Procurement of additional technologies to reduce pollution from the shaft furnace (Q61536): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Changed an Item)
Property / fund
 
Property / fund: Cohesion Fund / rank
 
Normal rank

Revision as of 16:27, 7 June 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Procurement of additional technologies to reduce pollution from the shaft furnace
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    19,255,678.75 Czech koruna
    0 references
    770,227.15 Euro
    10 January 2020
    0 references
    35,010,325.0 Czech koruna
    0 references
    1,400,413.0 Euro
    10 January 2020
    0 references
    55 percent
    0 references
    23 May 2016
    0 references
    18 August 2016
    0 references
    31 May 2017
    0 references
    Kovohutě Příbram nástupnická, a.s.
    0 references
    0 references

    49°41'14.42"N, 14°0'18.04"E
    0 references
    26101
    0 references
    V rámci projektu dojde k pořízení dodatečné technologie ke snížení znečištění emisemi ze šachtové pece. Budou realizovány stavební a technologické objekty zahrnující filtr šachtové pece a dohořívací věž vč. základů. Realizovaná opatření výraznou měrou přispějí mj. ke snížení TZL a SO2 a to nad rámce norem EU dle čl. 36. Stavba je navržena v souladu s ÚP, umístění nového filtračního a odsiřovacího zařízení bude ve stávajícím areálu žadatele. Projekt je v souladu s PO 2, SC 2.2 v rámci OPŽP. (Czech)
    0 references
    The project will acquire additional technology to reduce pollution from the shaft furnace. The construction and technological objects including the shaft furnace filter and the milking tower will be implemented, including foundations. The measures implemented will significantly contribute, inter alia, to reducing dust and SO2 over the framework of the EU standards referred to in Article 36. The construction works are designed in accordance with the PO, the location of the new filter and the desulphurisation plant will be on the current premises of the applicant. The project complies with PA 2, SC 2.2 in the context of the OPE. (English)
    0 references

    Identifiers

    CZ.05.2.32/0.0/0.0/15_008/0000001
    0 references