainland, the rehabilitation of the natural gas network, the modernisation of the area from the outskids of the area, the rehabilitation of the area from the outskirts of the area, the rehabilitation of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the rehabilitation of the infrastructure, the protection of the area from the outskirtment of the network, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area’s mainland, the mainland of the area, the protection of the area from the modernisation of the network of the area, the protection of the existing infrastructure from the construction of the mainland, in particular the protection of the area in the area, the restoration of the natural gas network, the modernisation of the network from the external network of the network, the protection of the area from the mainland of the area, the restoration of the mainland of the area, and the rehabilitation of the mainland from the outskills of the mainland of the area, Područje pripremljenih područja ulaganja: 11,633 ha (Croatian)
    2 July 2022
    0 references
    Proiectul implică extinderea zonei de activitate economică existentă în Andrychów. Proiectul acoperă zonele rezervate extinderii zonei de activitate economică din Andrychów, acoperind zona situată între străzi: Zonal, Drumul Alb, Șanț industrial și drenaj între ul. The purpose of the project is to prepare an investment area enabling the implementation of industrial and service facilities with access to the network of technical and communication infrastructure of the city, obejmujące:makroniwelację the area in order to obtain drops enabling the construction of large-area hall facilities to reconstruct part of the existing maintenance road Strefowa street with adaptation of parameters to the needs of heavy transport, construction of an internal access road enabling access to the separate investment plots, the extension of the network of the site’s armament in a way that provides access to the technical infrastructure: the water supply infrastructure, in particular the environmental protection of the building site, the restoration of the natural gas network of the natural gas network, and the reconstruction of the area from the outskills of the external illumination network, the protection of the existing infrastructure, in particular the rehabilitation of the construction of the building of the natural gas network, the rehabilitation of the area from the outskills of the area from the outskilling of the network, the protection of the existing infrastructure from the area’s mainland, the rehabilitation of the natural gas network, the modernisation of the area from the outskids of the area, the rehabilitation of the area from the outskirts of the area, the rehabilitation of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the rehabilitation of the infrastructure, the protection of the area from the outskirtment of the network, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area’s mainland, the mainland of the area, the protection of the area from the modernisation of the network of the area, the protection of the existing infrastructure from the construction of the mainland, in particular the protection of the area in the area, the restoration of the natural gas network, the modernisation of the network from the external network of the network, the protection of the area from the mainland of the area, the restoration of the mainland of the area, and the rehabilitation of the mainland from the outskills of the mainland of the area, Domeniul domeniilor de investiții pregătite: 11,633 ha (Romanian)
    2 July 2022
    0 references
    Projekt zahŕňa rozšírenie existujúcej zóny ekonomickej aktivity v Andrychówe. Projekt pokrýva oblasti vyčlenené na rozšírenie zóny hospodárskej činnosti v Andrychówe, ktoré pokrývajú oblasť nachádzajúcu sa medzi ulicami: Zóna, Biela cesta, Priemyselné a drenážne priekopy medzi ul. The purpose of the project is to prepare an investment area enabling the implementation of industrial and service facilities with access to the network of technical and communication infrastructure of the city, obejmujące:makroniwelację the area in order to obtain drops enabling the construction of large-area hall facilities to reconstruct part of the existing maintenance road Strefowa street with adaptation of parameters to the needs of heavy transport, construction of an internal access road enabling access to the separate investment plots, the extension of the network of the site’s armament in a way that provides access to the technical infrastructure: the water supply infrastructure, in particular the environmental protection of the building site, the restoration of the natural gas network of the natural gas network, and the reconstruction of the area from the outskills of the external illumination network, the protection of the existing infrastructure, in particular the rehabilitation of the construction of the building of the natural gas network, the rehabilitation of the area from the outskills of the area from the outskilling of the network, the protection of the existing infrastructure from the area’s mainland, the rehabilitation of the natural gas network, the modernisation of the area from the outskids of the area, the rehabilitation of the area from the outskirts of the area, the rehabilitation