“Development of railway infrastructure along the ‘core’ and ‘extended’ trans-European transport network” (Q4404082): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: total cost of selected operations (P577569): 700,232,701.41 euro, remove outdated Cohesion Data information) |
(Changed an Item: Modifying item Q4404082; priority_axis 2014BG16M1OP001-1) |
||||||||||||||
(2 intermediate revisions by the same user not shown) | |||||||||||||||
Property / total cost of selected operations | |||||||||||||||
694,817,636.71 Euro
| |||||||||||||||
Property / total cost of selected operations: 694,817,636.71 Euro / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / total cost of selected operations: 694,817,636.71 Euro / qualifier | |||||||||||||||
Property / total cost of selected operations: 694,817,636.71 Euro / qualifier | |||||||||||||||
Property / total cost of selected operations: 694,817,636.71 Euro / qualifier | |||||||||||||||
point in time: 30 September 2023
|
Latest revision as of 10:29, 22 December 2023
priority axis of 2014BG16M1OP001
Language | Label | Description | Also known as |
---|---|---|---|
English | “Development of railway infrastructure along the ‘core’ and ‘extended’ trans-European transport network” |
priority axis of 2014BG16M1OP001 |
Statements
694,817,636.71 Euro
0 references
Identifiers
2014BG16M1OP001-1
0 references