This is a test label (Q6831251): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Changed an Item)
Property / summary
This is a test summary (English)
 
Property / summary: This is a test summary (English) / rank
Normal rank
 
Property / summary: This is a test summary (English) / qualifier
curated by: test-user
 
Property / summary
The project involves modernising and extending the Kočín electricity substation, in the Czech Republic. (English)
 
Property / summary: The project involves modernising and extending the Kočín electricity substation, in the Czech Republic. (English) / rank
Normal rank
 
Property / summary: The project involves modernising and extending the Kočín electricity substation, in the Czech Republic. (English) / qualifier
curated by: test-user
 
Property / curated label
This is a test label (English)
 
Property / curated label: This is a test label (English) / rank
Normal rank
 
Property / curated label: This is a test label (English) / qualifier
curated by: test-user
 
Property / curated label
This is a test label (English)
 
Property / curated label: This is a test label (English) / rank
Normal rank
 
Property / curated label: This is a test label (English) / qualifier
curated by: test-user
 
Property / summary
 
This is a test summary (English)
Property / summary: This is a test summary (English) / rank
 
Normal rank
Property / summary: This is a test summary (English) / qualifier
 
curated by: test-user
Property / summary
 
The project involves modernising and extending the Kočín electricity substation, in the Czech Republic. This will bolster its transmission and interconnection capacity and improve its technical parameters to ensure reliable operation, even in extreme conditions. This should increase energy security in the country’s transmission system. </p><p>Being part of Priority Corridor North-South Electricity Interconnections in Central Eastern and South Europe (NSI East Electricity), the Kočín substation is an important node in the Czech transmission system and has a status of a Project of Common Interest (PCI) (cluster 3.11 in the Commission Regulation 2018/540). It primarily serves southern Bohemia, but is also connected to five 400 kV overhead lines which facilitate power evacuation to consumers in central and western Bohemia and Moravia, and ensures exchange of north-south and east-west power flows. The Temelín nuclear power station is connected to the Kočín substation. </p><p>The objectives of the project are closely linked to those of the North-South Interconnector Programme, which include increasing network capacity to ensure energy security and allowing for generation of more intermittent renewable energy, mainly from wind, from northern Germany towards Austria and Slovakia. Planned to be implemented between 2017 and 2034, the interconnector programme is included in the European Network of Transmission System Operators for Electricity's 10-year network development plan. </p><p>Additional objectives of the current project are to improve the reliability of energy transmission and transformation at the Kočín substation by replacing old and substandard equipment, and to enhance supply by improving connections with existing and potentially large energy sources in the area. </p> (English)
Property / summary: The project involves modernising and extending the Kočín electricity substation, in the Czech Republic. This will bolster its transmission and interconnection capacity and improve its technical parameters to ensure reliable operation, even in extreme conditions. This should increase energy security in the country’s transmission system. </p><p>Being part of Priority Corridor North-South Electricity Interconnections in Central Eastern and South Europe (NSI East Electricity), the Kočín substation is an important node in the Czech transmission system and has a status of a Project of Common Interest (PCI) (cluster 3.11 in the Commission Regulation 2018/540). It primarily serves southern Bohemia, but is also connected to five 400 kV overhead lines which facilitate power evacuation to consumers in central and western Bohemia and Moravia, and ensures exchange of north-south and east-west power flows. The Temelín nuclear power station is connected to the Kočín substation. </p><p>The objectives of the project are closely linked to those of the North-South Interconnector Programme, which include increasing network capacity to ensure energy security and allowing for generation of more intermittent renewable energy, mainly from wind, from northern Germany towards Austria and Slovakia. Planned to be implemented between 2017 and 2034, the interconnector programme is included in the European Network of Transmission System Operators for Electricity's 10-year network development plan. </p><p>Additional objectives of the current project are to improve the reliability of energy transmission and transformation at the Kočín substation by replacing old and substandard equipment, and to enhance supply by improving connections with existing and potentially large energy sources in the area. </p> (English) / rank
 
Normal rank
Property / summary: The project involves modernising and extending the Kočín electricity substation, in the Czech Republic. This will bolster its transmission and interconnection capacity and improve its technical parameters to ensure reliable operation, even in extreme conditions. This should increase energy security in the country’s transmission system. </p><p>Being part of Priority Corridor North-South Electricity Interconnections in Central Eastern and South Europe (NSI East Electricity), the Kočín substation is an important node in the Czech transmission system and has a status of a Project of Common Interest (PCI) (cluster 3.11 in the Commission Regulation 2018/540). It primarily serves southern Bohemia, but is also connected to five 400 kV overhead lines which facilitate power evacuation to consumers in central and western Bohemia and Moravia, and ensures exchange of north-south and east-west power flows. The Temelín nuclear power station is connected to the Kočín substation. </p><p>The objectives of the project are closely linked to those of the North-South Interconnector Programme, which include increasing network capacity to ensure energy security and allowing for generation of more intermittent renewable energy, mainly from wind, from northern Germany towards Austria and Slovakia. Planned to be implemented between 2017 and 2034, the interconnector programme is included in the European Network of Transmission System Operators for Electricity's 10-year network development plan. </p><p>Additional objectives of the current project are to improve the reliability of energy transmission and transformation at the Kočín substation by replacing old and substandard equipment, and to enhance supply by improving connections with existing and potentially large energy sources in the area. </p> (English) / qualifier
 
curated by: test-user
Property / curated label
 
This is a test label (English)
Property / curated label: This is a test label (English) / rank
 
Normal rank
Property / curated label: This is a test label (English) / qualifier
 
curated by: test-user
Property / curated label
 
This is a test label (English)
Property / curated label: This is a test label (English) / rank
 
Normal rank
Property / curated label: This is a test label (English) / qualifier
 
curated by: test-user

Revision as of 10:02, 17 October 2023

batch edit test entity
Language Label Description Also known as
English
This is a test label
batch edit test entity

    Statements

    0 references
    0 references
    This is a test summary (English)
    test-user
    0 references
    The project involves modernising and extending the Kočín electricity substation, in the Czech Republic. This will bolster its transmission and interconnection capacity and improve its technical parameters to ensure reliable operation, even in extreme conditions. This should increase energy security in the country’s transmission system. </p><p>Being part of Priority Corridor North-South Electricity Interconnections in Central Eastern and South Europe (NSI East Electricity), the Kočín substation is an important node in the Czech transmission system and has a status of a Project of Common Interest (PCI) (cluster 3.11 in the Commission Regulation 2018/540). It primarily serves southern Bohemia, but is also connected to five 400 kV overhead lines which facilitate power evacuation to consumers in central and western Bohemia and Moravia, and ensures exchange of north-south and east-west power flows. The Temelín nuclear power station is connected to the Kočín substation. </p><p>The objectives of the project are closely linked to those of the North-South Interconnector Programme, which include increasing network capacity to ensure energy security and allowing for generation of more intermittent renewable energy, mainly from wind, from northern Germany towards Austria and Slovakia. Planned to be implemented between 2017 and 2034, the interconnector programme is included in the European Network of Transmission System Operators for Electricity's 10-year network development plan. </p><p>Additional objectives of the current project are to improve the reliability of energy transmission and transformation at the Kočín substation by replacing old and substandard equipment, and to enhance supply by improving connections with existing and potentially large energy sources in the area. </p> (English)
    test-user
    0 references
    This is a test label (English)
    test-user
    0 references
    This is a test label (English)
    test-user
    0 references