HYDROGEOLOGICAL AND SEISMIC RISK (Q4405646): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: total cost of selected operations (P577569): 65,689,260.32 euro, remove outdated Cohesion Data information)
(‎Changed an Item: Modifying item Q4405646; priority_axis 2014IT16RFOP010-5)
 
(5 intermediate revisions by the same user not shown)
label / enlabel / en
RISCHIO IDROGEOLOGICO E SISMICO
HYDROGEOLOGICAL AND SEISMIC RISK
label / hrlabel / hr
 
HIDROGEOLOŠKI I SEIZMIČKI RIZIK
label / svlabel / sv
 
HYDROGEOLOGISK OCH SEISMISK RISK
label / ltlabel / lt
 
HIDROGEOLOGINĖ IR SEISMINĖ RIZIKA
label / ellabel / el
 
ΥΔΡΟΓΕΩΛΟΓΙΚΌΣ ΚΑΙ ΣΕΙΣΜΙΚΌΣ ΚΊΝΔΥΝΟΣ
label / delabel / de
 
HYDROGEOLOGISCHES UND SEISMISCHES RISIKO
label / sllabel / sl
 
HIDROGEOLOŠKO IN POTRESNO TVEGANJE
label / cslabel / cs
 
HYDROGEOLOGICKÉ A SEISMICKÉ RIZIKO
label / itlabel / it
 
RISCHIO IDROGEOLOGICO E SISMICO
label / sklabel / sk
 
HYDROGEOLOGICKÉ A SEIZMICKÉ RIZIKO
label / hulabel / hu
 
HIDROGEOLÓGIAI ÉS SZEIZMIKUS KOCKÁZAT
label / bglabel / bg
 
ХИДРОГЕОЛОЖКИ И СЕИЗМИЧЕН РИСК
label / eslabel / es
 
RIESGO HIDROGEOLÓGICO Y SÍSMICO
label / galabel / ga
 
RIOSCA HIDRIGEOLAÍOCH AGUS SEISMEACH
label / dalabel / da
 
HYDROGEOLOGISK OG SEISMISK RISIKO
label / nllabel / nl
 
HYDROGEOLOGISCHE EN SEISMISCHE RISICO’S
label / filabel / fi
 
HYDROGEOLOGINEN JA SEISMINEN RISKI
label / ptlabel / pt
 
RISCO HIDROGEOLÓGICO E SÍSMICO
label / lvlabel / lv
 
HIDROĢEOLOĢISKAIS UN SEISMISKAIS RISKS
label / rolabel / ro
 
RISC HIDROGEOLOGIC ȘI SEISMIC
label / frlabel / fr
 
RISQUE HYDROGÉOLOGIQUE ET SISMIQUE
label / mtlabel / mt
 
RISKJU IDROĠEOLOĠIKU U SISMIKU
label / etlabel / et
 
HÜDROGEOLOOGILINE JA SEISMILINE RISK
Property / total cost of selected operations
 
21,721,679.02 Euro
Amount21,721,679.02 Euro
UnitEuro
Property / total cost of selected operations: 21,721,679.02 Euro / rank
 
Normal rank
Property / total cost of selected operations: 21,721,679.02 Euro / qualifier
 
Property / total cost of selected operations: 21,721,679.02 Euro / qualifier
 
Property / total cost of selected operations: 21,721,679.02 Euro / qualifier
 
point in time: 30 September 2023
Timestamp+2023-09-30T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Latest revision as of 10:50, 22 December 2023

priority axis of 2014IT16RFOP010
Language Label Description Also known as
English
HYDROGEOLOGICAL AND SEISMIC RISK
priority axis of 2014IT16RFOP010

    Statements

    Identifiers

    2014IT16RFOP010-5
    0 references