Seismic and hydrogeological prevention, improvement of energy efficiency and support for the socio-economic recovery of areas affected by the earthquake (Q4405669): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Modifying item Q4405669; priority_axis 2014IT16RFOP013-8) Tag: Reverted |
(Changed an Item: Modifying item Q4405669; priority_axis 2014IT16RFOP013-8) |
||||||||||||||
(One intermediate revision by the same user not shown) | |||||||||||||||
Property / total cost of selected operations | |||||||||||||||
| |||||||||||||||
Property / total cost of selected operations: 208,675,069.02 Euro / rank | |||||||||||||||
Property / total cost of selected operations: 208,675,069.02 Euro / qualifier | |||||||||||||||
Property / total cost of selected operations: 208,675,069.02 Euro / qualifier | |||||||||||||||
Property / total cost of selected operations: 208,675,069.02 Euro / qualifier | |||||||||||||||
| |||||||||||||||
Property / total cost of selected operations | |||||||||||||||
217,219,904.64 Euro
| |||||||||||||||
Property / total cost of selected operations: 217,219,904.64 Euro / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / total cost of selected operations: 217,219,904.64 Euro / qualifier | |||||||||||||||
Property / total cost of selected operations: 217,219,904.64 Euro / qualifier | |||||||||||||||
Property / total cost of selected operations: 217,219,904.64 Euro / qualifier | |||||||||||||||
point in time: 30 September 2023
|
Latest revision as of 10:51, 22 December 2023
priority axis of 2014IT16RFOP013
Language | Label | Description | Also known as |
---|---|---|---|
English | Seismic and hydrogeological prevention, improvement of energy efficiency and support for the socio-economic recovery of areas affected by the earthquake |
priority axis of 2014IT16RFOP013 |
Statements
217,219,904.64 Euro
0 references
Identifiers
2014IT16RFOP013-8
0 references