Split sewerage — phase II, 2 rd part (Q60655): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Changed an Item)
Property / fund
 
Property / fund: Cohesion Fund / rank
 
Normal rank

Revision as of 16:22, 7 June 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Split sewerage — phase II, 2 rd part
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    25,262,164.92 Czech koruna
    0 references
    1,010,486.5968 Euro
    10 January 2020
    0 references
    39,626,925.37 Czech koruna
    0 references
    1,585,077.0148 Euro
    10 January 2020
    0 references
    63.75 percent
    0 references
    28 August 2018
    0 references
    31 August 2021
    0 references
    Město Kostelec nad Černými Lesy
    0 references
    0 references
    0 references

    49°58'1.06"N, 14°52'2.06"E
    0 references
    28163
    0 references
    Cílem projektu je vybudování splaškové kanalizace v celkové délce 4260,85 m pro dotčené oblasti, které zahrnují ulice: Lázeňská, Na Skále, Poustka, Lipanská, Zahradní, K Hošti, Příční, Tuchorazská, U Studánky, Nová a Na Krásné vyhlídce. Projekt řeší znečištění vod pro 440 EO. Plánovaná splašková kanalizace bude napojena na stávající systém kanalizace v lokalitách Kostelce nad Černými lesy. (Czech)
    0 references
    The project aims at building a 4 260.85 m domestic sewage system for the area in question, which includes the streets: Spa, Winek, Poustka, Lipanská, Zahradays, K Hoti, Tuchachazská, U stork, New and at the Timetable. The project addresses water pollution for 440 EO. The planned sewage drain will be linked to the existing system of sewerage system at the Kostelec site above the black forest. (English)
    0 references

    Identifiers

    CZ.05.1.30/0.0/0.0/16_042/0004904
    0 references