of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the rehabilitation of the infrastructure, the protection of the area from the outskirtment of the network, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area’s mainland, the mainland of the area, the protection of the area from the modernisation of the network of the area, the protection of the existing infrastructure from the construction of the mainland, in particular the protection of the area in the area, the restoration of the natural gas network, the modernisation of the network from the external network of the network, the protection of the area from the mainland of the area, the restoration of the mainland of the area, and the rehabilitation of the mainland from the outskills of the mainland of the area, Oblasť pripravených investičných oblastí: 11,633 ha (Slovak)
    2 July 2022
    0 references
    Il-proġett jinvolvi l-espansjoni taż-Żona ta’ Attività Ekonomika eżistenti f’Andrychów. Il-proġett ikopri ż-żoni mwarrba għall-estensjoni taż-Żona ta’ Attività Ekonomika f’Andrychów, li tkopri ż-żona li tinsab bejn it-toroq: Foss żonali, White Road, Industrijali u tad-drenaġġ bejn ul. The purpose of the project is to prepare an investment area enabling the implementation of industrial and service facilities with access to the network of technical and communication infrastructure of the city, obejmujące:makroniwelację the area in order to obtain drops enabling the construction of large-area hall facilities to reconstruct part of the existing maintenance road Strefowa street with adaptation of parameters to the needs of heavy transport, construction of an internal access road enabling access to the separate investment plots, the extension of the network of the site’s armament in a way that provides access to the technical infrastructure: the water supply infrastructure, in particular the environmental protection of the building site, the restoration of the natural gas network of the natural gas network, and the reconstruction of the area from the outskills of the external illumination network, the protection of the existing infrastructure, in particular the rehabilitation of the construction of the building of the natural gas network, the rehabilitation of the area from the outskills of the area from the outskilling of the network, the protection of the existing infrastructure from the area’s mainland, the rehabilitation of the natural gas network, the modernisation of the area from the outskids of the area, the rehabilitation of the area from the outskirts of the area, the rehabilitation of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the rehabilitation of the infrastructure, the protection of the area from the outskirtment of the network, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area’s mainland, the mainland of the area, the protection of the area from the modernisation of the network of the area, the protection of the existing infrastructure from the construction of the mainland, in particular the protection of the area in the area, the restoration of the natural gas network, the modernisation of the network from the external network of the network, the protection of the area from the mainland of the area, the restoration of the mainland of the area, and the rehabilitation of the mainland from the outskills of the mainland of the area, Qasam ta’ oqsma ta’ investiment ippreparati: 11.633 ettaru (Maltese)
    2 July 2022
    0 references
    O projeto envolve a expansão da Zona de Atividade Econômica existente em Andrychów. O projeto abrange as áreas reservadas para a ampliação da Zona de Atividade Económica em Andrychów, abrangendo a área situada entre as ruas: Zonal, estrada branca, fosso industrial e de drenagem entre ul. The purpose of the project is to prepare an investment area enabling the implementation of industrial and service facilities with access to the network of technical and communication infrastructure of the city, obejmujące:makroniwelację the area in order to obtain drops enabling the construction of large-area hall facilities to reconstruct part of the existing maintenance road Strefowa street with adaptation of parameters to the needs of heavy transport, construction of an internal access road enabling access to the separate investment plots, the extension of the network of the site’s armament in a way that provides access to the technical infrastructure: the water supply infrastructure, in particular the environmental protection of the building site, the restoration of the natural gas network of the natural gas network, and the reconstruction of the area from the outskills of the external illumination network, the protection of the existing infrastructure, in particular the rehabilitation of the construction of the building of the natural gas network, the rehabilitation of the area from the outskills of the area from the outskilling of the network, the protection of the existing infrastructure from the area’s mainland, the rehabilitation of the natural gas network, the modernisation of the area from the outskids of the area, the rehabilitation of the area from the outskirts of the area, the rehabilitation of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the rehabilitation of the infrastructure, the protection of the area from the outskirtment of the network, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area’s mainland, the mainland of the area, the protection of the area from the modernisation of the network of the area, the protection of the existing infrastructure from the construction of the mainland, in particular the protection of the area in the area, the restoration of the natural gas network, the modernisation of the network from the external network of the network, the protection of the area from the mainland of the area, the restoration of the mainland of the area, and the rehabilitation of the mainland from the outskills of the mainland of the area, Área de áreas de investimento preparadas: 11,633 ha (Portuguese)
