Disassociating Albufeira do Açude-Ponte de Coimbra and Stabilisation of the right bank of the Mondego River between the Santa Clara Bridge and the Dam – Coimbra Bridge (Q2981671): Difference between revisions
Jump to navigation
Jump to search
(BatchIngestion) |
(Changed an Item) |
||||||||||||||
Property / beneficiary name (string) | |||||||||||||||
Property / beneficiary name (string): MUNICÍPIO DE COIMBRA / rank | |||||||||||||||
Property / beneficiary | |||||||||||||||
Property / beneficiary: Q2991043 (Deleted Item) / rank | |||||||||||||||
Property / date of last update | |||||||||||||||
| |||||||||||||||
Property / date of last update: 23 May 2023 / rank | |||||||||||||||
Property / beneficiary | |||||||||||||||
Property / beneficiary: MUNICÍPIO DE COIMBRA / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / beneficiary name (string) | |||||||||||||||
MUNICÍPIO DE COIMBRA | |||||||||||||||
Property / beneficiary name (string): MUNICÍPIO DE COIMBRA / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / date of last update | |||||||||||||||
14 November 2023
| |||||||||||||||
Property / date of last update: 14 November 2023 / rank | |||||||||||||||
Normal rank |
Revision as of 17:50, 14 November 2023
Project Q2981671 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | Disassociating Albufeira do Açude-Ponte de Coimbra and Stabilisation of the right bank of the Mondego River between the Santa Clara Bridge and the Dam – Coimbra Bridge |
Project Q2981671 in Portugal |
Statements
12,771,668.27 Euro
0 references
14,028,372.04 Euro
0 references
91.04 percent
0 references
16 July 2015
0 references
30 June 2023
0 references
MUNICÍPIO DE COIMBRA
0 references
A operação é composta pela empreitada "Desassor. da Albufeira do Açude-Ponte de Coimbra" que tem por objeto a retirada de sedimentos da Albufeira do Açude e a "Estabiliz. da margem direita do Rio Mond. entre a Pte Sta. Clara e o Açude - Ponte de Coimbra" a estabiliz. das estruturas de contenção da margem direita, bem como os respetivos serviços de fiscalização. (Portuguese)
0 references
The operation is composed of the project "Disassor. da Albufeira do Açude-Ponte de Coimbra" which has as its object the removal of sediments from Albufeira do Açude and the "Estabiliz. of the right bank of the Mond. between Pte Sta. Clara e o Açude – Ponte de Coimbra" the stability of the containment structures on the right bank, as well as the respective inspection services. (English)
9 July 2021
0 references
L’opération consiste dans le contrat "Desassor. da Albufeira do Açude-Ponte de Coimbra" qui vise à enlever les sédiments d’Albufeira do Açude et "Estabiliz. sur la rive droite de la rivière Mond. entre le Pte Sta. Clara et l’Açude — Ponte de Coimbra" la stabilité des structures de confinement de la rive droite, ainsi que les services d’inspection respectifs. (French)
7 December 2021
0 references
Der Betrieb besteht aus dem Vertrag "Desassor. da Albufeira do Açude-Ponte de Coimbra", der Sedimente von Albufeira do Açude und "Estabiliz. am rechten Ufer des Monds. zwischen Pte Sta. Clara und die Açude – Ponte de Coimbra" die Stabilität der Einschließungsstrukturen der richtigen Bank sowie die jeweiligen Inspektionsleistungen. (German)
15 December 2021
0 references
De operatie bestaat uit het contract "Desassor. da Albufeira do Açude-Ponte de Coimbra", dat gericht is op het verwijderen van sedimenten uit Albufeira do Açude en "Estabiliz. op de rechteroever van de rivier Mond. tussen Pte Sta. Clara en de Açude — Ponte de Coimbra" de stabiliteit van de insluitingsstructuren van de rechterbank, evenals de respectieve inspectiediensten. (Dutch)
