Removal of old environmental load at the Slovak engineering station, a.s. — SUB plant 07 MEP Postrelmov (Q62284): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Changed an Item) |
||
Property / fund | |||
Property / fund: Cohesion Fund / rank | |||
Normal rank |
Revision as of 16:30, 7 June 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Removal of old environmental load at the Slovak engineering station, a.s. — SUB plant 07 MEP Postrelmov |
Project in Czech Republic financed by DG Regio |
Statements
23,657,897.68 Czech koruna
0 references
27,832,820.8 Czech koruna
0 references
85 percent
0 references
30 June 2016
0 references
30 November 2023
0 references
Slovácké strojírny, akciová společnost
0 references
68801
0 references
Předmětem projektu je odstranění staré ekologické zátěže v areálu žadatele, závod O7 MEP Postřelmov. Ekologická zátěž bude odstraněna metodou odtěžení znečištěných zemin v místech bývalých podzemních jímek staré galvanovny, sanace horninového prostředí metodou in situ a monitoring kvality podzemních vod.Žadatelem projektu je společnost Slovácké strojírny, a. s. (Czech)
0 references
The purpose of the project is to eliminate the old environmental burden on the applicant’s premises, O7 MEP Postrelmov. The ecological burden will be removed by the method of extraction of contaminated soils at the sites of former galvanic house, the in situ remediation of the rock environment and the quality monitoring of the groundwater. the applicant of the project is Slovácké Mechanical Engineering, a. s. (English)
0 references
Identifiers
CZ.05.3.24/0.0/0.0/15_007/0000588
0 references