    2 July 2022
    0 references
    Hankkeeseen sisältyy Andrychówin nykyisen taloudellisen toiminnan vyöhykkeen laajentaminen. Hanke kattaa Andrychówin taloudellisen toiminnan vyöhykkeen laajentamiseen varatut alueet, jotka kattavat kadun välissä olevan alueen: Alue, valkoinen tie, teollinen ja viemäröinti ojan välillä ul. The purpose of the project is to prepare an investment area enabling the implementation of industrial and service facilities with access to the network of technical and communication infrastructure of the city, obejmujące:makroniwelację the area in order to obtain drops enabling the construction of large-area hall facilities to reconstruct part of the existing maintenance road Strefowa street with adaptation of parameters to the needs of heavy transport, construction of an internal access road enabling access to the separate investment plots, the extension of the network of the site’s armament in a way that provides access to the technical infrastructure: the water supply infrastructure, in particular the environmental protection of the building site, the restoration of the natural gas network of the natural gas network, and the reconstruction of the area from the outskills of the external illumination network, the protection of the existing infrastructure, in particular the rehabilitation of the construction of the building of the natural gas network, the rehabilitation of the area from the outskills of the area from the outskilling of the network, the protection of the existing infrastructure from the area’s mainland, the rehabilitation of the natural gas network, the modernisation of the area from the outskids of the area, the rehabilitation of the area from the outskirts of the area, the rehabilitation of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the rehabilitation of the infrastructure, the protection of the area from the outskirtment of the network, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area’s mainland, the mainland of the area, the protection of the area from the modernisation of the network of the area, the protection of the existing infrastructure from the construction of the mainland, in particular the protection of the area in the area, the restoration of the natural gas network, the modernisation of the network from the external network of the network, the protection of the area from the mainland of the area, the restoration of the mainland of the area, and the rehabilitation of the mainland from the outskills of the mainland of the area, Valmisteltujen investointialueiden ala: 11,633 ha (Finnish)
    2 July 2022
    0 references
    Projekt vključuje razširitev obstoječega območja gospodarske dejavnosti v Andrychówu. Projekt zajema območja, namenjena razširitvi območja gospodarske dejavnosti v Andrychówu, ki zajema območje med ulicami: Območje, bela cesta, industrijska in drenažna jarek med ul. The purpose of the project is to prepare an investment area enabling the implementation of industrial and service facilities with access to the network of technical and communication infrastructure of the city, obejmujące:makroniwelację the area in order to obtain drops enabling the construction of large-area hall facilities to reconstruct part of the existing maintenance road Strefowa street with adaptation of parameters to the needs of heavy transport, construction of an internal access road enabling access to the separate investment plots, the extension of the network of the site’s armament in a way that provides access to the technical infrastructure: the water supply infrastructure, in particular the environmental protection of the building site, the restoration of the natural gas network of the natural gas network, and the reconstruction of the area from the outskills of the external illumination network, the protection of the existing infrastructure, in particular the rehabilitation of the construction of the building of the natural gas network, the rehabilitation of the area from the outskills of the area from the outskilling of the network, the protection of the existing infrastructure from the area’s mainland, the rehabilitation of the natural gas network, the modernisation of the area from the outskids of the area, the rehabilitation of the area from the outskirts of the area, the rehabilitation of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the rehabilitation of the infrastructure, the protection of the area from the outskirtment of the network, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area’s mainland, the mainland of the area, the protection of the area from the modernisation of the network of the area, the protection of the existing infrastructure from the construction of the mainland, in particular the protection of the area in the area, the restoration of the natural gas network, the modernisation of the network from the external network of the network, the protection of the area from the mainland of the area, the restoration of the mainland of the area, and the rehabilitation of the mainland from the outskills of the mainland of the area, Področje pripravljenih naložbenih področij: 11,633 ha (Slovenian)
