Promoting sustainable transport and removing bottlenecks in key infrastructure networks (OT7) (Q4406167): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created claim: total cost of selected operations (P577569): 109,058,369.8 euro, ingesting total cost of selected operation)
(‎Changed an Item: Modifying item Q4406167; priority_axis 2014PT16M3OP001-IV)
 
(15 intermediate revisions by 2 users not shown)
label / hrlabel / hr
 
Promicanje održivog prometa i uklanjanje uskih grla u ključnim infrastrukturnim mrežama (OT7)
label / svlabel / sv
 
Främja hållbara transporter och undanröja flaskhalsar i viktiga infrastrukturnät (OT7)
label / ltlabel / lt
 
Tvaraus transporto skatinimas ir kliūčių pagrindiniuose infrastruktūros tinkluose šalinimas (OT7)
label / ellabel / el
 
Προώθηση βιώσιμων μεταφορών και εξάλειψη των σημείων συμφόρησης σε βασικά δίκτυα υποδομών (OT7)
label / delabel / de
 
Förderung eines nachhaltigen Verkehrs und Beseitigung von Engpässen in wichtigen Infrastrukturnetzen (OT7)
label / sllabel / sl
 
Spodbujanje trajnostnega prometa in odprava ozkih grl v ključnih infrastrukturnih omrežjih (OT7)
label / cslabel / cs
 
Podpora udržitelné dopravy a odstraňování překážek v klíčových infrastrukturních sítích (OT7)
label / itlabel / it
 
Promuovere trasporti sostenibili ed eliminare le strozzature nelle reti infrastrutturali chiave (OT7)
label / sklabel / sk
 
Podpora udržateľnej dopravy a odstraňovanie prekážok v kľúčových sieťach infraštruktúry (OT7)
label / hulabel / hu
 
A fenntartható közlekedés előmozdítása és a szűk keresztmetszetek megszüntetése a kulcsfontosságú infrastrukturális hálózatokban (OT7)
label / bglabel / bg
 
Насърчаване на устойчивия транспорт и премахване на участъците с недостатъчен капацитет в ключови инфраструктурни мрежи (OT7)
label / eslabel / es
 
Promover el transporte sostenible y eliminar los cuellos de botella en las redes clave de infraestructura (OT7)
label / galabel / ga
 
Iompar inbhuanaithe a chur chun cinn agus scrogaill i bpríomhghréasáin bhonneagair a bhaint (OT7)
label / dalabel / da
 
Fremme af bæredygtig transport og fjernelse af flaskehalse i vigtige infrastrukturnet (OT7)
label / enlabel / en
 
Promoting sustainable transport and removing bottlenecks in key infrastructure networks (OT7)
label / nllabel / nl
 
Bevordering van duurzaam vervoer en het wegnemen van knelpunten in belangrijke infrastructuurnetwerken (OT7)
label / filabel / fi
 
Kestävän liikenteen edistäminen ja pullonkaulojen poistaminen keskeisistä infrastruktuuriverkoista (OT7)
label / lvlabel / lv
 
Ilgtspējīga transporta veicināšana un vājo vietu novēršana galvenajos infrastruktūras tīklos (OT7)
label / rolabel / ro
 
Promovarea transportului durabil și eliminarea blocajelor din rețelele de infrastructură esențiale (OT7)
label / frlabel / fr
 
Promouvoir des transports durables et éliminer les goulets d’étranglement dans les principaux réseaux d’infrastructures (OT7)
label / mtlabel / mt
 
Il-promozzjoni ta’ trasport sostenibbli u t-tneħħija ta’ punti ta’ konġestjoni f’netwerks infrastrutturali ewlenin (OT7)
label / etlabel / et
 
Säästva transpordi edendamine ja peamiste taristuvõrkude kitsaskohtade kõrvaldamine (OT7)
Property / Priority Axis ID: 2014PT16M3OP001-IV / qualifier
 
Property / thematic objective
 
Property / thematic objective: Network infrastructure in transport and energy / rank
Normal rank
 
Property / total cost of selected operations
696,056,952.48 Euro
Amount696,056,952.48 Euro
UnitEuro
 
Property / total cost of selected operations: 696,056,952.48 Euro / rank
Normal rank
 
Property / total cost of selected operations: 696,056,952.48 Euro / qualifier
 
Property / total cost of selected operations: 696,056,952.48 Euro / qualifier
 
Property / total cost of selected operations: 696,056,952.48 Euro / qualifier
point in time: 30 June 2022
Timestamp+2022-06-30T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
 
Property / total cost of selected operations
109,058,369.8 Euro
Amount109,058,369.8 Euro
UnitEuro
 
Property / total cost of selected operations: 109,058,369.8 Euro / rank
Normal rank
 
Property / Priority Axis ID
 
2014PT16M3OP001-4
Property / Priority Axis ID: 2014PT16M3OP001-4 / rank
 
Normal rank
Property / Priority Axis ID: 2014PT16M3OP001-4 / qualifier
 
Property / total cost of selected operations
 
705,176,347.12 Euro
Amount705,176,347.12 Euro
UnitEuro
Property / total cost of selected operations: 705,176,347.12 Euro / rank
 
Normal rank
Property / total cost of selected operations: 705,176,347.12 Euro / qualifier
 
Property / total cost of selected operations: 705,176,347.12 Euro / qualifier
 
Property / total cost of selected operations: 705,176,347.12 Euro / qualifier
 
point in time: 30 September 2023
Timestamp+2023-09-30T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / total cost of selected operations
 
109,058,369.8 Euro
Amount109,058,369.8 Euro
UnitEuro
Property / total cost of selected operations: 109,058,369.8 Euro / rank
 
Normal rank
Property / total cost of selected operations: 109,058,369.8 Euro / qualifier
 
Property / total cost of selected operations: 109,058,369.8 Euro / qualifier
 
Property / total cost of selected operations: 109,058,369.8 Euro / qualifier
 
point in time: 30 September 2023
Timestamp+2023-09-30T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Latest revision as of 10:57, 22 December 2023

priority axis of 2014PT16M3OP001
Language Label Description Also known as
English
Promoting sustainable transport and removing bottlenecks in key infrastructure networks (OT7)
priority axis of 2014PT16M3OP001

    Statements

    Identifiers

    2014PT16M3OP001-IV
    0 references
    2014PT16M3OP001-4
    0 references