The shooting path at the Krupce — stabilisation of the slopes (Q58801): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Changed an Item) |
||
Property / fund | |||
Property / fund: Cohesion Fund / rank | |||
Normal rank |
Revision as of 16:13, 7 June 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | The shooting path at the Krupce — stabilisation of the slopes |
Project in Czech Republic financed by DG Regio |
Statements
2,441,393.89 Czech koruna
0 references
2,872,228.11 Czech koruna
0 references
85.0 percent
0 references
10 January 2017
0 references
30 July 2019
0 references
30 June 2019
0 references
Město Krupka
0 references
41742
0 references
Předmětem projektu je stabilizování a sanace svahové nestability ve městě Krupka v důsledku nastalého havarijního stavu (sesuvu/řícení) na konci roku 2016. Svahová nestabilita je evidována v Registru svahových nestabilit na mapovém listu 02-32-09 pod kódem 1a. Z hlediska lokalizace se jedná o tzv. Střeleckou stezku na pozemcích 50/1, 50/2, 50/3 a 50/4 v k. ú. Krupka. Daná lokalita v dlouhodobém horizontu vykazuje vysokou rizikovost, v kategorizaci ohrožení dosahuje stupně III (C). (Czech)
0 references
The project aims at stabilising and rehabilitating the Krupp muscle instability as a result of the occurrence of the emergency situation (‘landslide’) at the end of 2016. The Holy See is registered in the Boilar-Unstung Register on the map sheet 02-32-09 under code 1a. From a location point of view, this is the so-called ‘shooting path’ on parcels 50/1, 50/2, 50/3 and 50/4. Krupka. The site shows, in the long term, high risk, Tier III (C) categorisation. (English)
0 references
Identifiers
CZ.05.1.24/0.0/0.0/17_062/0005907
0 references