    2 July 2022
    0 references
    Projekt zahrnuje rozšíření stávající zóny ekonomické aktivity v Andrychówě. Projekt se týká oblastí vyhrazených pro rozšíření zóny hospodářské činnosti v Andrychówě, která pokrývá oblast nacházející se mezi ulicemi: Zonal, White Road, Průmyslový a odvodňovací příkop mezi ul. The purpose of the project is to prepare an investment area enabling the implementation of industrial and service facilities with access to the network of technical and communication infrastructure of the city, obejmujące:makroniwelację the area in order to obtain drops enabling the construction of large-area hall facilities to reconstruct part of the existing maintenance road Strefowa street with adaptation of parameters to the needs of heavy transport, construction of an internal access road enabling access to the separate investment plots, the extension of the network of the site’s armament in a way that provides access to the technical infrastructure: the water supply infrastructure, in particular the environmental protection of the building site, the restoration of the natural gas network of the natural gas network, and the reconstruction of the area from the outskills of the external illumination network, the protection of the existing infrastructure, in particular the rehabilitation of the construction of the building of the natural gas network, the rehabilitation of the area from the outskills of the area from the outskilling of the network, the protection of the existing infrastructure from the area’s mainland, the rehabilitation of the natural gas network, the modernisation of the area from the outskids of the area, the rehabilitation of the area from the outskirts of the area, the rehabilitation of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the rehabilitation of the infrastructure, the protection of the area from the outskirtment of the network, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area’s mainland, the mainland of the area, the protection of the area from the modernisation of the network of the area, the protection of the existing infrastructure from the construction of the mainland, in particular the protection of the area in the area, the restoration of the natural gas network, the modernisation of the network from the external network of the network, the protection of the area from the mainland of the area, the restoration of the mainland of the area, and the rehabilitation of the mainland from the outskills of the mainland of the area, Oblast připravených investičních oblastí: 11,633 ha (Czech)
    2 July 2022
    0 references
    Projektas apima esamos ekonominės veiklos zonos Andrychów plėtrą. Projektas apima teritorijas, skirtas ekonominės veiklos zonai Andrychów išplėsti, apimančias teritoriją, esančią tarp gatvių: Zonal, White Road, Pramonės ir drenažo griovys tarp ul. The purpose of the project is to prepare an investment area enabling the implementation of industrial and service facilities with access to the network of technical and communication infrastructure of the city, obejmujące:makroniwelację the area in order to obtain drops enabling the construction of large-area hall facilities to reconstruct part of the existing maintenance road Strefowa street with adaptation of parameters to the needs of heavy transport, construction of an internal access road enabling access to the separate investment plots, the extension of the network of the site’s armament in a way that provides access to the technical infrastructure: the water supply infrastructure, in particular the environmental protection of the building site, the restoration of the natural gas network of the natural gas network, and the reconstruction of the area from the outskills of the external illumination network, the protection of the existing infrastructure, in particular the rehabilitation of the construction of the building of the natural gas network, the rehabilitation of the area from the outskills of the area from the outskilling of the network, the protection of the existing infrastructure from the area’s mainland, the rehabilitation of the natural gas network, the modernisation of the area from the outskids of the area, the rehabilitation of the area from the outskirts of the area, the rehabilitation of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the rehabilitation of the infrastructure, the protection of the area from the outskirtment of the network, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area’s mainland, the mainland of the area, the protection of the area from the modernisation of the network of the area, the protection of the existing infrastructure from the construction of the mainland, in particular the protection of the area in the area, the restoration of the natural gas network, the modernisation of the network from the external network of the network, the protection of the area from the mainland of the area, the restoration of the mainland of the area, and the rehabilitation of the mainland from the outskills of the mainland of the area, Paruoštų investicijų sričių plotas: 11 633 ha (Lithuanian)