20 December 2021
0 references
L'operazione consiste nel contratto "Desassor. da Albufeira do Açude-Ponte de Coimbra" che mira a rimuovere i sedimenti da Albufeira do Açude e "Estabiliz. sulla riva destra del fiume Mond. tra Pte Sta. Clara e l'Açude — Ponte de Coimbra" la stabilità delle strutture di contenimento della riva destra, così come i rispettivi servizi di ispezione. (Italian)
18 January 2022
0 references
La operación consiste en el contrato "Desassor. da Albufeira do Açude-Ponte de Coimbra", cuyo objetivo es eliminar sedimentos de Albufeira do Açude y "Estabiliz. en la margen derecha del río Mond. entre Pte Sta. Clara y la Açude — Ponte de Coimbra" la estabilidad de las estructuras de contención de la orilla derecha, así como de los respectivos servicios de inspección. (Spanish)
22 January 2022
0 references
Operatsioon koosneb projektist „Disassor. da Albufeira do Açude-Ponte de Coimbra“, mille objektiks on setete eemaldamine Albufeira do Açude’st ja Mondi parema panga asutamine Pte Sta. Clara e o Açude – Ponte de Coimbra vahel, paremal kaldal paiknevate isoleerimisstruktuuride stabiilsus ning vastavad järelevalveteenistused. (Estonian)
3 August 2022
0 references
Operaciją sudaro projektas „Disassor. da Albufeira do Açude-Ponte de Coimbra“, kurio tikslas – pašalinti nuosėdas iš Albufeira do Açude ir „Estabiliz. dešiniojo Mond banko tarp Pte Sta. Clara e o Açude – Ponte de Coimbra“ izoliavimo struktūrų stabilumą dešiniajame krante, taip pat atitinkamas tikrinimo tarnybas. (Lithuanian)
3 August 2022
0 references
Operacija se sastoji od projekta „Disassor. da Albufeira do Açude-Ponte de Coimbra” koji ima za cilj uklanjanje sedimenta iz Albufeira do Açude i „Estabiliz. desne obale Mond. između Pte Sta. Clara e o Açude – Ponte de Coimbra” stabilnost struktura za zadržavanje na desnoj obali, kao i odgovarajuće inspekcijske službe. (Croatian)
3 August 2022
0 references
Η πράξη αποτελείται από το έργο «Disassor. da Albufeira do Açude-Ponte de Coimbra», το οποίο έχει ως αντικείμενο την απομάκρυνση των ιζημάτων από την Albufeira do Açude και την «Estabiliz. της δεξιάς όχθης του Mond. μεταξύ Pte Sta. Clara e o Açude — Ponte de Coimbra» τη σταθερότητα των δομών περιορισμού στη δεξιά όχθη, καθώς και τις αντίστοιχες υπηρεσίες επιθεώρησης. (Greek)
3 August 2022
0 references
Operácia sa skladá z projektu „Disassor. da Albufeira do Açude-Ponte de Coimbra“, ktorý má za cieľ odstránenie sedimentov z Albufeira do Açude a „Estabiliz. pravého brehu Mond. medzi Pte Sta. Clara e o Açude – Ponte de Coimbra“ stabilitu ochranných štruktúr na správnej banke, ako aj príslušné kontrolné služby. (Slovak)
3 August 2022
0 references
Operaatio koostuu ”Disassor. da Albufeira do Açude-Ponte de Coimbra” -hankkeesta, jonka tavoitteena on sedimenttien poistaminen Albufeira do Açudesta ja ”Estabiliz. Mondin oikean pankin. välillä Pte Sta. Clara e o Açude – Ponte de Coimbra” oikean pankin suojarakenteiden ja vastaavien tarkastusyksiköiden vakaus. (Finnish)
3 August 2022
0 references
Operacja składa się z projektu „Disassor. da Albufeira do Açude-Ponte de Coimbra”, który ma na celu usunięcie osadów z Albufeira do Açude i „Estabiliz. prawego brzegu Mond. między Pte Sta. Clara e o Açude – Ponte de Coimbra” stabilność struktur przechowawczych na prawym brzegu, a także odpowiednie służby kontrolne. (Polish)
3 August 2022
0 references
A művelet a „Disassor. da Albufeira do Açude-Ponte de Coimbra” projektből áll, amelynek célja az üledékek eltávolítása az Albufeira do Açude-ból és az „Estabiliz. a Mond. jobb partján lévő Estabiliz. között Pte Sta. Clara e o Açude – Ponte de Coimbra” között, a megfelelő bank elszigetelési struktúráinak stabilitása, valamint a megfelelő ellenőrzési szolgálatok. (Hungarian)
