Reduction of the energy intensity of a building COH ratio Klatovy — Building construction work no 782/III (Q73015): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Changed an Item) |
||
Property / fund | |||
Property / fund: Cohesion Fund / rank | |||
Normal rank |
Revision as of 17:26, 7 June 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Reduction of the energy intensity of a building COH ratio Klatovy — Building construction work no 782/III |
Project in Czech Republic financed by DG Regio |
Statements
1,136,108.0 Czech koruna
0 references
2,840,270.0 Czech koruna
0 references
40 percent
0 references
14 August 2017
0 references
26 June 2019
0 references
30 June 2019
0 references
Město Klatovy
0 references
33901
0 references
Projekt řeší celkovou rekonstrukci administrativní budovy umístěné na p.č. 3643 v k.ú. Klatovy/III.V rámci rekonstrukce dojde k demontáži stávajícího lehkého obvodového pláště, který bude nahrazen vyzdívaným pláštěm s kontaktním ztplovacím systémem.Budou vyměněny všechny vnější otvorové prvky, provedeno zateplení podlahy 1.NP a střechy objektu. Objekt bude vytápěn plynovým kondenzačním kotlem, bude provedena nová otopná soustava. (Czech)
0 references
The project deals with the total renovation of the administrative building located on p. 3643 in the cadastral district. The Klatovy/III.V reconstruction phase will be the dismantling of the current light envelope, which will be replaced by a lining with the focal point of the focal point. all external wheel elements have been replaced, with the floor of the 1.NP and the roof of the building being replaced. The object will be heated by a gas condensing boiler, a new heating system will be used. (English)
0 references
Identifiers
CZ.05.5.18/0.0/0.0/16_039/0004502
0 references