    2 July 2022
    0 references
    Projekts ietver esošās ekonomiskās darbības zonas paplašināšanu Andrišovā. Projekts aptver teritorijas, kas paredzētas ekonomiskās darbības zonas paplašināšanai Andrišovā, aptverot teritoriju, kas atrodas starp ielām: Zonal, White Road, Rūpniecības un drenāžas grāvis starp ul. The purpose of the project is to prepare an investment area enabling the implementation of industrial and service facilities with access to the network of technical and communication infrastructure of the city, obejmujące:makroniwelację the area in order to obtain drops enabling the construction of large-area hall facilities to reconstruct part of the existing maintenance road Strefowa street with adaptation of parameters to the needs of heavy transport, construction of an internal access road enabling access to the separate investment plots, the extension of the network of the site’s armament in a way that provides access to the technical infrastructure: the water supply infrastructure, in particular the environmental protection of the building site, the restoration of the natural gas network of the natural gas network, and the reconstruction of the area from the outskills of the external illumination network, the protection of the existing infrastructure, in particular the rehabilitation of the construction of the building of the natural gas network, the rehabilitation of the area from the outskills of the area from the outskilling of the network, the protection of the existing infrastructure from the area’s mainland, the rehabilitation of the natural gas network, the modernisation of the area from the outskids of the area, the rehabilitation of the area from the outskirts of the area, the rehabilitation of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the rehabilitation of the infrastructure, the protection of the area from the outskirtment of the network, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area’s mainland, the mainland of the area, the protection of the area from the modernisation of the network of the area, the protection of the existing infrastructure from the construction of the mainland, in particular the protection of the area in the area, the restoration of the natural gas network, the modernisation of the network from the external network of the network, the protection of the area from the mainland of the area, the restoration of the mainland of the area, and the rehabilitation of the mainland from the outskills of the mainland of the area, Sagatavoto investīciju apgabalu platība: 11,633 ha (Latvian)
    2 July 2022
    0 references
    Проектът включва разширяване на съществуващата зона за икономическа дейност в Andrychów. Проектът обхваща площите, определени за разширяване на зоната за икономическа дейност в Andrychów, обхващаща площта, разположена между улиците: Зонал, Уайт път, Индустриална и дренажна канавка между ул. The purpose of the project is to prepare an investment area enabling the implementation of industrial and service facilities with access to the network of technical and communication infrastructure of the city, obejmujące:makroniwelację the area in order to obtain drops enabling the construction of large-area hall facilities to reconstruct part of the existing maintenance road Strefowa street with adaptation of parameters to the needs of heavy transport, construction of an internal access road enabling access to the separate investment plots, the extension of the network of the site’s armament in a way that provides access to the technical infrastructure: the water supply infrastructure, in particular the environmental protection of the building site, the restoration of the natural gas network of the natural gas network, and the reconstruction of the area from the outskills of the external illumination network, the protection of the existing infrastructure, in particular the rehabilitation of the construction of the building of the natural gas network, the rehabilitation of the area from the outskills of the area from the outskilling of the network, the protection of the existing infrastructure from the area’s mainland, the rehabilitation of the natural gas network, the modernisation of the area from the outskids of the area, the rehabilitation of the area from the outskirts of the area, the rehabilitation of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the rehabilitation of the infrastructure, the protection of the area from the outskirtment of the network, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area’s mainland, the mainland of the area, the protection of the area from the modernisation of the network of the area, the protection of the existing infrastructure from the construction of the mainland, in particular the protection of the area in the area, the restoration of the natural gas network, the modernisation of the network from the external network of the network, the protection of the area from the mainland of the area, the restoration of the mainland of the area, and the rehabilitation of the mainland from the outskills of the mainland of the area, Област на подготвените инвестиционни области: 11.633 ха (Bulgarian)