3 August 2022
0 references
Operace se skládá z projektu „Disassor. da Albufeira do Açude-Ponte de Coimbra“, jehož cílem je odstranění sedimentů z Albufeira do Açude a „Estabiliz. na pravém břehu Mond. mezi Pte Sta. Clara e o Açude – Ponte de Coimbra“ stability izolačních struktur na pravém břehu, jakož i příslušných kontrolních služeb. (Czech)
3 August 2022
0 references
Darbību veido projekts “Disassor. da Albufeira do Açude-Ponte de Coimbra”, kura mērķis ir nogulšņu noņemšana no Albufeira do Açude un Mond labās bankas “Estabiliz. starp Pte Sta. Clara e o Açude — Ponte de Coimbra” par ierobežošanas struktūru stabilitāti labajā bankā, kā arī attiecīgajiem pārbaudes dienestiem. (Latvian)
3 August 2022
0 references
Tá an oibríocht comhdhéanta den tionscadal “Disassor. da Albufeira do Açude-Ponte de Coimbra” a bhfuil sé mar chuspóir aige dríodair a bhaint ó Albufeira do Açude agus “Estabiliz. de bhanc ceart na Mond. idir Pte Sta. Clara e o Açude — Ponte de Coimbra” cobhsaíocht na struchtúr imshrianta ar an mbanc ceart, chomh maith leis na seirbhísí cigireachta faoi seach. (Irish)
3 August 2022
0 references
Operacijo sestavljajo projekt „Disassor. da Albufeira do Açude-Ponte de Coimbra“, katerega predmet je odstranitev usedlin iz Albufeira do Açude in „Estabiliz. desnega brega Mond. med Pte Sta. Clara e o Açude – Ponte de Coimbra“ stabilnost zadrževalnih struktur na desnem bregu ter ustrezne inšpekcijske službe. (Slovenian)
3 August 2022
0 references
Операцията се състои от проекта „Disassor. da Albufeira do Açude-Ponte de Coimbra„, който има за предмет отстраняването на седиментите от Albufeira do Açude и „Estabiliz. на десния бряг на Mond. между Pte Sta. Clara e o Açude — Ponte de Coimbra“ стабилността на херметичните структури на десния бряг, както и съответните инспекционни служби. (Bulgarian)
3 August 2022
0 references
L-operazzjoni hija magħmula mill-proġett “Disassor. da Albufeira do Açude-Ponte de Coimbra” li għandu bħala l-għan tiegħu t-tneħħija tas-sedimenti mill-Albufeira do Açude u l-“Estabiliz. tal-bank tal-lemin tal-Mond. bejn Pte Sta. Clara e o Açude — Ponte de Coimbra” l-istabbiltà tal-istrutturi ta’ konteniment fuq il-bank it-tajjeb, kif ukoll is-servizzi ta’ spezzjoni rispettivi. (Maltese)
3 August 2022
0 references
Operationen består af projektet "Disassor. da Albufeira do Açude-Ponte de Coimbra", der har til formål at fjerne sedimenter fra Albufeira do Açude og "Estabiliz. i højre bred af Mond. mellem Pte Sta. Clara e o Açude — Ponte de Coimbra" stabiliteten af indeslutningsstrukturerne på den rigtige bank samt de respektive inspektionstjenester. (Danish)
3 August 2022
0 references
Operațiunea este compusă din proiectul „Disassor. da Albufeira do Açude-Ponte de Coimbra”, care are ca obiect îndepărtarea sedimentelor din Albufeira do Açude și „Estabiliz. de pe malul drept al Mond. între Pte Sta. Clara e o Açude – Ponte de Coimbra” stabilitatea structurilor de izolare de pe malul drept, precum și serviciile de inspecție respective. (Romanian)
3 August 2022
0 references
Operationen består av projektet ”Disassor. da Albufeira do Açude-Ponte de Coimbra” som har till syfte att avlägsna sediment från Albufeira do Açude och ”Estabiliz. på den högra stranden av Mond. mellan Pte Sta. Clara e o Açude – Ponte de Coimbra” stabiliteten i inneslutningsstrukturerna på höger bank, samt respektive inspektionstjänster. (Swedish)
3 August 2022
0 references
Coimbra
0 references
14 November 2023
0 references
Identifiers
POSEUR-02-1810-FC-000380
0 references