    2 July 2022
    0 references
    A projekt az andrychówi gazdasági övezet bővítését foglalja magában. A projekt az andrychówi gazdasági tevékenységi övezet bővítésére kijelölt területekre terjed ki, amelyek az utcák közötti területet fedik le: Zonal, fehér út, ipari és vízelvezető árok között ul. The purpose of the project is to prepare an investment area enabling the implementation of industrial and service facilities with access to the network of technical and communication infrastructure of the city, obejmujące:makroniwelację the area in order to obtain drops enabling the construction of large-area hall facilities to reconstruct part of the existing maintenance road Strefowa street with adaptation of parameters to the needs of heavy transport, construction of an internal access road enabling access to the separate investment plots, the extension of the network of the site’s armament in a way that provides access to the technical infrastructure: the water supply infrastructure, in particular the environmental protection of the building site, the restoration of the natural gas network of the natural gas network, and the reconstruction of the area from the outskills of the external illumination network, the protection of the existing infrastructure, in particular the rehabilitation of the construction of the building of the natural gas network, the rehabilitation of the area from the outskills of the area from the outskilling of the network, the protection of the existing infrastructure from the area’s mainland, the rehabilitation of the natural gas network, the modernisation of the area from the outskids of the area, the rehabilitation of the area from the outskirts of the area, the rehabilitation of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the rehabilitation of the infrastructure, the protection of the area from the outskirtment of the network, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area’s mainland, the mainland of the area, the protection of the area from the modernisation of the network of the area, the protection of the existing infrastructure from the construction of the mainland, in particular the protection of the area in the area, the restoration of the natural gas network, the modernisation of the network from the external network of the network, the protection of the area from the mainland of the area, the restoration of the mainland of the area, and the rehabilitation of the mainland from the outskills of the mainland of the area, Az előkészített beruházási területek területe: 11,633 ha (Hungarian)
    2 July 2022
    0 references
    Is éard atá i gceist leis an tionscadal leathnú a dhéanamh ar an gCrios Gníomhaíochta Eacnamaíochta atá ann cheana in Andrychów. Clúdaíonn an tionscadal na limistéir atá curtha ar leataobh le haghaidh leathnú an Chrios Gníomhaíochta Eacnamaíochta in Andrychów, a chlúdaíonn an limistéar atá suite idir na sráideanna: Crios, Bóthar Bán, Tionscail agus díog draenála idir ul. The purpose of the project is to prepare an investment area enabling the implementation of industrial and service facilities with access to the network of technical and communication infrastructure of the city, obejmujące:makroniwelację the area in order to obtain drops enabling the construction of large-area hall facilities to reconstruct part of the existing maintenance road Strefowa street with adaptation of parameters to the needs of heavy transport, construction of an internal access road enabling access to the separate investment plots, the extension of the network of the site’s armament in a way that provides access to the technical infrastructure: the water supply infrastructure, in particular the environmental protection of the building site, the restoration of the natural gas network of the natural gas network, and the reconstruction of the area from the outskills of the external illumination network, the protection of the existing infrastructure, in particular the rehabilitation of the construction of the building of the natural gas network, the rehabilitation of the area from the outskills of the area from the outskilling of the network, the protection of the existing infrastructure from the area’s mainland, the rehabilitation of the natural gas network, the modernisation of the area from the outskids of the area, the rehabilitation of the area from the outskirts of the area, the rehabilitation of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the rehabilitation of the infrastructure, the protection of the area from the outskirtment of the network, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area’s mainland, the mainland of the area, the protection of the area from the modernisation of the network of the area, the protection of the existing infrastructure from the construction of the mainland, in particular the protection of the area in the area, the restoration of the natural gas network, the modernisation of the network from the external network of the network, the protection of the area from the mainland of the area, the restoration of the mainland of the area, and the rehabilitation of the mainland from the outskills of the mainland of the area, Réimse na limistéar infheistíochta ullmhaithe: 11.633 ha (Irish)
    2 July 2022
    0 references
    Projektet omfattar utbyggnad av den befintliga ekonomiska aktivitetszonen i Andrychów. Projektet omfattar de områden som avsatts för utvidgning av den ekonomiska aktivitetszonen i Andrychów, som omfattar det område som ligger mellan gatorna: Zonal, vit väg, industri och dränering dike mellan ul. The purpose of the project is to prepare an investment area enabling the implementation of industrial and service facilities with access to the network of technical and communication infrastructure of the city, obejmujące:makroniwelację the area in order to obtain drops enabling the construction of large-area hall facilities to reconstruct part of the existing maintenance road Strefowa street with adaptation of parameters to the needs of heavy transport, construction of an internal access road enabling access to the separate investment plots, the extension of the network of the site’s armament in a way that provides access to the technical infrastructure: the water supply infrastructure, in particular the environmental protection of the building site, the restoration of the natural gas network of the natural gas network, and the reconstruction of the area from the outskills of the external illumination network, the protection of the existing infrastructure, in particular the rehabilitation of the construction of the building of the natural gas network, the rehabilitation of the area from the outskills of the area from the outskilling of the network, the protection of the existing infrastructure from the area’s mainland, the rehabilitation of the natural gas network, the modernisation of the area from the outskids of the area, the rehabilitation of the area from the outskirts of the area, the rehabilitation of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the rehabilitation of the infrastructure, the protection of the area from the outskirtment of the network, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area’s mainland, the mainland of the area, the protection of the area from the modernisation of the network of the area, the protection of the existing infrastructure from the construction of the mainland, in particular the protection of the area in the area, the restoration of the natural gas network, the modernisation of the network from the external network of the network, the protection of the area from the mainland of the area, the restoration of the mainland of the area, and the rehabilitation of the mainland from the outskills of the mainland of the area, Område för beredda investeringsområden: 11 633 ha (Swedish)
    2 July 2022
    0 references
    Projekt hõlmab Andrychówi olemasoleva majandustegevuse tsooni laiendamist. Projekt hõlmab Andrychówi majandustegevuse laiendamiseks ette nähtud alasid, mis hõlmavad tänavate vahel asuvat ala: Tsoon, valge tee, tööstus- ja kuivenduskraav ul’i vahel. The purpose of the project is to prepare an investment area enabling the implementation of industrial and service facilities with access to the network of technical and communication infrastructure of the city, obejmujące:makroniwelację the area in order to obtain drops enabling the construction of large-area hall facilities to reconstruct part of the existing maintenance road Strefowa street with adaptation of parameters to the needs of heavy transport, construction of an internal access road enabling access to the separate investment plots, the extension of the network of the site’s armament in a way that provides access to the technical infrastructure: the water supply infrastructure, in particular the environmental protection of the building site, the restoration of the natural gas network of the natural gas network, and the reconstruction of the area from the outskills of the external illumination network, the protection of the existing infrastructure, in particular the rehabilitation of the construction of the building of the natural gas network, the rehabilitation of the area from the outskills of the area from the outskilling of the network, the protection of the existing infrastructure from the area’s mainland, the rehabilitation of the natural gas network, the modernisation of the area from the outskids of the area, the rehabilitation of the area from the outskirts of the area, the rehabilitation of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the rehabilitation of the infrastructure, the protection of the area from the outskirtment of the network, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area’s mainland, the mainland of the area, the protection of the area from the modernisation of the network of the area, the protection of the existing infrastructure from the construction of the mainland, in particular the protection of the area in the area, the restoration of the natural gas network, the modernisation of the network from the external network of the network, the protection of the area from the mainland of the area, the restoration of the mainland of the area, and the rehabilitation of the mainland from the outskills of the mainland of the area, Ettevalmistatud investeerimisvaldkondade valdkond: 11,633 ha (Estonian)
    2 July 2022
    0 references
    WOJ.: MAŁOPOLSKIE, POW.: wadowicki
    0 references
    13 December 2023
    0 references

    Identifiers

    RPMP.03.01.02-12-0582/16
    0 references